Resume Status: Locked Dusmanta Kumar Rout Consultant Deloitte Consulting India Pvt Ltd. Bengaluru, India. Work: +916152095951 Mobile: +91 9742634258 Instructions Summary of Experience and Qualifications Dusmanta Kumar has over 8 years of IT experience, which includes over 6.3 years of experience with all aspects of BASIS, Security and Netweaver Administration and over 2.04 years as system Administrator. Currently associated with Deloitte Consulting India Pvt. Ltd. , Bangalore as BASIS Consultant SAP HANA Installation, Configuration and Post System Installation activities. HANA System replication, DR/ HA setup. BW Migration to HANA DB using DMO. Performed SAP HANA SPS Upgrades using HLM/PLM. HANA Backup and Recovery. HANA Backup Configuration. SLT replication setup and configuration to HANA on sidecar configuration. Bouncing of SAP HANA System Using both Command Line and Studio Monitoring of SAP HANA system using administration perspective in HANA studio. HANA Alert handling and few areas on performance tuning. Hands-on experience in SAP R/3 4.7EE, ECC 6.0 Basis modules on oracle9i, oracle10g, oracle 11g Databases. SAP NETWEAVER 7.0 EHP1, Enterprise Portal 7.0 and 7.31, Solution Manager 7.0 and 7.1, Business Intelligence 7.0, BOBJ EDGE BI 3.1 and 4.0, Content Server 6.40 Client Exposure: Wal-Mart Stores, Inc, Reliance Capital, Raymond Ltd, Central Electricity Board (Mauritius), Bengaluru International Airport (BIAL), Kazstroy Service (KSS), Hero Moto Corp Ltd (HMCL). Page 2 of 10 Deloitte Experience : Industry: Retail Service Area: Technology Service Line: Application Management Service Enter your Role: BASIS Consultant Months: 2 Years 5 months Enter Generic Client Description: Client is an American public multinational corporation that runs a chain of large discount department stores and a chain of warehouse stores. The company headquartered in Bentonville, Arkansas, is the largest majority private employer and the largest grocery retailer in the United States. The component includes SAP ECC, Net weaver (BI, PI, and EP), Solution Manager Role: SAP HANA Installation, Configuration and Post System Installation activities. HANA System replication, DR/ HA setup. Performed SAP HANA SPS Upgrades using HLM/PLM. HANA Backup and Recovery. SLT replication setup and configuration to HANA on sidecar configuration. Bouncing of SAP HANA System Using both Command Line and Studio Monitoring of SAP HANA system using administration perspective in HANA studio Monitoring the production and non-production R/3, PI, BI, EP SAP systems. Client administration Perform switch over of DB2 threads in failover situations through DB2 on Z/OS Analyzing and providing prompt solutions for the everyday TiDAL Alerts/Pages including RCA. Performing IPL (initial program loading) on the LPARS on mainframe Z/OS servers. This includes switching of the central services from one LPAR to other in a clustered environment. Resolving daily pages received from user (internal or external), Ca-7. System clone Kernel update (USS/AIX) SMD installation EP support pack installation. Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 3 of 10 Previous Experience: Industry: Financial services Service Area: Technology Service Line: Application Management Service Enter your Role: BASIS Consultant Months: 8 months Enter Generic Client Description: Reliance Capital Limited (RCL) is a financial services company. Reliance Capital ranks among the top 3 private sector financial services and banking companies, in terms of net worth in India. Reliance Capital has interests in asset management and mutual funds; life and general insurance; commercial finance; equities and commodities broking; wealth management services; distribution of financial products; private equity; asset reconstruction; proprietary investments and other activities in financial services. Enter Project Description: Version upgrade This is a version upgrade project. RCL have a robust SAP practice, it has a three system landscape with various SAP modules closely integrated i.e. ECC, BI, EP, PI and Solution Manager. As RCL is a financial services company, the business downtime has a direct impact on business loss. The business downtime was planned carefully to minimize the loss of business hours. Role: Performed Hardware sizing to determine the Hardware