GLAST LAT Project Oct 05 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 Analysis of cPCI Backplane Connector Assembly xray’s 4.1.7 DAQ & FSW V1 Gunther Haller [email protected] (650) 926-4257 1 GLAST LAT Project Oct 05 Backplane Analysis • Method: give following information for each backplane – Starting point: list of pins supplied by GSFC identified as under-fill – Identify pins in that list which are not used • Pins already identified on SLAC’s spread-sheet • Pins not on the spread-sheet – There is no reason to spend time discussing the fill of any pins not used anyways – Of the remaining pins, list of pins used • Pins already identified on SLAC’s spread-sheet • Pins not on the spread-sheet • Discuss fill of both 4.1.7 DAQ & FSW V1 2 GLAST LAT Project Oct 05 Notes (1) • • • Number of pins soldered on backplane excluding shield-pins (which are not used and thus ignored) – P1: 25 rows – P2: 22 rows – P3: 19 rows – P4: 25 rows – P5: 22 rows – Each row: columns Z, A, B, C, D, E, F • Z and F are shield pins, not used – Total number of pins potentially used – 113 x 5 = 565 for each slot, times 4 slots = 2,260 pins – Identification of 4 slots • X1: CPU (3u-card in P1, P2) • X2: CPS (3u-card in P4, P5) • X3: SIB (6u-card in P1-P5) • X4: LCB (6u card in P1-P5) Connectors not used for flight – X1: P3, P4, P5 – X2: P1, P2, P3 – X3: P2, most of P3 • (P3 only uses: A19 (dclk); A1-E1 (gnd); A5-E5: (3.3V); B8-B14 (gnd); gnd and 3.3V redundant on other connectors) – X4: P2, P3 Following connector are used for EGSE only, thus ignored for flight crates – X1: P4/P5 holds custom Serial card, not used/integrated for flight – X2: P1/P2 holds commercial Ethernet card, not used/integrated for flight 4.1.7 DAQ & FSW V1 3 GLAST LAT Project Oct 05 Notes (2) • Comment to intentionally shorted shield pins (3 pins on row Z or row F) apparent on some xrays – Mostly, center pin identifies row in which pin was to be touched-up – Wanted some kind of indication that correct pin was in fact touched-up just in case that no change might be apparent before/after touch-up – Shorts were removed after xray but before QA, although shorts would have no effect since • Shield pins already shorted to each other via board/connector • LAT does not use shield pins anyways 4.1.7 DAQ & FSW V1 4 GLAST LAT Project Oct 05 First Flight Backplane 2414 • • • • Total of ~ 2,000 pins looked at in xray 22 pins identified on GSFC list Not used (16 pins) – Already identified on SLAC list • X1: P5-D11; P5-C12; P5-D12; • X2: P1-B17 • X3: P1-B17 – Not used from remaining identified (X1-P5, X2-P1 not used as stated) • X1: P5-E11 • X2: P1-A19 • X2: P2-C10, B11, C11, D11; P4-C6 • X3: P1-B2 ; P1-B6 (red+5); P5-B2 (ch-gnd); P5-C14 (red+5), P4-B21 (redGND); • X4: P5-B5 (red+3.3) Used – Already identified on SLAC list • X1: P1-B15 (Frame#); • X3: P1-A7 (AD30); – 4.1.7 DAQ & FSW Not on SLAC list • X1: P1-C23 (AD3) ; • X3: P1-D16 (stop_n) V1 5 GLAST LAT Project Oct 05 Second Flight Backplane 2415 • • • Total of ~ 2,000 pins looked at in xray 18 pins identified on GSFC list Not used – Already identified on SLAC list (7 pins) • X2: P1-B3; P4-A15; P4-B23; • X3: P1-B8; P2-C12; J4-C1, J4-C16 – Not used from remaining identified • X1: P1-A19 (3.3V, one of 7 pins, not needed) • X3: P2-B12; P3-C1 (red+5), C3 (red+5), E4 • X4: P1-B1 • Used – Already identified on SLAC list • X4: P1-C23(AD3); P4-C11(EI_PRIM_5_N); P4-C21(EI_PRIM_2_P) – Not on SLAC list • X1: P1-B19 (AD15), P1-A20 (AD12) ; 4.1.7 DAQ & FSW V1 6 GLAST LAT Project Oct 05 Third Flight Backplane 2420 • Total