Purchassing Departm ment 525 Buena B Vista SE Albuqueerque, NM 877106 R REQUEST FO OR PROPOSAL LS NO.: P-357 TITL LE: Engineerinng/Design Profeessional Servicess for Techhnology Loop annd Wellness Patth R RFP DUE DAT TE: October 21 1, 2013 R RFP DUE TIM ME: 4:00 PM lo ocal time (MST)) N NON-MANDAT TORY PRE-PR ROPOSAL MEE ETING D DATE: Frid day, October 4, 2013, 2:00 – 4:0 00 PM L Location: CNM M’s Main Camp pus 835 5 Buena Vista SE Stu udent Resource Center, C Rooms SRC111H/SRC C111J hhttp://www.cnm m.edu/maps-and--directory/mainccampus/map/maainccampus-map-09 9-12 B BUYER: Gil Rivera R P Phone: 505-224 4-4546 Fax x: 505-224-454 48 E E-mail address: griv [email protected] N NUMBER OF RESPONSES R REQUIRED: R One O (1) Originall and F Five (5) Copies NOT TE: Attendancce at this non n-mandatory m meeting is STR RONGLY recom mmended. FRE EIGHT TERMS S: FOB Destinaation Freight Inccluded YMENT TERM MS: Net 30 Dayys PAY T TABLE OF CO ONTENTS: SECTION A: SECTION C: SECTION D: SECTION E: SECTION F: SECTION G: SECTION H: EXHIBIT A: EXHIBIT B: EXHIBIT C: EXHIBIT D: EXHIBIT F: EXHIBIT N: EXHIBIT P: EXHIBIT Q: EXHIBIT R: EXHIBIT S: Proposal Su ubmission Requ uirements, Form mat and Content Submittal Instructions, Ten ntative Sequencee of events Standard Prroposal Terms and a Conditions CNM Geneeral Terms and Conditions C Scope of Seervices, Specificcations, and Evaaluation Criteriaa Signature of o Firm’s Authorrized Representtative Debarment//Suspension Staatus & Non-Colllusion Affidavitt Form Resident Veterans Preferen nce Certification n Affidavit Form Insurance Requirements R Campaign Contribution C Diisclosure Form Sample Non-Disclosure Ag greement Sample Serrvices Agreemen nt for Solution Constructio on Contract, AIA A A-201 as ameended by CNM. MAIN Cam mpus Technolog gy/Wellness Loo op Conceptual D Diagram Network To opology Phone Systtem Topology Future Tech hnology Environ nment ITS Changee Management Process P R RFP # P-357, Advertised Monday, M Septtember 30, 20 013 C Copyright CNM 2013. All rights r reserve ed. PA AGE #: 2–3 4–5 6 – 14 15 116 – 33 34 35 36 37 38 339 – 40 441 – 44 445 – 70 Posteed to website 1 Page 5 Pages 1 Page 2 Pages 220 Pages P Page 1 of 70 PROPOSAL SUBMISSION REQUIREMENTS, FORMAT AND CONTENT: Central New Mexico Community College (CNM) invites you to submit a proposal for the services specified in this Request for Proposals. Please read carefully all instructions, specifications, terms and conditions. Failure to comply with the instructions, specifications, terms and conditions of this Request for Proposals may result in your proposal being declared non-responsive. The purchase of materials and or services awarded under this Request is subject to CNM's General Terms and Conditions as well as all statements contained in this Request for Proposals. All terms and conditions of the Request for Proposals shall remain unchanged for the duration of any resultant agreement(s) and shall supersede and take precedence over any vendor agreement forms. Additional or different terms proposed by the vendor are hereby rejected unless agreed to in writing by CNM. The New Mexico criminal law prohibits bribes, gratuities and kickbacks (13-1-28 through 13-1-199, NMSA 1978). Any and all clarifications of instructions, specifications, scope, requirements, terms and conditions, insurance, bonds, or proposal preparation, etc. shall be made only by the Buyer listed above. All requests for clarification or exception to instructions, terms and conditions, specifications, requirements, scope, insurance, bonds, or proposal preparation, etc. must be made in writing, addressed to the Buyer listed above, and submitted no later than five (5) days prior to the proposal due date. Technical questions concerning scope of work, CNM's requirements, needs or expectations and the vendor's requirements, needs or expectations must be directed to the technical clarification contact listed above. If a technical clarification contact is not listed above, then all such questions must be directed to the Buyer listed above. If appropriate in CNM's sole judgment, CNM Purchasing may issue a written Amendment or addendum which shall thereafter become part of this Request for Proposals. No oral interpretations shall be binding upon CNM unless reduced to a written amendment issued by CNM Purchasing prior to the proposal due date and time. Your reliance on any such oral interpretations shall be deemed to be unreasonable. Each respondent, by submitting a response, represents that the respondent has read and completely understands the request for qualifications documents and agrees to abide by the terms of this RFP and any resulting agreement. Failure of the selected contractor to fulfill the provisions of this request for qualifications shall in no way relieve the obligation of the Contractor to furnish all services necessary to carry out the provisions of the agreement. The contents of this RFP, as revised and/or supplemented, and the successful Offeror’s proposal will be incorporated into and become part of the awarded Price Agreement. Should an Offeror object to any of the terms and conditions of this RFP, the Offeror must expressly identify any and all exceptions to this proposal’s scope of work, terms and conditions in their proposal response to receive consideration, and propose specific alternative language. Proposers must provide a brief discussion of the purpose and impact, if any, of each proposed change, followed by the specific proposed alternate wording.CNM may or may not accept the alternative language. General references to the Offeror’s terms and conditions or attempts at complete substitutions are not acceptable to CNM and will result in disqualification of the Offeror’s proposal. The final terms and conditions of any resultant contract may differ from those provided herein. Proposer’s Terms and Conditions – Proposers must submit with the proposal a complete set of any additional terms and conditions which they wish to have included in a contract negotiated with CNM including any license agreements, maintenance agreement, or warranties associated with the proposed solution. Contract Deviations – Any additional terms and conditions, which may be the subject of negotiation, will be discussed only between CNM and the selected proposer and shall not be deemed an opportunity to amend the substance proposer’s proposal. CNM is not responsible for representations made by any of its officers or employees prior to the execution of the Agreement(s) unless such understanding or representation is included in the RFP or in subsequent written addenda or responses provided to all proposers by CNM’s Purchasing Department. CNM is responsible only for that which is expressly stated in the solicitation document and any authorized addenda thereto. Any cost incurred by the RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 2 of 70 PROPOSAL SUBMISSION REQUIREMENTS, FORMAT AND CONTENT: Respondent in preparation, transmittal or presentation of any proposal or material submitted in response to the RFP shall be borne solely by the Respondent. Contractor shall not be an employee of CNM and is responsible for federal and state payroll and service taxes such as social security, unemployment and gross receipts taxes. Service required by this RFP for which the Successful Offeror does not identify cost will be borne at the Offeror’s expense and will not be charged to CNM. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 3 of 70 PROPOSAL SUBMISSION REQUIREMENTS, FORMAT AND CONTENT: SUBMITTAL INSTRUCTIONS: To submit a proposal, provide a type written document responding to the scope of work/services, specifications, and evaluation criteria contained herein. Complete the forms labeled “SECTION E: Signature of Firm’s Authorized Representative,” “SECTION F: Debarment/Suspension Status & Non-Collusion Affidavit Form,” “EXHIBIT B: Campaign Contribution Disclosure Form,” signed by the firm’s authorized representative, and submit these forms with your proposal’s response to Section D, Evaluation Criteria. Responses shall be signed by a legally authorized representative of the Respondent. Unsigned responses to SECTION E: Signature of Firm’s Authorized Representative and Section F: Debarment/Suspension Status & Non-Collusion Affidavit Form will be rejected as a material failure. CNM does not desire responses with fancy binders, binding, or sales literature. Instead, vendors' proposals should be organized in a format that promotes the easy and clear evaluation of your proposal. To this end, the organization of your proposal should generally follow the Request for Proposals' organization so that the Request and your proposal can be crossreferenced during the evaluation process. Likewise, information in your proposal should be presented in same order as the pertinent provisions of the Request for Proposals, referencing sections of the Request on any and all attachments that you include with your proposal. Each original proposal must be signed in ink by an authorized representative of your firm; all corrections shall be initialed in ink by person signing the proposal. The contents of the selected proposal may become part of any resultant award. If you wish to offer more than one proposal, clearly label the top as an alternate proposal and submit all responses in the same envelope as the original proposal. Submit the number of copies of your proposal as specified above. Each copy shall include all supporting documentation. Failure to submit the required number of copies may result in your proposal being considered non-responsive. 