required for Technical upgrade from SAP ECC6.0 to ECC6.0 EHP6 and EP 7.0 to EP 7.31 systems for Development, Quality and Production environment. Performed version upgrade from ECC 6.0 to ECC 6.0 EHP6 and EP 7.0 to EP 7.31 for Development, Quality environment. Installed SBP (SAP bundle Patches) for Oracle and fine tune the oracle parameters to improve system performance during upgrade. Built the mock (Test) sever with production data to simulate production scenario in a Test environment to estimate system downtime. Performed Database refresh of QAT environment with production data prior to QAT upgrade to estimate minimal production downtime. Performed EP 7.0 upgrade in two phases. In first phase Business Package (BP) components are upgraded to EHP4 and in the second phase 7.31 version upgrade is carried out. Imported WDA ESS and MSS packages and Buyer 1.6 business package. Assigned WDA roles to all users in 7.31 environments. Involved with OS and other teams to optimize the upgrade performance and minimize the down time. Performed various post upgrade performance optimization activities based on SAP recommendation and EWA recommendation. Involved in planning and successfully executing all the key phase of the project. Technical Environment: ECC 6.0 ECC 6.0 EHP6, EP 7.0, EP 7.31, Solman 7.1, Sun Solaris 10.2, Oracle 11g, BI 7. Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 4 of 10 Industry: Textiles and Engineering Service Area: Technology Service Line: Application Management Services Enter your Role: Consultant Months: 5 Months Enter Generic Client Description: Hardware migration Raymond Limited, Incorporated in 1925. Raymond Group is one of India's largest branded fabric and fashion retailers. It is one of the leading, integrated producers of suiting fabric in the world, with a capacity of producing 31 million meters of wool and wool-blended fabrics. The Group owns apparel brands like Raymond, Raymond Premium Apparel, Park Avenue, ColorPlus and Parx. In addition, the Group also has business interests in readymade garments, designer wear, cosmetics and toiletries, engineering files and tools, prophylactics and air charter operations. Enter Project Description: This is a hardware migration project in WINTEL environment. The target environment is based on multisid feature (Multi Instance Clustering) which is available in Windows Server 2008 (R2) operating system. Role: Involved in planning, sizing and coordinating with Microsoft team to materialize a successful hardware migration on multi SID environment with cluster environment Windows Server 2008 (R2) operating system with its Windows Server Failover Clustering feature supports multiple sapmnt file shares. This makes the installation of multiple clustered SAP systems in one failover cluster. Worked closely with internal Basis team, various process owners and team leads to plan the down time and understand business impact of various business processes. Worked closely with internal Basis team, Server team and Network team to plan and optimize the migration process and minimize the duration of downtime. Involved in understanding and analyzing the architecture, how the SAP system are integrated with one another as well as how they are integrated with various non-SAP systems. Various landscapes that are part of hardware migration involves Solution Manager 7.0, ECC 6.0, Enterprise Portal (EP), Business Intelligence (BI) and Exchange Infrastructure (XI) Used Standard System Copy/Migration (load-based) and Homogeneous System Copy procedure during migration. Involved in optimizing the system performance on post hardware migration Carried out all post migration activities that is reconfiguring and regenerating the affected ABAP and JCO RFCs, optimizing JAVA stack memory parameters, applying permanent license, reconfiguring TMS, reconfiguring UME for Enterprise portal (EP), registering new servers to SLD, installing web dispatcher and configuring load balancing etc. Involved in knowledge transfer and training the internal team to handover the Severs. Technical Environment: ECC 6.0, EP 7.0, BI 7.0, XI (PI) 7.0, Solution Manager 7.01, Windows 2008 R2 and SQL Server 2008 Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 5 of 10 Industry: Energy Service Area: Technology Service Line: Application Management Services