Kuali Project ____________________________________________________________________________________ Accounts Payable Matching Functional Specification The University of Arizonia Michigan State University _________________________________________________________________________________________ October 1, 2011 7/13/2017 3:53:00 PM –1– Table of Contents REVISION HISTORY ................................................................................................................................................................................. 3 FUNCTIONAL DESCRIPTION ................................................................................................................................................................... 4 BUSINESS REQUIREMENTS AND ASSUMPTIONS ................................................................................................................................. 4 Assumptions................................................................................................................................................................................................ 4 Requirements ............................................................................................................................................................................................. 5 PREQ FLOWCHART ................................................................................................................................................................................ 8 QUESTIONS/ISSUES ................................................................................................................................................................................ 9 7/13/2017 3:53:00 PM –2– Revision History Version 1.0 1.1 1.2 Date 11/04/2011 11/10/2011 11/29/2011 7/13/2017 3:53:00 PM User Vivienne Merriott Vivienne Merriott MSU Description Draft EIRT Draft –3– Functional Description KFS is delivered with matching functionality on quantity but not on Unit Price. This modification is being requested to account for Unit Price and Cost Source variances. Creating Unit Price tolerances and setting matching exceptions allows for the PREQ to be entered based on the vendor invoice without the initiator verifying the validity of the amount manually. This saves data entry time for the AP Specialist and prevents errors. This modification will use the delivered Cost Source table to identify allowable tolerances for a particular order which will be set when the Purchase Order is created. When the PREQ is processed tolerances will be applied and if a Unit Price falls outside of the tolerable variance a warning message will display to the user upon Calculate. A note explaining the variance for each line item will be added to the Notes upon submit. The PREQ will route to the Fiscal Officer and the Purchasing Office for approval and then back to Accounts Payable for processing. The Fiscal Officer and Purchasing Office approval will be noted in annotations on the Route Log and become part of the PREQ. A new Parameter COST_SOURCE_VALIDATIONS will be available. If turned on to validate against the cost source table and if PREQ does not match based on cost source variances then an EIRT should be created. Error messages should display on EIRT based on KFS validations. When an EIRT is generated from a PREQ the PREQ will be cancelled. Actual eInvoicing When a PREQ is generated from an EIRT and unit price exceeds the cost variance the PREQ should include the same warnings and follow the same routing as a normally created PREQ. Business Requirements and Assumptions Assumptions 1. The Cost Source Table will be used as delivered and configured to establish upper tolerances that meet the needs of all Purchase Orders. 2. All Unit Price tolerances are based on a percentage of the PO Unit Price. There will not be tolerances based on a set dollar amount. 3. The logic used by the EIRT to determine variances will be used by the PREQ. 4. Tolerances will not be calculated for sales/use tax or below the line items. 5. The code that was changed on the EIRT not to require the Specialist to approve overages will need to be added back in. 6. Hold and cancel buttons to function as originally established. 7. Error messages display on document, and move with document when routed. 7/13/2017 3:53:00 PM –4– Requirements 1. Clicking Submit (or calculate) will trigger the variance checking. When variances are exceeded, a warning message should be presented to the AP Specialist, and displayed on the PREQ. 2. When the AP Specialist clicks “reject”, a note is added to the PREQ indicating the type of variance and the lines affected. I.e. Lines 1,2,5 – Unit Price Tolerance exceeded. Lines 3, 4, 6 Quantity invoiced exceeds quantity ordered. Use delivered error messages from EIRT document. 3. The PREQ will go into “Awaiting Overage Approval- Fiscal Officer” when the AP Specialist clicks Submit and there is a variance. The PREQ will route to the Fiscal Officer’s action list. 4. When the AP Specialist clicks “Batch”, PREQ is held in a file to go through a “batch match” job to be run nightly. 5. PREQs that go through batch that have rejections will be in a status of Awaiting Overage Approval – Fiscal Officer. (See 6) Error messages will display as they do on EIRT. 6. Two new route statuses: a. Awaiting Overage Approval – Fiscal Officer b. Awaiting Overage Approval – Purchasing 7. Two new buttons to replace the Disapprove button: a. Overage Disapproved b. Overage Approved with Changes APPROVALS 8. If the Fiscal Officer clicks Approve, the following Question will display: “One or more of the PREQ line items are outside the set tolerances. “ Error messages will be displayed. Each line will have an “accept value” box if line item is outside the set tolerances based on cost source variances. Cost source variances will be determined by each institution. i. If FO approves payment (higher price or quantity)determined by Purchase Order values. Clicking the “accept Value” button and then clicking “Approve” will send PREQ to Awaiting Overage Approval – Purchasing. The PREQ will route to the Purchasing Processor group for Approval. 