1. REQUIRED SUBMITTAL DOCUMENTS NEEDED WITH YOUR SEALED RESPONSE: a. OFFEROR’S response to SECTION D, EVALUATION CRITERIA, paragraphs 3.3.1 THROUGH 3.3.4. CNM STRONGLY desires that your response be in a point-by-point format. b. SECTION E: Signature of Firm’s Authorized Representative c. SECTION F: Debarment/Suspension Status & Non-Collusion Affidavit Form d. EXHIBIT B: Campaign Contribution Disclosure Form e. Table of Contents to include section names, section numbers and page numbers f. Letter of Transmittal. The letter of transmittal will fairly and briefly depict the respondent’s proficiency, experience and capability to serve CNM and why the respondent believes they should be selected. g. Response length and font size: Proposal responses should be limited to 20 double spaced pages no smaller than 10 point font. h. The Fee Proposal must be submitted separately in a sealed envelope including ONLY the Fee Proposal. i. Submit one (1) original and five (5) copies of your response to this RFP with your SEALED response. NOTE: FAILURE TO SUBMIT ITEMS 1.A – 1.F. NOTED ABOVE WILL RENDER THE OFFER AS BEING NON-RESPONSIVE. ANY MODIFICATIONS TO SECTION E SIGNATURE OF FIRM’S AUTHORIZED REPRESENTATIVE RESPONSE FORM OTHER THAN FILLING IN THE FORM FIELDS IS NOT ACCEPTABLE AND WILL RESULT IN DISQUALIFICATION OF THE OFFEROR’S RESPONSE. THE GENERAL TERMS AND CONDITIONS ON THE REVERSE SIDE OF CNM’S PURCHASE ORDER ARE AN EQUAL AND INTEGRAL PART OF THIS REQUEST FOR PROPOSALS (RFP) AND ARE NOTED IN SECTION C. THE TERMS, CONDITIONS AND SPECIFICATIONS CONTAINED IN THIS RFP ALONG WITH ANY ATTACHMENTS AND THE OFFEROR’S RESPONSE ARE HEREBY INCORPORATED INTO ALL PURCHASE ORDERS ISSUED AS A RESULT OF THIS RFP, INCLUDING ANY ADDENDA. CNM RESERVES THE RIGHT TO NEGOTIATE WITH A SUCCESSFUL OFFEROR (CONTRACTOR) PROVISIONS IN ADDITION TO THOSE STIPULATED IN THIS RFP. THE CONTENTS OF THIS RFP, AS REVISED AND/OR SUPPLEMENTED, AND THE SUCCESSFUL OFFEROR’S PROPOSAL WILL BE INCORPORATED INTO THE CONTRACT. SHOULD AN OFFEROR OBJECT TO ANY OF THE CNM STANDARD TERMS AND CONDITIONS THAT OFFEROR MUST PROPOSE SPECIFIC ALTERNATIVE LANGUAGE THAT WOULD BE ACCEPTABLE TO CNM. GENERAL REFERENCES TO THE OFFEROR’S TERMS AND CONDITIONS OR ATTEMPTS AT COMPLETE SUBSTITUTIONS ARE NOT ACCEPTABLE TO CNM AND WILL RESULT IN DISQUALIFICATION OF THE OFFEROR’S PROPOSAL. OFFERORS SHOULD PROVIDE A BRIEF STATEMENT OF THE PURPOSE AND IMPACT, IF ANY, OF EACH PROPOSED CHANGE FOLLOWED BY THE SPECIFIC PROPOSED ALTERNATE WORDING. OFFEROR’S WHO HAVE QUESTIONS OR CONCERNS REGARDING THESE REQUIREMENTS ARE ENCOURAGED TO CONTACT CNM’S PURCHASING OFFICE FOR CLARIFICATION. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 4 of 70 PROPOSAL SUBMISSION REQUIREMENTS, FORMAT AND CONTENT: 2. SUBMITTAL DEADLINE AND LOCATION All responses must be received in a SEALED envelope by CNM no later than 4:00 PM MDT, Monday, October 21, 2013. Responses are to be submitted via MAIL, COURIER, or HAND DELIVERED to: Central New Mexico Community College Purchasing Department 525 Buena Vista Drive SE Albuquerque, NM 87106 Attn: RFP # P-357, Due on or before 4:00 PM MDT, October 21, 2013 PLEASE ENSURE THAT YOUR SEALED ENVELOPE IS LABELED WITH YOUR FIRM’S NAME, ADDRESS, RFP NUMBER, AND OPENING DATE AND TIME. Failure to properly identify this RFP #, Due Date and Time on the lower left outside corner of your sealed proposal envelope may result in either premature opening of your proposal or failure to open it upon the correct closing date and time. 3. a. Faxed or electronically mailed responses will NOT be accepted and CANNOT be considered for award. b. Late submissions of proposals will not be considered unless it is determined by CNM that the late receipt was due solely to mishandling by CNM or if the proposal is the only one received. All other late submissions will be returned unopened. c. Responses will not be publicly opened. d. Responses may be withdrawn at any time prior to the time and date set for RFP closing. e. CNM reserves the right to accept or reject any or all responses and to waive technical irregularities. TENTATIVE SEQUENCE OF EVENTS a. Pre-Proposal Meeting Date: Friday, October 4, 2013 Time: 2:00 – 3:00 PM, Walk-through 3:00 PM – 4:00 PM CNM Main Campus 835 Buena Vista SE SRC Building, Room SCR111H/111J b. c. d. Questions/Clarifications RFP Amendments Submission of Proposal Accepted through Monday, October 14, 2013 Issued by Wednesday, October 16, 2013 PROPOSALS MUST BE SEALED AND DATE STAMPED RECEIVED BY CNM PURCHASING DEPARTMENT SUBMISSION DEADLINE, ON OR BEFORE: Due Date: Monday, October 21, 2013 Due Time: 4:00 PM, Mountain Daylight Time Location: CNM Purchasing Office Building A, Room 109 525 Buena Vista SE Albuquerque, NM 87106 e. f. g. Shortlist Finalists Finalist Interviews Begin Contract Negotiations h. Notice of Award Friday, November 8, 2013 (If deemed necessary) Friday, November 15, 2013 (If deemed necessary) Monday, November 18, 2013 Monday, December 9, 2013 RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 5 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 1. ACCEPTANCE. Services - Right to reject; specifications. (I) All services furnished will be subject to inspection and testing by buyer and buyer's agents. Any services found by buyer in its sole discretion to be not in accordance with the specifications, drawings, plans, instructions, performance criteria, samples or other description furnished or adopted by buyer for the order or otherwise not in conformance with the terms of the order shall be subject to rejection, return and back charge as appropriate. Buyer's payment of all or any part of the purchase price prior to such inspection, testing and nonacceptance of the services involved shall not constitute a waiver of any of buyer's rights hereunder. 2. ACKNOWLEDGMENT OF AMENDMENT / ADDENDUM. Vendors shall acknowledge receipt of any amendments/addenda to this Request for Proposals by identifying the amendment/addendum number and date in the space provided on the form labeled “Signature of Firm’s Authorized Representative”. 3. ADDRESSES FOR NOTICES. A. Copies of Addenda/Amendments will be made available for inspection wherever Request for Proposals are on file for that purpose. B. No Addenda/Amendment may be issued later than five (5) days prior to the date for receipt of Proposals, except an Addendum withdrawing the Request for Proposals or one which provides notice of postponement of the date or time for receipt of Proposals. C. Any notice required to be given or which may be given under this Request for Proposals or the resultant price agreement shall be in writing and delivered in person or via first class mail to Central New Mexico Community College, Purchasing Department, 525 Buena Vista, SE, Albuquerque, NM 87106. 4. ATTORNEY’S FEES. If any action resulting from this RFP is brought against CNM, such action shall be brought in the County of Bernalillo, State of New Mexico. If CNM prevails, CNM shall be entitled to reasonable attorney’s fees. The law of the State of New Mexico shall govern these matters. 5. AUTHORITY TO BIND CNM. Offeror shall not have the authority to enter into any contracts binding upon CNM or to create any obligations on the part of CNM, except such as shall be specifically authorized by the CNM representative, acting pursuant to authority granted by CNM 6. AWARD OF PROPOSALS. A. Notice of Award - CNM will notify finalists in writing of the final award(s). This notice will include the score based rankings of firms from the written proposals and the final score based ranking made after interviews for the project award(s). B. CNM reserves the right to award this proposal based on price and any other evaluation criteria contained herein; to reject any and all proposals or any part thereof, and to accept the proposal that is most advantageous to CNM, taking into consideration the evaluation factors set forth in this Request for Proposals. C. CNM reserves the right to award this proposal based on the evaluation criteria contained herein; to reject any and all proposals or any part thereof, and to accept the proposal that is in the best interest of CNM RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. D. E. A written notice of award shall be issued by CNM after review and approval of the Proposal and related documents by CNM with reasonable promptness. The names of all contractors submitting proposals and the names of all businesses, if any, selected for interview shall be public information. After an award has been made, final ranking and evaluation scores for all proposals shall become public information. The contents of any proposal shall not be disclosed so as to be available to competing Offerors during the negotiation process. The resultant agreement shall not be binding on CNM unless approved by CNM’s Capital Outlay, CNM Governing Board, and the respective Vice President for Finance and the Director of Purchasing prior to services being rendered. The Agreement shall be signed by the Successful Offeror and returned within an agreed time frame after the date of the Notice of Award. No Agreement shall be effective until it has been fully executed by all of the parties thereto 7. BRIBES, GRATUITIES AND KICK-BACKS. Pursuant to §13-1-191 NMSA 1978, reference is hereby made to the criminal laws of New Mexico (including § 30-14-1, § 30-24-2, and § 30-41-1 through § 30-41-3 NMSA 1978) which prohibits bribes, kickbacks, and gratuities, violation of which constitutes a felony. Further, the Procurement Code (§ 13-1-28 through § 13-1-199 NMSA 1978) imposes civil and criminal penalties for its violation. 8. CNM’S RESPONSIBILITIES. CNM shall designate a representative to act on its behalf as project manager for the project. The Representative shall have limited authority to give general direction to the Engineer, answer questions, to approve pay applications, and initiate the change order process. The CNM’s Purchasing Director or the Director’s designee shall administer the resultant agreement and shall have the authority to 1) modify or interpret the Agreement, 2) to authorize the Engineer to perform additional services or 3) to approve change orders, all of which are decisions which are reserved to be made by CNM’s Purchasing Director. No action, representation, or conduct by any CNM’s Representative shall relieve the Engineer of its responsibilities to carry out its duties and obligations under the resultant agreement. 9. CNM’S RIGHTS TO ACCEPT/REJECT PROPOSALS. CNM reserves the right to accept and/or reject, at its sole discretion, any or all proposals, or parts thereof, to waive technicalities, or to re-advertise the project, when the best interests of CNM will be realized thereby. 10. CANCELLATION. CNM reserves the right to cancel without penalty this Request for Proposals, the resultant price agreement or any portion thereof for unsatisfactory performance, unavailability of funds, or when it is in the best interest of CNM. 11. CHANGE IN CONTRACTOR REPRESENTATIVES. CNM reserves the right to request a change in contractor representatives if the assigned representatives are not, in the opinion of CNM, meeting its needs adequately. 12. CHANGES/ALTERATIONS AFTER AWARD. Changes or alterations after the award can only be made if agreed to in writing by CNM. Page 6 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 13. COPIES OF REQUEST FOR PROPOSALS. A. A complete set of the Request for Proposals and all Exhibits may be obtained from the CNM Purchasing Department located on the Main Campus at 525 Buena Vista SE, A Building, Room #A128, Albuquerque, New Mexico 87106. B. A complete set of the Request for Proposals shall be used by the Offeror in preparing and submitting proposals; CNM assumes no responsibility for errors or misinterpretations resulting from the use of an incomplete set of the Request for Proposals. C. CNM in making copies of Request for Proposals available on the above terms, does so only for the Purpose of obtaining proposals on the Project and does not confer a license or grant for any other use. D. A complete copy of the Request for Proposals shall be made available for public inspection and shall be posted at the CNM Purchasing Department website. 