Moving Brisbane - Brisbane City Council

Program 2 – Moving Brisbane
Moving Brisbane
Program Goal
Brisbane’s transport network enables efficient and sustainable movement of people, freight and services.
The city's accessibility and liveability is maintained and all have access to a high quality road network, high
quality public transport (bus and ferry) services and active travel alternatives, with an understanding that
investment in each transport mode is required to cater for the differing needs of users.
Program Description
Council recognises the need to maintain Brisbane as an easy city to get around. The community pays the
costs of traffic congestion in increased costs of goods and services, reduced amenity and inconvenience.
Relief of traffic congestion through a balanced strategy of road upgrades and investment in public and active
transport is therefore a high priority.
The Transport Plan for Brisbane 2008-2026 outlines how increased public transport use, walking and cycling
can assist a program of targeted road investment to manage travel demand and reduce congestion on
Brisbane's road network. The Plan introduces corridor planning, a process of developing multi -modal
management plans for main arterial corridors and their local transport n etworks. From this planning, a rolling
program of projects will be developed and budgeted for. Also $120 million will be invested between 201 3
and 2016 to upgrade and expand the city’s bikeways and associated services.
Council's infrastructure investment has upgraded a significant number of the city's highest priority road
network links in recent years. Completion of the Telegraph Road and Robinson Road Open Level Crossing
Replacement projects will significantly improve transport connectivity in the northe rn suburbs. 2014-15 will
see progress on projects such as the Telegraph Road Corridor Upgrade, Wynnum Road Corridor Stage 1
upgrade and the Kingsford Smith Drive upgrade.
The TransApex vision is nearing completion with construction of Legacy Way to be completed in 2014 -15.
The Airport Link project as well as CLEM7 and the Go Between Bridge have already been completed.
Record investment over recent years in public transport has resulted in more than 66% growth in combined
bus and ferry patronage since 2003-04. This was achieved by:
•
an unprecedented program of acquisition of environmentally friendly, air-conditioned and wheelchair
accessible buses
•
acquiring 11 additional CityCats
•
the rollout of Bus Upgrade Zones (BUZ), the Blue CityGlider and the Maroon CityGlider.
Major initiatives in 2014-15 include:
•
delivering 60 new air-conditioned and wheelchair accessible rigid equivalent buses to continue the
acquisition of new buses to ensure that Council's fleet is one of the most modern in Australia
•
continuing the Better Bikeways 4 Brisbane program to provide $120 million in new bikeway infrastructure
over four years to improve bikeway links and connections to Brisbane's top employment areas
•
continued funding of the free CityHopper service, Brisbane's first free inner city ferry service
•
construction of a new ferry terminal in Milton
•
upgrading of the Bulimba ferry terminal
•
upgrading of existing terminals following the 2011 Brisbane floods
•
continuing operation of the Blue CityGlider and the Maroon CityGlider Bus Rapid Transit Routes
•
continuing the upgrade of bus stops and ferry terminals to provide a more accessible public transport
network and to meet requirements of the Disability Discrimination Act 1992 (DDA)
•
completion of the Telegraph Road and Robinson Road Open Level Crossing Replacement projects
•
completion of Legacy Way
•
completion of the New Farm to Howard Smith Wharves Riverwalk
•
continued operation of the Congestion Reduction Unit
•
progress on Telegraph Road Corridor Upgrade
•
Cycling Brisbane.
- 51 -
Program 2 – Moving Brisbane
Program Outcomes and Financial Summary
Program Outcomes
2.1 - Promoting Active Transport
Anticipated
Proposed
Anticipated
Proposed
Anticipated
Proposed
2013-14
2014-15
2013-14
2014-15
2013-14
2014-15
$000
$000
$000
$000
$000
$000
Expense
5,842
9,144
Revenue
6,602
4,193
Capital
79,118
37,363
2.2 - Public Transport
126,535
129,359
26,928
30,423
70,762
143,125
2.3 - Transport Network
442,202
509,409
98,535
645,030
662,872
555,336
574,579
647,912
132,065
679,646
812,752
735,824
Recurrent Operations Contracts
2015-16
$000
2016-17
$000
2017-18
$000
41,165
41,923
42,969
Outcome 2.1 Promoting Active Transport
Outcome description
Reducing congestion on roads and encouraging sustainable travel through the promotion of cycling and
walking as healthy and environmentally sustainable alternatives to car travel.
Brisbane residents who embrace active travel alternatives are not only reducing congestion, they a re also
helping Brisbane to become a healthy, sustainable and accessible city.
Where we are now
As a result of the record $100 million investment in new bikeway infrastructure between 2008 and 2012 and
the current $120 million investment between 2012 and 2016, Council has provided missing links and
expanded Brisbane's shared pathway network to ensure Brisbane residents have access to a world -class
and connected network to enable commuter and recreational active travel.
In addition, Council is working with schools and with the community to provide them with the information they
need to adopt sustainable travel solutions in order to reduce traffic congestion and improve the sustainability
of our city.
Council also launched the Cycling Brisbane program in March 2014 which aims to encourage people of all
ages and abilities to cycle more often and utilise the extensive bikeway network which Council has
developed.
Provision and take up of active transport alternatives contribute to achieving the Brisbane Vision.