of ~ 2,000 pins looked at in xray • 5 pins identified on GSFC list • Not used – Already identified on SLAC list • None – Not used from remaining identified • X1: P2-C21 • X2: P1-D25 • X3: P2-E8, B13 • X4: P5-C22 • Used – none 4.1.7 DAQ & FSW V1 7 GLAST LAT Project Oct 05 Fourth Flight Backplane 2418 • • • Total of ~ 2,000 pins looked at in xray 17 pins identified on GSFC list Not used – Already identified on SLAC list • None – Not used from remaining identified – X1: P2-B5, P4-E7, D8, E8, D9 (P4 not used) – X2: P1-D11, B23, B24, C24; P2-B1, C1; (P1, P2 not used) – X2: P4-C9 (red+5); P5-A5 (red-28) – X4: P5-D21 • Used – Already identified on SLAC list • None – Not on SLAC list • X1: P2-B6 (GBM RDNT) • X3: P1-E7 (AD27) 4.1.7 DAQ & FSW V1 8 GLAST LAT Project Oct 05 Fifth Flight Backplane 2419 • Total of ~ 2,000 pins looked at in xray • 6 pins identified on GSFC list • Not used – Already identified on SLAC list • X1: J5-C13, B15 – Not used from remaining identified • X1: P5-C15, A18 (X1-P5 not used) • X3: P2-D10 • X4: P2-A10 • Used – none 4.1.7 DAQ & FSW V1 9 GLAST LAT Project Oct 05 First Flight Spare Backplane 2416 • • • Total of ~ 2,000 pins looked at in xray 46 pins identified on GSFC list Not used – Already identified on SLAC list (17) • X1: P2-C10 • X2: P1-D11, A17, D19, A21 (P1 not used as indicated) P1-D11, A17, D19, A21 (X2 not used as indicated); P5-B6, C6 (redundant as indicated) • X3: P3-A4, B4, C5, D5, D6 (P3 not used as indicated) • X4: P3-E10 – Not used from remaining identified • X1: P2-B12, B13, C21 • X2: D25 (gnd red) • X3: P2-A7, B7, A8, B8; P4- D24 (not used), C25(gndred), D25 (not used); • X4: P2-B18, C18; P4-D6 (not used), • Used – Already identified on SLAC list • None – 4.1.7 DAQ & FSW Not on SLAC list • X2: P4-D2 (PRIM_SPO1_P), D3 (PRIM_SPO0_N), C25 (CLK_OUT_PRIM_P), P5-D2 (SPARE_TO_LCB_0), B21 (28V_RET), D21 (SPI_PRIM_RDNT_SEL) • X3: P1-A22 (AD7); P4-D20 (SC_RDNT_PWR_PDU_RDNT_SEL), P5-A19 (PRIM_1553_P) • X4: P4-C23 (EI_PRIM_1_P); P5-D1 (GND) V1 10 GLAST LAT Project Oct 05 Summary • 5 Flight boards (2414, 2415, 2420, 2418, 2419) – > 10,000 pins checked – 68 pins called out by GSFC as questionable – Of those 14 were already on SLAC spread-sheet identified as not used – 54 pins remaining – Of those 42 are not used (no need to discuss fill) – Remaining are 11 pins to examine (of those 6 were on SLAC list) – Next pages show all 11 pins • 1st flight spare (2416) – 46 pins called out by GSFC as questionable – Of those 42 are not used (no need to discuss fill) – Remaining are 11 pins to examine – Next pages show all 11 pins 4.1.7 DAQ & FSW V1 11 GLAST LAT Project Oct 05 Flight 4.1.7 DAQ & FSW V1 12 GLAST LAT Project Oct 05 X-ray of pins 2414: X1-P1-B15 Void a bit bigger than on one of the previous cross-sections shown below. Would estimate that to be about 75% fill and the pin on the right to be at least 65% GLAT2414 X1 P1 B15 FRAME# 4.1.7 DAQ & FSW V1 13 GLAST LAT Project Oct 05 X-ray of pins 2414: X1-P1-C23 Fill ~ 75%, based on simple ratio of 3 out of 4 shows solder fill. GLAT2414 X1 P1 C23 AD3 4.1.7 DAQ & FSW V1 14 GLAST LAT Project Oct 05 X-ray of pins 2414: X3-P1-A7 Fill >80%, assuming 5 out 6 ratio filled. GLAT2414 X3 P1 A7 AD30 4.1.7 DAQ & FSW V1 15 GLAST LAT Project Oct 05 X-ray of pins 2414: X3-P1-D16 Fill ~ 80%, based on simple ratio of 3.5 out of 4.5 shows solder fill. GLAT2414 X3 P1 D16 STOP_N 4.1.7 DAQ & FSW V1 16 GLAST LAT Project Oct 05 X-ray of pins 2415: X1-P1-A20 80% fill based on 4.5 out of 5.5 fill ratio. GLAT2415 X1 P1 A20 AD12 4.1.7 DAQ & FSW V1 17 GLAST LAT