14. CONFIDENTIALITY. Any information provided to or developed by the Contractor in the performance of the resultant agreement shall be kept confidential and shall not be made available to any other individual or organization by the Contractor without prior written approval of CNM. 15. CONSTRUCTION RECORD DRAWINGS. The successful contractor will be required to provide CNM, upon completion of the work, three (3) sets of record drawing(s) showing any changes from the contract drawings (especially electrical, plumbing, utility lines, etc.) added or affected by the work the contractor has performed, unless provisions for pre-approval of drawings is contained elsewhere in this Request for Proposals (RFP). 16. CONTRACT. CNM’s purchase order shall be considered the binding agreement/contract. In the event of any inconsistent or incompatible provisions, the purchase order (excluding contractor’s response to this RFP) shall take precedence, followed by the provisions of the Request for Proposals, and then lastly, the terms of the Vendor’s/Contractor’s response to this RFP. 17. CORRECTION OR WITHDRAWAL OF PROPOSALS. A. A Proposal containing a mistake discovered before proposal opening may be modified or withdrawn by an Offeror prior to the time set for proposal opening by delivering written or telegraphic notice to the location designated in the Request for Proposals as the place where Proposals are to be received. B. Withdrawn Proposals may be resubmitted up to the time and date designated for the receipt of Proposals, provided they are then fully in conformance with the Request for Proposals. C. Only modifications received prior to the time specified for the closing will be accepted. No modifications will be accepted following the opening. Technical clarifications of the offer may be requested by the Buyer following the opening. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. 18. DEBARRED OR SUSPENDED CONTRACTORS. A business (contractor, subcontractor or supplier) that has either been debarred or suspended pursuant to the requirements of § 13-1-177 through § 13-1-180, and § 13-3-11 through § 13-4-17 NMSA 1978 as amended, shall not be permitted to do business with CNM and shall not be considered for award of the contract during the period for which it is debarred or suspended with CNM 19. CONTRACTOR SCHEDULE REQUIRED. The contractor shall include a proposed schedule for completion of work under this RFP. It should contain an itemized break down of all items and projects, including testing dates if applicable. 20. DELIVERY DELAYS. If after award, the contractor becomes aware of possible problems that could result in delay in the agreed-to delivery schedule, the contractor must immediately notify the Buyer or the designated representative. The initial notification of the delay may be verbal with a written confirmation, giving the probable cause and effect, with recommendations for alternate action. Nothing in this paragraph will be interpreted as relieving the vendor of his/her contractual obligations. However, failure to notify CNM promptly will be a basis for determining vendor responsibility in an otherwise excusable delay. 21. DISCREPANCIES. Should any interested vendor find discrepancies in any part of the listed specifications or the terms and conditions, or find any part of the listed specification or the terms and conditions to be incomplete or otherwise questionable in any respect, such vendor shall immediately call such matters to the attention of the Buyer, in writing, prior to the established opening date. 22. EMPLOYEE CERTIFICATION. The vendor and all vendor's employees utilized on the work to be performed under this Request for Proposals must have the proper certification(s) and license(s) to comply with State and local requirements connected to this Request for Proposals. The contractor shall use only fully qualified and approved service technicians to perform inspections, service and or repairs under this Request for Proposals. 23. EMPLOYMENT OF CONSULTANTS AND SUBCONTRACTORS. A. Offeror agrees to employ competent and New Mexico licensed and registered Engineers, architects, surveyors and other professionals, and such consultants and subcontractors for the project, as might be necessary for the proper design and construction/demolition of the project. Offeror represents that services that are proposed to be performed by the design professionals under a resultant agreement shall be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing under the same or similar conditions. Offeror represents that the performance of any consultant or subcontractor assigned by Offeror to work on the project shall be in accordance with sound professional standards, and the requirements of the resultant agreement. B. The Offeror shall list and state the qualifications for each Consultant or Sub-contractor the Offeror proposes to use for all consultants and subcontracted Work. Page 7 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 C. D. The Offeror is specifically advised that any person or other party, to whom it is proposed to engage as a consultant or sub-contractor under this proposal, must be acceptable to CNM after verification by CNM of the current eligibility status, including but not limited to suspension or debarment by CNM. Any work to be performed by a consultant or sub-contractor by the successful Offeror shall require the prior written approval of CNM. All sub-contractors must be registered with the Labor and Industrial Division of the New Mexico Department of Labor (DOL). 24. ENTIRE AGREEMENT. CNM’S PURCHASE ORDER AND OTHER ATTACHED CONTRACT DOCUMENTS INCLUDING ATTACHMENTS AND ADDENDUMS ISSUED BY CNM, THIS RFP, AND CONTRACTOR’S RFP OFFER CONSTITUTES THE CONTRACT AGREEMENT BETWEEN THE PARTIES. A. This Proposal along with its attachments will be considered to be part of the resultant price agreement with purchase order and other contract documents are to be incorporated by reference. B. CNM's General conditions as an Attachment are an equal and integral part of this Request for Proposals and any resultant award(s). 25. ERRORS. CNM is not liable for any errors or misinterpretations made by the vendor responding to this Request for Proposals. No advantage shall be taken by Vendors in the omission of any details. Any misstatements of fact, misrepresentations or errors in the Vendor’s proposal may, at the sole discretion of CNM, be cause for disqualification. Each vendor is responsible for ensuring that all information provided in its proposal is accurate and complete in its entirety. 26. EVALUATION AND SELECTION PROCESS. A. Upon receipt of proposals or at any time during the proposal process, CNM’s Purchasing Department may determine the responsiveness of each proposal. B. A selection committee to evaluate the written proposals and interviews will be designated by the CNM Purchasing Office. Based upon the proposals and the evaluation criteria set forth within this Request for Proposals, the evaluation committee, composed of representatives selected by CNM, shall evaluate the RFP written offers submitted in regard to the particular project. Rankings will be score based upon an average of the committee’s scores, including any residential or resident veteran preference. The CNM Purchasing Department may verify for scoring purposes items such as preference or volume of work sections. C. Based upon the score based ranking from the written proposals, the committee may interview the top ranked contractors that have been shortlisted. The evaluation committee shall score the interviews based upon the criteria stated within the RFP and any additional questions related to the scope and requirements of the project. The committee will take into account the information received in the written proposals in addition to the information received from their interviews in making their final scores. D. The final scores will be submitted to the Buyer. The final scores shall be ranked independently from any previous scores and will not be averaged with the written proposal scores which were used to determine a short listed contractor selected for interviews. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. E. Based upon the average of the final scores, the evaluation committee shall recommend, ranked in the order of their qualifications using a point system, no less than three (3) contractors deemed to be the most qualified to perform the required services. If fewer than three (3) contractors have submitted a statement of qualifications for a particular project, the evaluation committee may: 1. Rank in order of qualifications the contractor (s) and submit to the Purchasing Office who will present and request approval of the finalist ranking to be considered by CNM Governing Board for award those businesses which have submitted an offer to the RFP; or 2. Recommend termination of the selection process pursuant to Section 13-1-131 NMSA 1978 and send out of new notices of the re-solicitation of the proposed procurement. Any proposal received in response to the terminated solicitation is not public information and shall not be made available to competing Offerors. 27. EXCLUSIVE RIGHTS. Under no circumstances shall this Agreement be construed or deemed to be a contract whereby CNM grants Contractor exclusive right to furnish CNM its needs or requirements for services described herein. 28. FINANCIAL STATEMENTS. If requested, all bidders may be required to submit their most recent Income Statement, Balance Sheet, and Statement of Cash Flows. 29. FORCE MAJEURE. Neither party to the resultant agreement will be liable to the other for any failure or delay in performance under the resultant agreement due to circumstances beyond its reasonable control including, but not limited to, acts of God, accidents, labor disputes, acts or omissions and defaults of third parties, and official, government or judicial action not the result of negligence of the party failing or late in performing. 30. GENERAL TERMS AND CONDITIONS. CNM's General Terms and Conditions are an equal and integral part of this Request for Proposals. 31. GOVERNING LAW. This Request for Proposals and all resultant price agreements shall be interpreted and governed by the Laws of the State of New Mexico. 