Where we want to be
The Brisbane Active Transport Strategy 2012-2026 sets out Council's vision for supporting active transport in
Brisbane. The strategy provides a targeted approach to promoting cycling and walking as an attractive
means of transport and recreation. It includes provision of an interconnected network of bikeways and
shared paths to ensure that everyone has access to safe and convenient cycling and walking facilities.
Strategy 2.1.1 Promote Sustainable Transport
Encourage people to travel actively in order to reduce congestion and support a sustainable city.
Service 2.1.1.1 Promote Sustainable Travel Choices
This service will continue to promote the uptake of active travel and provide schools and the community with
the information needed to change travel behaviours and help reduce traffic congestion.
- 52 -
Program 2 – Moving Brisbane
The majority of family car trips to school are less than three kilometres. The Active School Travel program
(AST) encourages a shift towards walking, riding, public transport and car-pooling as ways for children to
travel to and from school. The benefits are twofold. Firstly, the program relieves traffic congestion around
schools making the road environment around schools safer for both commuters and students. Secondly, the
program encourages healthier and more active school communities as well as increasing the amenity of
neighbourhoods around schools.
In addition to the 12 new schools participating in the AST program in 2014, the program will continue to
support 37 schools that have previously participated in the program by assisting them to embed active travel
behaviour.
Both the Brisbane Active Transport Strategy and Brisbane Bikeway Network Plan were updated in 2011 -12.
The Network Plan is currently being further updated to support the Brisbane City Plan 2014. The Brisbane
Active Transport Strategy 2012-2026 provides the strategic framework for encouraging increased community
uptake of active transport options.
Cycling Brisbane, Council’s new travel behaviour change program is designed to increase the number of
people who cycle, by providing them with information, support and incentives.
Cycling Brisbane will continue to provide a membership-based initiative designed to promote cycling
facilities, infrastructure and encourage people of all ages and abilities to cycle more often.
To complement the online element, the Active Communities program will provide a localised approach to
encourage walking and cycling. Following community engagement, improvements are being made in ten
suburbs to make walking and cycling easier and safer. The focus is on improving and then promoting access
to schools, public transport, shops and community facilities.
Across Brisbane, the Bike Skills Training program is providing courses to give people the confidence to get
back on their bike or to cycle in traffic. This program will be expanded in 2014 - 15 to provide combined bike
skills training courses for parents and their children.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
531
-
531
3
Projects
Active School Travel Program
Active Transport in the Community
Capital
Expense
Revenue
Capital
Expense
Revenue
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
718
265
-
720
275
-
722
278
-
720
277
-
Strategy 2.1.2 Design the Network
Developing plans to connect and expand Brisbane's bikeway and shared path network.
Service 2.1.2.1 Designing the Network
This service undertakes strategy development and ongoing evaluation of the Brisbane Active Transport
Strategy 2012-2026. It also provides strategic planning for bikeways and pedestrian connections throughout
Brisbane.
A key component of promoting the uptake of active transport options is the provision of a safe,
interconnected and enjoyable network of bikeways and shared pathways along with the associated
infrastructure such as lighting, way finding and bike racks.
Council will actively work with the Queensland and Federal governments to ensure a collaborative approach
to the planning and provision of new bikeway facilities.
- 53 -
Program 2 – Moving Brisbane
Council is investing $120 million, across the Council term, to link the commuter cycling network to service
Brisbane's top employment areas, and local suburban bikeway improvements including lighting, signage,
bicycle racks, mid-trip facilities and safety improvements.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
609
-
640
-
Strategy 2.1.3 Provide Cycling Infrastructure
Building a connected, expanded and safe bikeway network for Brisbane.
Service 2.1.3.1 Providing Cycling Infrastructure
Delivery of the $120 million Better Bikeways 4 Brisbane program is underway. Over the next two years,
Council will continue to create a commuter network of bikeways servicing Brisbane's top employment areas
in conjunction with a focus on improving bikeways linking to suburban shopping strips, schools and public
transport hubs.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
3,055
2,162
3,473
2,465
Projects
Constructing Key Bikeway Links in Brisbane Suburbs Capital
(Refer Appendix of Schedules)
Expense
Revenue
Enhancing Safety and Cyclist Facilities
Capital
Expense
Revenue
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
25,960
102
1,725
2,384
234
-
29,913
94
5,950
2,015
361
-
15,039
100
5,000
1,504
273
-
15,013
100
5,000
1,468
271
-
Service 2.1.3.2 Riverwalk
The key activity under this service is the rehabilitation and maintenance of Riverwalk along the Brisbane
River from Mariner's Reach at Newstead to William Jolly Bridge in the city.
This includes the section demolished and removed following the 2011 Brisbane flood.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
370
-
349
-
Projects
Jan 2011 Flood Damage - New Farm to Howard
Smith Wharves Riverwalk
Riverwalk Maintenance and Rehabilitation
(Refer Appendix of Schedules)
Capital
Expense
Revenue
Capital
Expense
Revenue
- 54 -
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
7,833
1,186
2,832
-
4,047
-
-
-
Program 2 – Moving Brisbane
Outcome 2.2 Public Transport
Outcome description
Providing high quality public transport services through the provision of a modern bus and ferry fleet,
accessible public transport infrastructure and a focus on customer service. Contribute to the reduction of
road congestion, increase options for sustainable and environmentally friendly transport and increase ease
of travelling around Brisbane.
