Chapter-4 Summary of Annual Revenue Requirement and Proposed Tariff 2003-04 SUMMARY 4.1 The Punjab State Electricity Board (PSEB) has filed its Revenue Requirement for the year 2003-04 for an aggregate amount of Rs. 8421 crores. This covers the total expenses of Rs. 8,201 crores and return on net fixed assets of Rs.220 crores (3% on net fixed assets). The expected revenue projected at the current tariff rates is Rs.6299 crores and non-tariff income at Rs. 260 crores thus forecasting a revenue gap of Rs.1,862 crores. The summary of Annual Revenue Requirement as filed by PSEB is given below in Table 4.1 Table – 4.1 Annual Revenue Requirement as per ARR (Rs. Crores) Sl.No. Item Estimated Expenditure 1 Generation costs 2 Power Purchase expenses 3 Depreciation 4 Interest charges* 5 A&G Expenses* 6 Employees cost* 7 R&M Expenses* 8 Finance charges and other debts 9 Net Expenditure 10 Reasonable return 11 Total Revenue Requirement 12 Less non tariff income 13 Net Revenue Requirement 14 Less Subsidy 15 Less Revenue at Current tariff 16 Net Revenue Gap * Net of capitalization. 2,120 2,350 707 1,227 40 1,461 252 44 8,201 220 8,421 260 8161 0 6,299 1,862 The major items of expenses are Generation [Fuel] cost (26%), power purchase (28%), establishment costs (18%) and interest charges (15%). PSERC-Tariff Order for PSEB – FY 2003-04 82 4.2 ENERGY PROJECTIONS PSEB in its ARR has given the projected energy sales and energy availability for the year 2003-04 as follows: Energy Sales Sl. No. Category of Consumers 1 2 3 4 5 6 7 8 9 Domestic Non-Residential Small power Medium Supply Large supply Agriculture Pubic lighting Bulk Supply and Railway traction Total Sales in the State (MU) Projected Energy Sales 5491 1212 643 1537 6260 6288 86 371 21888 Energy Availability (MU) (a) Generation (i) Gross Generation Hydro - Own generation - BBMB (including 340 MU as share of common pool consumers) Thermal Total (ii) Auxiliary consumption. (iii) Net generation (b) Power Purchases (Net) (c) Total energy available. (d) Less (i) Common pool sales. (ii) Outside State sales. (iii) Outside state (Royalty and free power to HP) (e) Energy available for sale within the State (c-d). (f) T&D loss at 26%. (g) Estimated energy sales in the State (e-f) 4.3 PROPOSED TARIFFS 4.3.1 Existing and Proposed Tariffs 3335 3900 13720 20955 (1167) 19788 10691 30479 340 460 101 29578 7690 21888 The PSEB has filed tariff proposals for increase in the existing tariffs to meet the Revenue Requirement for the year 2003-04. The existing and proposed tariff rates are given below in Table-4.2. PSERC-Tariff Order for PSEB – FY 2003-04 83 Table: 4.2 Existing and Proposed Tariffs for 2003-04 Category Existing Tariff Energy charges (P/U) MMC (Rs./kW) or part thereof Proposed Tariff Energy charges (P/U) MMC (Rs./kW) or part thereof % Increase Energy Charges MMC (A) Permanent Supply (1)Domestic Supply a) Upto 100 units b) 101-300 units c) Above 300 units (2) NRS (3) Public Lighting (4) Irrigation Tubewlls 179 265 301 48% 400 33% 35 334 390 390 1) Without Govt. subsidy 200 P/unit or Rs.212 /BHP/month II) With Govt. subsidy 57 P/unit or Rs.60/ BHP/month (5) Industrial Supply (a) Small 290 Power (b)Medium 329 Supply © Large Supply (i) General 342 Industry (ii) P.I.U. 342 (iii)Arc.Furn 342 ace (6) Bulk Supply HT 352 LT 374 (7) Railway 444 Traction 225 (8) Outside State 45 400 125 As per 8 hrs a day N.A. 475 470 100 29% 20% 150 As per 8 hrs a day Rs.320 per BHP per month for metered consumers 22% 21% 20% 382 135 33% 35% 135 418 165 22% 23% 370 350 400 400 435 411 17% 17% 17% 