Enter your Role: Consultant Months: 6 Months Enter Generic Client Description: Technical Upgrade The Central Electricity Board (CEB) is wholly owned by the Government of Mauritius and reporting to the Ministry of Energy and Public Utilities. CEB is Established in 1952, the CEB's business is to “prepare and carry out development schemes with the general object of promoting, coordinating and improving the generation, transmission, distribution and sale of electricity" in Mauritius. CEB produces around 40% of the country's total power requirements. It is the sole organization responsible for the transmission, distribution and supply of electricity to the population. Enter Project Description This is technical upgrade project form R/3 4.7 EE to ECC 6.0 Ehp5 along with hardware migration, Unicode conversion and Oracle database upgrade. The business down time was critical as its being directly reported to Ministry of Energy and published in national newspaper for general public. Role: Performed Hardware sizing to determine the Hardware required for Technical upgrade from SAP R/3 4.7EE to ECC6.0 EHP5 system for Development, Quality and Production environment Migration of systems from old hardware environment to new hardware environment with SAP R/3 4.7EE application, which involves migration of Production Server from a non-Cluster environment to new Cluster environment. Built the mock (Test) sever with production data to simulate production scenario in a Test environment to estimate system downtime. Performed Database refresh of QAT environment with production data prior to QAT upgrade to estimate minimal production downtime. Involved in defining the Veritas Cluster HA file system. Performed version upgrade from R/3 4.7 EE to ECC 6.0 EHP5 for Development, Quality and production Server with Add-on Software Component IS-U. Performed Unicode Conversion for three system land scape, where the production server database size was 1.8 TB. Performed Oracle database upgrade from 9i to 11g, which involves UNDO table space migration. Performed Solution Manager 7.1 installation and configure MOPZ to generate target stack file and download the required media. Involved with OS and other teams to optimize the upgrade performance and minimize the down time. Involved in various post upgrade performance optimization activities based on SAP recommendation and EWA recommendation. Technical Environment: SAP R/3 4.7 EE, ECC 6.0 EHP5, Solution Manager 7.1, Oracle 9i, Oracle 11g and Sun Solaris 10.2 Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 6 of 10 Industry: Airport Management Service Area: Technology Service Line: Application Management Services Enter your Role: Consultant Months: 3 months Enter Generic Client Description: Implementation Bengaluru International Airport (BIAL) is an international airport serving the Indian city of Bangalore. It was the fourth busiest airport in the country in overall passenger traffic (12.69 million) and fifth busiest in international passenger traffic. It is host to 10 domestic airlines and 21 international airlines connecting the city to about 50 destinations across India and rest of the world. Enter Project Description: This is Performance Management System (PMS) implementation project. The scope of work involves defining the landscape, sizing the new hardware, installing EP 7.01 (PMS), Go-Live and post Go-live support Role: Performed Hardware sizing in the market place using the Quick seizer tool to determine the Hardware required for installing Enterprise Portal (EP) system for Development and Production environment. Done post installation activity using Config Toll and Visual Admin Tool Applied support packages through JAVA Support Package Manager (JSPM) Maintained connectivity between Enterprise Portals EP 7.0 and SAP ERP systems using Single Sign on (SSO) Configure Active Directory (AD) as UME engine for portal. Two different domain (Active Directory) are integrated as UME for portal. Assigned required portal roles to users. Technical Environment: ECC 6.0 Ehp4, EP 7.1, Solution Manager 7.0, Windows 2008 R2 and Oracle 11g. Industry: infrastructure development Service Area: Technology Service Line: Application Management Services Enter your Role: Associate Consultant Months: 11 months Enter Generic Client Description: End-to-End