MKD generator , Installation and testing strategy / time line of production • Complete / approve design by end July • • • Trigger transformer top connection (old type) Ferrite region Produce proto (proposition: 2 Generators / 4 switches) • • • • Lab tests - 3 months ? Dec 2015 Mar 2016 • • • DO Aug/Sept Part production Oct + Nov Assembly starts end Nov Including tests of 2 trigger transformers v3 Decision for series production Mar 2016 DO + Part production Mar Sept 2016 MKD generator , Installation and testing strategy / time line of production • Assembly: 3 independent subsystems Oct 2016 subsystems Expected Gain Cost Lab tests HV Cap. connection Trigger transf. v3 Switch stack Independent (fully new) Independent (fully new) Need present stacks (reuse existing parts) Erratic type 2 Erratic type 1 Erratic type 1&2 € €€€€ €€€€€€ To be defined. have to understand why proto Lab tests are not fully representative (statistics, special care, transport, external condition ?) LHC validation Installation in operating generators Need a reliability run; limiting factor Anytime EYETS LS2 or LS2 Anytime EYETS LS2 or LS2 Progressive: • partial during EYETS & TS • full during LS2
© Copyright 2026 Paperzz