RETAIN RAISED MOUNDS FOR PITCHER 5. The Contractor shall employ tree protection/silt fencing and erosion control methods at and around limits of work as required by local ordinances. All work shall conform to requirements of the local soil conservation district and all applicable federal, state, county and/or local statutes, ordinances, regulations, laws and codes. Silt and erosion control methods shall be employed prior to demolition and shall remain in place until work is completed. 6. The Contractor is responsible for obtaining all necessary permits and for adherence to all ordinances, regulations, laws and codes having jurisdiction over the property. 7. The Contractor shall coordinate disposal of construction debris from demolition with Owner's Representative and follow methods of disposal as required by City of Alexandria ordinances. REMOVE EXISTING TIMBERS AND GRAVEL IN THIS AREA 2 PITCHING WARMUP AREA Scale: 1" = 10'-0" BALL FIELD IMPROVEMENTS 4. The Contractor shall contact all local utilities companies, a minimum of 72 hours prior to any demolition, to determine the exact location of all existing utilities, and shall be fully responsible for any and all damages which may be occasioned by the Contractor's failure to exactly locate and preserve any and all existing utilities. SCALE - 1" = 10' TREE PROTECTION AREANO STORAGE OR CONSTRUCTION TO OCCUR WITHIN TREE CANOPY 0' 5' 10' 20' 30' ALEXANDRIA, VIRGINIA 3. The Contractor shall preserve and protect all existing conditions unless otherwise noted. Methods used to protect existing conditions shall be maintained and replaced if they are damaged during construction. No materials may be stored anywhere within the root zone of the existing trees to remain and tree protection fencing shall remain in place during the entire term of construction. 101 N. Columbus Street Suite 408 Alexandria, Virginia 22314 (703) 549-9155 phone (703) 683-0295 fax www.kanegroup.com 2. Survey information, including topography, spot elevations, and location of utility vaults, tree, and buildings is provided by R.C. Fields of Alexandria, Virginia. Contractor is responsible for verification of existing conditions information shown on drawings and should he find any discrepancies, omissions, ambiguities, or conflicts, he shall bring these items to the attention of the Owner's Representative for direction before proceeding with work. St. Stephen's and St. Agnes School REMOVE TIMBER SURROUND AND ALL ASTROTURF 1. The Contractor shall fully acquaint himself and be familiar with the conditions of the site and also familiar with the drawings and specifications. After visiting the site or during construction, should the Contractor find any discrepancies, omissions, ambiguities, or conflicts in or among the contracts documents or question their meaning, he shall bring these items to the attention of the Owner's Representative for direction before proceeding with work. LANDSCAPE ARCHITECTS THE KANE GROUP DEMOLITION NOTES REMOVE TIMBER RETAINING WALL AND EXISTING ASTRO TURF REMOVE EXISTING CHAIN LINK FENCE AND POSTS ALONG EXTENT OF FIELD THIS SIDE BID FEBRUARY 27, 2012 FEBRUARY 27, 2012 1 BASEBALL FIELD DEMOLITION PLAN Scale: 1" = 10'-0" SCALE - 1" = 10' 0' 5' 10' 20' 30' BASEBALL DEMOLITION PLAN L-1 2. Survey information, including topography, spot elevations, and location of utility vaults, tree, and buildings is provided by R.C. Fields of Alexandria, Virginia. Contractor is responsible for verification of existing conditions information shown on drawings and should he find any discrepancies, omissions, ambiguities, or conflicts, he shall bring these items to the attention of the Owner's Representative for direction before proceeding with work. 3. The Contractor shall preserve and protect all existing conditions unless otherwise noted. Methods used to protect existing conditions shall be maintained and replaced if they are damaged during construction. No materials may be stored anywhere within the root zone of the existing trees to remain and tree protection fencing shall remain in place during the entire term of construction. 