Standard 019 Update Briefing Version 1

Standard 019 Update Briefing
Version 1
Network Rail Safety Vision
Safety… we have committed to
eliminating workforce fatalities and all
major injuries.
I know that improving workforce safety is
not only the right thing to do from a moral
and ethical perspective, it's also good
business.
Safety and performance go hand in hand.
My belief in this approach led to the
launch of our Safety Vision and the
refresh of our Lifesaving Rules.
Mark Carne
Standard 019 Update Briefing
2
Why?
14
November
2014
22
January 2014
December
2012
21:45
hrs
11:34
13:50 hrs
Garnant
Branch
line
in
Newark
North
Gate
station
Saxilby, near Lincoln
Carmarthenshire
Standard 019 Update Briefing
3
Background
Standard 019 Update Briefing
4
Background
Old Standard:
Ref:
NR/L2/OHS/019
Issue:
8
Date:
04 September 2010
Compliance date:
04 September 2010
Revised Standard:
Ref:
NR/L2/OHS/019
Issue:
9
Date:
03 July 2017
Compliance date:
03 July 2017
Standard 019 Update Briefing
5
Affected Parties
Responsible
Manager
Standard 019 Update Briefing
Planner
Individual
Working Alone
(IWA)
Controller of
Site Safety
(COSS)
Safe Work
Leader (SWL) –
Note: IP only
6
What’s new?
The person in charge
The person in charge is a new capability, not a competence
The person in charge will be appointed by the Responsible Manager
on their ability to manage the work activity planned and have an
understanding of the risks
The person in charge will make sure that all risk controls have been
implemented
The person in charge must hold a COSS competence and may act as
the COSS or delegate the COSS duties
The person in charge and the planner will collaborate to produce the
Safe Work Pack (SWP), which the person in charge will verify.
Standard 019 Update Briefing
7
What’s new?
Safe Work Pack (SWP)
The SWP provides information on how work is to be carried out safely and
gives details on how to manage and control task, site and operational risks.
It enables effective management and implementation of controls for the safety
of people involved, or who might be affected by the work activities on or near
the line, or which might affect the line.
SWP refers to the documentation provided to the person in charge for the work
they are to undertake. The information contained in the SWP should be:
a) concise and relevant to the task and
location where the work is being
undertaken; and
Standard 019 Update Briefing
b) provide clear information to allow the
person in charge to effectively use it
to manage the risks to themselves
and those working under their
supervision.
8
Currently a SSOW pack looks like….
• SSOW pack verification form
• Part completed RT9909 Record of arrangements
• Part completed RT3181 form(s) – where blockage(s)
of the line are part of the SSOW pack
• Possession arrangements
SSOW
• Safe access and egress information including walking
to and from site
• Sectional Appendix extracts showing the relevant
running lines, track layout and work location for the
entire mileage for which the work group will be On or
Near the Line
• National Hazard Directory extracts that are relevant to
the work and location
• Signalling or track diagrams where used
• Emergency arrangements
Standard 019 Update Briefing
9
What extra goes into a Safe Work Pack?
Additional contents required:
• SWP validation form, instead of the
SSOWP verification form.
• Site risk information and controls required
Safe Work
Pack
• Task risk information and controls required
e.g. task risk control sheets, work package
plans or task briefing sheets
• Permits, where applicable, such as lifting
plans, electrical, isolation, hot works,
confined spaces
• Welfare arrangements and their location
Standard 019 Update Briefing
10
What’s new?
Hierarchy of Control – Operational Risk
There are 8 Levels of hierarchy now, with a renaming of previous levels – Red & Green
zone terms replaced with Protection and Warning arrangements. Same requirements are
required for justification of level planned.
Safe System of Work
Type
1
Safeguarded site of work
Protection
2
Fenced site of work
Protection
3
Protection
Warning systems –
permanent
Warning
5
Warning systems – Train
Operated Warning System
(TOWS)
Warning
6
Warning systems – human
activated equipment
Warning
7
Warning systems – Portable
Warning
8
Lookout warning
Warning
4
Standard 019 Update Briefing
OLD
HIERARCHY
Separated site of work
11
Step 1 - What do we associate as a risk?