32. INDEMNIFICATION. Offeror agrees to indemnify, defend and hold harmless CNM, its officers and employees against all liability, claims, damages, losses or expenses (including attorney's fees) arising out of bodily injury to persons or damage to property caused by, or resulting from, Offeror's and/or its employees', Consultants, Subcontractors errors, acts, omissions or negligence. This hold-harmless and indemnification clause is subject to the immunities, provisions and limitations of the New Mexico Tort Claims Act (Sections 41-4-1 et seq. N.M.S.A. 1972) and Section 56-7-1, N.M.S.A. 1978 and any amendments thereto. This Agreement to Indemnify shall not extend to liability, claims, damages, losses or expenses, including attorney fees, arising out of: A. The preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or specifications by the indemnitee, or the agents or employees of the indemnitee; or Page 8 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 B. The giving or failure to give directions or instructions by the indemnitee, or the agents or employees of the indemnitee, where the giving or failure to give directions or instructions is the primary cause of bodily injury to persons or damage to property. 33. INSURANCE REQUIREMENTS. A. The successful vendors are required to carry insurance meeting the requirements in the Exhibit labeled "INSURANCE REQUIREMENTS" or as noted in the specifications. The successful vendors must submit the Certificate of Insurance to the appropriate Buyer prior to commencing work under the resultant price agreement. Insurance must remain in effect for the entire term of the resultant price agreement and must be extended to coincide with any future price agreement extension. The Project Name and CNM’s Name must appear on the Certificate of Insurance. B. PROFESSIONAL LIABILITY INSURANCE. At its own expense, the successful offeror shall be required to procure and maintain during the life of the resultant agreement professional liability insurance in an amount not less than One Million ($1,000,000) for each claim and in the aggregate. Insurance coverage shall not be canceled or materially changed except after thirty (30) days written notice has been provided to CNM. Design Professional shall furnish CNM copies of certificates of insurance showing the coverage, limits of liability, covered operations, effective dates and dates of expiration of policies of insurance carried by Design Professional. 34. INTERPRETATIONS. A. CNM is not liable for any errors or misinterpretations made by the offeror responding to this RFP. No advantage shall be taken by Offerors in the omission of any details. Any misstatements of fact, misrepresentations or errors in the Offeror’s proposal may, at the sole discretion of CNM, be cause for disqualification. Offerors are responsible for ensuring that all information provided in the proposal response is accurate and complete in its entirety. B. All questions about the meaning or intent of the Request for Proposals shall be submitted in writing to the attention of the Buyer for this procurement. Replies will be issued by Addenda mailed or delivered to all parties recorded by CNM as having received the Request for Proposals. Questions received less than five (5) days prior to the date for opening of proposals may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. C. Offerors shall promptly notify CNM of any ambiguity, inconsistency, or error, which they may discover upon examination of the Request for Proposals 35. RFP TERMS PART OF CONTRACT. This Request for Proposals along with its attachments will be considered to be part of the resultant price agreement and or purchase order and is to be incorporated by reference. A. B. The Offeror shall assume full responsibility for timely delivery of proposals at the Procurement Officer office, including those proposals submitted by mail. Handdelivered proposals shall be submitted to the Purchasing Agent/Buyer or his Procurement Officer or his designee and will be clocked in/time stamped at the time received, which must be prior to the time specified. Oral, telephonic, or electronically submitted proposals are invalid and will not receive consideration. However, proposals may be modified by telegraphic/facsimile notice, provided that the notice is received by the time and date specified for the closing. 37. MEDIATION. Notwithstanding any provision of any Contract Document to the contrary, any claim, dispute or other matter in question between the Contractor and the CNM and except to those which have been waived by the making or acceptance of final payment shall be subject to mediation pursuant to and under the provisions of the New Mexico Public Works Mediation Act, NMSA 1978 § 13 4C 1 et seq. as amended. A party seeking to resolve a dispute under this Agreement or any of the Contract Documents shall proceed under the procedures and provisions of the Public Works Mediation Act. 38. MODIFICATIONS. Only modifications received prior to the time specified for the closing will be accepted. No modifications will be accepted following the opening. The Buyer may request technical clarifications of the proposal following the opening. 39. NEGOTIATIONS. A. Contract Negotiations - The Owner and the successful Offeror(s) will begin contract negotiations as soon as possible after recommendation for award from the selection committee. Negotiations may be conducted with responsible Offerors who submit offers found reasonably likely to be selected for award. B. The CNM Standard Agreement Part A (Sample Services Agreement) and Part B (AIA A-201 as amended by CNM) and attachments between Owner and Engineer/Design Professional. Final Engineer/DESIGN PROFESSIONAL fees are determined during contract negotiations and depend on such factors as project size and complexity as related to the approved DESIGN PROFESSIONAL Rate Schedule. If contract negotiations are not finalized within a reasonable period of time, the Owner will conclude negotiations with the selected firm and begin negotiations with the next ranked firm based on final ranking. C. The CNM’s Buyer, Director of Purchasing or designee shall negotiate a contract with the highest qualified contractor for the services contemplated under this RFP at compensation determined in writing to be fair and reasonable. In making this decision, the Buyer or designee shall take into account the estimated value of the services to be rendered and the scope, complexity and professional nature of the services. 36. LATE SUBMISSIONS. Late submissions of proposals will not be considered unless it is determined by CNM that the late receipt was due solely to mishandling by CNM or if the proposal is the only one received. All other late submissions will be returned unopened. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 9 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 D. E. Should the Buyer or designee be unable to negotiate a satisfactory contract with the business considered to be the most qualified at a price determined to be fair and reasonable, negotiations with that business shall be formally terminated. The Buyer or designee shall then undertake negotiations with the second most qualified business. Failing accord with the second most qualified business, the Buyer or designee shall formally terminate negotiations with that business. The Buyer or designee shall then undertake negotiations with the third most qualified business. Should the Buyer or designee be unable to negotiate a contract with any of the businesses selected by the committee, additional businesses shall be ranked in order of their qualifications and the Procurement Officer or designee shall continue negotiations in accordance with this section until a contract is signed with a qualified business or the procurement process is terminated and a new request for proposals in initiated 40. NOTICE OF CONTRACT REQUIREMENTS BINDING ON OFFEROR. A. The Offerors’ attention is directed to all applicable federal and state laws, local ordinances and regulations and the rules and regulations of all authorities having jurisdiction over the services of the Project. B. In submitting a proposal response, the Offeror represents that the Offeror is familiarized with the nature and extent of this Request for Proposals dealing with federal, state and local requirements, which are a part of this Request for Proposals. Offeror agrees to be bound by and abide by and perform any and all of its duties, obligations and responsibilities awarded in response to this Request for Proposals in strict accordance with the ethics of its profession and all federal and state municipal laws, regulations, and ordinances regulating the practice of Architecture, engineering or surveying. C. Offeror agrees to perform all work and services awarded as a result of this Request for Proposals in accordance with normal standards of Professional care. The offeror agrees to cooperate with CNM and other contractors and coordinate work involving other contractors through CNM's authorized representative. 41. NUMBER FOR PROPOSAL CLARIFICATION. The Vendor should include a local or toll-free number for proposal clarifications. Failure to do so may result in the proposal being declared non-responsive. 42. OFFEROR’S TERMS AND CONDITIONS. Offerors must submit with the proposal a complete set of any additional terms and conditions they expect to have included in a contract negotiated with the agency. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. 43. OWNERSHIP OF MATERIAL. Any and all data, material, documentation, notes, drawings, design, specifications and other work prepared by, developed or performed by the Offeror in conjunction with a resultant award of an agreement to this RFP shall and will become the property of and belong exclusively to CNM. Before receiving final payment, the successful Offeror shall be required to deliver to CNM the original construction documents and details and a bound volume of the specifications. CNM shall not have the right to use the construction documents for other building projects except as may be required for reference without the successful Offeror’s consent. CNM shall not have the right to sell the construction documents, drawings and specifications. The successful Offeror shall not be permitted to reuse the drawings developed for the project identified within this RFP in whole or in part for other projects without obtaining CNM's prior written permission. 44. PAYMENT DISCOUNTS. CNM will take advantage of payment discounts offered whenever possible; however, payment discounts will not be used as a means to determine the highest evaluated offer. 