AGENDA ITEM NO. 16 1. REPORT TO: Executive Board REPORT NO: CTAMO/05/07 DATE: 13 February 2007 LEAD MEMBER: Councillor R J Dutton O.B.E. (Economic Prosperity and Asset Management) LEAD OFFICER: Chief Transportation and Asset Management Officer CONTACT OFFICER: Denise Garland (Tel: 297214) SUBJECT: Request for a contribution from the sale of land at College Hill Tanyfron, for the erection of a new Multi Use Games Area (MUGA), Tanyfron and the Enhancement of an existing MUGA at Brymbo. WARD: Brymbo PURPOSE OF THE REPORT To report the recommendation of the Joint/Member Officer Asset Management Working Group in relation to the completed sale of land at College Hill, Tanyfron and the Local Member’s request for a financial contribution from the gross capital receipt for the erection of a new Multi Use Games Area (MUGA) and the enhancement of an existing MUGA within the ward of Brymbo. 2. EXECUTIVE SUMMARY 2.1 The sale of the land at Tanyfron (as shown hatched on Appendix 1) was completed on 31t March 2006. The total gross capital receipt was £2,611,001 resulting in an additional £611,000 compared to the original estimate. 2.2 Councillor Shone, Local Member for Brymbo has requested that consideration be given to topslicing the capital receipt achieved from the sale to specifically fund the erection of a new MUGA at Tanyfron at an estimated cost of between £132K and £147K (depending upon location) and upgrade the existing MUGA at Argoed, Brymbo at an estimated cost of £49k. These costs do not include dealing with contaminants that may be present on site, obtaining consents, provision of mains services, planning permission etc. 2.3 Proposed MUGA at Meadow View, Tanyfron or Caer Merfyn, Tanyfron 2.3.1 The two preferred locations for a new MUGA were confirmed as land at Meadow View, Tanyfron and land at Caer Merfyn, Tanyfron. (As shown on Appendix 2). 2.3.2 2.3.3 2 The Chief Planning Officer has considered the positioning of the proposed MUGA on these two sites. He considers the positioning of the facility on land at Meadow View to be the most appropriate as this will require the removal of fewer trees and be further away from the boundaries of residential properties. Thus, it is less likely to cause disturbance, particularly if floodlighting is installed. Maintenance/revenue issues i) These involve ensuring that:The playing surface is kept clean The playing surface remains level Drainage of surface water is maintained throughout the life of the pitch The facility remains attractive and well-kept at all times ii) The Environment Department carry out routine maintenance on the Council-owned play area at Meadow View and have confirmed that they are able to carry out routine weekly inspections of the new facility and arrange for floodlighting maintenance. This together with an annual independent risk assessment and ongoing electricity costs would cost approximately £1500 per annum, which would require a revenue budget. 2.4 Existing MUGA at Argoed, Brymbo (Appendix 3). 2.4.1 The MUGA has a bitumen macadam-playing surface, which is playable, but is now approximately 25 years old. The playing surface would benefit from a new surface course, as would the link footpath off Argoed. 2.4.2 Maintenance/revenue issues i) The Environmental Department does not currently have responsibility in respect of this facility, as it is not situated on Council land. The Environment Department’s Inspection and Maintenance Team do, however, inspect and maintain the children’s play area located adjacent to the MUGA. ii) It will be necessary to ensure that:The playing surface is kept clean The playing surface remains level Drainage of surface water is maintained throughout the life of the pitch The facility remains attractive and well-kept at all times. iii) The Environmental Department have confirmed that they are able to inspect and maintain the facility, but would require a revenue budget of approximately £1,000 per annum to do this 2.4.3 Ownership details The MUGA is situated on land outside the ownership of the council. Councillor Shone has stated that Brymbo Development Ltd, the owners of the land would be willing to transfer the land to Wrexham County Borough Council, Brymbo Community Council or the Brymbo Tanyfron Regeneration Trust. However, no official approach to Brymbo Development Ltd has been undertaken at this time and, therefore, any terms and conditions associated with such a transfer are unknown and cannot be confirmed. Prior to committing expenditure it will be necessary to establish ongoing arrangements for the availability of the Argoed MUGA to the 3 public and the Council may need to consider securing a long-term lease or acquisition of the field. Any associated legal and/or surveyors costs will also need to be met. 2.5 The Joint Asset Management Working Group 9 January 2007 agreed “that a report be submitted to the Executive Board for consideration, indicating their support, in principle, for inclusion in the current capital programme the provision of an additional MUGA in the Brymbo Ward, and an upgrade of an existing MUGA at Argoed, Brymbo and detailing the financial implications of the proposals”. 