Daily Plan - CERN Indico

NSW SG 29 Oct 2014
29 Oct 2014
S. Zimmermann, NSW SG
1
Upgrade Week
• Next week is ATLAS Upgade Week.
• Muon & TDAQ session: Tue 9-13h, 15-16h
https://indico.cern.ch/event/349322/
• NSW talk in Phase-1 Plenary on Thursday afternoon will be given by George
Iakovidis
29 Oct 2014
S. Zimmermann, NSW SG
2
2015 Muon/NSW Week dates
•
•
•
•
•
March 9–13 (Dirac except Monday Curie)
June 1–5 (Curie)
September 28–October 2 (Curie)
Clashed with INFN Gruppo Uno
October 12–16 (Dirac)
jamboree – request in IB to avoid
December 7–11 (Curie)
Outside week will be not easy to accommodate … New October NSW week slot is
now directly after ATLAS week in Lecce, ATLAS management discourages outside
meetings until July 2015 …
29 Oct 2014
S. Zimmermann, NSW SG
3
SCAB Nominations for Speakers
• It’s time once again for the twice yearly update of nominations for the ATLAS
speakers for conferences.
– Require names and priority ranking, from 1 (deserves a talk very much, outstanding
contribution to the project in the last year) to 5. Usually we rank people 1-3.
– People who stopped being actively involved: Will not update the nominations, priority will
automatically go down by 1 every round
• List of nominations from May 2014 is attached to the agenda
• Please have a look and send me updated suggestions, and especially names of
people newly to be added – by end of next week
29 Oct 2014
S. Zimmermann, NSW SG
4
NSW Week: Decisions and Action Items
Summary of Decisions or quasi-decisions:
1.
Number of B-field sensors:
– converged to 64 sensors per side.
– AI: exact positions to be defined and integrated into layout/drawings
2.
Temperature Sensors:
–
Have a baseline inventory on needed sensors – indicate either 1 or 2 ELMBs per
sector needed (exact numbers as long as within max. of ELMB can be defined a bit
later together with sensor positions)
– AI: NIKHEF and Alignment team to compare cost and space requirements of
electronics if a) 2 ELMBs/sector or b) additional T-sensors for deformation read by
LWDAQ. (Gerian, Christoph, Jim)
3.
NSW Grounding strategy and architecture --- Document from GNDing WG
approved in the meeting, AI: 1. Clarification on MM FEB analog GND 2. How to
ensure commitment of all stakeholders to adhere to it ?
29 Oct 2014
S. Zimmermann, NSW SG
5
NSW Week: Decisions and Action Items
Follow-Up and Action Items, Open Points
1.
MicroMegas Module-0 panel layout interconnect positions are not fully
compatible with alignment system needs for supporting platforms
– AI: Define how to resolve
– AI: Timescale
– AI: Decision on In-Plane alignment ?
2.
MicroMegas detector Ground connection/FEB detector GND connection
–
–
–
–
3.
Proposal of GND near Cooling channel implies GND not in direct vicinity of VMM
Noise ?
MMFE demonstrator design is with GND near front edge of the card
AI: Clarify latest design, make sure everybody is in the loop
MicroMegas Quadruplet section mock-up, zebra connector compression and
FEB insertion/alignment
–
–
Freiburg can offer workshop/technicians for construction
AI: Define details and schedule.
29 Oct 2014
S. Zimmermann, NSW SG
6
NSW Week: Decisions and Action Items
4.
Expansion/deformation of FR4 (with/without copper on both side) under
humidity … raised in design review
– AI: Tests to be done in the lab. WHO ?
5.
MMFE frontend board schedule shown by Ken
https://indico.cern.ch/event/344459/contribution/2/material/slides/0.pdf
– AI: Arrange dedicated meeting for discussing
– AI: Demonstrator V1 production needs to include sufficient boards to allow test sites
setting up and commissioning cosmics test stand etc.
29 Oct 2014
S. Zimmermann, NSW SG
7
NSW Week: Decisions and Action Items
6.
MSW – Completion of Services, Cables, Fibers
–
–
7.
MSW Software
–
–
8.
AI: Status ? Before closure of UX15 end of November.
AI: Discuss with TC installation options for the chamber in January
Long wish list presented by Nectarios of “what could be done”
https://indico.cern.ch/event/343852/contribution/7/material/slides/0.pdf
AI: Define realistic priority list and assign (limited) existing manpower
MSW DAQ Integration into ATLAS partition
–
–
Setting up standalone readout well advanced
AI: Official request to ATLAS RunCoord concerning ATLAS partition plans during
run time, presentation in run meeting
9) VMM2 evaluation results, VMM2a or VMM3 as next step decision
29 Oct 2014
S. Zimmermann, NSW SG
8
NSW Week: Decisions and Action Items
10. Completion of Electronics Boxes inventory, size and shape constraints, boxes
placement
–
–
11.
12.
13.
14.
Aimilianos secured to remain with us or full 2015,
AI: need to get him integrated with Design Office asap
Logistics Handling
BB5 Cleanup
MicroMegas mesh cleaning needed or not decision
Radiation and ageing qualification of materials plans and needs
–
–
–
–
Zebra connector neutron and gamma irradiation studies – South Africa ?
MicroMegas glue qualification
…?
AI: Arrange meeting to define roadmap, decide on South Africa or Michigan for
neutron radiation
29 Oct 2014
S. Zimmermann, NSW SG
9