Purchasing Department 525 Buena Vista SE Bldg A, Room #128 Albuquerque, NM 87106 (505) 224-4546 Addendum/Amendment # 2 DATE: TO: FROM: Tuesday, February 9, 2010 All Offerors of Record Charlotte Gensler, Director for Purchasing SUBJECT: Addendum/Amendment #2 to P-291 “Architectural Design Services for the Renovation of former Data Center Building for a new Bookstore, Student Activities and Gathering Areas at CNM’s Main Campus”. This addendum becomes part of the Contract Documents. Bidders are required to acknowledge receipt of this Addendum in the space provided on the RFP Form SECTION F: Signature of Firms Authorized Representative. 1. Q: A: Are images of the existing site and the APS Data Center Facility available? See Attached 2. Q: A: Is CNMCC considering out-of-state architectural firms for the project? Yes, however all offerors, in state or out of state, must meet the requirements of the rfp. 3. Q: A: Is a list of previous architectural design contract awards available for review? CNM posts recent awards to our web site. 4. Q: Is a list of architects, engineers and subcontractors interested in the Data Center renovation project available for review? A: They are available for review after an award is made. 5. Q: A: rfp). 6. Q: Should respondents provide proof of required insurance with the submittal. Is a letter of intent written by the respondents insurer to provide required insurance and said limits acceptable? A: Offerors do not have to submit insurance with their offer. In signing Section F, offerors acknowledge that they are a competent firm capable of providing the goods and services, including the requirements of the insurance. Does the Section E 30-page limit refer to single-sided or double-sided pages? Does not matter so long as it is 30 pages with the allowed exclusions(see page 30 of P-291 Amendment/Addendum #2 1 7. Q: Is there any further narrative information available on the CNM master plan, aside from the addendum/amendment #1 sent out on P-290? A: Can you tell us which firm prepared the master plan document? CNM prepared the masterplan document. The text and graphics are included as a part of this rfp. 8. Q: Will solar and wind power options be integrated into the power supply for the new buildings? A: CNM would like to explore the issue of solar and wind in a limited scale to serve as a demonstration for students, for example exterior lighting on the entrance may use some solar technology. It is the intent that the building will not use solar or wind power but CNM will purchase renewable energy from PNM. 9. Q: Is there a document which delineates the actual location of the 5 acres to be surveyed? A: No. CNM has a general idea of the location but would like input from the Architect as ideas are generated which may alter the location of the 5 acres. 10. Q: Would CNM desire the architect to explore the issues of water harvesting and sustainable landscape as part of the project? A: This possibility will depend on the LEED Checklist that will be developed with CNM and the ability to meet the LEED Silver Certification. 11. Q: In the Scope of Work section of the RFP, you describe a landscaping plan that will “help guide students from the parking area to the corner intersection so that students can travel safely from one side of the campus to the other.” Is the intersection in question the corner of Basehart and University? A: Yes, the intersection that is referred to in the RFP in the corner of Basehart and University 12. Q: Are there other landscape issues to be addressed that are campus-wide, and not just confined to the area surrounding the former Data Center building? A: CNM would like the landscaping to compliment the other areas of the campus and reinforce the recently constructed pedestrian fence that runs through the center of the median. 13. Q: Will the new bookstore continue to be run by the college, or will it be run by another vendor with specific requirements? A: The facility and the bookstore including all furniture fixtures equipment and supplies will be owned by CNM and an outside vendor will be selected to manage the operations of the bookstore. 14. Q: On page 7 under section 3.9 RESPONSIBLE OFFEROR, there is an underlined sentence .....and must be registered with the appropriate State of New Mexico body. Could you clarify what is meant by appropriate? A: Required by local, state or any other appropriate governmental entity. 15. Q: Please clarify page limitation. On page 30, section E: PROPOSAL FORMAT AND EVALUATION CRITERIA FOR RFP #P291, paragraph 2 there is an explanation of excluded pages. My question is concerning the resumes. Are the resumes included in the page numbering? P-291 Amendment/Addendum #2 2 A: resumes are not included in the page limitation. See question 5. 16. Q: The new construction at the old APS data center facility will be 25,000 sf. What portion of that will be devoted to the bookstore? A: 10,000 square feet will be devoted to the bookstore. 17. Q: Please clarify Exhibit A: Insurance Requirements. We are asked to provide certificates of insurance for Workman's Compensation, Professional Liability, Public Liability and Vehicle Liability. The Public Liability and Vehicle Liability and maybe even the Workman's Compensation seem more geared toward the General Contractor, not the Architect. A: see question #6. 18. Q: A: What is your projected construction completion date? Beginning of Spring 2013 term. P-291 Amendment/Addendum #2 3 RECORD DRAWINGS
© Copyright 2026 Paperzz