Project Oct 05 X-ray of pins 2415: X1-P1-B19 >90% fill. GLAT2415 X1 P1 B19 AD15 4.1.7 DAQ & FSW V1 18 GLAST LAT Project Oct 05 X-ray of pins 2415: X4-P1-C23 65% fill based on 2 out of 3 fill ratio. GLAT2415 X4 P1 C23 AD3 4.1.7 DAQ & FSW V1 19 GLAST LAT Project Oct 05 X-ray of pins 2415: X4-P4-C11 >70% fill assuming 2.25 out of 3 fill ratio. Summed voids to get to 0.75 voids. GLAT2415 X4 P4 C11 EI_PRIM_5_N 4.1.7 DAQ & FSW V1 20 GLAST LAT Project Oct 05 X-ray of pins 2415: X4-P4-C21 80 % fill assuming 2.4 out of 3 solder fill. GLAT2415 X4 P4 C21 EI_PRIM_2_P 4.1.7 DAQ & FSW V1 21 GLAST LAT Project Oct 05 X-ray of pins 2418: X1-P2-B6 70 % fill assuming 4 out of 5.5 solder fill. GLAT2418 X1 P2 B6 GBM RDNT 4.1.7 DAQ & FSW V1 22 GLAST LAT Project Oct 05 X-ray of pins 2418: X3-P1-E7 65 % fill assuming >3 out of 5 solder fill. GLAT2418 X3 P1 E7 AD27 4.1.7 DAQ & FSW V1 23 GLAST LAT Project Oct 05 Flight Spare 4.1.7 DAQ & FSW V1 24 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P4-D2 80 % fill assuming 4 out of 5 solder fill. GLAT2416 X2 P4 D2 PRIM_SPO1_P 4.1.7 DAQ & FSW V1 25 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P4-D3 75 % fill assuming 4.5 out of 6 solder fill. GLAT2416 X2 P4 D3 PRIM_SPO0_N 4.1.7 DAQ & FSW V1 26 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P4-C25 90 % fill. GLAT2416 X2 P4 C25 CLK_OUT_PRIM_P 4.1.7 DAQ & FSW V1 27 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P5-D2 75 % fill assuming 4.5 out of 6 solder fill. GLAT2416 X2 P5 D2 SPARE_TO_LCB_0 4.1.7 DAQ & FSW V1 28 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P5-B21 80 % fill assuming 5 out of 6 solder fill. GLAT2416 X2 P5 B21 28V_RET 4.1.7 DAQ & FSW V1 29 GLAST LAT Project Oct 05 X-ray of pins 2416: X2-P5-D21 80 % fill assuming 5 out of 6 solder fill. GLAT2416 X2 P5 D21 SPI_PRIM_RDNT_SEL 4.1.7 DAQ & FSW V1 30 GLAST LAT Project Oct 05 X-ray of pins 2416: X3-P1-A22 > 65 % fill assuming 4 out of 6 solder fill. GLAT2416 X3 P1 A22 AD7 4.1.7 DAQ & FSW V1 31 GLAST LAT Project Oct 05 X-ray of pins 2416: X3-P4-D20 70 % fill assuming 3.5 out of 5 solder fill. GLAT2416 X3 P4 D20 SC_RDNT_PWR_PDU_RDNT_SEL 4.1.7 DAQ & FSW V1 32 GLAST LAT Project Oct 05 X-ray of pins 2416: X3-P5-A19 >65 % fill assuming 4 out of 6 solder fill. GLAT2416 X3 P5 A19 PRIM_1553_P 4.1.7 DAQ & FSW V1 33 GLAST LAT Project Oct 05 X-ray of pins 2416: X4-P4-C23 >65 % fill assuming 3 out of 5 solder fill. GLAT2416 X4 P4 C23 EI_PRIM_1_P 4.1.7 DAQ & FSW V1 34 GLAST LAT Project Oct 05 X-ray of pins 2416: X4-P5-D1 70 % fill assuming 4 out of 5.5 solder fill. GLAT2416 X4 P5 D1 GND 4.1.7 DAQ & FSW V1 35 GLAST LAT Project Oct 05 Conclusion • • • • • • All boards were conformal coated a while ago The boards are at different stages in assembly Touching up boards now will require stripping off some conformal coat (not difficult) Flight – 2414: 4 pins ok – 2515: 5 pins ok – 2420: no issues – 2418: 2 pins ok (might touch these up, but no great hope of improvement) – 2419: no issues Flight spare – 2416: 11 pins. Looks ok although we will try to touch up several of those pins. In summary although fill is not ideal and what we would like, it is acceptable considering all other constraints – Qual testing of example boards (using short-open tests) did not show any issue even with pins filled down to 30% fill. – TC/Vib/Thermal-vacuum did not show any issues on the proto-flight SIU crate (with flight assembled SIB/CPS/LCB/CBP/RAD750) and those boards had more voids and underfill than the above flight backplanes) 4.1.7 DAQ & FSW V1 36
© Copyright 2025 Paperzz