17% Rs.200/kVA Rs.200/kW Rs.200/kVA 429 455 444 Rs.305/kVA Rs.305/kW Rs.200/kVA 22% 22% 0% 52% 52% 0% NA 236 NA 5% NA Without Govt. Subsidy 286 P/unit or Rs.330/ BHP/month 135 PSERC-Tariff Order for PSEB – FY 2003-04 84 Category Existing Tariff Energy charges (P/U) MMC (Rs./kW) or part thereof Proposed Tariff Energy charges (P/U) MMC (Rs./kW) or part thereof % Increase Energy Charges MMC (B)Seasonal Industry: Cotton Ginning. Pressing & Bailing Plant, Rice Shellers/Huller mills, Rice bran stabilization units (without T.G sets) (a) During Relevant Rs.370/KW 418 Rs.455/KW 22% season Industrial tariff (Prescribed as per A(5) seasonal period is from 1st Sept. to 31st May next year) (b) Off Season SP 345 NA 446 NA 29% NA MS 384 LS 395 483 22% (c ) Ice Factory, Ice Candies and Cold Storage (a) Season (April to July) SP 290 Rs.500/KW 382 Rs.625/KW 33% 25% (Apr-July) (Apr-July) MS 329 LS 342 418 22% (b) Off season SP 290 Rs.100/KW 382 Rs.135/KW 33% 33% MS 329 Rs.135/KW LS 342 Rs.135/KW 418 Rs.165/KW 22% 22% (d) Golden Temple, Amritsar (a) 1st 2000 Free NA Free NA NA Units (b) Beyond 246 NA 295 NA 20% NA 2000 Units (E) Temporary Supply (1) 546 Rs.500 or 655 Rs.600 or Domestic Rs.100/KW Rs.120/KW whichever is whichever is higher higher (2) NRS 546 Rs.1000 or 655 Rs.1200 or Rs.250/KW Rs.300/KW whichever is whichever is higher higher (3) As per tariff at Rs.400/kW of As per tariff at Rs.480/kW of Industrial A(5) above for sanctioned A(5) above for sanctioned load (SP,MS & permanent load permanent LS) supply +100% supply +100% (4) wheat As per tariff at Rs.400/kW of As per tariff at Rs.480/kW of Thrasher A(5) above for sanctioned A(5) above for sanctioned load permanent load permanent supply + 100% supply +100% PSERC-Tariff Order for PSEB – FY 2003-04 85 Category Existing Tariff Energy charges (P/U) (5)Fairs, Exhibition & melas Congregation (6)Touring Cinemas a) Lights and fans b) Motive load As per tariff at A(6) above for bulk supply +50% MMC (Rs./kW) or part thereof Rs.4000 per service Proposed Tariff Energy charges (P/U) As per tariff at A(6) above for bulk supply +50% MMC (Rs./kW) or part thereof % Increase Energy Charges MMC Rs.4800 per service 546 For (a) & (b) 655 For (a) & (b) Rs.1000 or Rs.1200 or Rs.300/kW of As per tariff at Rs.250/kW of As per tariff at sanctioned load A(5) above for sanctioned A(5) above for load whichever is permanent permanent higher supply +100% whichever is supply +100% higher Note: Tariff proposed for Irrigation Tubewell and Domestic category supply to SC category is without Govt. Subsidy Note:- It has been noted that in the existing tariff the Board has not included the fuel surcharge @ 3 paise/ unit approved by the Commission w.e.f. 18.8.2002. The Board has proposed two slabs for Domestic consumers (upto 100 units/month and above 100 units/month) against the existing three slabs (Upto 100 Units, 101300 units and above 300 units) The Board has also proposed to reduce the industrial consumers to two categories by merging medium supply consumers partly with small power (50 kW and below) and the balance (51 kW – 100 kW) with large supply. The Commission in its Tariff order for the year 2003-03 directed the Board to submit the required data to introduce two-part tariff for MS and LS consumers. The Board in its petition has submitted that the data on contract demand for MS consumers would take considerable time and it would be possible to furnish the data after about a year and has requested that such charges be levied from the year 2004-05. 