7/13/2017 3:53:00 PM –5– 9. If the Purchasing Processor clicks ‘Approve”, the following Question will display: “One or more of the PREQ line items is outside the set tolerance. Error messages will be displayed. Each line will have an “accept value” box if line item is outside the set tolerances based on cost source variances. If Purchasing “accepts value” and clicks “Approve” the PREQ will route to Accounts Payable. 10. For each of the above approvals an annotation will be added to the route log indicating each areas approval of the overage. Approval to exceed the Unit Cost tolerance has been granted by <PACS> or <FISCAL OFFICER> 11. The Fiscal Officer and Purchasing Processor will have two additional buttons when the PREQ is in the Awaiting Overage Approval statuses. The Disapprove button will not display DISAPPROVED 12. Overage Disapproved – means all lines should be short paid. a. If the Fiscal Officer clicks this button: i. An explanation box will display ii. The PREQ will be sent to the Initiator’s (AP Specialist) action list. iii. The PREQ will be editable and the AP Specialist will short pay the entire invoice. b. If the Purchasing Office clicks this button: i. An explanation box will display. ii. The Buyer will add a note explaining why they are disapproving. iii. The explanation will be added to the Notes section. iv. An FYI will be sent to the Fiscal Officer letting them know the Purchasing Office disapproved the overage. v. The PREQ will route to the Initiator’s (AP Specialist) Action List. vi. The PREQ will be editable and the AP Specialist will short pay the entire invoice. 13. Overage Approved with Changes – means some of the lines are approved to be overpaid. a. If the Fiscal Officer clicks this button: i. An explanation box will display. ii. The Fiscal Officer will indicate which lines should be overpaid. iii. The explanation will be added to the Notes. iv. The PREQ will route to the Purchasing Processor group for Approval. b. If the Purchasing Office clicks this button they are changing what the Fiscal Officer has approved. i. An explanation box will display. ii. The buyer will indicate what lines are approved for over pay. iii. The explanation will be added to the Notes. iv. An FYI will be sent to the Fiscal Officer. 7/13/2017 3:53:00 PM –6– v. The PREQ will route to the Initiator (AP Specialist). vi. The AP Specialist will pay the PREQ according to the Buyers instructions. 14. The AP Processor should receive the PREQ back into their action list after it has routed to the Fiscal Officer and Buyer and should be editable when they access it. Their approval completes the PREQ. Additional approvals by the Fiscal Officer are not required. 15. The Auto approval job should not pay PREQs when they are in the new statuses. 16. PREQs generated from EIRTs where the Specialist has approved unit prices outside of the variance will add the same explanatory notes and drop into the routing explained above. 17. When “accept Value” button is clicked the PREQ will advance in workflow no matter the price or quantity. 18. The “accept value” button will appear on the fields of the PREQ to mimic the fields as they apprear on the EIRT doc. PARAMETER 19. If parameter (COST_SOURCE_VALIDATIONS)is turned on and an EIRT is generated then PREQ will be in AP Action list. a. Status will be Enroute 7/13/2017 3:53:00 PM –7– PREQ Flowchart Ø EIRT is created. Ø Ø Ø Create PREQ. Calculate. Compare each line to Cost Source Table to determine Allowable Variance. Calculate Or Batch PREQ follows normal process. No Yes Yes Ø Ø Ø Ø Submit. Note added to PREQ. Routes to Fiscal Officer. Status: Awaiting Overage Approval – Fiscal Officer. No Yes Display Question Prompt: PREQ contains overages - OK? Yes Approve? Approve Overage with Changes No No Disapprove Overage Yes Ø Ø Yes Routes to PACS. Status: Awaiting Overage Approval – Purchasing. Display input box so the user can indicate which lines can be overpaid. No Display Question Prompt: PREQ contains overages - OK? Yes Approve? No Approve Overage with Changes? No Disapprove Overage? Yes Display input box so the user can indicate which lines can be overpaid. Yes Yes Send FYI to Fiscal Officer. 7/13/2017 3:53:00 PM –8– Questions/Issues 1. Can a routing for approval be sent to go to the buyer on the PO after the A/P specialist has submitted the PREQ and answered “Y” to the warning? Yes – we are adding new route nodes. 2. If the Fiscal Officer approves the PREQ to over pay, do they need to approve again? No. Cost Source Upper Price % Lower Price % Upper QTY % Estimate Quote Contract Construction Shipping Variance 7/13/2017 3:53:00 PM –9– Freight Parameter Active Indicator Accounts Payable/ Calculate Process Flow: Invoice Match Author: Merriott Page 1 of 2 Invoice Calculate Or Batch? PREQ validations Are in place Calculate Yes PREQ Validation/ Cost Source Table Match? Batch Department Office Batch Approve PREQ Routes to Purchasing Disapprove PREQ Routes to Accounts Payable A FO Overages Parameter Cost Source PREQ Validations PREQ Routes to Accounts Payable A Match? No Parm On or OFF On EIRT C AP Short Pays per instructions Accounts Payable pays overages and Doc is FINAL Approve No PREQ Routes to Accounts Payable PREQ In AP Review PREQ Is FINAL End End AP Short Pays per instructions ebsp.msu.edu Copyright ©2008 Michigan State University. All rights reserved. 7/13/2017 3:53:00 PM No Approve Or Disapprove C Purchasing Overages PREQ Nightly Batch Run End PREQ Routed to FO YES Purchasing Purchasing w/Overages PREQ In AP Review Yes PREQ Creation 11/10/2011 – 10 –
© Copyright 2026 Paperzz