Where we are now
Brisbane City Council maintains its unique position as the only Aus tralian council to provide funding for and
operate its own public transport fleet. Having built more than 500 new air -conditioned and wheelchair
accessible buses in the previous four year term, Council operates a fleet of more than 1200 buses, the
second largest bus fleet in Australia, along with the iconic CityCat and CityFerry fleets.
Although the planning and funding of public transport is a Queensland Government responsibility,
undertaken by the TransLink Division of the Department of Transport and Mai n Roads, Council continues to
work collaboratively with the Queensland Government to plan, fund and operate Brisbane's bus and ferry
services and will continue to make significant investments in our bus and ferry networks in order to maintain
an efficient and effective network.
As well as delivering new buses, Council will continue to work with TransLink to plan an integrated network,
promote public transport initiatives such as the high frequency BUZ and CityGlider routes and facilitate the
development of key public transport infrastructure.
The 2011 Brisbane floods caused significant damage to ferry infrastructure. The terminal upgrade program
will replace temporary structures installed after the flood. This program will be progressively rolled out over
the Council term.
This outcome contributes to the achievement of the following goals of the Brisbane Vision :
•
Our accessible, connected city
•
Our clean, green city
•
Our well-designed, subtropical city.
Where we want to be
Public transport is frequent, convenient, reliable, safe and easy to use while providing a high level of access
to facilities and services in Brisbane, reducing the need to use a car and maintaining accessibility and
liveability. Brisbane bus, rail and ferry public transport services are integrated and provide a high level of
service to the community.
Services meet the needs of the community, encourage increased use of public transport and are capable of
accommodating patronage growth.
Council is committed to upgrading the city's bus and ferry network to provide improved access for people
with disabilities. All future upgrades and delivery of new public transport assets are to comply with the
requirements for public transport in the Disability Discrimination Act 1992 (DDA), Disability Standards for
Accessible Transport 2002 (DSAPT) and the Disability Standards 2010 (Premises Standards).
Strategy 2.2.1 Providing a High Quality Ferry Service
Providing river travel along the Brisbane River including the iconic CityCat service and CityHopper,
Brisbane's first free inner-city ferry service. The CityHopper is designed to make Brisbane a tourist friendly
destination and complements the free City Loop bus service.
Council's passenger ferries and CityCats are a city icon. They provide an enjoyable and unique service for
commuter, tourist and recreational travel. They assist in reducing car travel and congestion and are an
important part of the city's public transport network.
- 55 -
Program 2 – Moving Brisbane
Service 2.2.1.1 Enhancing the Network through New Infrastructure
Council maintains a fleet of monohull City Ferries. These ferries provide cross river services at selected
locations as well as the CityHopper inner-city ferry service.
The 2011 flood caused significant damage to infrastructure across the ferry network. Temporary structures
were installed at seven terminals and the upgrade of the West End ferry terminal was fast tracked so
services could recommence as quickly as possible. Council continues to work towards the upgrade of all
ferry terminals damaged during the 2011 floods. The University of Queensland St Lucia, QUT Gardens
Point, Sydney Street, Holman Street, Regatta, North Quay and Maritime Museum ferry terminals will be
upgraded with permanent structures featuring greater flood resilience, DDA com pliance and improve the
efficiency of the terminals.
Having delivered new terminals at Northshore Hamilton and Teneriffe, Council will construct a new ferry
terminal at Milton and complete a full upgrade of the Bulimba, Hawthorne and Bretts Wharf ferry te rminals.
To improve safety and security, Council is progressively installing CCTV at ferry terminals. The activities in
this service are funded by projects.
Projects
CityCat Stop - Milton
DDA Compliant Ferry Terminals
Ferry Terminal Upgrade - Bulimba
Generation 1 CityCats
Jan 2011 Flood Damage - Ferry Terminals
New CityCats
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
4,743
18,979
6,408
1,061
69,502
1,000
2,156
-
21,226
650
-
-
-
-
Service 2.2.1.2 Provide Ferry Services
Ferry services are an important part of the transport network in providing access along and across the
Brisbane River.
Council continues to provide significant funding for infrastructure and the operation of ferry services.
Council will ensure their investment is delivering the most efficient network possible for Brisbane ratepayers.
Contract payments to the CityCat and CityFerry operator, covering working and maintenance costs, are
included in this service.
This service includes the funding of Brisbane's first free inner-city ferry service, the CityHopper.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
36,404
17,000
40,532
16,500
- 56 -
Program 2 – Moving Brisbane
Strategy 2.2.2 Providing High Quality Bus Services
Ensure that Brisbane residents continue to have access to a high quality and modern public transport
network.
Service 2.2.2.1 Modern and High Quality Bus Infrastructure
This service covers the provision of buses and bus depots and other measures to support an efficient public
transport network for Brisbane.
Funding has been provided to purchase 60 rigid equivalent new air-conditioned and wheelchair accessible
buses each year to meet the requirements of the network.
The service will also continue to ensure that Brisbane ratepayers receive an efficient, strategic and
optimised bus network for their investment.
The activities in this service are funded by the following projects.
Projects
A Strategically Located Bus Network
An Efficient and Optimised Bus Network
Bus Build
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
-360
-4,000
33,932
-
31,778
-
34,602
-
34,975
-
Service 2.2.2.2 Support Bus Services
Brisbane City Council is the major provider of bus services in Brisbane. Due to the investment made by
Council, Brisbane Transport now operates the second largest fleet in Australia, with more than 1200 buses.