Implementation KazStroyService (KSS) established in July 2007, is a wholly owned subsidiary of KazStroyService, Kazakhstan, and has its corporate office located in Gurgaon, near New Delhi, India. KSS was established to meet the growing demand of infrastructure development in the fields of cross-country gas, hydrocarbon and water pipelines, Off-site works of refineries, petrochemicals, and allied plants and LNG terminals in India. Enter Project Description: This is a complete end-to-end implementation project. The scope of work starts with defining the landscape, System sizing, installation, integrating various components, defining the day-to-day technical process, performance optimization, defining system security, GO-LIVE and post golive support. Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 7 of 10 The various components that are part of the land scape are ECC 6.0 Ehp4, EP 7.01, BI 7.01, BO 3.0, Content Server 640 and Solution Manager 7.01 Role: E.C.C 6.0 EHP4: Performed Hardware sizing to determine the Hardware required for installing ECC 6.0 EHP4 system for Development, Quality and Production environment. The Production environment is on high availability cluster with multiple application servers. Done the post installation activities in DEV, QAS and PRD Systems which includes importing profiles, applying permanent license, configuring TMS, client administration, support package, SPAM and Kernel upgrade etc Performed Printer installation (Frontend and Local) Performed SMTP mail configuration through SCOT Performed Adobe document service (ADS) installation and configuration for DEV, QAT and PRD environment. Created roles based on core users and functional consultant’s input Applied Patches, Support Packages, Kernel patches and GUI Patch updates as and when required Performed table space administration and maintenance by increasing the size of table space using BRTOOLS and reorganization of table spaces Involved in knowledge transfer and training the internal team for Server hand over. Business Information Warehouse (SAP BW): Performed Hardware sizing to determine the Hardware required for installing SAP BI 7.0 (SAP NETWEAVER 7.0 EHP1 SR1) system for Development, Quality and Production environment. Done the post installation activities in DEV, QAS and PRD Systems which includes importing profiles, applying permanent license, configuring TMS, client administration, support package, SPAM and Kernel upgrade etc Integrate BI Server to respective ERP Server (ECC) to fetch data. Enterprise Portal (EP) 7.0 EHP1: Performed Hardware sizing in the market place using the Quick seizer tool to determine the Hardware required for installing Enterprise Portal (EP) system Done post installation activity using Config Toll and Visual Admin Tool Applied support packages through JAVA Support Package Manager (JSPM) and SDM Configure JCORFC connection to various backend systems like ERP, BW Maintained connectivity between Enterprise Portals EP 7.0 and SAP systems using Single Sign on (SSO) Business Object (BOBJ) EDGE BI 3.1: Installed BOBJ EDGE BI 3.1 system with support package SP3 Installed Business Object Integration Kit for SAP and the respective support package Installed Business Object Server side components that is CRYSTAL REPORTS 2008, XCELSIUS ENTERPRISE 2008, LIVE OFFICE XI 3.1 Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 8 of 10 Integrate BOBJ EDGE BI 3.1 with BI and ECC server Installed Business Object client side components on Client machines as and when required Configure SAP authentication for Business Object leverage functionality like singlesign-on with Business Object SAP Content Server (DMS): Installed SAP Content Server 6.40 on Windows Server 2008/R2 on data base MAXDB 7.8 for DEV and PRD environment. Integrate Content Server 6.40 with IIS 7.5 Defined content repository in ECC system (For DEV, QAT and PRD environment) Solution Manager 7.0 EHP1: Performed Solution Manager 7.0 EHP1 Installation Configured Maintenance Optimizer (MOPZ) to download latest support packages and patches Define the system landscape in SMSY Configure Early Watch Alert (EWA) for Production Servers As a team member involved in configuration of CHARM and Service Desk technical part. As a team member involved in configuration of CHARM and Service Desk technical part. Define