45. PERIOD FOR PROPOSAL ACCEPTANCE. The Vendor agrees, if its proposal is accepted within ninety (90) calendar days of the closing date, to furnish the goods and services at the prices set forth in its proposal, delivered to the designated point(s) within the specified time in the delivery schedule. Failure to comply may result in removal from the bid list. An additional time period may be requested elsewhere in this Request for Proposals. 46. PROPOSAL EVALUATION. A. Proposals shall be evaluated on the basis of demonstrated competence and qualifications for the type of service required, and shall be based on the evaluation factors set forth in this RFP. B. CNM shall have the right to waive technical irregularities in the form of the Proposal of the Offeror, which do not alter the price, quality or quantity of the services, construction or items of tangible personal property offered. 47. PROPOSAL OPENING. A. Proposals will be opened on the due date and time specified on the proposal cover sheet in the Purchasing Department Office. This is not a public opening and contractors are not invited to attend. B. Offerors may request in writing nondisclosure of confidential data and trade secrets. Such data should accompany the proposal and should be readily separable form the proposal in order to facilitate eventual public inspection of the non-confidential or non-trade secret portion of the proposal. A request that states that the entire proposal be kept confidential will not be acceptable. Only matters, which clearly are of a confidential nature considered to be a trade secret, will be considered. All information, except that marked as confidential and considered a trade secret, will become public information at the time that the Proposal is awarded. Page 10 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 48. PROTESTS. A. Any Offeror who is aggrieved in connection with a solicitation or award of an Agreement may protest to CNM’s Buyer for the procurement and the CNM Director for Purchasing in accordance with the requirements of CNM’s Procurement Regulations and the state Procurement Code. The protest should be made in writing within 24 hours after the facts or occurrences giving rise thereto, but in no case later than 15 calendar days after the facts or occurrences giving rise thereto. B. In the event of a timely protest under this section, CNM shall not proceed further with the procurement unless CNM makes a determination that the award of Agreement is necessary to protect substantial interests of CNM. C. The Director of Purchasing, or designee shall have the authority to take any action reasonably necessary to resolve a protest of an aggrieved Offeror concerning procurement. This authority shall be exercised in accordance with adopted regulations, but shall not include the authority to award money damages or attorneys’ fees (§ 13-1-174 NMSA 1978). D. The Director of Purchasing or designee shall promptly issue a determination relating to the protest. The determination shall: 1. state the reasons for the action taken; and 2. inform the protestant of the right to judicial review of the determination pursuant to § 13-1-183 NMSA 1978. E. A copy of the determination issued under § 13-1-175 NMSA 1978 shall immediately be mailed to the protestant and their Offerors involved in the procurement (§ 13-1178 NMSA 1978). 49. PROPOSER QUALIFICATIONS. The selection committee may make such investigations as necessary to determine the ability of the proposer to adhere to the requirements specified within this RFP. The selection committee will reject the proposal of any proposer who is not a responsible proposer or fails to submit a responsive offer, as defined in § 13-1-83 and 13-1-85 NMSA 1978. 50. PUBLIC INFORMATION. All information, except that marked as confidential, will become public information at the time that the Proposal is awarded. Confidential information must be marked "CONFIDENTIAL" in red letters in the upper right hand corner of the sheets containing the confidential information. Price and information concerning the specifications cannot be considered confidential. 51. RECORDS AND AUDIT. The successful offeror shall be required to maintain detailed time records that show the date, time and nature of services rendered. These records shall be subject to inspection by the CNM, its representatives, and the State Auditor. CNM, its representatives, and the State Auditor shall have the right to audit billings both before and after payment. Payment under this Agreement shall not foreclose the right of CNM to recover excessive and/or illegal payments. CNM, its representatives and the State Auditor shall have access to and the right to examine and/or audit any directly pertinent records, books, documents and papers of the successful Offeror involving transactions related to any Agreement entered into as a result of this RFP for a period of three (3) years after final payment. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. 52. REFERENCES. Vendor should furnish the minimum number of reference requested herein. Failure to submit the information may result in your proposal being considered non-responsive. Vendor, by furnishing these references, agrees to allow CNM to contact any person or organization listed, and to utilize information obtained in the evaluation of the offer. 53. RELEASES. Upon final payment of the amount due under the terms of the resultant agreement, the successful vendor shall release CNM, its Governing Board, officers and employees from all liabilities, claims and obligations arising from or under the terms of the resultant agreement. The successful vendor agrees not to purport to bind CNM to any obligation not assumed herein by CNM unless CNM has expressly authorized the successful vendor to do so and then only within the strict limits of that authority. 54. REPORTS AND INFORMATION. At such times and in such forms as CNM may require, there shall be furnished to CNM such statements, records, reports, data and information, as CNM may request pertaining to matters covered by all resultant agreements to this Request for Proposals. 55. RESPONSIBLE OFFEROR. A. All work shall be under the direction of the applicable engineer/design professional legally licensed and registered by the state of New Mexico. The contractor and all contractor's employees and subcontractor’s and subcontractor’s employees utilized on the work to be performed under this Proposal must have the proper certification(s) and license(s) to comply with all Federal, State and local requirements connected to this proposal and must be registered with the appropriate State of New Mexico body, the contractor shall use only fully qualified and approved service technicians to perform inspections and services under this Proposal. B. CNM reserves the right to conduct any investigations deemed necessary to determine the responsibility of a vendor (i.e., prove that its financial resources, production or service facilities, personnel, service reputation and experience are adequate to make satisfactory delivery of the services, construction or items of tangible personal property described in the Request for Proposals). Vendor shall provide audited financial statements if requested by CNM. C. OFFEROR’S QUALIFICATION STATEMENT. Offeror to whom award of an Agreement is under consideration shall submit, upon request, information and data to prove that their financial resources, production or service facilities, personnel, and service reputation and experience are adequate to make satisfactory delivery of the services described in the Request for Proposals. Offer shall provide audited financial statements if requested by CNM. D. If an Offeror who otherwise would have been awarded a contract is found not to be a responsible Offeror; a Determination that the Offeror is not a responsible Offeror, setting forth the basis of the finding, shall be prepared by the CNM Buyer. The unreasonable failure of the Offeror to promptly supply information in connection with an inquiry with respect to responsibility is grounds for a determination that the Offeror is not a responsible Offeror. Contractors, which have not been selected, shall be so notified in writing within twenty-one days after an award is made through a posting to the CNM website Page 11 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 56. RESPONSIVENESS OF PROPOSALS. Vendors are hereby expressly instructed that all proposals in response to this solicitation shall meet all specifications and requirements of this solicitation. 57. SCHEDULE DELAYS. If after award, the contractor becomes aware of possible problems that could result in delay in completion of the work on the agreed-to schedule, the contractor must immediately notify the Buyer or the designated representative. The initial notification of the delay may be verbal with a written confirmation per Section 7, giving the probable cause and effect, with recommendations for alternate action. Nothing in this paragraph will be interpreted as relieving the contractor of his/her contractual obligations. However, failure to notify CNM promptly will be a basis for determining the contractor responsibility in an otherwise excusable delay 58. SEVERABILITY. If any provision of the resultant agreement is found invalid or unenforceable, the remainder of the resultant price agreement will be enforced to the maximum extent permissible and the legality and enforceability of the other provisions of the resultant agreement will not be affected. 59. SIGNATURE. The response must be signed by an authorized representative in order for proposal to be considered responsive. Compete and return the form labeled “Signature of Firm’s Authorized Representative” with proposal response. 60. SITE FAMILIARITY. The contractor shall be responsible for thoroughly inspecting the site and work to be done prior to submitting an offer. The contractor warrants by this submission that he/she has had the opportunity to inspect the site and work to be done and that his/her offer includes all costs required to complete the work. The failure of the contractor to be fully informed regarding the requirements of this RFP will not constitute grounds for any claim, demand for adjustment or the withdrawal of a bid after the opening. 63. STATUS OF VENDOR. The successful vendor is an independent contractor performing services for CNM and neither he/she nor his/her agents or employees shall, as a result of the resultant agreement, accrue leave, retirement, insurance, bonding authority, use of CNM vehicles, or any other benefits, prerequisites or allowances normally afforded only to employees of CNM. The successful vendor acknowledges that all sums received under the resultant agreement are personally reportable by him/her/her for income, self-employment and other applicable taxes. 