A key objective is to continue to provide services to enable more Brisbane residents to utilise public
transport thereby reducing congestion. To achieve this, Council will continue to provide a significant financial
contribution through a Community Service Obligation towards the operating costs of Brisbane Transport.
This funding is in addition to, and distinct from, the funding Brisbane Transport receives from TransLink for
operating services.
Council will also continue to operate the very successful free CBD Loop and Spring Hill Loop services. In
addition, Council, in conjunction with the Queensland Government, will continue to fund the operating cost of
the Blue CityGlider, Brisbane's Bus Rapid Transit Service between West End and Newstead. Council will
also fully fund the successful Maroon CityGlider which serves Brisbane's popular sports, entertainment and
food precincts including Caxton Street, Suncorp Stadium, South Bank and The Gabba, with a service
between Ashgrove and Stones Corner.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
74,886
-38
80,450
-200
- 57 -
Program 2 – Moving Brisbane
Projects
Blue CityGlider
Capital
Expense
Revenue
Capital
Expense
Revenue
Maroon CityGlider
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
6,551
5,100
5,022
-
7,020
5,125
5,250
-
7,414
5,140
5,413
-
7,577
5,150
5,542
-
Strategy 2.2.3 Develop Public Transport Strategies and Plans
Develop public transport strategies and network plans.
Service 2.2.3.1 Plan for Public Transport
Public transport is vital to support the growth of Brisbane as a New World City.
Council will work with strategic stakeholders to assist in the development and optimisation of the public
transport network to ensure Council's investment is appropriately targeted to Brisbane's requirements. This
will be supported by developing, updating, monitoring and communicating public transport initiatives and
network plans.
Planning of the public transport network will include developing bus stop and ferry terminal i nfrastructure to
support high quality services and prioritised opportunities to reduce congestion as outlined in the Transport
Plan for Brisbane.
Council will continue to negotiate with TransLink and the Queensland Government to achieve the best
outcomes for our public transport customers and ratepayers.
Operating
Anticipated
2013-14
$000
Proposed
2014-15
$000
469
-
515
-
Expense
Revenue
Strategy 2.2.4 Provide Intermodal Facilities
The provision of bus stop infrastructure facilities increases the attractiveness of public transport.
Service 2.2.4.1 Integrate the Various Modes
The continued development and upgrade of infrastructure to support Council’s public transport services
contributes significantly to Council’s objective to encourage residents to use public transport more often and
to reduce traffic congestion.
Council’s bus infrastructure network consists of:
•
9 bus interchanges
•
approximately 6700 actively serviced bus stops
•
10 Park ‘n Ride facilities (7 Bus and 3 Ferry).
Activities within this service include:
•
provision of new bus stops
•
service upgrades and improvements to existing bus interchanges and bus stops
•
upgrading of bus stops to improve accessibility to people with a disability to achieve the outcomes of the
Disability Discrimination Act 1992 (DDA).
These activities include working closely with TransLink to provide equitable access across the whole of the
Brisbane public transport network.
- 58 -
Program 2 – Moving Brisbane
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
4,802
6,312
Projects
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
Delivering an Accessible Public Transport Network in Capital
Brisbane's Suburbs
Expense
Revenue
7,405
650
650
7,000
666
650
5,940
683
650
6,000
700
650
Outcome 2.3 Transport Network
Outcome description
Brisbane is developing a quality transport network that supports safe and efficient movement of people and
freight.
Where we are now
Brisbane's road transport network is extensive and Council is responsible for the vast majority of this
network. Council controls more than 5600 kilometres of road within the Brisbane Local Government Area,
compared to the Queensland Government’s control of 170 kilometres.
The strong and continuous economic and population growth of Brisbane places pres sure on the need for
Council to maintain and upgrade the transport network to meet community needs.
Furthermore, as a capital city with a growing economy, Brisbane's road and transport network is used daily
by residents of other local government areas who do not contribute financially to the cost of maintaining and
upgrading the network.
This growth means the current transport system is under increasing pressure. The community has concerns
about levels of congestion on the network and the impacts of futur e population on traffic growth. Failure to
invest in the road network has severe economic and accessibility impacts.
Whilst funding contributions are received from the Federal and Queensland governments for some transport
projects, Council funds the major components of upgrading our city’s road network. This means that our
road and transport networks are substantially funded from general rates revenue.
Where we want to be
Continued investment in Brisbane's road and transport network is made through co -operation and
partnerships, both with other levels of government and the private sector, to ensure that our city's key
infrastructure meets future challenges.
The road network provides for safe and efficient movement of people and goods on the road network by the
most appropriate modes and routes. The network has sufficient capacity to cope with the transport demands
of the city, provides access to destinations and enhances the liveability of the city. The network is well
managed and quickly adapts to traffic incidents. This keeps Brisbane moving. Projects and services are
highly integrated and deliver best value for the city.
Strategy 2.3.1 Plan and Design the Network
Plan and design the transport network using principles of transport planning and asset and financial
management.
- 59 -
Program 2 – Moving Brisbane
Service 2.3.1.1 Plan and Design the Network
The objective of this service is to plan and design a quality transport network using principles of transport
planning, value for money and sound asset and financial management.
In delivering a quality transport network, the key activities under this service include:
•
monitoring and updating the road and freight network plans
•
integrated transport network planning and city development activity
•
prioritisation and detailed planning and design of transport projects
•
developing plans for designated transport corridors
•
reviewing and updating traffic and transport models
•
undertaking concept planning and design for future network upgrades.