4. The Contractor shall contact all local utilities companies, a minimum of 72 hours prior to any demolition, to determine the exact location of all existing utilities, and shall be fully responsible for any and all damages which may be occasioned by the Contractor's failure to exactly locate and preserve any and all existing utilities. 101 N. Columbus Street Suite 408 Alexandria, Virginia 22314 (703) 549-9155 phone (703) 683-0295 fax www.kanegroup.com 1. The Contractor shall fully acquaint himself and be familiar with the conditions of the site and also familiar with the drawings and specifications. After visiting the site or during construction, should the Contractor find any discrepancies, omissions, ambiguities, or conflicts in or among the contracts documents or question their meaning, he shall bring these items to the attention of the Owner's Representative for direction before proceeding with work. LANDSCAPE ARCHITECTS THE KANE GROUP DEMOLITION NOTES REMOVE TIMBER EDGE AND ASTRO TURF SCORE BOARD TO REMAIN ALEXANDRIA, VIRGINIA 7. The Contractor shall coordinate disposal of construction debris from demolition with Owner's Representative and follow methods of disposal as required by City of Alexandria ordinances. BALL FIELD IMPROVEMENTS RETAIN ALL ELECTRICAL JUNCTION BOXES IN THIS AREA. 6. The Contractor is responsible for obtaining all necessary permits and for adherence to all ordinances, regulations, laws and codes having jurisdiction over the property. St. Stephen's and St. Agnes School 5. The Contractor shall employ tree protection/silt fencing and erosion control methods at and around limits of work as required by local ordinances. All work shall conform to requirements of the local soil conservation district and all applicable federal, state, county and/or local statutes, ordinances, regulations, laws and codes. Silt and erosion control methods shall be employed prior to demolition and shall remain in place until work is completed. BID FEBRUARY 27, 2012 FEBRUARY 27, 2012 1 SOFTBALL FIELD DEMOLITION PLAN Scale: 1" = 10'-0" SCALE - 1" = 10' 0' 5' 10' 20' 30' SOFTBALL DEMOLITION PLAN L-2 S T. 50'-0" 6 L-5 FLEX-I-PAVE SURFACE DETAIL DETAIL BEGIN SAFETY FENCE EXPAND WIDTH OF PITCHING WARM-UP AREA BY 3'-0" RETAIN EXISTING PITCHING MOUNDS OPENING 3'-0" EX. OAK EXISTING TREES (MULCH ENTIRE BED LENGTH) 2 6 8'-HT. CHAIN-LINK FENCE L-5 (FRONT OF DUGOUT) Scale: 1" = 10'-0" SCALE - 1" = 10' 0' 5' 10' 20' 30' BEGIN CHAIN LINK 8' HT. CHAIN LINK FENCE existing sidewalk 6 L-5 OPENING 10' HT. SAFETY FENCE END SAFETY FENCE 8' HT. CHAIN-LINK FENCE (FRONT OF DUGOUT) 4' HT. CHAIN-LINK FENCE ONE SIDE & BACK OF DUGOUT) 6 L-5 CAST STONE SCHOOL LOGOCENTER ON END WALL (OWNER PROVIDED) OPENING BEGIN SAFETY FENCE CAST STONE SCHOOL LOGOCENTER ON END WALL (OWNER PROVIDED) 4'-0" 20' HT. SAFETY FENCE AND POSTS AT BACKSTOP 20'-0" 2 L-5 5 L-5 EX. OAK 101 N. Columbus Street Suite 408 Alexandria, Virginia 22314 (703) 549-9155 phone (703) 683-0295 fax www.kanegroup.com PITCHING WARMUP AREA ALEXANDRIA, VIRGINIA 4'-HT. CHAIN-LINK FENCE (BACK & ONE SIDE OF DUGOUT) RETAIN ALL EXISTING EVERGREEN TREES St. Stephen's and St. Agnes School END CHAIN LINK BALL FIELD IMPROVEMENTS FLEX-I-PAVE SURFACE 3 L-5 LANDSCAPE ARCHITECTS 10' HT. SAFETY FENCE THE KANE GROUP R OA D S T. S T E P H E N ' S RETAIN ALL EXISTING EVERGREEN TREES S T E P H E N' S BEGIN SAFETY FENCE ROAD (10) 6' - 7' HT. 