64. SUBCONTRACTORS. Any work subcontracted by the successful vendor shall require the prior written approval of the subcontractor by CNM. A. DEFINITIONS. A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor. B. A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-subcontractor. C. AWARD OF SUBCONTRACTORS. All awards of subcontracts shall be in accordance with the New Mexico Subcontractors Fair Practices Act as applicable. 61. SITE INSPECTION. The site(s) referenced in this document are available for inspection. Arrangements can be made by calling the contact for Technical Clarification shown on the cover page. Note, bidders shall not consider any comments made by employees of CNM to be modifications to the bid specifications unless distributed as a written amendment to this bid by CNM’s Purchasing Department. All requests for clarification must be submitted in writing to CNM’s Purchasing Department to receive consideration. Such requests must be submitted no later than five (5) days prior to the bid due date 62. STATE AND LOCAL ORDINANCES. The successful vendor shall perform work under the resultant price agreement in strict accordance with the latest version of all State and local codes, ordinances, and regulations governing the work involved. All materials and labor necessary to comply with the rules, regulations and ordinances shall be provided by the vendor. Where the drawings and or specifications indicate materials or construction in excess of the code requirements, the drawings and or specifications shall govern. The vendor shall be responsible for the final execution of the work to meet these requirements. In the event of a conflict between various codes and standards, the more stringent shall apply. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 12 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 65. SUBCONTRACTUAL RELATIONS. By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents, assumes toward CNM. Each subcontract agreement shall preserve and protect the rights of CNM under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against CNM. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors. 66. SUBMISSIONS OF SAMPLES/DRAWINGS / LITERATURE. It may be necessary to test samples or have demonstrations to make an award. All samples, when required, shall be furnished free of expense to CNM. Returns shall only be made at the Bidder’s request and expense. Bid samples or descriptive literature should not be submitted unless expressly requested; and, regardless of any attempt by a bidder to condition the bid, unsolicited bid samples or descriptive literature shall be submitted at the Bidder’s risk 67. SUBMITTALS. A. Offerors are hereby expressly instructed that all proposals in response to this solicitation shall meet all specifications and requirements of this solicitation. B. Proposals shall be submitted at the time and place indicated in the Notice of Request for Proposals and shall be included in an opaque sealed envelope marked with the Project title and name and address of the Offeror and accompanied by the documents listed in the Request for Proposal. C. The envelope shall be addressed to the Procurement Officer/Buyer of CNM. The following information shall be provided on the front lower left corner of the Bid envelope: Request for Proposal number, Project Title, date and time of opening. If the Proposal is sent by mail, the sealed envelope shall have the notation “SEALED PROPOSAL ENCLOSED” on the face thereof. D. E. F. In submitting a proposal in response to this Request for Proposals, the Offeror represents that the Offeror is familiarized with the nature and extent of the Request for Proposals dealing with federal, state, and local requirements which are part of the Request for Proposal. The successful Offeror shall perform work under the resultant agreement in strict accordance with the latest version of all Federal, State and local codes, rules, laws, ordinances, and regulations governing the work involved. All materials and labor necessary to comply with the rules, regulations and ordinances shall be provided by the contractor. The response must be signed by an authorized representative in order for proposal to be considered responsive. Complete and return the form labeled, EXHIBIT E: “Signature of Firm’s Authorized Representative” with proposal response. Each proposal shall include a proposal of fees for Basic Services to be charged under this agreement. Central New Mexico Community College adheres to the State of New Mexico General Services Division-Architect Rate Schedule. THE FEE PROPOSAL SHALL BE SUBMITTED IN A SEPARATE SEALED ENVELOPE. Fees shall not be used in the evaluation of qualifications. However, failure to submit an appropriate fee proposal may lead to disqualification. Such separate submittals, shall only be opened, after final rankings of submittals have been performed and finalized. Cost Proposals will be opened in the presence of two or more witnesses. To submit an offer on the goods or services specified, provide a type written proposal responding to the scope of work/services, specifications, and evaluation criteria contained herein. Vendors are to submit responses as required for easy and clear evaluation with information presented in the order it appears herein referencing sections on all attachments. Each original proposal must be signed in ink by an authorized representative; all corrections shall be initialed in ink by person signing the proposal. Note, if you wish to offer more than one proposal, clearly label each additional offer as an alternate proposal and submit all responses in the same envelope/package as the original proposal. 68. SUCCESSORS AND ASSIGNS. Contractor shall not assign the Contract as a whole without written consent of Owner. If Contractor attempts to make such an assignment without such consent, Contractor shall nevertheless remain legally responsible for all obligations under the Contract. 69. TAXES. CNM is exempt from Federal excise taxes and from New Mexico gross receipts taxes on materials, except construction materials used by a contractor. Services are not exempt from gross receipts taxes. Taxes, if any, on services must be included as a separate line item and not included in your base price proposed. Applicable taxes are excluded from the evaluation of the proposal. 70. TECHNICALITIES. CNM reserves the right to waive minor irregularities. Also CNM reserves the right to waive mandatory requirements provided that all of the otherwise responsive proposals failed to meet the mandatory requirements and/or doing so does not otherwise materially affect the procurement. This right is at the sole discretion of CNM. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 13 of 70 SECTION A: STANDARD PROPOSAL TERMS AND CONDITIONS FOR RFP # P-357 71. ELECTRONIC/FACSIMILE SUBMITTALS. Electronic / Facsimile proposal submittals will not be considered. However, proposals may be modified by electronic/facsimile notice, provided that the notice is received by the time and date specified for the closing. 72. TERMINATION. Termination for cause. If Offeror, for any cause, fails or omits to carry out the work in an acceptable manner CNM may give notice in writing of such failure or omission and of a reasonable time within which to cure the deficiency. Offeror shall take corrective measures within such time. Offeror's failure to comply with such notice and to cure the deficiency as provided in the notice shall subject this Agreement to immediate termination by CNM. In the event of a for-cause termination, CNM shall terminate this Agreement by delivering to Offeror a written notice of termination. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the date of delivery of the notice. Upon such termination, the Offeror shall deliver to CNM all design plans, construction estimates, drawings, documents, survey books, construction documents and all other materials developed under this Agreement. CNM shall then have the right to retain the services of other engineers/design professionals to complete the Offeror’s work under this Agreement, and shall have no obligation to seek bids for that replacement design professional(s). The cost of completing the Offeror’s work under this Agreement shall be paid for by applying the balance of the contract amount remaining on this Agreement at the time of termination. If the cost to complete the work under this Agreement is less than the remaining contract amount, the remaining contract amount shall be paid to the Engineer. If the cost of completing the work under this Agreement exceeds the contract amount, then the Offeror shall pay CNM for the difference between the contract amount and the cost to complete the Offeror’s work. 73. TIMELINESS OF PERFORMANCE. The Engineer/Design Professional agrees and shall be required to prosecute work under any resultant agreement to this RFP with diligence and continuous effort, and that the Design Professional will not delay the work in order to perform other contracts entered into by the Engineer/Design Professional. The Engineer/Design Professional agrees that time is of the essence in the performance of services awarded in response to this RFP and the construction project. The Engineer/Design Professional understands that if the Engineer/Design Professional fails to meet any of the time schedules or milestones without the written approval of CNM, CNM may suffer damages as a result of such delay. Should such damage occur, CNM will take appropriate action for recovery of such damage. However, Engineer/Design Professional will not be responsible for consequential damages resulting from delays beyond Engineer’s/Design Professionals’ control. Engineer/Design Professional agrees to and shall be required to continue to perform work under a resultant Agreement through all disputes, with the Owner (CNM) and/or the Contractor, including but not limited to payment disputes and disputes regarding the scope of the Engineer’s/Design Professional’s obligations under the Agreement. 74. WITHDRAWAL OF PROPOSALS. Proposals may be withdrawn by written notice, telegram or in person by an vendor or an authorized representative any time prior to the award. Proposals requiring proposal security may result in forfeiture of the security if the proposal is withdrawn following the opening. 