Planning and design of the city's transport network will also include consideration of land use, economic,
environmental and community lifestyle issues. The program will also integrate Brisbane's transport network
with Queensland and Federal transport networks.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
8,311
-
11,695
6
Projects
Corridor Planning
Network Investigations
Road Network Design
(Refer Appendix of Schedules)
Transport and Traffic ICP Revenue Project
Transport Planning Studies
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
270
392
1,513
32,739
668
-
286
400
2,109
36,844
671
-
310
436
2,414
39,061
543
-
304
403
2,463
40,695
536
-
Strategy 2.3.2 Build the Transport Network
Build a transport network that is safe, enhances accessibility and reduces congestion.
Service 2.3.2.1 Build the Transport Network
This service aims to build an improved road and transport network across the city through a range of key
projects, including:
•
TransApex
•
open level crossing replacements
•
major road construction
•
major intersection upgrades.
A quality transport network relies on the delivery of key physical transport assets in accordance with the
needs of a capital city in a fast growing region.
TransApex includes a number of significant transport projects, which together, are delivering the biggest
boost to Brisbane's accessibility in many decades. CLEM7 has delivered significant travel time savings and
reduced congestion on surface routes such as the Story Bridge. The Go Between Bridge has reduced inner
city traffic congestion and will cater for expected growth in West End and South Brisbane. It has also
become an important inner city pedestrian, cyclist and public transport link.
- 60 -
Program 2 – Moving Brisbane
Legacy Way is the 4.6km tolled road tunnel connecting the Centenary Motorway at Toowong with the Inner
City Bypass (ICB) at Kelvin Grove. Opening in 2015, the tunnel will relieve congestion on Brisbane's arterial
roads and improve cross city connectivity. The tunnel will cut travel times from the Centenary Motorway to
the ICB by up to twenty minutes and reduce congestion on Milton Road and Coronation Drive and benefit
local streets.
Another key component of this service is the replacement of two open level crossings with overpass es in
partnership with the Queensland Government. These major projects are being delivered on an accelerated
timeframe and are funded on an equal cost sharing basis between Council and the Queensland
Government. Council is also providing support and technical expertise for the Queensland Government’s
BaT Tunnel project and will also upgrade the Melbourne Street Bus Portal to cope with future public
transport demand.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
15,594
6,483
1,273
2014-15
$000
Projects
BaT Tunnel
Capital
Expense
Revenue
Blunder Rd Stage 6 - Blunder Creek to Stapylton Rd Capital
Expense
Revenue
Kangaroo Point Pedestrian Bridge
Capital
Expense
Revenue
Kingsford Smith Drive - Future Upgrade
Capital
Expense
Revenue
Major Traffic Improvements – Intersections
Capital
(Refer Appendix of Schedules)
Expense
Revenue
Melbourne Street Portal Safety Improvements
Capital
Expense
Revenue
Progress Road Stage 4
Capital
Expense
Revenue
Railway Crossing - Robinson Rd Geebung
Capital
Expense
Revenue
Railway Crossing - Telegraph Rd Bald Hills –
Capital
Bracken Ridge
Expense
Revenue
Roads To Recovery Project
Capital
Expense
Revenue
TransApex - Legacy Way
Capital
Expense
Revenue
TransApex - Legacy Way Capitalised Interest
Capital
Expense
Revenue
- 61 -
250
250
849
15,101
11,119
4,522
374
4,240
643
41,726
18,630
21,297
9,760
8,100
255,020
42,961
452,090
41,955
-
2015-16
$000
2016-17
$000
2017-18
$000
250
250
250
250
250
250
2,347 29,930
93,594 193,354 247,685
11,731 11,976 14,422
3,000
3,000
3,000
10,674 24,357
3,462
609
246
807
295
8,100
8,100
8,100
4,889
465
-
Program 2 – Moving Brisbane
Wynnum Rd Corridor - Stage 1
Capital
Expense
Revenue
662
-
1,118
-
38,333
-
24,876
-
Service 2.3.2.2 Improve Local Transport Networks
To improve access to major transport networks throughout Brisbane, minimise traffic congestion, and to
improve safety in local areas, a quality transport network requires construction of local transport assets.
To achieve this objective, the key activities of this service include construction of:
•
footpaths
•
intersections
•
corridor upgrades
•
minor road projects
•
school safety projects
•
local area traffic management (LATM) projects.
Funding for footpaths will be distributed evenly between each ward through the Ward Footpat h and Parks
Trust Fund. Priorities for footpath construction will be determined by the local Councillor following
consultation with property owners.
Provision of new footpaths will be enhanced by funding sourced from infringement notices and parking meter
revenue.
The performance of the network will be enhanced through a project to modernise, improve the reliability and
safety of the ageing traffic signals network hardware and communication equipment.
Corridor upgrades, such as Telegraph Road Corridor, will support growth particularly in the outer suburbs of
our city, improving access, reducing congestion and travel times for road users, and enhancing pedestrian
and cycle facilities.
The activities of this service are funded by projects.
