Practioner Name - SAP India Certification

Resume Status: Locked
Dusmanta Kumar Rout
Consultant
Deloitte Consulting India Pvt Ltd.
Bengaluru, India.
Work: +916152095951
Mobile: +91 9742634258
Instructions
Summary of Experience and Qualifications
Dusmanta Kumar has over 8 years of IT experience, which includes over 6.3 years of
experience with all aspects of BASIS, Security and Netweaver Administration and over 2.04
years as system Administrator.











Currently associated with Deloitte Consulting India Pvt. Ltd. , Bangalore
as BASIS Consultant
SAP HANA Installation, Configuration and Post System Installation activities.
HANA System replication, DR/ HA setup.
BW Migration to HANA DB using DMO.
Performed SAP HANA SPS Upgrades using HLM/PLM.
HANA Backup and Recovery.
HANA Backup Configuration.
SLT replication setup and configuration to HANA on sidecar configuration.
Bouncing of SAP HANA System Using both Command Line and Studio
Monitoring of SAP HANA system using administration perspective in HANA
studio.
HANA Alert handling and few areas on performance tuning.

Hands-on experience in SAP R/3 4.7EE, ECC 6.0 Basis modules on oracle9i,
oracle10g, oracle 11g Databases. SAP NETWEAVER 7.0 EHP1, Enterprise Portal 7.0
and 7.31, Solution Manager 7.0 and 7.1, Business Intelligence 7.0, BOBJ
EDGE BI 3.1 and 4.0, Content Server 6.40

Client Exposure: Wal-Mart Stores, Inc, Reliance Capital, Raymond Ltd, Central Electricity
Board (Mauritius), Bengaluru International Airport (BIAL), Kazstroy Service (KSS), Hero
Moto Corp Ltd (HMCL).
Page 2 of 10
Deloitte Experience :
Industry: Retail
Service Area: Technology
Service Line: Application Management Service
Enter your Role: BASIS Consultant
Months: 2 Years 5 months
Enter Generic Client Description:
Client is an American public multinational corporation that runs a chain of large discount
department stores and a chain of warehouse stores. The company headquartered in
Bentonville, Arkansas, is the largest majority private employer and the largest grocery
retailer in the United States. The component includes SAP ECC, Net weaver (BI, PI, and EP),
Solution Manager
Role:

















SAP HANA Installation, Configuration and Post System Installation activities.
HANA System replication, DR/ HA setup.
Performed SAP HANA SPS Upgrades using HLM/PLM.
HANA Backup and Recovery.
SLT replication setup and configuration to HANA on sidecar configuration.
Bouncing of SAP HANA System Using both Command Line and Studio
Monitoring of SAP HANA system using administration perspective in HANA
studio
Monitoring the production and non-production R/3, PI, BI, EP SAP systems.
Client administration
Perform switch over of DB2 threads in failover situations through DB2 on
Z/OS
Analyzing and providing prompt solutions for the everyday TiDAL Alerts/Pages
including RCA.
Performing IPL (initial program loading) on the LPARS on mainframe Z/OS
servers. This includes switching of the central services from one LPAR to
other in a clustered environment.
Resolving daily pages received from user (internal or external), Ca-7.
System clone
Kernel update (USS/AIX)
SMD installation
EP support pack installation.
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 3 of 10
Previous Experience:
Industry: Financial services
Service Area: Technology
Service Line: Application Management Service
Enter your Role: BASIS Consultant
Months: 8 months
Enter Generic Client Description:
Reliance Capital Limited (RCL) is a financial services company. Reliance Capital ranks
among the top 3 private sector financial services and banking companies, in terms of net
worth in India.
Reliance Capital has interests in asset management and mutual funds; life and general
insurance; commercial finance; equities and commodities broking; wealth management
services; distribution of financial products; private equity; asset reconstruction;
proprietary investments and other activities in financial services.
Enter Project Description: Version upgrade
This is a version upgrade project. RCL have a robust SAP practice, it has a three system
landscape with various SAP modules closely integrated i.e. ECC, BI, EP, PI and Solution
Manager. As RCL is a financial services company, the business downtime has a direct
impact on business loss. The business downtime was planned carefully to minimize the
loss of business hours.
Role:

Performed Hardware sizing to determine the Hardware required for Technical
upgrade from SAP ECC6.0 to ECC6.0 EHP6 and EP 7.0 to EP 7.31 systems for
Development, Quality and Production environment.

