History of
Control Functions
• Older Buildings
– One layer does
everything
• Newer Building
– Separate layers,
. . . separate functions
Building Science.com
Lukachko
No. 2
© buildingscience.com
1 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Changes
Building Science.com
3
Basic Functions of the Enclosure
• 1. Support
– Resist and transfer physical forces from inside and
out
Functional Layers
• 2. Control
– Control mass and energy flows
• 3. Finish
– Interior and exterior
surfaces for people
• Distribution – a building function
Building Science
Lukachko
© buildingscience.com
2 of 29
The Perfect Enclosure ApproahA Retrofit Case Study
6th Annual Passive House Conference
October 28-29
What is a high performance
enclosure?
• One which provides high levels of control
• Poor continuity limits performance
• Poor continuity causes most problems too:
– E.g. air leakage condensation
– Rain leakage
– Surface condensation
– Cold windows
• Particularly important for retrofits
www.BuildingScience.com
The “Perfect Wall”
• Finish of whatever
• Control continuity
– Rain control layer
• Perfect barrier
• Drained with gap
• Storage
– Air control layer
• Air barrier
– Thermal control layer
• Aka insulation, radiant barriers
– Vapor control layer
• Retarders, barriers, etc
• Structure can be anything
Fire Control may be needed
Sound Control optional
Building Science.com
Lukachko
6
© buildingscience.com
3 of 29
6th Annual Passive House Conference
Lukachko
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Building Science.com
7
Building Science.com
8
© buildingscience.com
4 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science.com
Building Science.com
Lukachko
October 28-29
9
10
© buildingscience.com
5 of 29
6th Annual Passive House Conference
Lukachko
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science.com
11
Building Science.com
12
© buildingscience.com
October 28-29
6 of 29
6th Annual Passive House Conference
Lukachko
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science.com
13
Building Science.com
14
© buildingscience.com
October 28-29
7 of 29
6th Annual Passive House Conference
Building Science.com
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
15
Window
Building Science.com
Lukachko
16
© buildingscience.com
8 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Connections: Who is in charge
Building Science.com
17
Complexity increases detailing effort / risk of failure / cost
reduces performance
Building Science.com
Lukachko
Enclosures
© buildingscience.com
No. 18 /
9 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Enclosure Design: Details
• Details demand the same
approach as the enclosure.
• • • Scaled drawings required at
Building Science.com
Perfect Wall expanded
Fire Control may be needed
Sound Control optional
Building Science.com
Lukachko
20
© buildingscience.com
10 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Any R-value,
e.g.
4” PIC=R25
5”XPS =R25
6”MFI=R25
Building Science Corporation
Lukachko
Joseph Lstiburek 22
© buildingscience.com
11 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 23
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 24
© buildingscience.com
12 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 25
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 26
© buildingscience.com
13 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 27
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 28
© buildingscience.com
14 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 29
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 30
© buildingscience.com
15 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 31
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 32
© buildingscience.com
16 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 33
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 34
© buildingscience.com
17 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 35
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 36
© buildingscience.com
18 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 37
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 38
© buildingscience.com
19 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 39
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 40
© buildingscience.com
20 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 41
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 42
© buildingscience.com
21 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 43
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 44
© buildingscience.com
22 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 45
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 46
© buildingscience.com
23 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 47
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 48
© buildingscience.com
24 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Joseph Lstiburek 49
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 50
© buildingscience.com
25 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
Building Science Corporation
Lukachko
October 28-29
Joseph Lstiburek 51
© buildingscience.com
26 of 29
6th Annual Passive House Conference
Lukachko
The Perfect Enclosure ApproahA Retrofit Case Study
© buildingscience.com
October 28-29
27 of 29
6th Annual Passive House Conference
Lukachko
The Perfect Enclosure ApproahA Retrofit Case Study
© buildingscience.com
October 28-29
28 of 29
6th Annual Passive House Conference
The Perfect Enclosure ApproahA Retrofit Case Study
October 28-29
Preliminary Airtightness
Measurements
69
Questions?
Contact information:
• Alex Lukachko, Building Science Corporation
– [email protected]
Lukachko
© buildingscience.com
29 of 29