LOCATION PLAN p ZDDDDDZZZZZZZ Q1 Q1 Q1 Q1 Q1 Q1 Q1 Q1

REMOVE END SECTION OF ROSE
BED TO PROVIDE VIEWS ALONG
CREEK & IMPROVE PEDESTRIAN
& BIKE LLINKS
Q1
Q1
INCLUDE HERITAGE ROSE
WITH IDENTIFICATION
PLAQUES
Q1
Q1
Q1
Q1
Q1
AVENUE OF SCARLET OAKS PLANTED
AS PART OF AUTUMN WALK
Q1
Q1
BOLLARDS
CAR PARK
SCATTERED TREE PLANTING
WITH POSSIBLE TRANSPLANTING
OF EXISTING CONIFERS
RETAIN
EXISTING HEDGE
D
+
Q1
ST
R
EE
T
Z
+
Z
REGRADE DETENTION BASIN
TO CREATE A MORE
ATTRACTIVE, FUNCTIONAL
& ACCESSIBLE SPACE
Z
CLOSE EXISTING
CROSS OVER
Z
Z
TREE TO BE REMOVED
ROSES
W
RELOCATE BOLLARDS,
PROVIDE NEW PAVING OF MORE
APPROPRIATE MATERIALS
NE
RECONSTRUCT
END SECTION
OF WALL
TH
PA
Z
RETAINING
WALL
Z
NOMINAL PLANTING OF ZELKOVA ‘GREEN
VASE’ SUBJECT TO FUTURE DEVELOPMENT.
PROVIDE CONTINUOUS PERMEABLE VERGE IF
POSSIBLE OR GENEROUS TREE PITS, WITH
ROSES, PAVED BETWEEN.
NEW PATH
Z
PROVIDE FILL TO UNUSED ROAD
RESERVE TO CREATE GRADED
BIKE/PEDESTRIAN LINK TO TOWN
CENTRE. PLANT WITH ROSES.
AS
+
EXISTING TREES TO BE
RELOCATED IF REQUIRED
FOR DETENTION BASIN
REGRADING
NEW RAMP
PRICKLY SHRUBS TO
RESTRICT ACCESS
D
Q1
D
U
M
Q1
BOLLARDS
AUCHE
AUCHENDARROCH
ENDARROCH
COMPLEX
COMPL
LEX
RELOCATE EMERGENCY EXIT
PATH FROM CINEMA TO OPEN,
SAFE PUBLIC AREA
D
QT QT
Q1
CREATE STRONGER
‘CREEK LINE’ WITH
ROCKS + SEDGES
RETAIN RUBBLE SURFACE
FOR HISTORIC ASSOCIATION
OF FORMER ROADWAY
D
D
Q1
MAJOR ART PIECE AS FOCAL
POINT, VARIOUS POSSIBLE
THEMES E.G. HISTORY OF
AUCHENDARROCH
CINEMA
RETAIN
EXISTING ROSES
ROAD
AIDE
ADEL
PROPOSED SIGNALLED PEDESTRIAN
CROSSING TO IMPROVE SAFETY AND
CONNECTIONS TO PARK AND
COMMUNITY FACILITIES
GE
ED
D
CB
ST
INFILL TO MATCH
ADJACENT TREES
OF
THE TRIANGLE RESERVE
ER
WL
GA
p
MA
NN
ST
match to L1: Keith Stephenson Park Master Plan
GRASS
Q1
)
ET
RE
ST
TT
HE
RP
MO
DECIDUOUS
TREES AS
PART OF
‘AUTUMN
WALK’’’
Q1
PROVIDE SWALE
CROSSING POINT
Q1
3 EXISTING PIN OAKS (
TO BE TRANSPLANTED
AFTER REGRADING (QT)
QT
Q1 Q1
RETAIN
EXISTING KERB
NEW PATH TO
SKATE PARK’
Q1
Q1
GRASS
match to L3
HERITAGE ROSE WALK
RETAIN ROSE BEDS BUT MIX
PINK & WHITE TO ACHIEVE
BETTER BALANCE
LOCATION PLAN
LEGEND
Z
new tree, refer
schedule for species
existing tree
to be retained
+
QT to be relocated
Z: Zelkova serrata (Green Vase)
Q1 : Quercus coccinea (scarlet oak
P: Platanus acerifolia (plane tree)
D: Deciduous tree with good
autumn colour
TREE SCHEDULE
0
L3
project:
ADELAIDE ROAD & KEITH STEPHENSON PARK
drawing:
ADELAIDE ROAD - MANN ST to DUMAS ST
client:
DC Mount Barker
job no.:
HA08290
scale:
1:500 at A1
drawing no.:
L3
date:
February 2010
dwgs in set:
3 of 6
issue:
FINAL
amendments:
transplanting clarified
5
10
15
20
25m
hilary hamnett & associates
30 little sturt st . adelaide . sa 5000
t: 08 8211 6212 . m: 0408 897 445
in association with Martin Corbin
A1
sheet size