Bunker Requisition Form
The Chief Engineer
EMMA MAERSK
MV/SS :
Part 1 of 2
Date :
Location :
30-03-2014
ROTTERDAM
Dear Sir,
We have been nominated to supply you the following grade (s) of bunkers:
1.200
Tonnes Marine Fuel Oil of ISO 8217 grade
Tonnes Marine Fuel Oil of ISO 8217 grade
Tonnes Marine Diesel Oil/Gas Oil of ISO 8217 grade
Tonnes Marine Fuel Oil as per agreed specifications
RMK 500 HSFO
We undertake to supply you with the above grade (s) of bunkers. Some basic characterstics of
the bunkers are as folows:
Grade
Kinematic
Density@ 15
Water
Flash
Sulpher
Pour Point
Viscosity@ 40 or
°C, Kg/m³
Content % Point °C
Content %,
°C
50 °C, mm²/s
V/V
m/m
500,00
1.009,8
<0,5
60,00
3,30
<30C
RMK 500
Average
Delivery Temp
°C
48,0
HSFO
The delivery sequence is as follows:
Grade
Delivery Sequence
RMK 500 HSFO
1)
2)
3)
4)
5)
6)
7)
8)
9)
Maximum line
Pressure ( bar )
bar
Supplier Pumping Rate
( Tonnes per hour )
m³/hr
Required Receiving Rate
( Tonnes per hour )
m³/hr
Will you witness the opening and closing gauge of our tanks?
Yes
No
Will you witness our meter readings?
Yes
No
Will you witness sampling?
Yes
No
What method will be used for clearing hose content at the end of bunkering?
Line clearing into the vessel’s tank(s) and drain back / drain back
Location of sampling point
X
Bunker Tanker manifold
XX Vessel manifold
XX Continuous drip
Sampling method
Automatic
NA
NA
Other:
Other:
Do you need One sample bottle filled for fuel testing analysis?
Yes / No
Will you provide this One empty sample bottle?
Yes / No
Do you need a copy of the Matrial Safety Data Sheet (MSDS) for the products
we are supplying?
Yes and I acknowledge receipt
NO, I have documents on board.
Remarks
Prepared by:
Acknowledged by:
Signature of Cargo Officer
Name in Full:
RICHARD
Signature of Chief Engineer
Name in Full:
( Block letters )
Date:
Bunker Tanker’s Stamp:
30-03-2014
( Block letters )
Date:
Vessel’s Stamp:
Printed by Port Traveling Software
20140330
30-03-2014
Bunker Requisition Form
The Chief Engineer
EMMA MAERSK
MV/SS :
Part 2 of 2
Date :
Location :
30-03-2014
ROTTERDAM
Dear Sir,
We have been nominated to supply you the following grade (s) of bunkers:
1.200
Tonnes Marine Fuel Oil of ISO 8217 grade
Tonnes Marine Fuel Oil of ISO 8217 grade
Tonnes Marine Diesel Oil/Gas Oil of ISO 8217 grade
Tonnes Marine Fuel Oil as per agreed specifications
RMK 500 HSFO
We undertake to supply you with the above grade (s) of bunkers. Some basic characterstics of
the bunkers are as folows:
Grade
Kinematic
Density@ 15
Water
Flash
Sulpher
Pour Point
Viscosity@ 40 or
°C, Kg/m³
Content % Point °C
Content %,
°C
50 °C, mm²/s
V/V
m/m
500,00
1.009,8
<0,5
60,00
3,30
<30C
RMK 500
Average
Delivery Temp
°C
48,0
HSFO
The delivery sequence is as follows:
Grade
Delivery Sequence
RMK 500 HSFO
1)
2)
3)
4)
5)
6)
7)
8)
9)
Maximum line
Pressure ( bar )
bar
Supplier Pumping Rate
( Tonnes per hour )
m³/hr
Required Receiving Rate
( Tonnes per hour )
m³/hr
Will you witness the opening and closing gauge of our tanks?
Yes
No
Will you witness our meter readings?
Yes
No
Will you witness sampling?
Yes
No
What method will be used for clearing hose content at the end of bunkering?
Line clearing into the vessel’s tank(s) and drain back / drain back
Location of sampling point
X
Bunker Tanker manifold
XX Vessel manifold
XX Continuous drip
Sampling method
Automatic
NA
NA
Other:
Other:
Do you need One sample bottle filled for fuel testing analysis?
Yes / No
Will you provide this One empty sample bottle?
Yes / No
Do you need a copy of the Matrial Safety Data Sheet (MSDS) for the products
we are supplying?
Yes and I acknowledge receipt
NO, I have documents on board.
Remarks
Prepared by:
Acknowledged by:
Signature of Cargo Officer
Name in Full:
RICHARD
Signature of Chief Engineer
Name in Full:
( Block letters )
Date:
Bunker Tanker’s Stamp:
30-03-2014
( Block letters )
Date:
Vessel’s Stamp:
Printed by Port Traveling Software