3. RECOMMENDATIONS 3.1 That the Executive Board notes the information contained within the report with regard to the sale of the land at College Hill, Tanyfron, and the suitability and cost of the proposed new MUGA at Tanyfron and refurbishment of the existing MUGA at Brymbo 3.2 That the Executive Board:i) ii) iii) endorses the resolution of the Asset Management Working Group at its meeting on 9th January 2007 authorises the Chief Transportation and Asset Management Officer working with the Chief Legal and Democratic Services Officer to identify the most appropriate method of acquiring a suitable interest in the site of the existing MUGA at Argoed authorises the Chief Transportation and Asset Management Officer to submit a requisite planning application for the new MUGA facility at Meadow View, Tanyfron all with a view to reporting back to Executive Board for it to consider the possible inclusion in the capital programme of the provision of an additional MUGA in the Brymbo Ward and upgrade of an existing MUGA at Argoed, Brymbo subject to acquiring a suitable interest in the land at Argoed Brymbo and obtaining planning permssion for the facility at Meadow View. REASONS FOR RECOMMENDATIONS To give consideration to enhancing the existing facility of Argoed and to provide a replacement facility in Tanyfron. To allow future consideration of the possible topslicing of the capital receipt received for the sale of land at College Hill Tanyfron to deliver the new and refurbished facilities and the future revenue and maintenance liabilities for the facilities. Martin Wright Chief Transportation and Asset Management Officer 4 4. BACKGROUND INFORMATION 4.1 At the Joint Member/Officer Asset Management Working Group on 30th November 2005, the Chief Finance and Performance Officer informed Members that the forecast surplus in the Capital Receipts Programme would be allocated to school improvements to replace the SBIG allocated to the Rhos Schools Project. That is, £1.1m in 2007/08, £1.1m in 2008/09 and £45k in 2009/10. These figures were based on the anticipated capital receipts being realised at their estimated valuations. 4.2 The local Member commented upon a projected capital receipt of £2,000,000 in respect of disposal of land at Tanyfron and requested that consideration be given to “top slicing” the proceeds realised for reinvestment in the Brymbo/Gwersyllt/Coedpoeth Enterprise Resource Centres. He referred to severe anti-social behaviour problems at Tanyfron and also the need to provide sport facilities. Members were also reminded of the decision of the Executive Board (4/10/2005) that any future capital receipts be invested to enable improvement works to be undertaken in other schools in the County Borough. 4.3 It was resolved that the issues raised in the Local Member’s representations in respect of sale of land at Tanyfron and the proposal to “topslice” be deferred, pending a report on the actual sale of the land. 4.4 The sale of the land at Tanyfron (as shown hatched on Appendix 1) was completed on 31 st March 2006. The total gross capital receipt was £2,611,001 resulting in an additional £611,000 compared to the original estimate. 4.5 A condition was made before the sale of the land at Tanyfron that a scheme for playing fields improvements at Tanyfron C.P. School be commenced. The Scheme was part funded from NOF funding and has now been completed at a cost of £72k. 4.6 Appendix 4 compares the capital receipts position reported to the Asset Management Group in November 2005 with the current position. In November 2005, anticipated receipts were £18,968k and receipts required for funding approved projects were £16,904K, giving a forecast surplus of £2,064k. The current position as reported to the Joint Asset Management Working Group on 9 January was of anticipated receipts of £21,312k, requirements of £21,292k, and a forecast surplus of £20k. 4.7 A significant factor in the reduction in surplus receipts is the additional £1,700k expenditure approved by the Executive Board for the Environment Waste Management PFI project. 4.8 Due to the reduction in the anticipated surplus in capital receipts, the total receipt for Tanyfron is now needed for reinvestment in the capital programme. If capital receipts are allocated to MUGA’s in Tanyfron, receipts will need to be diverted from currently approved schemes (Appendix 4, column D). 