WEST VIRGINIA LAND STEWARDSHIP CORPORATION CONSULTANT QUALIFICATION QUESTIONNAIRE Project Name Statewide Engineering Services Date Click or tap to enter a date. FEIN Number Click or tap here to enter text. 1. Firm Name Click or tap here to enter text. 2. Address Click or tap here to enter text. 3. Former Firm Name, if any Click or tap here to enter text. 4. Contact Name and Telephone Click or tap here to enter text. 5. Year Established 6A. Is the firm a WV Registered DBE (Disadvantaged Business Enterprise)? 6. Ownership Structure ☐Individual ☐Corporation ☐Partnership ☐Joint Venture ☐Yes ☐No 7A. Name, Title, & Telephone – Other Principals Click or tap here to enter text. 7. Principal Officers or Members of Firm Click or tap here to enter text. 8. Number of Personnel by Discipline: # Discipline Administrative Architects Biologists CADD Operators Chemical Engineers Civil Engineers Construction Inspectors Designers Draftsmen Ecologists # Discipline Economists Electrical Engineers Environmentalists Estimators Geologists Historians Hydrologists Landscape Architects Mechanical Engineers Mining Engineers # Discipline Planners: Urban Regional Photogrammetrists Sanitary Engineers Soils Engineers Specification Writers Surveyors Structural Engineers Traffic Engineers Other Total Personnel 8A. Total Number of WV Registered Professional Engineers in Primary Office: *RPEs other than Civil and Mining must provide supporting documentation that qualifies them to supervise and perform this type of work. 1 9. If this is a joint-venture, has this joint-venture worked together before? ☐Yes ☐ No 10. List outside key consultants/sub-consultants anticipated to be used. (Attach “Consultant Qualification Questionnaire” for each) Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No Name and Address: Click or tap here to enter text. Specialty: Click or tap here to enter text. Worked with before? ☐ Yes ☐ No 2 11. A. Does your firm have experience in designing passive treatment systems for Acid Mine Drainage (AMD) on bond forfeiture sites? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. B. Does your firm have experience in designing active treatment systems for AMD on bond forfeiture sites? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. C. Does your firm have experience completing an Acid Base Analysis (ABA) based on information generate by soil and refuse analytical information on bond forfeiture sites? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. 3 D. Does your firm have experience in using hydrological and hydraulic engineering principals in designing collection and transporting systems for AMD and surface water on bond forfeiture sites? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. E. Does your firm have experience in designing land reclamation projects of bond forfeiture sites inclusive of but not limited to highwall reclamation, site grading, revegetation, material placement planning, pond reclamation, and road reclamation? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. F. Does your firm have experience in inspecting mine reclamation construction projects? ☐Yes ☐ No If yes, please provide up to three projects your firm has designed and briefly describe each project including type(s) of treatment. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. 4 G. A. Explain in detail how your firm is committed to meeting project deadlines. Click or tap here to enter text. B. What measures are in place at your firm to assure project deadlines are met? Click or tap here to enter text. 12A. Personal History Statement of Principals & Associates Responsible for Project Design (Furnish complete information but keep to essentials) Name & Title Click or tap here to enter text. YEARS OF EXPERIENCE Years of AMD Related Design Experience Brief explanation of responsibilities: Click or tap here to enter text. Education (Degree, year, specialization) Click or tap here to enter text. Membership in Professional Organizations Registration (Type, year, state) Click or tap here to enter text. Click or tap here to enter text. 5 12B. Personal History Statement of Principals & Associates Responsible for Project Design (Furnish complete information but keep to essentials) Name & Title Click or tap here to enter text. YEARS OF EXPERIENCE Years of AMD Related Design Experience Brief explanation of responsibilities: Click or tap here to enter text. Education (Degree, year, specialization) Click or tap here to enter text. Membership in Professional Organizations Registration (Type, year, state) Click or tap here to enter text. Click or tap here to enter text. 12C. Personal