the Transport Management System (TMS) for CHARM Technical Environment: ECC 6.0 EHP4, Solution Manager 7.01, EP 7.0 Ehp1, BI 7.0 Ehp1, Content Server 6.40, BOBJ 3.1, Oracle 11g, MAXDB 7.8, IIS 7.5, HP-UX B.11.31 and Windows Server 2008/R2 Industry: Automobile Service Area: Technology Service Line: Application Management Services Enter your Role: Associate Consultant Months: 10 months Enter Generic Client Description: Support Hero Motocorp Ltd, formerly Hero Honda, is an Indian motorcycle and scooter manufacturer based in New Delhi, India. Hero MotoCorp is the World's single largest two wheeler motorcycle manufacturer based in India. The 2006 Forbes 200 Most Respected companies list has Hero Honda Motors ranked at 108. Hero Motocorp have a robust SAP practices, it has a three system landscape with various SAP modules closely integrated i.e. ECC, BI, EP, CRM and Solution Manager. Enter Project Description: Performed Oracle Database patch upgrade from 10.2.0.2 to 10.2.0.4 and applied the respective MOpatches, modified database parameters to optimize performance Performed support pack upgrade for both ABAP and JAVA stack in SOLMAN server Installed and configure Wily Introscope to monitor the JAVA stack performance on EP server Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 9 of 10 Performed Security optimization bases on SSO report (SAP Security Optimization), where more than 400 roles are modified to close the security loopholes As part of security optimization some of the profile parameters are modified along with SAP ROUTER table (tab) to close the security loopholes Industry: Software services Service Area: Technology Service Line: Application Management Services Enter your Role: System Administrator Months: 28 months Enter Generic Client Description: Support Mindfire Solutions is an India-based offshore software development company providing customized services and services. Mindfire Solutions is an ISO 9001:2000 certified company and a Microsoft Gold Certified Partner as well as an Apple Premier Partner. Founded in Delhi in 1999, it caters to more than 100 clients in the US and Europe. Enter Project Description: Creating user accounts, configuring user profiles, creating local and global groups, managing accounts and domain controllers Setting up and maintaining the Local Area Network (LAN) Working with all hardware related issues Installing the printers Troubleshooting the issues related to printer Creating user accounts, configuring user profiles, creating local and global groups, managing accounts and domain controller Sharing folders, planning and assigning NTFS permissions Implementing Security Policies, Auditing Resource Access, System Recovery Functions Creating and managing users, groups, group policies and domains Configuring Active Directory, DNS, DHCP, print server in Windows 2000/2003 Used to take backup of user’s data, database and restoring on request System Experience Software / Products: Products: ERP: SAP R/3 4.7 EE, ECC 6.0, ECC 6.0 EHP4, ECC 6.0 EHP5, ECC 6.0 EHP6 NETWEAVER: Netweaver 7.0 EHP1 and Netweaver 7.31 Components: Enterprise Portal 7.0 and 7.31, Business Intelligence 7.0, Solution Manager 7.0 and 7.1, BOBJ EDGE BI 3.1 and 4.0, Content Server 6.40 Proficiency: Project experience Development Tools / Languages: Tools: Software Provisioning Manager (SWPM), Software Update Manager (SUM), Installation Master (SAPINST), EHP INSTALLER (SAPehpi) Proficiency: Project experience Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1) Page 10 of 10 Hardware / Operating Systems: Hard Ware: HP ( Blade Server), SUN (M4000 SUN SPARC) Operating System: HP-UX B.11.31, Sun Solaris 10.2, Windows Server 2008 R2 Proficiency: Project experience Middleware / Databases: Databases: Oracle 9i, Oracle 10g, Oracle 11g Proficiency: Project experience General Tools: Microsoft Excel, Microsoft Word, Microsoft Power Point Proficiency: Project experience Education Bachelor in Computer Science and Engineering from I.E.T.E, New Delhi Foreign Language Skills English – Proficient for Business Internal References Name, Mithilesh Patel (US - Hyderabad) Office, +1 6157186766, Email : [email protected] Name, Bhupesh Kuttuva (US - Bengaluru) office, +1 6782991224, Email : [email protected] Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
© Copyright 2026 Paperzz