4.3.2 Revenue from Existing and Proposed tariff rates The Board has projected the following revenue from various consumer categories with reference to existing and proposed tariffs as given below in Table 4.3. PSERC-Tariff Order for PSEB – FY 2003-04 86 Table: 4.3 Revenue from Existing and Proposed Tariff Rates Annual Consumption (MU) Delivered Cost @ 358 P/Unit* Rs. Crores Domestic 5491 1966 1271 1740 (696) (226) NRS 1212 434 473 576 39 142 86 31 34 40 3 10 6288 2252 1154 1797 (1098) (455) Small Power 1119 401 343 428 (214) 27 Large Supply 7320 2622 2500 3027 (476) 405 294 105 107 130 1 25 77 28 34 34 7 7 901 323 169 169 (154) (154) Revenue from MMC and other Charges 220 220 Revenue Recovery from Sale of Power 6304 8162 Consumer category Public Lighting Agriculture Recovered Cost (Rs. Crores) Existing Proposed Tariff Tariff Deficit / Surplus (Rs. Crores) Existing Proposed Tariff Tariff Industrial Bulk Supply Railway Traction Other * Net Average cost of Power after considering the non-tariff income. Notes : i) In the above table energy sales SP and LS category has been shown as 1119 MU and 7320 MU and MS category has not been indicated. However, in the ARR energy sales for SP, MS and LS category has been shown as 643 MU, 1537 MU and 6260 MU respectively. This may be presumably due to the fact that in the tariff application, PSEB has proposed to reduce the industrial consumers to two categories by merging medium supply consumers partly with small and partly with large supply. ii) The figure of total revenue, with existing and proposed tariffs, depicted in the above table differ from those given in the ARR as is clear from table 4.1. iii) There are some discrepancies in the figure work in the above table e.g. deficit with existing tariff for small power and large supply should have been Rs. 58 crore and Rs. 122 crore in place of the indicated figures of Rs. 214 crore and Rs. 476 crore respectively. The Board has requested for tariff increase of about 17% to 48% for different categories of consumers other than Railway traction and Agriculture pumpsets. For railway traction no increase in tariff has been proposed. For Agricultural pumpsets a rate of Ps. 286/ unit or alternatively Rs.330/ BHP / month has been proposed without subsidy from the State Government. PSERC-Tariff Order for PSEB – FY 2003-04 87 2002-03 REVIEW PSEB has stated that as per the Tariff Order issued by the Commission on 6th September 2002 PSEB was expected to achieve a surplus of about Rs.38 crores during 2002-03. But it is now mentioned in the ARR that operational costs of the Board have increased and there is a decrease in the revenue receipts and PSEB projected the Revenue gap at Rs.1401 crores in the revised estimates for 2002-03. As per PSEB, the gap has arisen mainly on account of: Shortfall in hydel generation due to partial monsoon failure. Shortfall in thermal generation. Increase in the consumption by agricultural pumpsets on account of drought conditions. Resultant increase in energy purchases and cost of power purchase. Increased consumption by the low yield categories of consumers. Sharp decline in the consumption by the Large Supply category of consumers and Anomaly due to over stated non-tariff income by Rs. 192 cores on account of railway freight surcharge. PSEB has proposed that the expected shortfall of Rs.1401 crores in 2002-03 may be treated as a “Regulatory Asset” to be recovered in subsequent years with interest. The performance of the PSEB for the year 2002-03 is analyzed in Chapter 2 of this Tariff Order. PSERC-Tariff Order for PSEB – FY 2003-04 88
© Copyright 2026 Paperzz