Control Plan Training Control Plans Page 2 Control Plan Control Plans: • • • • • • Control the risks identified in the P-FMEA (High RPNs) A structured approach to control process and product characteristics Focusses on Customer Requirements Assure reaction plans are in place in case of out-of-control conditions Provide a central document for communication of control methods A Control Plan contains following key information: Identification of the control factors The specifications and tolerances The measurement system Sample size and frequency The control method The reaction plan • Control Plans are living documents, just like FMEA’s 3 Page 3 Control Plan, Objectives Objectives of the training: • To understand the use of a Control Plan • To learn the steps to develop a Control Plan • To learn how to link each step in the Control Plan to the FMEA 4 Page 4 Control Plan, Summary Control Plan, a systemic way to Control a process: • Define Characteristics per process step: • Machines, Devices, Jigs and Tools • Product, Process and Special characteristics • Define Methods per process step: • Process and Product Specifications and Tolerances • Measurement and Inspection techniques • Sample size and frequency • Actions that should be taken in case of Non Conformities 5 Page 5 Control Plan, Summary Control Plan, a systemic way to Control a process: • Verify if defined steps are followed • Audit the process by Control Plan on a regular base • Update the Control Plan consistently 6 Page 6 Benefits Control Plan, Inputs Control Plan, inputs might include following tools: • • • • • • • • • • FMEA Flow Chart (process sequence) Lay-out Plan production line Sequence Of Events Part Number/ Tooling / Tool List Assembly Drawing Specifications/ Dimensions/ Tolerances CTQ List Process Map Historical OMS 7 Page 7 Control Plans, Planning A build B build Pilot Drawing Issue part approval form Tool development FMEA + control plan Fit / performance 1. Purchasing Source SQE QA Conditional approval 2. HVPT approval 3. Part approval SQE approval Quality and capacity confirmation HVPT process approval Issue HF PA requirements HF proto part approval MF and LF part receipt HF full part approval (OT/OP) Inspection OK – NOK send CAR’s VCB approval Page 8 SOP Control Plans Prototype Control Plan Number Pre-launch Production Key Contact/Phone Date (Original) Part Number/Latest Change Level Core Team Date (Revised) Part Number / Description Plant / Supplier Approval Date Customer Eng.'s Approval / Date (if Required) Other Approval / Date (if Required) Customer Quality Approval / Date (if Required) Plant / Supplier Part / Process Number 1 Supplier Code Process Name / Operation Description Machine Device Jig. Tools for Manufacturing 2 3 Characteristics No. 4 Product Process 5 Special Characteristics Product/Process Class Specification tolerance 6 A B Operation Characteristics 7 8 Methods Evaluation Measurement Technique Page 9 Size Freq. 9 10 C Methods Advanced Product Quality Planning (APQP) Reference Manual, QS-9000 Reaction Plan Sample Control Method 11 12 D Reaction Plan Control Plans What is being done? A Operation PART/ PROCESS NUMBER LTVL010 PROCESS NAME/ OPERATION DESCRIPTION 8416010, FRAME, 1x MACHINE, DEVICE JIG, TOOLS FOR MFG. 1 1. Part/Process Number: • Usually referenced from the process flow chart, PFMEA or Tool sheets 2. Process Name/Operation Description: • Identify the process/operation that best describes the activity being addressed (e.g. work elements) • Use verb / noun format 3. Machine, Device, Jig, Tools for Manufacturing: • Identify the processing equipment required. (e.g.. machine, device, jig power tools, assist arms, conveyors, etc.) Page 10 Control Plans What is Important? B Characteristics MACHINE, DEVICE JIG, TOOLS FOR MFG. 1 CHARACTERISTICS NO. 1 PRODUCT Appearance PROCESS Inspect the frame 4. Number: • Identifies the cross reference number from the applicable documentation. 