PPMs
The Pre-Production Models are deliverables of
KM3NeT-PP
•
•
•
•
PPM of the optical module
PPM of the calibration system
PPM of the readout/DAQ system
PPM of a ‘small scale’ detection unit

Final deliverable: description of the Production
Models
PPM-objectives
Questions to be answered with these PPMs:
– Can we deploy?
– Can we calibrate?
– Can we measure signals?
– Can we get the signals to shore?
– Can we measure muon signals?
– What do we learn for the PM?
December 2010: Report delivered to EC describing the PPM
models (KM3NeT_FL_REP_PPM_description)
PPM
• 20 storeys, 6m bars, for DU distance of 180m
• 2 storeys with ‘active’ DOMs
• To be deployed and connected at….?
Components
Adjusted PPM test programme
for in-situ validation of technology
1.
PPM-PMTunit: ‘mini-DOM’ in ANTARES
–
2.
Singles rate and coincidence measurements with 3” PMTs
PPM-DOM: ‘full’ DOM in ANTARES
–
–
3.
Long term benchmark of the optical module
Test of KM3NeT readout electronics
DU deployment tests in Toulon area (5 storeys)
–
–
4.
Test of the design and integration of the detection unit (DU)
Test of deployment method
PPM-DU-Mechanics: deployment tests in Toulon area (20 storeys)
–
5.
Test of full unfurling and stability of tower
PPM-DU-Backbone: Deployment of mechanical DU in Pylos area (20 storeys)
–
6.
PPM-Operation Deployment and connection of ‘mini-tower’ at Capo Passero
–
–
time
Test of reliability of backbone handling and DOM penetrators
Test of KM3NeT fibre optics and data transmission
Test of detector operation
Using the facilities and services of the ANTARES, Capo Passero, Pylos sites
i.e. An operational telescope, cables to shore, shore stations, RoVs, deployment
vessels, calibration devices
PPM-PMTunit:
‘mini-DOM’ in ANTARES
• Objective:
– Measurement of singles rates and coincidences with 3”
PMTs
– Delivery of info for simulation software and PMT specs
for tendering
• Implementation:
– 5 PMTs only (limited by ANTARES readout)
– Integration of mini-DOM in ANTARES instrumentation
line
PPM-DOM: ‘full’ DOM in ANTARES
• Objective
– Long term benchmark of DOM
– Test of KM3NeT readout electronics
– Delivery of Production Models for DOM, calibration,
readout/DAQ, transmission network
• Implementation:
– Install a DOM in Instrumentation Line of ANTARES
– Adapt optical data transmission to ANTARES network
PPM-DU mechanics and deployment
• Objective
– Test of deployment and unfurling of full detection unit
– Test of handling of backbone cable during deployment
and unfurling
– Delivery of Production Models of DU mechanics
– Delivery of Production Model of backbone
• Implementation
– Several test deployments with smaller DU models
– Test deployments with 20 storey DU model
PPM-DU backbone
• Objective
– Test of handling of backbone cable during deployment
and unfurling
– Test of penetrators
– Delivery of Production Models of backbone
• Implementation
– Shallow water tests with backbone unfurling
– Install backbone with autonomous fibre monitoring
devices on 20 storey DU
– If possible, use Delta Berenike for deployment/recovery
PPM-Operation:
‘mini-tower’ at Capo Passero site
• Objectives
–
–
–
Test of KM3NeT fibre optics and data transmission
network
Test of detector operation
Delivery of Production Modules of all components
(update)
• Implementation
– Install 3 DOMs (two with ETEL, one with Hamamatsu
PMTs)
– Install ‘active’ backbone cables
– Install ‘active’ storey cables
– Connect to the existing seabed infrastructure and use the
shore station facilities at the Capo Passero site
Prelim planning PPM projects
Project
Deployment
Production Models Delivered
Mini-DOM in ANTARES
Mar-Jul 2012
PMTs (Jun-Aug 2012)
Full DOM in ANTARES
Jul 2012
DOM/calibr./readout/DAQ (Sep 2012)
DU-test deployments
Apr 2012
Mechanical DU
Sep 2012
DU mech. unfurling/Backbone (Oct 2012)
Mini-tower
Oct 2012
Update on PMs (Dec 2012)
Planning needs to be updated
during the WPF/L parallel sessions
PPM-objectives
Questions to be answered with these PPMs:
– Can we deploy?  Mechanical DU
– Can we calibrate?  DOM in Antares, mini-tower
– Can we measure signals?  idem
– Can we get the signals to shore? idem
– Can we measure muon signals?  mini-tower
– What do we learn for the PM?  next slides….
WPF/L today
•
•
•
•
•
•
PMTs
mini-DOM in Antares
DOM in Antares
Calibration
Optical network
Timing
Tomorrow
•
•
•
•
Electronics
DU mechanics and deployment
Backbone
Assembly and integration
14:30Intro
Els de Wolf
14:15PMT measurements at ECAP
Oleg Kalekin
14:40PMT measurements at Nikhef
PMT specs for tendering and alternative for
15:00 glass PMT lense
Maria Tselengidou
Paul Kooijman
15:20CoCo chip on PMT base
Eric Heine
PPM-PMTunit: status and planning mini-DOM in
15:40 Antares
Vlad Popa
16:00PPM-DOM: planning DOM in Antares
16:20
Eric Heine
16:50PPM-DOM: acoustics
Giorgio Riccobene
17:10PPM: Optical time calibration
Umberto Emanuele
17:30PPM: optical network
Jan Willem Schmelling
17:50Timing of the optical network
Henk Peek