“What the best and wisest parent wants for his own child, that must the community want for all its children” – John Dewey STRONG SCHOOLS, STRONG COMMUNITY Agenda • • • • Opening Remarks Overview of District Needs The Plan Your Support Overview of District Needs and Other Considerations Space • Overcrowding HS built for 565, now houses 1120+ students and enrollment continues Band room sized for 50-60 and band now numbers 130+ Lunches completed in “shifts” Forced to use non-traditional space, ie, basement space 52 year old pool, while losing 400-600 gal/day, does not meet SD or Community needs Space (con’t) • Lacks flexible spaces that allow for efficient multiple uses • Current spaces are not accessible to all ages and abilities • Crowding creates a real safety issue in the event of evacuation Age of existing structures • With exception of Northside, the most recently constructed building was the HS in 1965 • Most buildings are not handicap accessible • Several mechanical systems are inefficient and/or failing Capital Maintenance Costs • • • • • Unavoidable costs Boilers Pool ADA compliance Safety and security Additional Key Points • This problem has been studied for more than 10 years by many Board members and objective citizens • Additional renovations to existing buildings have been evaluated and dismissed as not meeting the needs of the District or not being cost effective • The current proposal is a LONG TERM solution Additional Key Points (con’t) • Due to state-imposed revenue limits, the District cannot raise taxes without a referendum to maintain existing programming • The District has managed the situation very well and ranks lowest in the state in spending/student • The District has the LOWEST tax mill rate among all School Districts in the region and in the Badger Conference Additional Key Points (con’t) • The School Board has REDUCED the mill rate for two consecutive years, while student enrollment has reached an alltime high • The District has demonstrated fiscal responsibility time and time again and is doing so again now as interest rates are at a 60 year lows Additional Key Points (con’t) • Fort Atkinson saw an increase in home values, business revenue, and business development following their HS construction project • A very similar plan was developed in 2008 and not implemented, that plan now costs $15-16M more The Plan • All accessibility issues in all schools would be improved (ADA Compliance) • Outdated mechanical structures that are failing would be replaced • Overcrowding is fixed by building a new high school, and grade level configuration which include: – New MHS next to the current one on district-owned land (Grades 9-12) and replaces overcrowded pool and gym – Old MHS becomes the new Milton Middle School (Grades 6-8) – Northside Intermediate School (Grades 3-5) – Four Elementary Schools (Grades PreK-2) – Note: Pre-K sites would exist at each elementary school and the district would still maintain community-based sites The Plan (con’t) • New HS would open fall of 2019 for the 2019/20 school year • $87M requested in the referendum • Spend and tax increase to be phased in over a two year period • $150k home would see a $15.50/mo in year 1 and then increase to $22.17/mo in year two Your Support is Needed • There has been much misinformation shared to date and we need your help to get the FACTS in front of the public • We need: – Your voice – Your passion for this community – Your vote Specifically, you can • Add us and like us on Facebook • Visit our website and share content, testimonials, and photographs • Distribute fact sheets/yard signs • Be positive, thoughtful and inspired by this project and the future of our community • Share the FACTS with everyone • Contribute positive letters to the editor and sound-offs • Help staff booths at community events • Sign onto upcoming advertisements in local newspapers • Donate time or, if able, money • Want to be excluded? Just let us know Questions?
© Copyright 2026 Paperzz