FJPPL-FKPPL ATF2 Workshop Synchronization needs March 18, 2014 Synchronization needs for the ground motion experiment Marcin Patecki Juergen Pfingstner 18th of March 2014 FJPPL-FKPPL ATF2 Workshop Synchronization needs March 18, 2014 Synchronization task 1: ground motion – beam GM GM … ADCs: 1kHz NI-PXI GM • Task of NI-PXI: Record ground motion between two beam arrivals. • Possible solution: Record kicker signal for synchronization. • Necessary actions: 1. Providing signal/cabling. 2. Converting NIM pulse (ns) to long pulse (several ms) that can be recorded with NI-PXI 1kHz ADCs. FJPPL-FKPPL ATF2 Workshop Synchronization needs March 18, 2014 Synchronization task 2: ground motion – BPM GM GM … • System task: Data are acquired via NI-PXI system and via EPICs and are then correlated. • Potential problem: The clocks of the two systems could be not synchronized. • Old solution: Rely on NTP distributed through Ethernet. • Proposed solution: Provide to NI-PXI a hardware signal that shows the beam presence. Then switch the beam on/off to check the synchronization. GM ADCs: 1kHz NI-PXI Clock 1 EPICS Clock 2 BPM BPM … BPM FJPPL-FKPPL ATF2 Workshop Synchronization needs March 18, 2014 Synchronization task 2: ground motion – BPM GM GM … GM • Necessary actions: 1. Determine which signal could be used. ADCs: 1kHz NI-PXI Clock 1 EPICS Clock 2 BPM BPM … BPM 2. What type of signal is and how can it be recorded with the NI-PXI ADCs (conversion necessary)?
© Copyright 2026 Paperzz