Folie 1

FJPPL-FKPPL ATF2 Workshop
Synchronization needs
March 18, 2014
Synchronization needs for the
ground motion experiment
Marcin Patecki
Juergen Pfingstner
18th of March 2014
FJPPL-FKPPL ATF2 Workshop
Synchronization needs
March 18, 2014
Synchronization task 1: ground motion – beam
GM
GM
…
ADCs: 1kHz
NI-PXI
GM
• Task of NI-PXI:
Record ground
motion between two
beam arrivals.
• Possible solution:
Record kicker signal
for synchronization.
• Necessary actions:
1. Providing signal/cabling.
2. Converting NIM pulse (ns) to long
pulse (several ms) that can be
recorded with NI-PXI 1kHz ADCs.
FJPPL-FKPPL ATF2 Workshop
Synchronization needs
March 18, 2014
Synchronization task 2: ground motion – BPM
GM
GM
…
•
System task: Data are acquired
via NI-PXI system and via
EPICs and are then correlated.
•
Potential problem: The clocks
of the two systems could be not
synchronized.
•
Old solution: Rely on NTP
distributed through Ethernet.
•
Proposed solution: Provide to
NI-PXI a hardware signal that
shows the beam presence.
Then switch the beam on/off to
check the synchronization.
GM
ADCs: 1kHz
NI-PXI
Clock 1
EPICS
Clock 2
BPM
BPM
…
BPM
FJPPL-FKPPL ATF2 Workshop
Synchronization needs
March 18, 2014
Synchronization task 2: ground motion – BPM
GM
GM
…
GM
• Necessary actions:
1. Determine which signal
could be used.
ADCs: 1kHz
NI-PXI
Clock 1
EPICS
Clock 2
BPM
BPM
…
BPM
2. What type of signal is and
how can it be recorded
with the NI-PXI ADCs
(conversion necessary)?