75. WORKMANSHIP/COOPERATION. All work shall be done in a neat, workman-like manner using acceptable equipment and methods. The successful vendor will cooperate with CNM and other contractors and coordinate his/her work involving other contractors through CNM's authorized representative. Termination for convenience of CNM. On fifteen (15) business days written notice to Engineer, CNM may terminate this Agreement in whole or in part for its own convenience in the absence of any default of Offeror. In the event of a no-cause termination, CNM shall terminate this Agreement by delivering to Offeror notice of termination without cause specifying the extent to which performance of work under this Agreement is terminated and the date upon which such termination becomes effective. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the sixteenth (16th) business day after delivery of the notice. Within ten (10) calendar days of the effective date of termination, Offeror shall deliver to CNM all design plans, construction estimates, drawings, documents, survey books, construction documents and any or all other materials developed under this Agreement. Upon delivery of such notice, the Offeror shall have the right to receive payment for services satisfactorily performed to termination date, including reimbursement then due. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 14 of 70 SECTION C: GENERAL TERMS AND CONDITIONS 1. Inspection and Audit. a. CNM may inspect, at any reasonable time, any part of Seller's plant or place of business which is related to performance of this Purchase Order. Acceptance of delivery shall not be considered acceptance of the materials, supplies or services furnished. Final inspection of product and services will be made at the destination. Any testing or inspection procedures required by the specification are in addition to CNM's rights under this paragraph. b. The Contractor shall maintain detailed time records which indicate the date, time and nature of services rendered. Contractor shall maintain detailed records of all materials or supplies delivered to CNM under this Purchase Order, including serial numbers and other appropriate identifiers. These records shall be subject to internal and external audit. CNM shall have the right to audit billings both before and after payment. Payment under the resultant Agreement shall not preclude CNM from recovering excessive, erroneous or illegal payments previously made to the Contractor. 2 Warranties. Seller warrants the materials, supplies or services furnished to be exactly as specified in this order, free from defects in Seller's design, labor, materials and manufacture, and to be in compliance with any drawings or specifications incorporated herein and with any samples furnished by Seller. All applicable UCC warranties, express and implied, are incorporated herein. 3. Acceptance and Rejection. If prior to final acceptance, any materials, supplies or service are found to be defective or not as specified, or, if CNM is entitled to revoke acceptance of them, CNM may reject or revoke acceptance, require Seller to correct without charge within a reasonable time, or require delivery at an equitable reduction in price at CNM's option. Seller shall reimburse CNM for all incidental and consequential costs related to unaccepted materials, supplies or service. Notwithstanding final acceptance and payment. Seller shall be liable for latent defects, fraud, or such gross mistakes as amount to fraud. Acceptance of performance shall not waive CNM's right to claim damages for breach. 4. Assignment. This order is assignable by CNM. Except as to any payment due hereunder, this order is not assignable by Seller without written approval of CNM. 5. Changes. CNM may make changes within the general scope of this order by giving notice to Seller and subsequently confirming such changes in writing. If such changes affect the cost of, or the time required for performance of this order, an appropriate equitable adjustment shall be made. No change by Seller shall be recognized without written approval of CNM. Any claim of Seller for an adjustment under this paragraph must be made in writing within thirty (30) days from the date of receipt of Seller of notification of such change, unless CNM waives this condition. Nothing in this paragraph shall excuse Seller from proceeding with performance of the order as changed hereunder. 6. Termination and Delays. CNM, by written notice stating the extent and effective date may terminate this order for convenience in whole or in part, at any time. CNM shall pay Seller as full compensation for performance until such termination: (1) the unit or pro rata order price for the delivered and accepted portion; and (2) a reasonable amount to be approved by CNM, and not otherwise recoverable from other sources by Seller, with respect to the undelivered or unaccepted portion of this order. Provided, however, compensation hereunder shall in no event exceed the total order price. Such amount will be limited to Seller's actual cost and may not include anticipated profits. CNM may terminate this order by written notice in whole or in part for Seller's default if Seller refuses or fails to comply with the provision of this order, or fails to make progress so as to endanger performance and does not cure such failure within a reasonable period of time. In such event, CNM may otherwise secure the materials, supplies or services ordered, and Seller shall be liable for damages suffered by CNM, including incidental and consequential damages. If, after notice of termination, CNM determines Seller was not in default, or if Seller's default is due to failure of CNM, termination shall be deemed for the convenience of CNM. The rights and remedies of CNM provided in this article shall not be exclusive and are in addition to any other rights and remedies provided by law or under this order. As used in this paragraph, the word "Seller" includes Seller and its subsuppliers at any tier. 9. Patent and Copyright Indemnity. Seller shall pay all royalty and license fees relating to deliverables and other items covered hereby. In the event any third party shall claim that the reproduction, manufacture, use, or sale of goods or items covered hereby infringes any copyright, trademark, patent, or other intellectual property rights, Seller shall indemnify and hold CNM harmless from any cost, expense, damage, or loss resulting therefrom. 10. Discounts. Any discount time will not begin until the materials, supplies, or services have been received and accepted and correct invoice received by CNM's Purchasing Department. In the event testing is required, the discount time shall begin upon the completion of the tests. 11. Penalties. The Procurement Code, Section 13-1-28 et seq., imposes civil and criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities and kickbacks. 12. Title and Delivery. Title to the materials and supplies passed hereunder shall pass to CNM at the F.O.B. point specified subject to the right of CNM to reject upon inspection. For any exception to the delivery date specified, Seller shall give prior notification and obtain approval from CNM's Purchasing Department. Time is of the essence and the order is subject to termination for failure to deliver on time. 13. Payment Charges. Late payment charges shall be paid in the amount and under the conditions stated in Section 13-1-158, NMSA 1978. 14. Other Applicable Laws. Any provision required to be included in a contract of this type by any applicable and valid Executive order, federal, state or local law, ordinance, rule or regulation shall be deemed to be incorporated herein. 15. OSHA Regulations. The contractor shall abide by Federal Occupational Safety and Health Administration (OSHA) regulations and the State of New Mexico Environmental Improvement Board occupational health and safety regulations that apply to the work performed under this Invitation. ALL PRODUCTS CONTAINING HAZARDOUS SUBSTANCES MUST BE PROPERLY LABELED AND ACCOMPANIED BY MATERIAL SAFETY DATA SHEETS. The contractor shall defend, indemnify and hold CNM free and harmless against any and all claims, loss, liability and expense resulting from any alleged violations of said regulations including but not limited to fines, penalties, judgments, court costs and attorney fees. 16. Debarment/Suspension. In performing the services and/or furnishing the goods specified within this purchase order, the vendor/contractor certifies that it is not suspended, debarred or declared ineligible from entering into contracts with the Executive Branch of the Federal Government, any State agency or local public body; nor is in receipt of a notice of proposed debarment or suspension from the Executive Branch of the federal Government, any State agency or local public body. 17. Applicable Law. Each party acknowledges that the New Mexico Procurement Code, NMSA 1978 13-1-28 through -199, as amended, applies to every CNM purchase or contract agreement of tangible personal property, services and construction, including participation made pursuant to this purchase order. Further, each party acknowledges that it will be responsible for claims or damages arising from personal injury or damage to persons or property to the extent they result from negligence of its employees or agents and that the liability of CNM shall be subject in all cases to the immunities and limitation of the New Mexico Tort Claims Act, NMSA 1978 41-4-1 through -2 7, as amended. SECTION 2 GOVERNMENT SUBCONTRACT PROVISIONS 7. Affirmative Action. Seller shall not discriminate with regard to hiring, termination or other incidents of employment on the basis of race, sex, national origin, religion, age or handicap. Seller agrees to: a) adhere to the principles set forth in Executive Order 11246 and 11375, and to undertake specifically to maintain employment policies and practices that affirmatively promote equality of opportunity for handicapped persons, minority group persons and women; b) take affirmative steps to hire and promote women and minority group persons at all job levels and in all aspects of employment; c) communicate this policy in both English and Spanish to all persons concerned within the company, with outside recruiting services and the minority community at large; d) provide CNM on request a breakdown of labor force by ethnic group, sex, and job category; and e) discuss with CNM its policies and practices relating to its affirmative action program. If this order is subcontract under a U.S. Government Prime Contract, the applicable clauses listed below are incorporated into, and form a part of, the terms and conditions of this order. In the event of any conflict between the terms and condition of Section 2 and any other provisions of this order the