Operating
Anticipated
2013-14
$000
Proposed
2014-15
$000
-
312
-
Expense
Revenue
Projects
Boundary Rd - Progress Rd to Kelliher Rd Upgrade
Bridge and Culvert Construction – New
(Refer Appendix of Schedules)
Developer Contributions - Council Contributions to
Developer Constructed Works
District Projects
(Refer Appendix of Schedules)
Footpath Contributed Assets
Howard Smith Wharves
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
- 62 -
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
431
2,638
3,412
2,596
1,500
1,500
1,963
-
9,074
2,140
3,737
2,253
1,500
1,500
200
-
8,227
2,171
2,493
1,500
1,500
2,804
-
2,221
2,554
1,500
1,500
-
Program 2 – Moving Brisbane
Kerb and Channel Contributed Assets
Local Access Network Improvements
(Refer Appendix of Schedules)
Local Area Traffic Management - Traffic Calming
(Refer Appendix of Schedules)
Modernise Traffic Signal Communications
New Kerb and Channel and Kerb Ramps
Construction
(Refer Appendix of Schedules)
Paradise Rd Upgrade
Retaining Walls and Embankments
(Refer Appendix of Schedules)
Road Construction Minor Traffic Density
(Refer Appendix of Schedules)
Roads and Bikeways Contributed Assets
Safe School Travel
(Refer Appendix of Schedules)
Safer Routes to School
(Refer Appendix of Schedules)
Stapylton Rd Pallara
Telegraph Rd Corridor
Traffic Signals Hardware Equipment
Ward Footpath and Parks Trust Fund
(Refer Appendix of Schedules)
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
- 63 -
5,000
5,000
230
1,301
1,773
1,180
98
382
1,649
1,650
1,084
131
11,000
11,000
700
350
483
1,369
5,087
5,000
10,422
8,280
3,012
-
5,000
5,000
419
2,494
1,790
1,416
416
3,516
792
1,477
11,000
11,000
700
350
332
3,024
5
11,354
8,444
3,129
-
5,000
5,000
450
2,448
1,870
1,493
430
10,097
1,129
1,488
11,000
11,000
700
350
357
67
559
12,185
8,901
2,845
-
5,000
5,000
653
2,492
1,913
1,526
268
499
1,111
1,531
11,000
11,000
700
350
352
12,459
8,816
3,144
-
Program 2 – Moving Brisbane
Strategy 2.3.3 Maintain and Improve the Network
Maintain and improve the network using strategic asset management principles.
Service 2.3.3.1 Maintain and Improve the Network
The Moving Brisbane program is responsible for a large portfolio of transport network assets. Strategic asset
management principles are applied to ensure these assets are managed appropriately and that maintenance
and renewal activities are prioritised utilising the most optimised approach. A best value approach is used to
ensure the most cost effective delivery of the program.
The key activities under this service include:
•
renewal, maintenance and improvements to roads, kerb and channel, bridges, culverts, footpaths,
linemarkings, signs, bikeways and public lighting
•
strategic management of assets
•
systematic condition and risk assessment of assets.
This budget will build upon the previous increases in road resurfacing and footpath and bikeway
reconstruction so that our transport network continues to deliver a high quality experience for users.
Rehabilitation of footpaths will continue to benefit from infringement notices and parking meter revenue.
Enhanced expenditure continues to improve the appearance of Brisbane's roadsides with:
•
additional grass cutting on major arterial and minor roads
•
additional roadside and Brisbane Improvement Projects and Suburban Centre Improvement Projects
landscaping.
2014-15 funding will maintain the Lord Mayor's commitment to $60 million of road resurfacing per annum
through continuing investment in the road network across the city and suburbs to help deliver smoother,
safer roads.
Council is committed to innovation in management of its asset base and works with peak Australian and
international bodies in researching and trialling cost effective and high -performance products, materials and
construction methodologies.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
283,557
-127,697
298,600
-15,597
Projects
Additional Cuts - Streets Grass
Bikeway Reconstruction
(Refer Appendix of Schedules)
BIPS and SCIPS Maintenance and Rehabilitation
Bridges and Culverts Reconstruction and
Rehabilitation
(Refer Appendix of Schedules)
Data Tools to Manage Duct Fibre Infrastructure
Information
Duct and Fibre Telecommunications Infrastructure
Project Management
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
- 64 -
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
4,480
2,421
1,000
246
10,772
137
35
234
200
4,533
2,506
1,000
252
11,195
151
34
201
200
4,646
1,426
1,001
284
12,133
148
34
229
200
4,747
1,248
1,001
290
12,949
147
34
201
200
Program 2 – Moving Brisbane
Field Data Collectors for RSI
Footpath Reconstruction
(Refer Appendix of Schedules)
ITS - Wireless Infrastructure
Kerb and Channel
(Refer Appendix of Schedules)
Major Assets Project Management
Modular Infrastructure POD
Pavement Design and Construction
Roads Network Resurfacing
(Refer Appendix of Schedules)
Safe Paths CBD
(Refer Appendix of Schedules)
Safety Fences and Guard Rails
(Refer Appendix of Schedules)
Story Bridge Safety Measures
Uniform Management of BCC Duct Fibre for
Broadband Traffic Control Security and WAN
Upgrade of the Road Surface Inventory System
VMS Safety Refurbishment
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
- 65 -
19
5,316
12,084
278
7,716
178
257
225
1,022
3,666
56,194
3,868
1,115
1,072
850
6,986
375
84
117
535
-
17
5,334
12,311
449
8,585
21
278
225
678
4,280
56,581
3,939
1,102
1,070
841
175
97
135
-
17
6,521
11,547
449
8,671
21
249
225
768
4,557
56,548
3,932
1,157
1,157
884
101
119
-
17
6,606
11,594
426
9,043
21
261
225
786
4,668
56,380
3,912
1,058
1,020
881
96
134
-
Program 2 – Moving Brisbane
Strategy 2.3.4 Manage the Transport Network
Manage the transport network to operate efficiently for the benefit of all users.
