FIRST SAMPLE REPORT Cover Sheet Production process and product approval report DmbA Level: _______________________ Sample inspection New part Product modification (Specification M.) Production transfer Change in production procedures Long production pause (> 12 M) Tool modification /Tool adjustment Change at purchased parts Change the supplier Other:______________________________ Re-sampling First sample inspection Test report other samples Sender: Appendices 01 Function test 02 Dimensional check 03 Material testing 04 Haptics 05 Acustics 06 Olfactory test 07 Appearance 08 Surface inspection 09 Electromagnetic compatibility [EMC] 10 Reliability test 11 Design – FMEA 12 Design approval 13 Process FMEA 14 Process Flow Chart 15 Control plan 16 Process capability evidence 17 Inspection and test equipment list 18 Evidence for inspection and test equipment list 19 EU-Data safety sheet 20 IMDS 21 Means of transport / packing 22 Certificates 23 Process approval 24 Other:______________________ Supplier / Production location: Customer: Identification no. / DUNS-Code: Test report no: Subject no: Part no: Drawing no: Change no: Order/Call off date: Identification no: Test report no: Subject no: Part no: Drawing no: Change no: Order/Call off date: Delivery Note No /Date: No of samples: Charge no: Sample weight: Incoming Goods No /Date: Delivery destination: Supplier Confirmation: It is hereby confirmed that the sampling has been carried out according to VDA Volume 2 chapter 4 IMDS-Data has been changed: IMDS-ID-No.: _____________________________ Name: Comments: Department: Telephone: Fax: E-Mail: _________________________________________ Date signature supplier Customer Decision: total According to Appendix 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Approved Approved with conditions Rejected new samples required Deviation concession no: valid till: Return: Delivery note no./ delivery date: Name: Department: Telephone / Fax: E-Mail: Change index 2, valid since 8th Nov. 12 no of items: date for new sample: Comments: ____________________________________________ Date signature issued by: C. Behr 8th Nov. 2012 released: M. Herdner FIRST SAMPLE REPORT Content of the Report Supplier / Production location:: Customer: Identification no. / DUNS-Code: Test report no: Subject: Part no: Drawing no: Change no / date: Identification no: Test report no: Subject: Part no: Drawing no: Change no / date: Appendix Level / Date form, scale of operation and identification of appendix 01 Function test 02 Dimensional check 03 Material testing 04 Haptics 05 Acustics 06 Olfactory test 07 Appearance 08 Surface inspection 09 Electromagnetic compatibility [EMC] 10 Reliability Test 11 Design – FMEA 12 Design approval 13 Process FMEA 14 Process flow chart 15 Control plan 16 Process capability evidence 17 Inspection and test equipment list 18 Evidence for inspection and test equipment list 19 EU-data safety sheet 20 IMDS 21 Means of transport / packing 22 Certificate 23 Process approval 24 Other Supplier Confirmation: Name: Department: Telephone: Fax: E-Mail: __________________________________________ Date signature Change index 2, valid since 8th Nov. 12 Comments: issued by: C. Behr 8th Nov. 2012 released: M. Herdner FIRST SAMPLE REPORT Product-related test-results 06 Olfactory test 07 Appearance 08 Surface inspection 09 Electromagnetic compatibility [EMC] 10 Reliability test 01 Function test 02 Dimensional Check 03 Material testing 04 Haptics 05 Acustics Supplier / Production location:: Customer: Identification no. / DUNS-Code: Test report no: Subject no: Part no: Drawing no: Change no: Identification no: Test report no: Subject no: Part no: Drawing no: Change no: Refno. Actual value supplier Actual value customer Requirements / Specification / Tolerances Complies with specification yes Supplier Confirmation: Comments: Notes no Customer Decision: Approved Rejected, new samples required Comments: Name: Department: Telephone: Fax: E-Mail: _________________________________________ Date signature Change index 2, valid since 8th Nov. 12 issued by: C. Behr 8th Nov. 2012 Name: Department: Telephone: Fax: E-Mail: __________________________________________ Date signature released: M. Herdner FIRST SAMPLE REPORT Process-related results and other 18 Evidence for inspection and test equipment list 19 EU-Data safety sheet 20 IMDS 21 Means of transport / packing 22 Certificate 23 Process approval 24 Other:_____________________________________ 11 Design – FMEA 12 Design approval 13 Process FMEA 14 Process Flow Chart 15 Control plan 16 Process capability evidence 17 Inspection and test equipment list Supplier / Production location: Customer: Identification no. / DUNS-Code: Test report no: Subject no: Part no: Drawing no: Change no: Identification no: Test report no: Subject no: Part no: Drawing no: Change no: Supplier Confirmation: Comments: Customer Decision: Name: Department: Telephone: Fax: E-Mail: _______________________________________ Date signature Name: Department: Telephone: Fax: E-Mail: ___________________________________________ Date signature Change index 2, valid since 8th Nov. 12 Approved Rejected new samples required Comments: issued by: C. Behr 8th Nov. 2012 released: M. Herdner
© Copyright 2026 Paperzz