5. Product Characteristic: • Distinguishing features and/or attributes 6. Process Characteristic: • Characteristics of the process 7. Special Characteristic: • key processes (e.g. Delta K, QS) Page 11 SPECIAL CHAR. CLASS Y Control Plans Characteristics: Identify Product and Process characteristics for each Control Plan step PRODUCT CHARACTERISTIC • physical properties of the part • Identified important customer characteristics (CTQs and Delta-K) Examples: length, width, tensile strength, torque, weld integrity, color, alignment, etc. A description of the state of the component or vehicle after the particular operation is completed Page 12 PROCESS CHARACTERISTIC • identify characteristics, which when controlled, reduce variation in product characteristics Examples: pressure, temperature, force, feed rate, RPM (torque), etc. Related to product characteristics Control Plans C Methods What is the Means for Controlling? 8. Product/Process Specification: • Specifications/tolerance for a part or process. (eg. may be obtained from various engineering documents) 9. Evaluation/Measurement Technique: • Identifies the measurement system being used to measure product/process characteristics. (eg. gages, fixtures, test equipment, blocks, go/no go, etc) 10 / 11. Sample Size/Frequency: • List sample size and frequency to perform evaluation. (eg. size: 4 pieces / frequency: fifth time per shift) METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE No damage Page 13 EVALUATION/ MEASUREMENT TECHNIQUE Visual Inspection SAMPLE SIZE FREQ. 1 1/Works hop CONTROL METHOD OMS REACTION PLAN Inform Trainer Control Plan, Benefits Sample size and frequency • Until a process is Capable (Cpk 1.33), 100% Inspection is required • If process is Capable, define Sample Size and Frequency reflecting acceptable risk 10-nov-08 9-nov-08 8-nov-08 7-nov-08 6-nov-08 5-nov-08 4-nov-08 Xbar-R Chart of x 1 Mee-1248 Mee-1251 1 2 3 1 Mee-1291 2 2 1 Mee-1256 3 4 5 6 3 1 SPC Chart 20 Sample Range 1 LCL=27.82 2 Sample Mee-1289 UCL=20.15 15 10 _ R=6.17 5 0 Mee-1257 LCL=0 1 Mee-1258 2 3 4 5 6 Sample 1 4 Mee-1260 OK 35 1 Mee-1255 Total NOK __ X=39.42 40 Counting Defects Mee-1253 Mee-1259 45 30 Mee-1250 Mee-1288 UCL=51.01 50 Sample Mean Mee-1247 3-nov-08 Station: Install O-ring C/R into C/C S/R assy S/R height V-coupling assy Act assy Lever welding Lever welding Act measurement Engraving Rev & K-ring check Weld-assy-act C/C angle check V-coupl-lever-act 2-nov-08 1-nov-08 • Use Six Sigma tools and techniques to control the Process 2 3 220 2 1247 450 0 300 0 7 1 2 0 4 350 455 275 400 430 C-Graph of Defects Page 14 Capability Graph 1 4 Control Plans, Control Method C Methods 12. Control Method: • Brief description of how the operation will be controlled • When selecting the method of control, focus on: • process control rather than product control • prevention rather than detection • targeting nominal rather than specification limits Examples: - Check sheets (weld, quality, tool, - Variation control charts material, etc) - Error/mistake proofing - Preventative tooling maintenance - SPC charts METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE No damage Page 15 EVALUATION/ MEASUREMENT TECHNIQUE Visual Inspection SAMPLE SIZE FREQ. 1 1/Works hop CONTROL METHOD OMS REACTION PLAN Inform Trainer Control Plans, Reaction Plan D Reaction Plan 13. Reaction Plan: • Specifies who to inform to make a decision or what to do when a process goes out of control • Written for people closest to the process (e.g. replace a drill) • Review systemic root cause and update the FMEA Examples: - Call supervisor - 100% Inspection until the process is back in control - Calibrate equipment METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE No damage Page 16 EVALUATION/ MEASUREMENT TECHNIQUE Visual Inspection SAMPLE SIZE FREQ. 1 1/Works hop CONTROL METHOD OMS REACTION PLAN Inform Trainer Control Plans, Plug Example Control Plan Number Key Contact/Phone Date (Orig.) Wytse Zijlstra 05/10/2016 Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd.) PL30 Wytse Zijlstra, Stephen McLaughlin Part Name/Description Supplier/Plant Approval/Date 1 Plug assembly Supplier Code Hyster-Yale Group PART/ PROCESS NUMBER N/A N/A Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.) H-Y PROCESS NAME/ OPERATION