Site
Task
Operational
Working at night
Hazardous dust
Trains
Electricity
Slips, trips and
falls
Working at
height
Noise
Access and
egress points
Vibration
Standard 019 Update Briefing
On track
machines
On track plant
12
Modules in working practice
Modules
Ref:
NR/L2/OHS/019
Issue:
9
Date:
03 July 2017
Compliance Date:
03 July 2017
Level 2
Business process
Safety of People at Work On or Near
the Line
Standard 019 Update Briefing
Module 4
Module 3
Module 2
Module
1
Planning
and working using
Planning
and
working using
warning
arrangements
Planning
andarrangments
working in a possession
protection
Planning and working during incident
response
15
Core 019 standard overview
Responsible
Manager
The
Responsible
identifies
The
Planner
willManager
review
SWP
The
Responsible
Manager
willand
The
Responsible
Manager
must
The
person
in charge
will the
check
The
Planner
will
create
the
work
to
be
undertaken,
appoints
the
for
amendments
future
The
person
inand
charge
will
review
the
SWP
record
authorise
the
SWP.
In for
doing
sothe
they
accept
the
SWP
details
are
valid
(at
After
work
has
finished
the
person
SWP
in
conjunction
with,
and
Planner
and
the
person
in
charge,
planning.
Where
a
pack
has
not
verify
the
Safe
Work
Pack
details
as
per
arrangements.
are
confirming
that
all
least
shift
inlocal
advance
of theorwork)
inone
charge
returns
theoperational,
used
appropriate
help
from,
the
giving
them
suitable
resources
to
been
returned,
a
record
must
be
when
they
are
satisfied
thebeen
site
and
task
risk
controls
and
checks
the
Responsible
Manager
unused
SWP
back
to thehave
Planner.
person
inthe
charge.
produce
SWP.
kept
the
Responsible
plan
is appropriate.
appropriately
has by
authorised
theidentified.
SWPManager.
for use.
Planner
Person in
charge
Person in
charge
Person in
charge
Standard 019 Update Briefing
Planner
Responsible
Manager
16
Module 1: Planning and working during
incident response
On site
Planner
Person in
charge
Responsible
Manager
Signaller
Return
Review
Person in charge will
send the IRP to the
The person in charge shall decide what
Planner (or Responsible
response and resources are required for the
Manager
where
no
The
person
in charge
shall
arrange
The
person
in charge
shall
arrange
forfor
the
incident.
The
following
must
be
considered:
The
The
person
Planner/Responsible
in
charge
will
be
Manager
The
charge
shall
arrange
for
planner
exists).
aperson
Incident
Pack
(IRP)
to the
beWhere a
work
groupintoResponse
be briefed
on
the
•
Is
protection/warning
arrangements
required?
contacted
will
update
as
the
any
appropriate
systems
and
person
store
Signaller
to be including
contacted
to arrange
appropriate
pack
hasand
not
been
completed
task,
site
protection/warning
arrangements
including
•toWhat
task
and
site The
riskincident.
controlscontacting
are required?
respond
the IRP
following
assurance
an
processes.
protection,
if for
required.
person
the
returned
by
the
person
operational
risks.
task,
site
and
operational
risks.
If the
the
Signaller
is
unable
to
provide
the
protection
When
work
is complete,
the
person
in
•
Identify
safe
systems
of
work
and
the
signaller,
if not required,
the personinincharge
charge,
will
act as:
record
arrangements
person
charge
charge
shall
check the the
work
groupainis
clear must
ofshall
controls
required.
•consider
COSS using a lower level
kept
byinthe
in the
the site and
the line hasbe
been
left
a safe
•protection/warning
IWA
Responsible
If no
state. They shouldhierarchy.
make sure
thesuitable
lineManager.
has
•arrangement
SWL (IP only)
can
be
implemented,
the
person
in
been handed back to the Signaller where
•charge
PC must escalate to Route Control or the on
protection
has been arranged.
call Responsible Manager.
The Signaller shall confirm protection
arrangements they are able to provide.
Video
Standard 019 Update Briefing
18
Over to you, what does this module mean for you?
• What are we currently doing that meets the requirements in the updated 019
standard?
• What's new for us in the updated 019 standard?
• How can we bridge the gap that will meet the updates in the standard 019?