Performed version upgrade from ECC 6.0 to ECC 6.0 EHP6 and EP 7.0 to EP 7.31
for Development, Quality environment.

Installed SBP (SAP bundle Patches) for Oracle and fine tune the oracle parameters
to improve system performance during upgrade.

Built the mock (Test) sever with production data to simulate production scenario
in a Test environment to estimate system downtime.

Performed Database refresh of QAT environment with production data prior to
QAT upgrade to estimate minimal production downtime.

Performed EP 7.0 upgrade in two phases. In first phase Business Package (BP)
components are upgraded to EHP4 and in the second phase 7.31 version upgrade
is carried out.

Imported WDA ESS and MSS packages and Buyer 1.6 business package. Assigned
WDA roles to all users in 7.31 environments.

Involved with OS and other teams to optimize the upgrade performance and
minimize the down time.

Performed various post upgrade performance optimization activities based on SAP
recommendation and EWA recommendation.

Involved in planning and successfully executing all the key phase of the project.
Technical Environment: ECC 6.0 ECC 6.0 EHP6, EP 7.0, EP 7.31, Solman 7.1, Sun
Solaris 10.2, Oracle 11g, BI 7.
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 4 of 10
Industry: Textiles and Engineering Service Area: Technology
Service Line: Application Management Services
Enter your Role: Consultant
Months: 5 Months
Enter Generic Client Description: Hardware migration
Raymond Limited, Incorporated in 1925. Raymond Group is one of India's largest
branded fabric and fashion retailers. It is one of the leading, integrated producers of
suiting fabric in the world, with a capacity of producing 31 million meters of wool and
wool-blended fabrics.
The Group owns apparel brands like Raymond, Raymond Premium Apparel, Park Avenue,
ColorPlus and Parx. In addition, the Group also has business interests in readymade
garments, designer wear, cosmetics and toiletries, engineering files and tools,
prophylactics and air charter operations.
Enter Project Description:
This is a hardware migration project in WINTEL environment. The target environment is
based on multisid feature (Multi Instance Clustering) which is available in Windows
Server 2008 (R2) operating system.
Role:

Involved in planning, sizing and coordinating with Microsoft team to materialize a
successful hardware migration on multi SID environment with cluster environment

Windows Server 2008 (R2) operating system with its Windows Server Failover
Clustering feature supports multiple sapmnt file shares. This makes the
installation of multiple clustered SAP systems in one failover cluster.

Worked closely with internal Basis team, various process owners and team leads
to plan the down time and understand business impact of various business
processes.

Worked closely with internal Basis team, Server team and Network team to plan
and optimize the migration process and minimize the duration of downtime.

Involved in understanding and analyzing the architecture, how the SAP system
are integrated with one another as well as how they are integrated with various
non-SAP systems.

Various landscapes that are part of hardware migration involves Solution Manager
7.0, ECC 6.0, Enterprise Portal (EP), Business Intelligence (BI) and Exchange
Infrastructure (XI)

Used Standard System Copy/Migration (load-based) and Homogeneous System
Copy procedure during migration.

Involved in optimizing the system performance on post hardware migration

Carried out all post migration activities that is reconfiguring and regenerating the
affected ABAP and JCO RFCs, optimizing JAVA stack memory parameters,
applying permanent license, reconfiguring TMS, reconfiguring UME for Enterprise
portal (EP), registering new servers to SLD, installing web dispatcher and
configuring load balancing etc.