DESCRIPTION PL-10 1010; 1 Plug face PL-10 1345; 1 Cable Grip. 1060; 2 cable screw s PL-10 Deliver batch of plugs to station 2 PL-20 MACHINE, DEVICE JIG, TOOLS FOR MFG. N/A CHARACTERISTICS NO. PRODUCT PROCESS SPECIAL CHAR. CLASS METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE Select 1 plug face w ith inside facing operator 1 Code: PA320, White Bar Grip Rew ireable 13A Resilient Plug Top Assembly Fit 1x Cable Grip using 2 cable screw s. Screw hand tight Y Ensure Cable Grip screw s go through back of cable grip 6789; 1 Fuse holder 2 Assembly Fit fuse holder Y PL-20 1011; 1 Live pin 3 Assembly Fit 1 Live pin Y PL-20 1213; 1 Neutral pin w ith black band on pin 1415; 1 Earth pin 4 Assembly Fit 1 Neutral pin Y Assembly Fit 1 Earth pin PL-20 1617; 1 fuse 13 Amp 1616; 1 fuse 5 Amp 5 Assembly Fit 1 fuse Check correct location of the fuse holder Pin has fuse clamp on top Check if black band on pin Check if pins are in correct position 13 Amp fuse 5 Amp for Euro PL-20 Deliver batch of plugs to station 3 Box PL-30 2022; 3 screw s to connect w ires Screw driver PL-30 Deliver batch of of plugs to station 4 PL-40 1819; Plug Front PL-40 2013; Wiring diagram PL-40 Deliver batch of plugs to QA PL-20 1 Customer Quality Approval/Date (If Req'd.) 15/10/2016 Supplier/Plant Date (Rev.) SAMPLE 100% OMS Inform Trainer Hand tight 100% OMS Adjust/ re-check OMS Inform Trainer Visual Inspection 100% OMS Adjust/ re-check Visual Inspection 100% OMS Adjust/ re-check Visual Inspection 100% OMS Adjust/ re-check Visual Inspection 100% OMS Adjust/ re-check Visual Inspection 100% OMS Adjust/ re-check OMS Inform Trainer OMS Adjust/ re-check SIZE Box 6 Assembly 7 Assembly 8 Assembly Box Page 17 Deliver batch of plugs to station 3 Fit 1 screw to Neutral pin, Earth pin and Live pin and tighten hand tight w ith screw driver Y REACTION PLAN EVALUATION/ MEASUREMENT TECHNIQUE Visual Inspection FREQ. CONTROL METHOD Y Ensure all screw s are nipped tight and unable to undo by hand Hand tight 100% OMS Inform Trainer Fit Plug Front Y Hand tight 100% OMS Adjust/ re-check Fit w iring diagram Y Ensure all screw s are tight Ensure text is readable Visual Inspection 100% OMS Adjust/ re-check OMS Inform Trainer Control Plans, Next Steps Next Steps to H-Y Suppliers: 1. 2. 3. 4. 5. 6. 7. 8. 9. Know your customers’ expectations - CTQ’s (Critical to Quality Characteristics) Have a defined and documented production process (SOE) Follow 5S Principles Employ a formal training system Involve the people on the shop floor Audit the production process constantly Manage supplied parts and control supplier performance Measure/monitor key quality performance indicators Use an effective Corrective & Preventative Action Process FMEA and Control Plans are mandatory for PPAP submission level 3. Page 18 Control Plans, Next Steps Page 19 Quality Focus Day Workshop List of acronyms: CTQ: Critical To Quality, a characteristic judged to be important to the fit and function of a component or assembly as well as customer satisfaction FMEA: Failure Mode and Effect Analysis ICAM: Interactive Corrective Action Management OMS: Operational Method Sheet Off Tool: (Production Tooling) - When a part is said to be “Off Tool” it is required that the part be manufactured using the exact tooling which will be used for long-term production. This does NOT mean the parts were manufactured from tooling that is “like” or “similar” to the intended production tooling. Off Process:(Production Process) – When a part is said to be “Off Process” it is required that the part be manufactured and tested using the exact process that will be used for long-term production. This does NOT mean the parts were manufactured using a “like” or “similar” or less than 100% completed process. P.A.: Part Approval process to determine if part characteristics and specifications are understood and met by the supplier. PCR: Process Change Request PFD: Process Flow Diagram SQM: Supplier Quality Manual QFD: Quality Function Deployment QS-9000, PPAP: Product Part Approval Process QS-9000, APQP: Advanced Project Quality Plan Page 20
© Copyright 2026 Paperzz