DATA PROVISION REQUEST This form must be completed by a Registered Participant (Please refer to current list of Registered Participants on the AEMO website) Registered Participant name (in full): Click here to enter text. Registered Participant ACN (or ABN): Click here to enter text. Click here to enter text. Project Name Reason for Data request Purpose: Refer to 3.13.3 k(2) Data requested: (Please check the relevant box) Type of snapshot requested1 Choose an item. Click here to enter text. Choose an item. Please specify other. System Normal Snapshot ☐ System Snapshot ☐ Name of person requesting the data Click here to enter text. Address for invoice: Click here to enter text. Contact Email: Click here to enter text. Contact Phone Number: Click here to enter text. 1 Please refer to Note 1 and Note 2 on page 2 for details Page 1 of 2 Declaration: I hereby declare that I am authorised by the Registered Participant to submit this Data Provision Request on the Registered Participant’s behalf and that the data will be used solely for the purpose described above. Signature: Position Title: Click here to enter text. Name: Click here to enter text. Date: Click here to enter a date. Note: Under 3.13.3(l1) of the NER, AEMO is entitled to charge a fee to recover all reasonable costs incurred in providing information to a Registered Participant. 1. AEMO categorizes load flows into two categories based on system topology they represent. The two categories are: System snapshot based on the system topology at the time of the snapshot. Bus numbers are less consistent between cases (compared to ‘System normal’) as bus numbers are assigned or removed from the case to accommodate the changes in topology. System normal based on a nominated “normal” system topology. These are available for snapshots recorded after summer 2012/2013. They represent the nominal topologies of the various parts of the National Electricity Market (NEM). Bus numbers for these cases are more consistent between cases (compared to ‘System snapshot’). 2. The standard load flows are for National Electricity Market summer high demand, summer low demand, winter high demand, winter low demand, spring high demand, spring low demand, autumn high demand and autumn low demand conditions. These standard load flows are provided for the System Normal configuration only, based on a nominated “normal” system topology at the time. A fee of $500 plus GST will be charged per request for this set of load flows. 3. Other ad hoc data requests will be charged, based on actual hours for preparing the requested information, at $200/hour with a minimum charge of $200. Any ad hoc data request that include load flow snapshot files will be charged at a minimum fee of $500 (all costs are excluding GST). Page 2 of 2
© Copyright 2026 Paperzz