Service 2.3.4.1 Manage the Network
This service aims to reduce congestion on the Brisbane transport network. It includes the provision of traffic
management, co-ordination and approvals for the safe and efficient operation of the network, and response
to customer enquiries. It also includes the management and monitoring of traffic flows, signal timing and
parking, minimising traffic congestion and ensuring the network operates a s efficiently and safely as
possible.
The key activities under this service include:
•
managing clearways
•
continuing the rollout of Pedestrian Countdown Timers
•
expanding Council’s Left Turn on Red Project
•
conducting Emergency Vehicle Priority (EVP) trials
•
corridor operation optimisation
•
traffic management systems
•
traffic management projects
•
traffic signals operational support.
Key drivers for parking and clearway management include:
•
optimise arterial routes both in and out of the city at peak demand times
•
population growth creating additional road use demand
•
number of complaints or intelligence initiating road use/demand investigations/improvements
•
community awareness of parking regulations to reduce the need of enforcement and improve vehicle
movements at peak demand times.
This budget funds Council's Congestion Reduction Unit, including funding for Closed Circuit Television
(CCTV) and variable message signs (VMS).
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
40,689
37,503
52,301
38,971
Projects
Congestion Reduction Unit Initiatives
(Refer Appendix of Schedules)
Etoll Management
Events Parking
Left Turn on Red Rollout
Network Modernisation
(Refer Appendix of Schedules)
PDA Replacement Program
Pedestrian Countdown Timers
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
- 66 -
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
4,160
1,661
39,579
41,646
196
513
1,101
2,179
164
280
-
2,682
3,254
46,673
49,987
209
526
48
2,522
420
286
-
2,626
3,218
48,529
51,947
214
539
2,613
179
-
2,618
3,207
50,422
53,984
214
552
2,686
192
-
Program 2 – Moving Brisbane
Residential Parking Permits Scheme
Signs and Lines - Roadmarkings
Suburban Amenity Improvements
Traffic Management Systems Security Improvement
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
Capital
Expense
Revenue
557
237
3,216
3,315
1,275
-
590
251
4,033
2,559
882
-
598
260
4,042
2,822
925
-
622
269
3,135
2,870
757
-
Service 2.3.4.2 City Parking
This service provides funding to manage, operate and maintain car parking services both on and off street.
Council manages the large undercover car parks at King George Square and Wickham Terrace, as well as
temporary and event parking.
This car parking service will:
•
provide competitive car parking services to all customers
•
ensure customer focused service
•
act to ensure the security of all Council monies and assets
•
maintain best practice infrastructure.
Council is also responsible for all services related to on street parking meters a cross the city including:
•
coin collection
•
asset management
•
parking meter maintenance.
Operating
Expense
Revenue
Anticipated
2013-14
$000
Proposed
2014-15
$000
12,945
29,257
13,918
29,888
Projects
Smart Meter Technology
Parking Review
Capital
Expense
Revenue
Capital
Expense
Revenue
- 67 -
2014-15
$000
2015-16
$000
2016-17
$000
2017-18
$000
1,392
100
-
-
-
-
Program 2 – Moving Brisbane
Total Project Expenditure Combined with Rolling Projects
Project
A Strategically Located Bus Network
Active School Travel Program
Active Transport in the Community
Additional Cuts - Streets Grass
An Efficient and Optimised Bus Network
BaT Tunnel
Bikeway Reconstruction
2014-15
$000
-360
718
265
4,480
-4,000
250
2,421
2015-16
$000
720
275
4,533
250
2,506
2016-17
$000
722
278
4,646
250
1,426
2017-18
$000
720
277
4,747
250
1,248
1,246
6,551
849
1,252
7,020
-
1,285
7,414
-
1,291
7,577
-
431
9,074
8,227
-
2,638
2,140
2,171
2,221
10,909
11,346
12,281
13,096
33,932
4,743
5,821
31,778
5,936
34,602
5,844
34,975
5,825
26,062
30,007
15,139
15,113
270
35
286
34
310
34
304
34
18,979
8,055
21,226
7,666
6,623
6,700
3,412
3,737
2,493
2,554
2,596
2,253
-
-
234
201
229
201
2,618
39,579
196
6,408
19
1,500
17,400
2,376
46,673
209
17
1,500
17,645
1,777
48,529
214
17
1,500
18,068
1,739
50,422
214
17
1,500
18,200
1,963
278
69,502
7,833
650
200
449
-
2,804
449
-
426
-
(Refer Appendix of Schedules)
BIPS and SCIPS Maintenance and Rehabilitation
Blue CityGlider
Blunder Rd Stage 6 - Blunder Creek to Stapylton
Rd
Boundary Rd - Progress Rd to Kelliher Rd
Upgrade