'NELLIE STEVENS' HOLLY; CONTINUOUS BED MULCH ENTIRE LENGTH RELOCATE EX. GFCI ON BACK OF BRICK WALL BRICK BACKSTOP COPING LAYOUT 20'-0" (typ) 21'-8" 4'-0" BID 50'-0" 38'-0" 12" THICKNESS, CMU CORE WALL WITH BRICK VENEER; BRICK AND MORTAR TO MATCH NEW BACKSTOP. WALL HEIGHT VARIES 12" - 20" FEBRUARY 27, 2012 FEBRUARY 27, 2012 1 BASEBALL FIELD LAYOUT PLAN Scale: 1" = 10'-0" SCALE - 1" = 10' 0' 5' 10' 20' 30' HARDBALL FIELD LAYOUT PLAN L-3 CONCRETE PAD 4'-0" 4''0" OPENING 14'-3" CONCRETE PAD MAINTAIN 1" DRIP EDGE ON BOTH SIDES OF BACKSTOP WALL CANTILEVER DUGOUT 2 L-4 5'-9" TYP. BENCHES INSIDE 14'-3" TYP. 8' HT. CHAIN LINK FENCE (FRONT OF DUGOUT) 4' HT. CHAIN LINK FENCE; BACK & SOUTH SIDE 11'-0" 1'-6" 1'-6" MORTAR JOINTS MORTAR COLOR TO MATCH CAST STONE COPING CORE DRILL HOLES FOR BACKSTOP SAFETY NET POSTS AND POST SLEEVES SEAL TO PREVENT MOISTURE INFILTRATION 2'-9" TYP. BEGIN SAFETY FENCE BEGIN SAFETY FENCE 11'-0" 3'-0" OPENING 3'-0" OPENING 10' HT. SAFETY FENCE 1 2" 8' HT. CHAIN LINK FENCE (FRONT OF DUGOUT) 4' HT. CHAIN LINK FENCE: BACK & SOUTH SIDE 10' HT. SAFETY FENCE 4'-0" 3 101 N. Columbus Street Suite 408 Alexandria, Virginia 22314 (703) 549-9155 phone (703) 683-0295 fax www.kanegroup.com 16' HT. SAFETY FENCE AND POLES; OPTION 1: REUSE EXIST. POLES AND SAFETY NE T COPING LAYOUT LANDSCAPE ARCHITECTS 3 L-4 THE KANE GROUP SPACING ON SAFETY NET POSTS PER MANUFACTURER SPECIFICATION 3' COPING LAYOUT Scale:1/4" = 1'-0" 30'-0" END SAFETY FENCE 1 END SAFETY FENCE SOFTBALL FIELD LAYOUT PLAN 7'-6" STEEL COLUMN MOUNTING FLANGE TYP. Scale: 1" = 10'-0" BLEACHER SUPPORT SCALE - 1" = 10' EDGE OF CONCRETE PAD ROOF LINE OF DUGUOUT 0' CONCRETE SCORING PATTERN 24" O.C. START LAYOUT FROM CENTER LINE OF SLAB 5' BALL FIELD IMPROVEMENTS 21'-6" 10' 20' 4" THICK CONCRETE PAD BELOW REINFORCED WITH 6 X 6 X #10 WWM; BLEACHERS TO BE BOLTED TO SLAB PER MANUFACTURER SPECIFICATION 30' 4 21' METAL BLEACHER Scale:1/4" = 1'-0" CHAINLINK FENCE TYP. ALEXANDRIA, VIRGINIA 4'-0" St. Stephen's and St. Agnes School 30'-0" 10' 25'-6" FIELD SIDE OF DUGOUT 29 GA. CLASSIC RIB CORRUGATED METAL ROOFING COLOR T.B.D. PLAN 24'-0" PRE-FABRICATED 8" X 4" X 41" HR STEEL TUBE COLUMNS w/ PRE DRILLED 10" X 13" X 34" BASE PLATES FASCIA COLOR T.B.D. FASCIA COLOR T.B.D. 8'-0" CHAINLINK FENCE COLUMN COLOR T.B.D. 4 - 34" HILTI-KWIK BOLT 3 MIN. 6 21" EMBEDMENT IN SLAB FEBRUARY 27, 2012 9'-3" 7'-2" FINISH GRADE 1' 3000 PSI NORMAL WEIGHT CONCRETE REINFORCED WITH #4 REBAR 2' O.C. ROUGH BROOM FINISH ALIGN REBAR GRID IN SLAB TO AVOID MOUNTING HARDWARE OF COLUMNS CANTILEVER DUGOUT Scale:1/4" = 1'-0" FEBRUARY 27, 2012 4'-0" CHAINLINK FENCE 18" THICKENED PERIMETER EDGE w/ 8" SLAB THICKNESS 2 BID FENCE POST FOOTING 1'-6" ELEVATION SOFTBALL FIELD LAYOUT PLAN SECTION L-4 SECTION BASEBALL CANTILEVER DUGOUT 1/4" = 1'-0" 5 COPING LAYOUT 1/4" = 1'-0" 101 N. Columbus Street Suite 408 Alexandria, Virginia 22314 (703) 549-9155 phone (703) 683-0295 fax www.kanegroup.com ALEXANDRIA, VIRGINIA 1 1/4" = 1'-0" St. Stephen's and St. Agnes School ELEVATION 5-TIER METAL BLEACHER WITH CENTRAL AISLE (BASEBALL) BALL FIELD IMPROVEMENTS 4 LANDSCAPE ARCHITECTS THE KANE GROUP PLAN BID NOTE: SCHOOL MUST PROVIDE CUSTOM SAFETY MATS FOR FIELD SIDE OF BOTH BACKSTOPS. FEBRUARY 27, 2012 FEBRUARY 27, 2012 2" DETAILS 2 BRICK BACKSTOP 1/2" = 1'-0" 3 FLEXI-PAVE PERMEABLE PAVEMENT 1/2" = 1'-0" 6 CHAIN LINK FENCE 1/2" = 1'-0" L-5
© Copyright 2026 Paperzz