History Statement of Principals & Associates Responsible for Project Design (Furnish complete information but keep to essentials) Name & Title Click or tap here to enter text. YEARS OF EXPERIENCE Years of AMD Related Design Experience Brief explanation of responsibilities: Click or tap here to enter text. Education (Degree, year, specialization) Click or tap here to enter text. Membership in Professional Organizations Registration (Type, year, state) Click or tap here to enter text. Click or tap here to enter text. 6 12D. Personal History Statement of Principals & Associates Responsible for Project Design (Furnish complete information but keep to essentials) Name & Title Click or tap here to enter text. YEARS OF EXPERIENCE Years of AMD Related Design Experience Brief explanation of responsibilities: Click or tap here to enter text. Education (Degree, year, specialization) Click or tap here to enter text. Membership in Professional Organizations Registration (Type, year, state) Click or tap here to enter text. Click or tap here to enter text. 12E. Personal History Statement of Principals & Associates Responsible for Project Design (Furnish complete information but keep to essentials) Name & Title Click or tap here to enter text. YEARS OF EXPERIENCE Years of AMD Related Design Experience Brief explanation of responsibilities: Click or tap here to enter text. Education (Degree, year, specialization) Click or tap here to enter text. Membership in Professional Organizations Registration (Type, year, state) Click or tap here to enter text. Click or tap here to enter text. 7 13. Provide a list of software and equipment available in the PRIMARY office which will be used to complete design services. 1. Click or tap here to enter text. 2. Click or tap here to enter text. 3. Click or tap here to enter text. 4. Click or tap here to enter text. 5. Click or tap here to enter text. 6. Click or tap here to enter text. 7. Click or tap here to enter text. 8. Click or tap here to enter text. 9. Click or tap here to enter text. 10. Click or tap here to enter text. 14. List current activities on which your firm is the designated Engineer of Record Project Name, Type & Location Total Number of Projects: Name & Address of Owner Nature of Firm’s Responsibility Estimated Construction Cost Percent Complete Total Estimated Construction Costs: $ 8 15. List current activities on which your firm is serving as a sub-consultant to others. Project Name, Type & Location Nature of Firm’s Responsibility Name & Address of Owner Estimated Completion Date Estimated Construction Cost Entire Project Your Firm’s Responsibility 16. List completed work within the last 5 years on which your firm was the designated Engineer of Record. Project Name, Type Name & Address of Owner Estimated Construction Cost & Location Year Constructed (Yes or No) 17. List completed work within last 5 years on which your firm has been a sub-consultant to other firms. (Indicate phase of work which your firm was responsible.) Project Name, Type Name & Address Estimated Construction Year Constructed Firm Associated With & Location of Owner Cost of Your Firm’s Portion (Yes or No) 9 18. Use this space to provide any additional information or description of resources supporting your firm’s qualifications to perform work for the West Virginia Land Stewardship Corporation on mine land reclamation and mine drainage water treatment. Click or tap here to enter text. 19. The foregoing is a statement of facts, attested to by: Signature: ________________________________________________ Date: _______________________________ Title: Printed Name: __ __________________________________________ 10 BOND FORFEITURE and RELATED PROJECT EXPERIENCE MATRIX Primary staff participation/capacity *** M-Management P-Professional NPDES/ Stormwater preparation Geotechnical/stability Stream restoration Equipment /structure removal Water treatment Construction inspection / management Water quality evaluation /mitigation replacement Project specifications Hazardous waste disposal Subsidence investigation/ mitigation Mine / refuse fire abatement Remining Evaluation Additional info provided in Section (s) ** Hydrologic/Hydraulic design/ Eval. C-Corp P-Personal * Portal/shaft closure Exp. Basis Forfeited Deep Mine Reclamation PROJECT Forfeited Surface Mine Reclamation PROJECT EXPERIENCE REQUIREMENTS *List whether project experience is corporate or personnel based or both ** Use this area to provide specific sections or pages if needed for reference *** List primary design personnel and their functional capacity for the projects listed. 11
© Copyright 2026 Paperzz