Standard 019 Update Briefing
19
Module 2: Planning and working in a
possession
Create
Planner
Person in
charge
Responsible
Manager
Verify
Authorise
Accept
On Site
Return
Review
The Planner shall apply for
aResponsible
worksite Manager must authorise the
TheSWP
The
Planner
will
create
the
with
under possession using the
SWP at least one shift in advance of the work
appropriate
involvement
from(PPS).
the
possession planning
system
taking
place. In doing so they are confirming
person in charge to produce a SWP.
that all operational, site and task risk controls
The
Theperson
personinin
charge,
charge
when
will also
acting
This
will include
things
such
as,
have been appropriately identified and the
Person in charge to conduct briefings
as
accept
COSS
will
sign
into
the
are
ES/SWL
Person
Thethe
person
inSWP
charge
indetails
charge,
will
send
when
also
used
or
Thethe
Planner
willunused
review
the SWP
for
welfare
arrangement,
the amount
of been
has
considered:
including task and site risk controls. following
If
Person
in
charge
a final
worksite
still
validto
before
and
the
theycompletes
commence
anyneeded,
SWP
acting
as
the
COSS,
Planner
will
(orcontact
Responsible
Manager
amendments
to
support
future
The
person
in
will verify
the
people
required,
tools
and
• charge
Work
content
is understood
by the person
acting as COSS they will also brief the
For
cyclical
and
repeated
tasks,
the
check
of
the
SWP
on
site
against
the
work
Responsible
(or the
Manager
COSS
has
will
sign
where
ES/SWL
no delegated
Planner
(IP
only)
exists).
when
work
Where
has
aIf pack
has
there
isn'tnot
designated
SWP
atwork.
least
one
shift
ina advance
the
duration
ofplanning.
the
in
charge
operational risk controls. All requiredResponsible Manager must authorise the
site
conditions
before
implementation.
into
authorised
the
ES/SWL
the SWP
worksite).
forconfirm
use
The
been
been
returned
completed
by the
to
person
in charge,
line
aplace.
record competence
the
Manager will
ofPlanner,
the the
work
taking
• Responsible
Necessary
within team to
paperwork must be completed before
initial
SWP
to
be
implemented
repeatedly
ES/SWL
at must
least
one
gives
shift
permission
advance
for
theout out.
is clear
be
kept
and
safe
byinthe
before
Responsible
signing
Manager.
carry
the
review
of the
pack.
undertake
task
work can begin.
for
the following
periods
without
further
COSS
of the work
to sign
taking
the Responsible
RT3199.
place.
• identifies
Task
risk and
specific
controls
are
The
Manager
workany
that
authorisation:
Responsible
Managers
will
review
at
least 10%
and
sufficient
needs
to be undertaken
andsuitable
appoints
the
a)
Twelve
month
period
the SWP
of completed
and implemented
SWP,them
up
to a when
• charge,
The
appropriate
hierarchy
of Safe
System
Planner
and the person
in
giving
uses
protection
maximum
of 50 packs
per
period.
However,
the green zone);
of
Work
has
been(formerly
selected
appropriate
resources
to produce
the
SWP
andsite
Responsible
Manager
must
review
allspecific
SWPscontrols identified
• and
Any
additional
including
operational,
task
risk controls.
b)
Six
monthmade
period
SWP
uses
• aThe
welfare
arrangements
have
been
where there has been
change
onwhen
site. the
identified
are appropriate.
warning and
(formerly
red zone).
Video
Standard 019 Update Briefing
21
Over to you, what does this module mean for you?
• What are we currently doing that meets the requirements in the updated 019
standard?
• What's new for us in the updated 019 standard?
• How can we bridge the gap that will meet the updates in the standard 019?
Standard 019 Update Briefing
22
Module 3: Planning and working using
protection arrangements
Create
Planner
Person in
charge
Responsible
Manager
Verify
Authorise
Accept
On Site
Return
Review
Manager must authorise the
The Planner will arrangeThe
for aResponsible
line
SWP
at with
least one shift in advance of the work
blockage
application
required.
