REQUEST FOR QUALIFICATIONS (RFQ) FOR CAMPUS-WIDE FURNITURE REPLACEMENT FOR Victor Valley Community College District AT Victor Valley Community College District 18422 Bear Valley Road Victorville, CA 92395 1 TABLE OF CONTENTS TITLE PAGE ......................................................................................................................1 TABLE OF CONTENTS .....................................................................................................2 1.0 INTRODUCTION ..................................................................................................3 – 4 1.1 Project Purposed 1.2 Submittal Requirements 1.3 Requests for Information (RFI) 1.4 Response to RFIs 2.0 QUALIFICATIONS ...............................................................................................5 – 6 2.1 Transmittal Letter 2.2 Company Work Experience 2.3 Project Approach 2.4 References 2.5 Project Management / Delivery and Install Personnel 2.6 Quality Assurance 2.7 Key Supplier Relationship 2.8 Insurance Certificate 2.9 Vendors 3.0 EVALUATION CRITERIA ..........................................................................................6 4.0 RFQ SCHEDULE .......................................................................................................6 2 1.0 INTRODUCTION 1.1 Project Purpose The VICTOR VALLEY COMMUNITY COLLEGE DISTRICT will be allocated funds for instructional support needs from the California Community Colleges’ Chancellor’s office through the 2014 – 2015 Budget Act [SB 852, Ch. 25/14, Item 6970-101-0001(19)]. The District will use this money to hire a company to perform a needs assessment of current classrooms and labs, provide classroom and lab furnishing as needed, and administer delivery and set up of said furnishings, providing the best value to the District. Services to be provided may include but are not limited to: 1.) Programing a. Needs analysis meeting. b. Review project parameters and goals. c. Perform audit of existing furniture and equipment of VVC campus. d. Design coordination with VVC staff to determine individual, classroom and departments and programs needs for furniture and equipment 2.) Site verify measurements and Design Development: Furniture Layout and Product Application a. Provide classroom and lab furniture and equipment layouts, maximizing occupancy while meeting all ADA and Fire Code requirements (Auto CAD drawings preferred). b. Create furniture plan. c. Review with District. d. Revise as needed. e. Finalize space plan of all classrooms/labs. f. Cost estimates, value engineering, multiple product options g. Review with District 3.) Contract Documentation and Administration a. General product specifications b. Review of all final drawings and specifications with the District c. Preparation of installation package d. Plot drawing and printing of all specifications e. Pre-installation meeting 4.) Furniture Delivery and Installation a. Schedule delivery of products according to District timelines b. Provide all labor, material, equipment, and supervision to deliver, set up, and install products onsite as specified c. Provide all debris containment and removal as well as provide a clean site at the end of each working day d. Keep all corridors and access points free and clear of all debris and furniture during delivery and installation e. Inspect all deliveries for shortages or damage, creating a punch list of any items f. Final walkthrough, inspection and acceptance of project 3 5. Submittals a. Develop CAD drawings of floor plans showing space allocation of furnishings b. Submit actual samples for final product selection during design development c. Submit copies of Operations and Maintenance manual, containing a narrative on operations of all equipment, preventative maintenance including cleaning, adjusting, and lubrication schedules (if applicable). The manual should also include a copy of the manufacturer’s warranty and service agreement. d. Submit Materials Safety Data Sheets (MSDS) as applicable. e. Submit certification that, to the best of the manufacturers and contractors knowledge, no asbestos containing materials have been incorporated into this project. 1.2 Submittal Requirements Five (5) copies of the Statement of Qualifications must be provided. Each copy shall be signed and clearly marked on the cover: RFQ: Campus-Wide Furniture Replacement - Victor Valley College Facilities Construction Department and shall contain the name of the company responding to the RFQ. 1.3 Requests for Information (RFI) Any requests for information or other clarification must be submitted to the Facilities Department office no later than 4:00 p.m. October 8, 2014. Please submit RFIs directly to Michelle Messer, RFQ Coordinator at [email protected]. 1.4 Response to RFIs All responses to RFIs or other modifications will be answered no later than 4:00 p.m. October 10, 2014 and posted on the VVC website at www.vvc.edu/office/facilities. Any questions relating to the submittal requirements shall be directed to: Michelle Messer RFQ Coordinator Victor Valley College 18422 Bear Valley Road Victorville, CA 92395 760.245.4271, ext. 2199 or 2250 [email protected] 4 2.0 QUALIFICATIONS: Statements of Qualifications shall respond to each criteria listed below. Statements of Qualifications should be clear and concise and formatted as outlined below to provide the selection committee with the following information and allow for consistent evaluation of each submittal. 2.1 Transmittal Letter: Provide a transmittal letter which introduces the company. Discuss services offered, size, and office location(s) of the company. 2.2 Company Work Experience Provide a list of school projects that your company has successfully completed or that a contract has been awarded. 2.3 Project Approach Provide a detailed description of understanding of the project and identify your company’s approach to the project. In addition, identify any work performed by subcontractors. 2.4 References Provide references of completed projects for school projects. Provide a minimum of six references for recently completed work to include school name, contact and telephone number. 2.5 Project Management/Delivery and Install Personnel Provide a list of key personnel, skills and qualifications, technical competence, experience on similar projects, current workload and workload during the project. Specifically identify the person who will be the Project Manager. Describe if delivery and install will be subcontracted. 2.6 Quality Assurance Provide a description of the quality assurance process your firm will use for space layout and furniture drawings, budget tracking, tracking system for items the District may add during a later phase of work, delivery and install process, punch process, and warranty tracking. 2.7 Key Supplier Relationship List the Key suppliers/manufacturers that your company represents. Describe how the relationship will benefit the District. How many manufacturers are available through each contract? Is a discount schedule available per manufacturer, and will the manufacturer contract allow for pricing based on volume? 5 2.8 Insurance Certificate The selected firm will be required to indemnify and hold Victor Valley Community College District and its agents and employees harmless from and against all suits or actions of any kind, including, but not limited to, workers’ compensation claims brought against them for or on accounts of any damages or injuries received or sustained by any parties, by or from the acts of the successful firm or its agents or employees. 2.9 Vendors Provide a list of the vendors your firm will be using for this project. 3.0 EVALUATION CRITERIA The selected firm will be based on the RFQ submittal responses, work experience, services, and references provided. 4.0 REQUESTS FOR QUALIFICATIONS SCHEDULE The following is the anticipated schedule for the selection process. 1. Advertisement of RFQ: September 24 & October 1st 2. Informational Meeting: TBD 3. Deadline for Requests for Information (RFI): October 8, 2014 4:00 p.m. 4. District response to RFIs: October 10, 2014 4:00 p.m. 5. Statement of Qualification Submittals Due: October 15, 2014 3:00 p.m. 6. Notice of Intent to Award Contract: October 22, 2014 7. Award Contract November 11, 2014 END OF INSTRUCTIONS 6
© Copyright 2026 Paperzz