LBNF/DUNE – Construction Summary
LBNF-DUNE Summary Construction Schedule
Calendar Year 2017
a
a
a
a
a
a
a
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
a
Pre-Excavation
Excavation #1
Shaft Utilities
Cryostat #1
ProtoDUNEs running
Cryostat #1, Cryo Equip & Piping &
Commission Plant
FAR
DETECTOR #1
PROTODUNES DESIGN &
CONSTRUCTION
Test TPC/
LAr FILL
1st
Data
Commission
Excvn #2
Cryostat #2, Cryo Equip & Piping
FAR
DETECTOR #2
Test TPC/
LAr FILL
Commission
Excvn #3
Cryostat #3, Cryo Equip & Piping
FAR
DETECTOR #3
Test TPC/
LAr FILL
Commission
Excvn #4
Cryostat #4, Cryo Equip & Piping
FAR
DETECTOR #4
Test TPC/ LAr FILL
Commission
FAR SITE
NEAR SITE
1st Beam
PRMY BEAMLINE, HALLS & DECAY REGION
BEAMLINE
NEAR DETECTOR HALL
1
NEAR
DETECTOR
LBNF
Far Site Facilities Scope and Requirements
Scope Element
Funding Source
Excavation of 4850L detector and utility caverns and drifts
DOE
Surface buildings, utility infrastructure, cavern outfitting
DOE
LN2 cryogenic systems
DOE
Four 10kt fiducial cryostats
Non-DOE
LAr cryogenic systems
Non-DOE
LAr and LN2 cryogenic fluids procurement
DOE and Non-DOE
CD-3a
Scope
• LNG Membrane cryostat is an European technology.
• CERN has now a frame contract with the French firm holding the main IP.
• The support structure requires many mechanical items (beams, flanges,
plates, …) easely available in Europe, which can also be prefabricated.
• Europe with ICARUS and ATLAS has the main knowledge of LAr cryogenic
technologies. Several firms available in Europe and interested.
2
LBNF
Far Site Facilities Scope and Requirements
Scope Element
Funding Source
Excavation of 4850L detector and utility caverns and drifts
DOE
Surface buildings, utility infrastructure, cavern outfitting
DOE
LN2 cryogenic systems
DOE
Four 10kt fiducial cryostats
Non-DOE
LAr cryogenic systems
Non-DOE
LAr and LN2 cryogenic fluids procurement
DOE and Non-DOE
CD-3a
Scope
• CERN is doing the final design of the cryostats, in contact with the LNG
industrial community. We are constructing large prototypes (-> ProtoDUNEs).
• CERN has accepted to finance the first cryostat construction.
• We have the opportunity to build a consortium with several FAs for cryostat
number 2. Several EU firms can be involved.
• There are plenty of opportunities to participate in the engineering of the
cryostats, in particular for all the penetrations to the liquid.
• Same for the LAr cryogenics. We could effectively use the EU knowledge
3
LBNF
and
market.
In practice:
- We need to engineer an European in-kind for the second cryostat:
- involve European firms in the various procurements
- more engineering effort (distributed also
outside CERN)
- Prepare the installation scenario (technical
teams, QA teams, ….)
- All this can start with teh first cryostat
- We need to engineer an European in-kind for LAR cryogenics:
- involve European firms
- We need to strength the CERN cryogenics group
- Distribute the engineering design work also outside CERN
- Work out the scenarios for installation and commissioning