Involved in knowledge transfer and training the internal team to handover the
Severs.
Technical Environment: ECC 6.0, EP 7.0, BI 7.0, XI (PI) 7.0, Solution Manager 7.01,
Windows 2008 R2 and SQL Server 2008
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 5 of 10
Industry: Energy
Service Area: Technology
Service Line: Application Management Services
Enter your Role: Consultant
Months: 6 Months
Enter Generic Client Description: Technical Upgrade
The Central Electricity Board (CEB) is wholly owned by the Government of Mauritius
and reporting to the Ministry of Energy and Public Utilities. CEB is Established in 1952,
the CEB's business is to “prepare and carry out development schemes with the general
object of promoting, coordinating and improving the generation, transmission,
distribution and sale of electricity" in Mauritius.
CEB produces around 40% of the country's total power requirements. It is the sole
organization responsible for the transmission, distribution and supply of electricity to the
population.
Enter Project Description
This is technical upgrade project form R/3 4.7 EE to ECC 6.0 Ehp5 along with hardware
migration, Unicode conversion and Oracle database upgrade. The business down time
was critical as its being directly reported to Ministry of Energy and published in national
newspaper for general public.
Role:

Performed Hardware sizing to determine the Hardware required for Technical
upgrade from SAP R/3 4.7EE to ECC6.0 EHP5 system for Development, Quality
and Production environment

Migration of systems from old hardware environment to new hardware
environment with SAP R/3 4.7EE application, which involves migration of
Production Server from a non-Cluster environment to new Cluster environment.

Built the mock (Test) sever with production data to simulate production scenario
in a Test environment to estimate system downtime.

Performed Database refresh of QAT environment with production data prior to
QAT upgrade to estimate minimal production downtime.

Involved in defining the Veritas Cluster HA file system.

Performed version upgrade from R/3 4.7 EE to ECC 6.0 EHP5 for Development,
Quality and production Server with Add-on Software Component IS-U.

Performed Unicode Conversion for three system land scape, where the production
server database size was 1.8 TB.

Performed Oracle database upgrade from 9i to 11g, which involves UNDO table
space migration.

Performed Solution Manager 7.1 installation and configure MOPZ to generate
target stack file and download the required media.

Involved with OS and other teams to optimize the upgrade performance and
minimize the down time.

Involved in various post upgrade performance optimization activities based on
SAP recommendation and EWA recommendation.
Technical Environment: SAP R/3 4.7 EE, ECC 6.0 EHP5, Solution Manager 7.1, Oracle
9i, Oracle 11g and Sun Solaris 10.2
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 6 of 10
Industry: Airport Management Service Area: Technology
Service Line: Application Management Services
Enter your Role: Consultant
Months: 3 months
Enter Generic Client Description: Implementation
Bengaluru International Airport (BIAL) is an international airport serving the Indian
city of Bangalore.
It was the fourth busiest airport in the country in overall passenger traffic (12.69 million)
and fifth busiest in international passenger traffic.
It is host to 10 domestic airlines and 21 international airlines connecting the city to about
50 destinations across India and rest of the world.
Enter Project Description:
This is Performance Management System (PMS) implementation project. The scope of
work involves defining the landscape, sizing the new hardware, installing EP 7.01 (PMS),
Go-Live and post Go-live support
Role:

Performed Hardware sizing in the market place using the Quick seizer tool to determine
the Hardware required for installing Enterprise Portal (EP) system for Development and
Production environment.
 Done post installation activity using Config Toll and Visual Admin Tool
 Applied support packages through JAVA Support Package Manager (JSPM)
 Maintained connectivity between Enterprise Portals EP 7.0 and SAP ERP systems using
Single Sign on (SSO)
 Configure Active Directory (AD) as UME engine for portal. Two different domain (Active
Directory) are integrated as UME for portal.
 Assigned required portal roles to users.
Technical Environment: ECC 6.0 Ehp4, EP 7.1, Solution Manager 7.0, Windows 2008 R2
and Oracle 11g.
Industry: infrastructure development
Service Area: Technology
Service Line: Application Management Services
Enter your Role: Associate Consultant
Months: 11 months
Enter Generic Client Description: End-to-End Implementation
KazStroyService (KSS) established in July 2007, is a wholly owned subsidiary of
KazStroyService, Kazakhstan, and has its corporate office located in Gurgaon, near New
Delhi, India.
KSS was established to meet the growing demand of infrastructure development in the
fields of cross-country gas, hydrocarbon and water pipelines, Off-site works of refineries,
petrochemicals, and allied plants and LNG terminals in India.
Enter Project Description:
This is a complete end-to-end implementation project. The scope of work starts with
defining the landscape, System sizing, installation, integrating various components,
defining the day-to-day technical process, performance optimization, defining system
security, GO-LIVE and post golive support.
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 7 of 10
The various components that are part of the land scape are ECC 6.0 Ehp4, EP 7.01, BI
7.01, BO 3.0, Content Server 640 and Solution Manager 7.01
Role:
E.C.C 6.0 EHP4:










