ust outside of Normangee, Texas, Harding Directional Drilling was in the middle of a gas pipeline
installation project. The pipeline was in a dry low lying area near the Navasota River. They had
worked in the area for several weeks and had already installed more than 5,400 feet of casing
ranging in sizes from 20" to 36" in five pulls. The project was on schedule and going well, little did they
know that Mother Nature was about to pitch them a curve ball that no one was expecting.
In the first week of June, Harding Directional had nearly completed the installation of a 2,800 foot
section of 36" steel casing. Heavy spring rains began and Harding was forced to halt construction. Within
a few days, the weather service warned that flooding was expected within the Navasota River basin.
The river was expected to crest and flooding expected to be nearly 3 feet by June 10th. Harding
Directional and WILLBROS RPI (General Contractor on the project), moved their equipment to the
highest ground possible. On the morning the river was expected to crest, the contractors witnessed
Mother Nature at her angriest.
The area flooded to depths of 6 - 10 feet and the river was still rising. "The rig side was on relatively high
ground; however the pipe side was a different story. Water levels had risen up so high that only the
operator's cabs were visible on our large excavators," said Robert Hamilton of Harding Directional. "A
job of this scope is something that Harding Directional will do any day of the week," said Hanson
Turnbull of Earth Tool Company LLC (Earth Tool). This job was different. Because of the delay of the
project, deluge of rainwater and the sugar sand material that they were boring through, the bore
collapsed and stuck the casing. With the hole collapsed, the massive 680,000 lbs of pullback force their
rig produced, wasn't enough to finish the bore. Hamilton contacted Vermeer Texas to analyze options
for completing this complicated bore. Vermeer placed a call to Earth Tool, manufacturer of
HammerHead trenchless equipment and a plan to use HDD pipe ram assist was put into place.
Combining Technologies
Pipe ramming is a technique that is frequently used to install various sized casing for a variety of utilities.
The process simply described is a non-steerable system of forming a bore by driving an open-ended
steel casing using a percussive hammer from a drive pit. The soil may be removed from the casing by
augering, jetting, or compressed air.
Pipe ramming technology has been identified as a useful tool in helping complete stuck or hydrolocked
directional bores. The method is commonly referred to as "Pullback Assist" and has been successfully
used on steel pipe as well as HDPE. In anticipation of problems, the method is viewed by many
contractors as a safety measure. "When problems arise on an HDD project, quick reaction time is a
critical factor with any HDD assist method and the rate of success improves the quicker problems are
responded to," said Jeff Wage of Earth Tool.
Mother Nature Throws Curve Ball, Texas Contractor Hits Home Run
Completing the Job
To assist the pull back, Earth Tool suggested a 24" HammerHead Mole® pipe rammer be used to save
the bore. Earth Tool recommended the 24" rammer because of its massive impact force of 2,000,000 lbs
when traveling at one foot per minute.
Because time was a critical factor, Earth Tool expedited the equipment and support personnel to the
work site. Once the ram assist equipment arrived, it was loaded onto flexi floats and barged to the job
site. "I've never had to take a boat to a job site before," said Turnbull. With the equipment on site, the
system was setup and ready to fire. Prior to the equipment being fired up, Tracey Cearley of Harding
Directional said, "If that hammer can move this pipe an inch, I'll be impressed." Within ten impacts of
the hammer, the pipe began to move and the drill rig only used 200,000 lbs of force to pull back. Within
a day and a half, the pipe was in the ground and the bore saved. Harding Directional had beat back
Mother Nature and hit a home run, and Mr. Cearley was clearly impressed.
toll free: 800.331.6653 (USA only) | international: +1 262.567.8833 | web: www.hammerheadtrenchless.com | email: [email protected]