The
Planner
will createwhen
the
SWP
taking place. In doing so they are confirming
appropriate involvement from
the person
that all operational, site and task risk controls
The
Person
When
person
inwork
charge
in charge
is complete,
to conduct
will
the
briefings
person
to produce
a SWP. This will
have been appropriately identified and the
accept
including
in charge
the in
task
SWP
shall
and
details
check
site
risk
the
controls.
work
group
If or
Person
charge
will are
send
theas,
used
unused
The
Planner
will
review the SWP for
include
things
such
site
and
task
following has been considered:
still
acting
is
valid
clear
as
and
COSS,
of
the
the
site
they
and
willwelfare
the
also
line
hasthe
SWP
to
the
Planner
(or
Responsible
Manager
amendments
to support
future
Person
in
charge
completes
The
person
abrief
final
will verify
the
controls,
and
arrangements.
•in charge
Work
content
is understood
by the person
Responsible
operational
been of
left
Manager
risk
in aSWP
controls
safeexists).
state.
has
and
They
if at
required
should
where
nothe
planner
Where
athe
pack
has
not
planning.
Ifone
there
isn't
a
designated
check
on
site
SWP
against
least
shift
in
advance
in charge
authorised
arrange
make
the
sure
theplanned
the
SWP
line
for
line
has
use
blockage(s).
been
handed
been
returned
by
the
person
in
charge
a record
Planner,
the
Responsible
Manager within team to
site
conditions
before
implementation.
of
the
work
taking
place. competence
• Necessary
atAll
least
back
required
one
to kept
the
shift
paperwork
Signaller
in advance
must
where
becarryManager.
must
be
by
the Responsible
will
outundertake
the reviewtask
of the pack.
For
cyclical
repeated
tasks,
the are
ofcompleted
the
protection
work taking
before
hasResponsible
place.
been
work arranged.
can begin.
The
Manager
workany
that
• identifies
Task
risk and
and
specific
controls
Responsible
Managers
will
review
atsufficient
least 10%
Responsible
Manager
must authorise the
needs
to be undertaken
and
appoints
the
suitable
and
of completed
and implemented
SWP,
up
tothen
a be
initial
SWP
whichthem
can
• charge,
The
appropriate
hierarchy
of Safe System
Planner
and the person
in
giving
maximum
of
50
packs
per
period.
However,
the
implemented
for a twelve month
of Work
hasrepeatedly
been
selected
suitable resources to produce
the SWP
including
Responsible
Manager
must
review
SWPs
when
theallSWP
uses
protection
Any
additional
specific
controls
identified
operational,
task and
site•period
risk
controls.
where there has been
aThe
change
made
on site.
•arrangements
welfare
arrangements
have
(formerly
known
asbeen
green
identified
and
are appropriate.
zone)
without
further
authorisation.
Video
Standard 019 Update Briefing
24
Over to you, what does this module mean for you?
• What are we currently doing that meets the requirements in the updated 019
standard?
• What's new for us in the updated 019 standard?
• How can we bridge the gap that will meet the updates in the standard 019?
Standard 019 Update Briefing
25
Module 4: Planning and working using
warning arrangements
Create
Verify
Authorise
Accept
On Site
Return
Review
The Responsible Manager must authorise the
Planner
Person in
charge
Responsible
Manager
The Planner will create the
SWP
withone shift in advance of the work
SWP
at least
appropriate involvementtaking
from the
place. In doing so they are confirming
person in charge to produce
a operational,
SWP.
that all
site and task risk controls
The
person
in charge
This will include things such
as,
have been appropriately identified
andwill
the
Person in charge to conduct briefings
Planner
will
review
the
SWP
for details are
accept
the
SWP
Person inwelfare
chargearrangement,
will send The
the used
or unused
the
amount
of
following
has
been
considered:
including
taskisand
site riskthe
controls.
If
When work
complete,
person
amendments
to
support
future
still
and theby the person
SWP to
Planner
(orThe
Responsible
Manager
person
inWork
charge
will
verify
the
people
required,
tools
needed,
and
the
Person
in the
charge
completes
a
final
• the
content
isvalid
understood
acting
as COSS
they will
in charge
shall check
thealso
workbrief
group
planning.
If charge
there
a designated
Manager has
where
planner
exists).
Where
a pack
has isn't
not
SWP
at least
one
shift
inResponsible
advance
in
duration
of
the
work.
check
of no
the
SWP on
site
against
the
operational
risksite
controls.
Allline
required
is clear of the
and the
has
the
Manager
• taking
Necessary
competence
within
team
the
SWP
for to
use
been
returnedbefore
by theimplementation.
person
in charge
aResponsible
recordauthorised
of thePlanner,
work
place.
site
conditions
paperwork
bestate.
completed before
been left inmust
a safe
undertake
task
will carry
out the review
of the
at least
onepack.
shift in advance
must be kept by the Responsible
Manager.
work can begin.