4.9 The Local Member, Councillor Shone is concerned that given the ongoing developments in Tanyfron and Brymbo there is now a deficit of open space/playing fields within the Brymbo Ward. In particular, Councillor Shone states that the figures quoted by the Planning survey include land at Brymbo Sports Club, which is accessed by a membership arrangement and therefore, should be excluded. Councillor Shone has now requested that consideration be given to topslicing the capital receipt achieved from the sale of land at College Hill to specifically fund an upgrading of the existing MUGA at Argoed, Brymbo and the erection of an additional MUGA at Meadow View, Tanyfron. 4.10 Site 5 An assessment of existing Open Space/playing facilities within the Brymbo Ward is summarised below: Informal Green Space Area (ha) Total Informal Green Space according to Planning Survey Residential development on land at Rose Way, Tanyfron Possible residential development on land at Argoed Brymbo Total Surplus/Deficit (ha) (Standard = 2.00ha) 3.82 -0.41ha -0.48 2.93 +0.93 ** NB this figure does not include the area of open space which will be required as part of the development of land at Rose Way Tanyfron or the informal green space requirements which have been determined as part of the former Brymbo Steel works site development. Therefore the amount of surplus informal green space will be greater than the figure indicated. Site Youth/Adult Playing Fields Area (ha) Total Youth/Adult Playing Fields according to Planning survey Total Area designated as part of the Brymbo Sports Club Total if excluding Brymbo Sports Centre Surplus/Deficit (ha) (Standard = 5.35ha) 6.97 +1.63 4.03 -2.41 ** NB Brymbo Sports Club - Although the facilities are accessed by a membership arrangement, membership is open to all the community at a nominal annual fee. Site Children’s Equipped Playgrounds Area (ha) Total Childrens Equipped Playgrounds according to Planning survey Total Surplus/Deficit (ha) (Standard = 0.67ha) 0.73 +0.11 ** NB this figure does not include 3 areas designated for playgrounds (equipped) which have been determined as part of the former Brymbo Steel works site development. Therefore the amount of surplus children’s equipped playgrounds will be greater than the figure indicated. The figure does include the removal of an existing facility at Mountain View, Brymbo. 4.11 Establishment of a new MUGA at Tanyfron After discussions with Councillor Shone the two preferred locations for a new MUGA were confirmed as land at Meadow View, Tanyfron and land at Caer Merfyn, Tanyfron. (As shown on Appendix 2). It should be noted however that no ground or drainage investigations have been undertaken prior to the preparation of this report, and at both locations it will be necessary to 6 demonstrate that the use of floodlights will not cause glare or disturbance to nearby properties from light spilling beyond the play area. If a new MUGA were to be erected at one of these locations then ongoing Maintenance procedures would need to be established to ensure that: The playing surface is kept clean The playing surface remains level Drainage of surface water is maintained throughout the life of the pitch The facility remains attractive and well-kept at all times The Environment Department has stated that they are able to carry out routine weekly inspections of the new facility and arrange for floodlighting maintenance. This together with an annual independent risk assessment and ongoing electricity costs would cost approximately £1500 per annum. A summary of the suitability of these sites is given below. 4.11.1 Land at Meadow View The site slopes gently in an east-west direction and consists of mown grass next to a fenced child’s play area. There are overhanging branches, which will require lopping on the northern and western boundaries. The Chief Planning Officer has considered the positioning of the proposed MUGA on this site. He considers the position as shown on Appendix 2 to be the most appropriate as this will require the removal of fewer trees and be further away from the boundaries of residential properties. Thus it is less likely to cause disturbance, particularly if floodlighting is installed. The games area should be ideally located 3.5 metres from the northern boundary of the site beyond the spread of the tree canopy in order to protect two lime trees situated close by. If this matter is pursued further, it will be necessary to demonstrate that the use of floodlights will not cause glare or disturbance to nearby properties from light spilling beyond the play area. The existence of a right of way has also been taken into