Purchasing Department 525 Buena Vista SE Albuquerque, NM 87106 (505) 224-4546 AMENDMENT # 1 DATE: September 21, 2010 TO: All Bidders of Record FROM: Gil Rivera, Buyer SUBJECT: Amendment #1 to P-302, “Campus Master Plan” This amendment becomes part of the Contract Documents and modifies the original bidding documents as noted below: Bidders are required to acknowledge receipt of this Amendment in the space provided in Section E. 1. QUESTION: ANSWER: 2. QUESTION: ANSWER: The criteria states that fees are 15% of the total score. Does that indicate that the fees will be used in the selection for a short list of firms or does it indicate, since the fees are to be included in a separate sealed envelope, that fees will be used in the negotiations with the most qualified firm after the short list and interviews? No, CNM amends the requirement for the price proposal as follows. CNM no longer requires pricing to be provided in a separate sealed envelope. Price Proposals shall be included in the Bidder’s main offer, and not supplied in a separate sealed envelope. All offers including pricing shall then be reviewed by the Evaluation Committee. Reference to Section 3.4.2 under Response Format (page 8). Item 2 – Letter of Transmittal – is this item included in the 10 page limitation referenced in item #4? I ask because item 4 references only SECTION D for the 10 page limitation, then it specifically excludes several items, but does not mention the Letter of Transmittal. The Letter of Transmittal is included in the ten (10) page limit. This is a letter is intended as a brief, concise, depiction on why the Offeror believes they should be selected. RFP # P-302, Amendment # 1 Copyright CNM 2010. All rights reserved. Page 1 of 2 3. QUESTION: ANSWER: Where exactly is the 40 acre site located? Would it be possible for a respondent to visit the site prior to the due date for the RFP? The property is located approximately ¾ miles west of the Atrisco Heritage High School on Dennis Chavez. The property is vacant land to the south of the road. Refer the attached drawing labeled “Exhibit C.” Yes, Offerors may visit the site on their own; CNM will not send a representative should Offerors wish to perform a site survey. 4. QUESTION: ANSWER: 5. QUESTION: ANSWER: 6. QUESTION: ANSWER: Has CNM developed any specific uses or needs that the site plan will need to address? Total build out? CNM has not developed any specific uses for the site. It is anticipated that the campus will be phased in 4 phases. Is there any current infrastructure at the site? If not will a central plant need to be addressed as part of the master plan? There currently exists no infrastructure to the site. Dennis Chavez Road borders the property to the north, but utilities will need to be extended to the site from existing services. Does CNM have an existing set of sustainable guidelines? No sustainable guidelines are documented. It is the intent of the plan to assist CNM in developing sustainable guidelines specific to this site. CNM is interested in developing a sustainable campus. Bidders are required to acknowledge receipt of this Amendment in the space provided in Section E. The due date and time of 3PM MDT, Monday, October 4, 2010 remains unchanged. All other specifications, terms and conditions remain unchanged. RFP # P-302, Amendment # 1 Copyright CNM 2010. All rights reserved. Page 2 of 2
© Copyright 2026 Paperzz