PUBLIC ADVISORY Muskrat Falls Project – Heavy Equipment Move From Bay Bulls to Soldiers Pond Construction Site Soldiers Pond Butter Pot Provincial Park Holyrood Witless Bay Line Pennecon Energy Marine Base Gull Pond Mobile Big Pond Southside Road Witless Bay Important Information for Motorists in Bay Bulls and Surrounding Areas Transport Bellemare International will be moving oversized equipment from Pennecon Energy Marine Base, Bay Bulls, to the Soldiers Pond construction site on the Trans-Canada Highway. A total of six equipment moves will take place using Southside Road, Route 10 (Main Road) and Witless Bay Line as indicated on the above map. The equipment moves are planned to begin on February 16, with each move taking place between the hours of 8 PM and 6 AM, on Mondays, Thursdays and Saturdays. Given the size of the equipment being moved, Southside Road, Route 10 (Main Road) and Witless Bay Line will be temporarily closed until the equipment has moved through each roadway indicated. Safety personnel will be present to facilitate the essential move of traffic. At Nalcor Energy, safety is our number one priority. We apologize for any inconvenience and ask for your cooperation to ensure the safety of everyone. For more information or to speak to a project team member, please contact us at: 1-888-576-5454 or [email protected] muskratfalls.nalcorenergy.com
© Copyright 2025 Paperzz