Performed Hardware sizing to determine the Hardware required for installing
ECC 6.0 EHP4 system for Development, Quality and Production environment.
The Production environment is on high availability cluster with multiple
application servers.
Done the post installation activities in DEV, QAS and PRD Systems which
includes importing profiles, applying permanent license, configuring TMS,
client administration, support package, SPAM and Kernel upgrade etc
Performed Printer installation (Frontend and Local)
Performed SMTP mail configuration through SCOT
Performed Adobe document service (ADS) installation and configuration for
DEV, QAT and PRD environment.
Created roles based on core users and functional consultant’s input
Applied Patches, Support Packages, Kernel patches and GUI Patch updates as
and when required
Performed table space administration and maintenance by increasing the size
of table space using BRTOOLS and reorganization of table spaces
Involved in knowledge transfer and training the internal team for Server hand
over.
Business Information Warehouse (SAP BW):



Performed Hardware sizing to determine the Hardware required for installing SAP
BI 7.0 (SAP NETWEAVER 7.0 EHP1 SR1) system for Development, Quality and
Production environment.
Done the post installation activities in DEV, QAS and PRD Systems which includes
importing profiles, applying permanent license, configuring TMS, client
administration, support package, SPAM and Kernel upgrade etc
Integrate BI Server to respective ERP Server (ECC) to fetch data.
Enterprise Portal (EP) 7.0 EHP1:





Performed Hardware sizing in the market place using the Quick seizer tool to
determine the Hardware required for installing Enterprise Portal (EP) system
Done post installation activity using Config Toll and Visual Admin Tool
Applied support packages through JAVA Support Package Manager (JSPM) and SDM
Configure JCORFC connection to various backend systems like ERP, BW
Maintained connectivity between Enterprise Portals EP 7.0 and SAP systems using Single
Sign on (SSO)
Business Object (BOBJ) EDGE BI 3.1:
 Installed BOBJ EDGE BI 3.1 system with support package SP3
 Installed Business Object Integration Kit for SAP and the respective support package
 Installed Business Object Server side components that is CRYSTAL REPORTS 2008,
XCELSIUS ENTERPRISE 2008, LIVE OFFICE XI 3.1
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 8 of 10



Integrate BOBJ EDGE BI 3.1 with BI and ECC server
Installed Business Object client side components on Client machines as and when
required
Configure SAP authentication for Business Object leverage functionality like singlesign-on with Business Object
SAP Content Server (DMS):
 Installed SAP Content Server 6.40 on Windows Server 2008/R2 on data base MAXDB
7.8 for DEV and PRD environment.
 Integrate Content Server 6.40 with IIS 7.5
 Defined content repository in ECC system (For DEV, QAT and PRD environment)
Solution Manager 7.0 EHP1:
 Performed Solution Manager 7.0 EHP1 Installation
 Configured Maintenance Optimizer (MOPZ) to download latest support packages and
patches
 Define the system landscape in SMSY
 Configure Early Watch Alert (EWA) for Production Servers
 As a team member involved in configuration of CHARM and Service Desk technical part.
 As a team member involved in configuration of CHARM and Service Desk technical part.
Define the Transport Management System (TMS) for CHARM
Technical Environment: ECC 6.0 EHP4, Solution Manager 7.01, EP 7.0 Ehp1, BI 7.0 Ehp1,
Content Server 6.40, BOBJ 3.1, Oracle 11g, MAXDB 7.8, IIS 7.5, HP-UX B.11.31 and
Windows Server 2008/R2
Industry: Automobile
Service Area: Technology
Service Line: Application Management Services
Enter your Role: Associate Consultant
Months: 10 months
Enter Generic Client Description: Support
Hero Motocorp Ltd, formerly Hero Honda, is an Indian motorcycle and scooter
manufacturer based in New Delhi, India. Hero MotoCorp is the World's single largest two
wheeler motorcycle manufacturer based in India.
The 2006 Forbes 200 Most Respected companies list has Hero Honda Motors ranked at 108.
Hero Motocorp have a robust SAP practices, it has a three system landscape with various
SAP modules closely integrated i.e. ECC, BI, EP, CRM and Solution Manager.
Enter Project Description:



