In planning a successful and safe event, responsible risk management is an obligation. To understand the scope of safety issues associated with live performance events refer to the LPA Safety Guidelines for the Entertainment Industry. EVENT SUMMARY PRODUCER / PRESENTER: EVENT: PRODUCTION / TECH MANAGER: VENUE: CONTACT NUMBER: BUMP IN DATE: START TIME: EMAIL: OHS BRIEFING DATE: MEET TIME: STAGE MANAGER: EVENT OPENS DATE: START TIME: CONTACT NUMBER: BUMP OUT DATE: START TIME: EMAIL: TRANSPORT: NAME OF PERSON(S) WHO CONDUCTED THIS EVENT RISK ASSESSMENT: VERSION NUMBER: VERSION DATE: REVIEW DATE: ..BRIEF DESCRIPTION OF EVENT: DESIGN ELEMENTS SUMMARY: Please insert plan or production picture if available if other please type here FRONT OF HOUSE WARNINGS: SPECIAL PERFORMANCE CONDITION/S : Please note: The Hirer’s event risk assessment must be provided to the Venue Management no later than two weeks prior to bumping in the event. REGISTER OF EVENT RISKS Lacerations Trip Slip & Fall RISK LEVEL LIKELIHOOD EXISTING CONTROL MEASURES Adequate briefing. Toolbox talks. Crew, Cast and Musicians that are familiar with the site and safety issues. Bruises 1 RISK RATING with additional controls CONSEQUENCE RISKS RISK LEVEL HAZARDS LIKELIHOOD No CONSEQUENCE RISK RATING with existing controls ADDITIONAL CONTROL MEASURES TO BE ACTIONED BY Management Supervisors Staff vigilance Adequate work lighting during bump in/out and through rehearsals. Sprains 3 C S Fractures Brain Injury Sufficient house lighting to allow safe audience ingress & egress. House lights illuminated promptly post-performance Deaths Walk through checks and good housekeeping Bruises All production staff to be made aware of the hazard. Lacerations 1.1 Sprains 3 Open Pit Fractures Brain Injury Deaths C S Pit opening to have a net (if possible) Front edge of stage to be clearly marked Management Supervisors Staff Vigilance 3 D M SM, ASM, Cast, Crew and Orchestra RISK OWNER CHECK SIGN OFF All set construction designed in accordance with safe build and lifting practices in mind Designers Constructors Transporters Management Supervisors Sprains & Strains Manufactures risk assessment instructions and weights clearly labelled Back/Neck Injury 2 Awkward & Heavy Manual Handling Crush injuries 2 C M Puncture Injuries All build and rig participants fully briefed and trained in correct manual handling technique Hernias 2.1 2.2 3 Large Top Heavy Set Trucks Platform Trucks on Wheels Electrical Energy Disabilities Adequate staff numbers and safety supervision Strains Provision and use of mechanical lifting and carrying devices Truck base to be counter weighted to allow for top heavy front of set. Back Neck Injury 2 C M Crush Injuries All personal using the trucks to undergo an induction on the use of the truck 2 D L L All personal to be trained in the use of the trucks Electric shock All operators familiar with safe use of equipment including par safes 3 D M All equipment tagged and tested by qualified electrician SM, ASM, Cast and Crew Supervisors 2 Sprains & Strains Electrocution D Trucks designed with locks and low ground clearance. Crush Injuries Burns 2 E L SM, ASM, Cast and Crew Suppliers Management Venue Electrician Supervisors Correct use of com systems Management Sound Designers Musical Directors Supervisors PA monitoring and adjustment Mental irritation 4 Noise Energy Exposure monitoring and limiting Acute hearing damage 2 C M Orchestra management consulted for noise hazard control use of baffles etc Chronic hearing damage PPE provided and used Use of fire retardant chemical on set Isolation of in-house smoke alarms and brigade-calling alarms during performance and rehearsals Requested and confirmed Respiratory Irritation 5 Burns 4 Fire & Smoke D S Suffocation Incineration Dedicated fire warden delegated to manage as required Management Safety Officers MFB Wardens Supervisors ASM to be on stand by with a fire extinguisher. Management Safety Officers Wardens Supervisors Fire exits/paths of travel not obstructed Safety brief and induction carried out Special Performance Condition approval process Fire drum designed to contain the fire. Separate container in the fire drum houses the file Incineration 5.1 Open Fire Burns 4 D S Fire blanket located on back of the drum. Water on stage in a bucket next to fire drum Suffocation 4 E S Safety Officer to be made aware when fire lit and extinguished SM, ASM and Cast involved Cast member in charge of the lighting of the fire to be briefed on proper way to extinguish the flame if needed. Irritation MSDS for all chemicals provided Burns 6 Hazardous Chemicals and Substances Suffocation 3 D M Gases and chemicals stored and handled in accordance with codes of practice Toxicity PPE issued as required Cancers Management Facilities Supervisors FURTHER EVENT RISKS Notification of Special Performance Conditions, demonstration and venue approval required Crush Collisions Injuries Fatalities Venue Loading Procedures Traffic Control Officers Public Safety Systems Warning Lights, Signs and Systems 8 Flown Set Elements Children Backstage D RISK LEVEL M 3 D M 2 D L Bruising All flown items are under the control of authorised and certified operators Children to be accompanied by a children wrangler at all times ADDITIONAL CONTROL MEASURES As may be specified by Venue Safety Manager TO BE ACTIONED BY Hirer Management Management Supervisors Safety Officers Flown Set designer with approved rigging points Head strike Trips, Slips & Falls RISK LEVEL High risks to safety, security and legal liabilities 3 EXISTING CONTROL MEASURES LIKELIHOOD Cigarettes Naked Flame Hazers & Fogs Weapons Firearms etc CONSEQUENCE RISKS Pedestrians Crowds Vehicles Traffic 7 RISK RATING with additional controls HAZARDS LIKELIHOOD No CONSEQUENCE RISK RATING with existing controls 3 E M Safety Officer Supervisors Head Mechanist Flymen SM & ASM 1 E L Supervisors SM & ASM Cast and Crew DCC RISK OWNER CHECK SIGN OFF Venue Safety Manager THE RISK ASSESSMENT MATRIX (Adapted from AS 4360) MEASURE OF CONSEQUENCE OR IMPACT: MEASURE OF LIKELIHOOD Level Description Explanation Level Descriptor Explanation 1 Insignificant No injuries, low financial loss A Almost certain Is expected to occur in most circumstances 2 Minor First aid treatment, on site- release immediately contained. Medium financial loss B Likely Will probably occur in most circumstances 3 Moderate Medical treatment required, on site release contained with outside assistance, high financial loss C Possible Might occur at some time 4 Major Extensive injuries, loss of production capability, off site release with no detrimental effects, major financial loss D Unlikely Could occur at some time 5 Catastrophic Death, toxic release off site with detrimental effect, huge financial loss E Rare May occur only in exceptional circumstances LEVEL OF RISK QUALITATIVE RISK ANALYSIS MATRIX Consequences Likelihood Insignificant Minor Moderate Major Catastrophic 1 2 3 4 5 Almost certain A S S H H H Likely B M S S H H Possible C L M S H H Unlikely D L L M S H Legend H High Immediate action required S Significant Senior Management attention needed M Moderate Management responsibility must be specified Rare E L L M S S L Low Manage by routine procedures
© Copyright 2026 Paperzz