consideration with the positioning of the proposed MUGA. The space available between the existing playground and site boundaries is such that a games area can be accommodated by altering the position of the playground boundary fence on the western edge. The size of the MUGA would enable the provision of a standard basketball court and non standard 5 a side football pitch to be marked out if required. An access and perimeter footpath will also need to be created which could consist of either paving slabs or bitumen macadam surfacing to allow spectators and participants to approach the play facility from a safe to walk on surface. It would also reduce the possibility of any dirt, dust, or other contaminants, being transported onto the playing surface. This will also improve accessibility for disabled users. The provision of lighting along such footpath should also be considered. 4.11.2 Land at Caer Merfyn This site would be more difficult to develop than that at Meadow View. The site is situated on a lower plateau of a former shale tip. The area would need to be reduced by approximately 1 m to form a level surface. There is no formalised access for 7 wheeled traffic. Access would have to be made along a footpath off Meadow View, which would require a closure during construction. An additional cost of £15,000 should be added to the civil works at Meadow View. Due to the site being set at a higher level than nearby residential properties, and in spite of the fact there are trees along the boundary, the Chief Planning Officer is concerned the siting of the MUGA in this location has greater potential to affect the amenity of nearby properties than the Meadow View option in terms of both noise and flood lighting. A breakdown of the estimated costs for the erection of a MUGA at both locations is detailed on Appendix 5 4.12 Refurbishment of Existing MUGA at Argoed (As shown on Appendix 3) The existing bitumen macadam-playing surface is playable, but is now approximately 25 years old. The playing surface would benefit from a new surface course, as would the link footpath off Argoed. However, access to the site would be required across a field in the ownership of Brymbo Developments and due to the nature of the ground, this would be difficult to achieve at any time other than during the summer months. The existing floodlights (2 no.) will require servicing during any work carried out at the facility Ongoing Maintenance procedures are established to ensure that: The playing surface is kept clean The playing surface remains level Drainage of surface water is maintained throughout the life of the pitch The facility remains attractive and well-kept at all times. The Environmental Department does not currently have responsibility in respect of this facility, as it is not situated on Council land. To inspect and maintain the facility would require a revenue budget of approximately £1,000 per annum. Prior to committing expenditure it will be necessary to establish ongoing arrangements for the availability of the Argoed MUGA to the public and the Council may need to consider securing a long-term lease or acquisition of the field. Any associated legal and/or surveyors costs will also need to be met. The adjoining land has outline permission for residential use, and although a detailed planning application has not yet been submitted there may be an opportunity as part of any open space provision to seek a contribution towards the upgrade of this existing facility. A breakdown of the estimated costs for the upgrade of the MUGA is detailed in Appendix 6 5. CONSULTATION 5.1 Consultation has taken place with the Planning Department, the Legal and Democratic Services Department, the Finance and Performance Department, the Operational Manager Highways Planning and Local Members. Any comments have been reported within the main body of the report 6. 8 SCRUTINY COMMITTEE COMMENTS This matter has not been considered by a Scrutiny Committee. 7. IMPLICATIONS 7.1 Policy Framework. The Community Strategy and Corporate Objectives One of the objectives of the Community Strategy is to increase the availability of safe leisure and cultural activities and more opportunities for play and creativity 7.2 Budget/Finance - Costs of the proposal are an estimated £196K. (This excludes any costs for dealing with contaminants that may be present on site, obtaining consents, provision of mains services, planning permission etc. Additional revenue costs of up to £2,500 per annum are estimated. 7.3 Legal - Any legal implications are identified in the body of the report. 7.4 Staffing - There are no direct staffing implications as a result of this report. BACKGROUND PAPERS LOCATION WEBSITE INFO.
© Copyright 2026 Paperzz