For
cyclical
and
repeated
tasks,
theare
• Task
riskreview
and
specific
controls
of any
the
work
place.
The Responsible
Responsible
Manager
Managers
identifies
will
work
at
that
least taking
10%
Responsible
must authorise
suitable
andManager
sufficient
needs to
of be
completed
undertaken
and and
implemented
appoints
the
SWP,
up to a
theThe
initial
SWP which
can then
be System
•in
appropriate
hierarchy
of Safe
Plannermaximum
and the person
of 50 packs
charge,
per
period.
giving However,
them
the
implemented
for a six
of Work has repeatedly
been selected
suitableResponsible
resources toManager
producemust
the SWP
review
including
all SWPs
period when
the SWP
uses
• month
Any additional
specific
controls
identified
operational,
wheretask
there
and
has
site
been
risk acontrols.
change made on site.
• warning
The welfare
arrangements
been
(formerly
known redhave
zone)
identified
and authorisation.
are appropriate.
without
further
Video
Standard 019 Update Briefing
27
Over to you, what does this module mean for you?
• What are we currently doing that meets the requirements in the updated 019
standard?
• What's new for us in the updated 019 standard?
• How can we bridge the gap that will meet the updates in the standard 019?
Standard 019 Update Briefing
28
Our commitment
Safe behaviour is a requirement of working for Network Rail:
• We will always comply with our Lifesaving Rules.
work to
ensure
that itunsafe
can bebehaviours
done safely.
• We will plan
use Close
Calls
to report
and conditions.
work
environments
will be
tidy andtowe
will leave incidents
them tidy and
when
we’ve
• Our
We will
use
our Fair Culture
principles
investigate
learn
finished.to prevent them occurring again.
lessons
ensure people
have
the skills
and the
equipment
required
to work
• We will relentlessly
strive
to find
new ways
to keep
ourselves,
colleagues,
safely.
passengers
and the public safe.
stop work
if it cannot
be done
safely.
• We will design,
construct,
inspect,
operate
and maintain the railway to keep
everyone safe.
• We will personally intervene if we feel a situation or behaviour might be unsafe.
• Safety leadership is key to how we assess our people’s performance and
readiness for progression.
29
Worksafe procedure
Standard 019 Update Briefing
30
Over to you…
Now that you’ve seen in full the revised 019 standard, to conclude the brief it is
over to you. Discuss in your groups:
1. What you believe the key issues you will face locally?
2. Agree consensus on the top priority issues you believe need to be resolved in
your area.
3. Suggest actions which could address each of your priority issues.
4. How can you individually contribute to these actions?
Standard 019 Update Briefing
31
Final summary
•Let’s
Therecap
Formally
Planner
there
on will
allwere
the
stillkey
create
7 levels
points:
a of
Safe
hierarchy,
Systemformally
of Workknown
pack but
as will
red need
and green
additional
documents
zone
working.
alongside
Now there
to create
are 8 levels
the Safe
of hierarchy
Work Pack.
and
These
they are
additional
now known as
• protection
The
person
in
charge
is
new,
it’s
a
new
capability,
not
a
competence.
documentsand
are:warning arrangements.
•• Incident
The
person
in charge
willisbethere
appointed
by the
ontotheir
− Safe
Response
Work
Pack
Pack
validation
form
to enable
youResponsible
to plan how Manager
to respond
an
ability
to
manage
the
work
activity
planned
and
have
an
understanding
of
the
incident safely, importantly this now includes task and site risk assessments.
risks.
− Site risk information and controls required
• The
− Task
person
risk
in information
charge will and
verifycontrols
the Safe
required
Work Pack.
• Person
− Permits
in charge must hold a minimum of a COSS competence or be a Safe
Work Leader (IP only).
− Welfare arrangements and location
• The person in charge will make sure that all risk controls have been
• Planners
should
planchanges
for the highest
of protection
possible.
implemented.
If any
need tolevel
be made,
these should
be reported to the
on call manager.
• Possession
planning meetings are important to deconflict between work
• groups.
The Responsible Manager will authorise the Safe Work Pack.
Standard 019 Update Briefing
32