Problem 4.2: Part (a) Take wash order mix 6/1-2 doz spoon load bake & set 2 TFT = 6+2+1+9+5+2+1 = 26 1 unlo- cool pack ad 9 get pay 5 2 1/order Part (a): Gant Chart and the theoretical flow time for 1 doz orders Take wash order mix spoon load bake unlo- & set 6/1-2 doz 2 wash cool pack get ad 1 pay 9 5 2 1/order spoon mix l u s l pack g p bake cool 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Part (b): general explanations; mix can handle 2 doz, oven 1 doz Take wash order mix 6/1-2 doz spoon load bake & set 2 1 unlo- cool pack ad 9 get pay 5 2 1/order Flow unit = 1 order of 2 dozen. Certain activities can be performed in parallel. For example, while the oven is baking the first dozen, You can spoon the dough for the second dozen into another tray. Therefore, the flow time of such an order is not simply the sum of the activity times. A useful tool is a Gantt chart that shows the times during which different resources of interest are occupied for various activities. The dough for the 2 dozen cookies is mixed by You in 6 minutes and subsequently you spoon dough for 1 dozen in 2 minutes. Therefore in the 8th minute, the RM is ready to load the oven and set timer, which takes 1 minute. The oven starts baking the first dozen at the 9th minute and completes baking at the 18th minute. Meanwhile, You spoon the second dozen into another tray. At the 18th minute, the RM unloads the first tray from the oven and loads the second tray into the oven and sets the timer. So the second dozen starts baking at the 19th minute. While the second dozen bakes, the first dozen cookies cool and RM packs them into a bag, which takes a total of 7 minutes. At the 28th minute the second dozen finishes baking at which time the RM unloads the tray. After cooling for 5 minutes, the RM packs the second dozen in 2 minutes by the 35th minute. Finally, payment for the order and delivery to customer takes place in the 36th minute. The theoretical flow time for an order of 2 dozen cookies is 36 minutes. Part (b): Gant Chart and the theoretical flow time for 2 doz orders Take wash order mix spoon load bake unlo- & set 6/1-2 doz 2 wash spoon cool pack get ad 1 pay 9 5 2 1/order spoon mix l u l s l s pack u l bake bake cool cool 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Part (b): Gant Chart and the theoretical flow time for 2 doz orders (cont.) Take wash order mix spoon load & set 6/1-2 doz 2 1 2 pack g p cool 31 32 33 34 35 bake 36 37 38 39 40 unlo- cool pack ad 9 get pay 5 2 1/order Part (b): CPM Take wash order mix spoon 6/1-2 doz 2 spoon load bake & set 2 unlo- cool pack ad 1 9 5 2 get pay 1/order load bake & set 1 unlo- cool pack ad 9 5 2 Part (b): CPM 0 0 Take order 0 6 wash 6 spoon 8 mix 6/1-2 doz 8 spoon 2 1018load 10 18 2 28 28 19 19 bake unlo- & set 28 28 33 33 cool 35 pack ad 1 9 5 35 2 35 25 36 get pay 1/order 8 load 9 9 18 18 bake & set 1 unlo- 18 18 23 23 cool 25 pack ad 9 5 2 Forward Path Max = 30 35 10 35 30 20 35 5 Part (b): CPM 0 0 Take 0 6 wash order 6 spoon 8 mix 0 0 8 0 spoon 6/1-2 doz 6 6 2 18 10 load 10 18 18 16 8 bake 1 28 28 unlo- & set 18 2 28 28 19 33 33 cool 35 pack ad 19 19 9 28 28 28 28 5 33 33 2 35 35 25 8 load 9 9 bake 1818 & set 8 1 18 18 23 23 18 unlo- cool 25 pack ad 9 9 9 18 18 18 28 5 33 33 2 35 35 36 get 35 pay 1/order 36 Backward Path 30 Min = 35 30 35 30 30 45 5 Part (b1): theoretical flow time when buying a second oven with 1 doz capacity Take wash order mix spoon load bake unlo- & set 6/1-2 doz 2 wash spoon cool pack get ad 1 pay 9 5 2 1/order spoon mix l l u u s s l l pack g p bake bake cool 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 cool 20 21 22 23 24 25 26 27 28 29 Part (b1): CPM spoon load bake & set 2 1 unlo- cool pack ad 9 5 2 get Take wash order mix 6/1-2 doz spoon pay 1/order 2 load bake & set 1 unlo- cool pack ad 9 5 2 Part (b2): theoretical flow time when buying a large oven with 2 doz capacity Take wash order mix spoon load bake unlo- & set 6/1-2 doz 2 wash spoon cool pack get ad 1 pay 9 5 2 1/order spoon mix l u s l pack g p bake cool 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 We do not need CPM since activities are sequential 19 20 21 22 23 24 25 26 27 28 29 30 Part (b3): theoretical flow time when buying a fast oven with 1 doz capacity Take wash order mix spoon load bake unlo- & set 6/1-2 doz 2 wash spoon cool pack get ad 1 pay 9 5 2 1/order spoon mix l u l s l s pack u 3 4 5 6 7 8 9 10 p bake cool 2 g l bake 1 pack 11 12 13 14 15 16 cool 17 18 19 20 21 22 23 24 25 26 27 28 29 CPM is the same as the CPM for original case, just bake time is 6 min instead of 9 min. 30 Trade-off Analysis No Investment Second Oven Large Oven Fast Ovens 36 28 30 30 The second oven (a) leads to the shortest flow time (b) Perhaps is cheaper than a large oven or 2 fast ovens
© Copyright 2026 Paperzz