Performed Oracle Database patch upgrade from 10.2.0.2 to 10.2.0.4 and
applied the respective MOpatches, modified database parameters to optimize
performance
Performed support pack upgrade for both ABAP and JAVA stack in SOLMAN
server
Installed and configure Wily Introscope to monitor the JAVA stack performance
on EP server
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 9 of 10


Performed Security optimization bases on SSO report (SAP Security
Optimization), where more than 400 roles are modified to close the security
loopholes
As part of security optimization some of the profile parameters are modified
along with SAP ROUTER table (tab) to close the security loopholes
Industry: Software services
Service Area: Technology
Service Line: Application Management Services
Enter your Role: System Administrator
Months: 28 months
Enter Generic Client Description: Support
Mindfire Solutions is an India-based offshore software development company providing
customized services and services. Mindfire Solutions is an ISO 9001:2000 certified company
and a Microsoft Gold Certified Partner as well as an Apple Premier Partner. Founded in Delhi
in 1999, it caters to more than 100 clients in the US and Europe.
Enter Project Description:










Creating user accounts, configuring user profiles, creating local and global groups, managing
accounts and domain controllers
Setting up and maintaining the Local Area Network (LAN)
Working with all hardware related issues
Installing the printers
Troubleshooting the issues related to printer
Creating user accounts, configuring user profiles, creating local and global groups, managing
accounts and domain controller
Sharing folders, planning and assigning NTFS permissions
Implementing Security Policies, Auditing Resource Access, System Recovery Functions
Creating and managing users, groups, group policies and domains
Configuring Active Directory, DNS, DHCP, print server in Windows 2000/2003
Used to take backup of user’s data, database and restoring on request
System Experience
Software / Products:
Products:
ERP: SAP R/3 4.7 EE, ECC 6.0, ECC 6.0 EHP4, ECC 6.0 EHP5, ECC 6.0 EHP6
NETWEAVER: Netweaver 7.0 EHP1 and Netweaver 7.31
Components: Enterprise Portal 7.0 and 7.31, Business Intelligence 7.0, Solution Manager
7.0 and 7.1, BOBJ EDGE BI 3.1 and 4.0, Content Server 6.40
Proficiency: Project experience
Development Tools / Languages:
Tools: Software Provisioning Manager (SWPM), Software Update Manager (SUM),
Installation Master (SAPINST), EHP INSTALLER (SAPehpi)
Proficiency: Project experience
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)
Page 10 of 10
Hardware / Operating Systems:
Hard Ware: HP ( Blade Server), SUN (M4000 SUN SPARC)
Operating System: HP-UX B.11.31, Sun Solaris 10.2, Windows Server 2008 R2
Proficiency: Project experience
Middleware / Databases:
Databases: Oracle 9i, Oracle 10g, Oracle 11g
Proficiency: Project experience
General Tools:
Microsoft Excel, Microsoft Word, Microsoft Power Point
Proficiency: Project experience
Education

Bachelor in Computer Science and Engineering from I.E.T.E, New Delhi
Foreign Language Skills

English – Proficient for Business
Internal References Name, Mithilesh Patel (US - Hyderabad) Office, +1 6157186766, Email : [email protected]
Name, Bhupesh Kuttuva (US - Bengaluru) office, +1 6782991224, Email : [email protected]
Copyright © 2007 Deloitte Development LLC. All rights reserved. (r.v.. 9.1)