Bridge and Culvert Construction – New
(Refer Appendix of Schedules)
Bridges and Culverts Reconstruction and
Rehabilitation
(Refer Appendix of Schedules)
Bus Build
CityCat Stop - Milton
Congestion Reduction Unit Initiatives
(Refer Appendix of Schedules)
Constructing Key Bikeway Links in Brisbane
Suburbs (Refer Appendix of Schedules)
Corridor Planning
Data Tools to Manage Duct Fibre Infrastructure
Information
DDA Compliant Ferry Terminals
Delivering an Accessible Public Transport
Network in Brisbane's Suburbs
Developer Contributions - Council Contributions
to Developer Constructed Works
District Projects
(Refer Appendix of Schedules)
Duct and Fibre Telecommunications
Infrastructure Project Management
Enhancing Safety and Cyclist Facilities
Etoll Management
Events Parking
Ferry Terminal Upgrade - Bulimba
Field Data Collectors for RSI
Footpath Contributed Assets
Footpath Reconstruction
(Refer Appendix of Schedules)
Generation 1 CityCats
Howard Smith Wharves
ITS - Wireless Infrastructure
Jan 2011 Flood Damage - Ferry Terminals
Jan 2011 Flood Damage - New Farm to Howard
Smith Wharves Riverwalk
- 68 -
Program 2 – Moving Brisbane
Total Project Expenditure Combined with Rolling Projects
Project
Kangaroo Point Pedestrian Bridge
Kerb and Channel
2014-15
$000
7,894
2015-16
$000
8,606
2016-17
$000
2,347
8,692
2017-18
$000
29,930
9,064
5,000
15,101
1,101
1,531
5,000
93,594
48
2,913
5,000
193,354
2,898
5,000
247,685
3,145
1,773
1,790
1,870
1,913
257
11,119
278
11,731
249
11,976
261
14,422
5,022
4,614
1,278
1,022
392
2,179
5,250
1,416
678
400
2,522
5,413
1,493
768
436
2,613
5,542
1,526
786
403
2,686
2,156
382
416
430
268
1,649
100
3,666
164
280
643
41,726
21,297
3,516
4,280
420
286
10,674
609
807
10,097
4,557
179
24,357
-
499
4,668
192
3,462
-
557
1,650
590
792
598
1,129
622
1,111
4,018
4,047
-
-
1,215
1,477
1,488
1,531
1,513
2,109
2,414
2,463
11,000
60,062
11,000
60,520
11,000
60,480
11,000
60,292
1,115
1,102
1,157
1,058
700
700
700
700
483
332
424
352
(Refer Appendix of Schedules)
Kerb and Channel Contributed Assets
Kingsford Smith Drive - Future Upgrade
Left Turn on Red Rollout
Local Access Network Improvements
(Refer Appendix of Schedules)
Local Area Traffic Management - Traffic Calming
(Refer Appendix of Schedules)
Major Assets Project Management
Major Traffic Improvements – Intersections
(Refer Appendix of Schedules)
Maroon CityGlider
Melbourne Street Portal Safety Improvements
Modernise Traffic Signal Communications
Modular Infrastructure POD
Network Investigations
Network Modernisation
(Refer Appendix of Schedules)
New CityCats
New Kerb and Channel and Kerb Ramps
Construction
(Refer Appendix of Schedules)
Paradise Rd Upgrade
Parking Review
Pavement Design and Construction
PDA Replacement Program
Pedestrian Countdown Timers
Progress Road Stage 4
Railway Crossing - Robinson Rd Geebung
Railway Crossing - Telegraph Rd Bald Hills Bracken Ridge
Residential Parking Permits Scheme
Retaining Walls and Embankments
(Refer Appendix of Schedules)
Riverwalk Maintenance and Rehabilitation
(Refer Appendix of Schedules)
Road Construction Minor Traffic Density
(Refer Appendix of Schedules)
Road Network Design
(Refer Appendix of Schedules)
Roads and Bikeways Contributed Assets
Roads Network Resurfacing
(Refer Appendix of Schedules)
Safe Paths CBD
(Refer Appendix of Schedules)
Safe School Travel
(Refer Appendix of Schedules)
Safer Routes to School
(Refer Appendix of Schedules)
- 69 -
Program 2 – Moving Brisbane
Total Project Expenditure Combined with Rolling Projects
Project
Safety Fences and Guard Rails
2014-15
$000
1,922
2015-16
$000
1,911
2016-17
$000
2,041
2017-18
$000
1,901
3,216
1,392
1,369
6,986
3,315
5,087
1,275
4,033
3,024
175
2,559
5
882
4,042
559
2,822
925
3,135
2,870
757
10,422
297,981
41,955
668
459
11,354
4,889
671
97
12,185
465
543
101
12,459
536
96
117
535
11,292
135
11,573
119
11,746
134
11,960
662
1,118
38,333
24,876
879,145
492,288
607,332
638,956
(Refer Appendix of Schedules)
Signs and Lines - Roadmarkings
Smart Meter Technology
Stapylton Rd Pallara
Story Bridge Safety Measures
Suburban Amenity Improvements
Telegraph Rd Corridor
Traffic Management Systems Security
Improvement
Traffic Signals Hardware Equipment
TransApex - Legacy Way
TransApex - Legacy Way Capitalised Interest
Transport Planning Studies
Uniform Management of BCC Duct Fibre for
Broadband Traffic Control Security and WAN
Upgrade of the Road Surface Inventory System
VMS Safety Refurbishment
Ward Footpath and Parks Trust Fund
(Refer Appendix of Schedules)
Wynnum Rd Corridor - Stage 1
TOTAL
- 70 -