terms and conditions of Section 2 shall prevail. The clauses contained in the following paragraphs of the Federal Acquisition Regulations are incorporated herein by reference. For purposes of this Purchase Order, in the following clauses, the term "contract" shall mean "this order", the term "contractor" shall mean "Seller" and the term "Government" and "Contracting Officer" shall mean "Albuquerque CNM" and the "Director of Purchasing," respectively. The following provisions of the Federal Acquisition Regulations (FAR) apply regardless of the amount of this order: 8. Indemnification and Insurance Seller assumes the entire responsibility and liability for losses, expenses, damages, demands and claims in connection with or arising out of any actual or alleged personal injury (including death) and/or damage or destruction to property sustained or alleged to have been sustained in connection with or arising out of the performance of the work by Seller, its agents, employees, subcontractors or consultants, except to the extent of liability arising out of the negligent performance of the work by or willful misconduct of CNM. In any event, CNM's liability shall be subject to the limitations of the New Mexico Tort Claims Act. Seller shall indemnify and hold harmless CNM, its officers, agents, and employees from any and all liability for such losses, expenses, damages, demands, and claims and shall defend any suit or action brought against any or all of them based on any actual or alleged personal injury or damage and shall pay any damage costs and expenses including attorneys fees, in connection with or resulting from such suit or action. Seller agrees that it and its subcontractors will maintain public liability and property damage insurance in reasonable amounts covering the above obligation and will maintain workers' compensation coverage covering all employees performing this order. * Anti-kickback Procedures: 52.203-7 Buy American Act and Balance of Payments Program 52.225-7001 * Contract Work Hours and Safety Standards Act-Overtime Comp. 52.222-4 * Equal Employment Opportunity 52.222-26 Integrity of Unit Prices 52.215-26(a)(b) Notice to the Government of Labor Disputes 52.222-1 Preference for U.S. Flag Air Carriers (For internal air travel) 52.247-63 Restriction on Subcontractor Sales to the Government 52.203-6 Service Contract Act of 1965 (Reserved) 52.222-41 * Termination for Convenience of Government (Education and other Nonprofit Institutions) 52.249-5(a)(f) RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. CNM reserves all administrative, contractual, and legal remedies against Seller in case of any breaches of the contract. * On contracts funded by federal grants, only the Special Terms and Conditions clauses identified by the asterisk (*) are incorporated into this contract. Page 15 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 1. SCOPE OF REQUEST: Central New Mexico Community College (CNM) is soliciting proposals from experienced, industry leading firms (the Vendor), with expertise and resources to provide advanced telecommunications engineering and construction administration services for the design and implementation of an underground telecommunication utility infrastructure system to be constructed primarily on CNM’s Main Campus, including a comprehensive topographical survey with some additional design and construction administration services at CNM’s Joseph M. Montoya Campus (JMMC). The underground telecommunication utility infrastructure system shall provide CNM with adequate growth capacity and flexibility to serve both CNM’s immediate and future requirements. In order to future proof its communications infrastructure CNM is seeking solutions that will allow cost effective expansion, replacement and upgrades of media in the future with minimal service impacts. CNM is also seeking designs that will allow for reduction or possible elimination of its OSP copper infrastructure requirements. It is expected that the Vendor shall work closely with CNM/ITS staff and CNM’s Network Managed Services contractor to achieve this objective. The selected engineering firm is expected to serve as the primary design professional throughout the following project phases: a) b) c) d) e) f) g) h) Programming Phase Schematic Design Phase Design Development Phase Construction Document Phase Construction Bidding Phase Construction Administration Phase Final Completion Phase Commissioning Phase (CNM will contract with a 3rd party to perform the Commissioning Phase. Any required changes resulting from this may require the awarded Vendor to this RFP to correct and/or address.) In addition the overall project will involve the design and construction of a “Wellness Path” located above the underground communications utilities on CNM’s Main Campus. The project will likely require extensive civil engineering services as well as landscape architecture. This portion of work may comprise up to 30% of the overall project MACC. While important, the primary focus is for the Engineering disciplines needed to achieve the underground telecommunication utility infrastructure. The project will also require planning and coordination in conjunction with CNM’s Information Technology Services (ITS) and Facilities departments in order to deliver an operable communications system with minimal adverse impact to CNM’s IT services, parking services and building access to students. The Vendor is also expected to provide as a deliverable updated Outside Cable Plant (OSP) standards as additions to CNM’s Facilities Management / Construction Manual. Funding: The maximum allowable construction cost (MACC) is $3,267,520.00 excluding gross receipts tax. CNM also desires to establish a price agreement for future Telecommunications Engineering Services as well as other engineering services that comprise the scope of this RFP. CNM wishes to qualify and award the highest ranked respondent to this RFP for Engineering/Architectural services described in this RFP. 1.1 CNM INSTITUTIONAL INFORMATION: CNM is the largest community college in the State of New Mexico, providing year-round instruction. CNM is a metropolitan commuter college with a primary focus on quality instruction. As such CNM does not have dormitories, research or sports facilities. CNM has an enrollment of approximately 30,000 students in both the fall and spring semesters and approximately 15,000 students enrolled in the summer term. The current Full Time Enrollment (FTE) is 16,415 students. The average FTE over the past two years has been approximately RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 16 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 15,000 students. CNM serves its students at seven campus locations in the Albuquerque metropolitan area: Main Campus (MAIN), Joseph M. Montoya Campus (JMMC), South Valley Campus (SVC), Workforce Training Center (WTC), West Side Campus (WSC), Rio Rancho Campus (RRC) and the Applied Technology Center (ATC) as well as two Small Business Development Centers (SBDCs) and online distance learning and hybrid instruction. The college offers associates degrees and certificates in a variety of subject areas. For complete information about CNM see the current CNM Fact Book located at: http://www.cnm.edu/depts/planning/instres/fact_book/factbook.html 1.2 CAMPUS LOCATIONS: Street addresses, campus layouts, building names and parking areas are provided per the below link. http://www.cnm.edu/maps-and-directory 1.3 CURRENT TECHNOLOGY ENVIRONMENT A summary of CNM’s current technology environment relevant to this RFP is provided in Exhibit F: Current Technology Environment. An understanding of the current technology may provide insight into the level of coordination that will be required to design and implement the new telecommunication utilities. Locations, conceptual designs, topology maps and business processes relevant to this RFP are included as exhibits as follows: 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 Exhibit N: Exhibit P: Exhibit Q: Exhibit R: Exhibit S: 1.4 MAIN Campus Technology/Wellness Loop Conceptual Diagram. Network Topology Phone System Topology Future Technology Environment CNM Change Management Process FUTURE ENVIRONMENT As a large community college serving a dynamic community CNM’s mission is, “To create education opportunities and community partnerships while pursuing a level of community college excellence that is worthy of local and national recognition.” In order to serve this mission and CNM’s goals of Student Success, Community Success, and Organizational Excellence and Innovation, CNM’s technology environment reflects the dynamic nature of the college and is constantly challenged to integrate new technologies that serve the needs of the college community. Over the duration of the contract resulting from this RFP, CNM may determine it is in CNM’s best interest to upgrade or expand existing telecommunication utility systems. The successful Vendor shall play a key role in technology discussions and will be asked to work with CNM to identify potential technical constraints, benefits and impacts of various technology solutions, and to assist in determining Return On Investment (ROI). A summary of technology initiatives that CNM is actively pursuing or is considering in the near future is provided per Exhibit R: Future Technology Environment. 1.5 CNM IT SUPPORT STAFF CNM’s department of Information Technology Services (ITS) provides centralized support for all of CNM’s information technology services and initiatives at all campus locations. ITS strives to maintain a highly motivated customer oriented support organization by recruiting talented IT professionals and offering ongoing opportunities for advancement and training. 2. SCOPE OF WORK The successful Vendor will propose Engineering Design and Construction Administration Services that meet the criteria identified by CNM’s ITS and Facilities departments. The vendor will be responsible for the technical accuracy and identifying the impacts of the proposed solution to the current environment as well as the impacts to CNM staff responsible for the ongoing administration, maintenance and support of CNM’s telecommunication utilities and grounds based on the proposed solution as described herein and in the related Exhibits. A compliance statement by the vendor is required on each point. The compliance statement shall include the method of delivery for each requirement as well as any costs or limitations not provided elsewhere RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 17 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 by the Vendor. Bidders shall be deemed non-responsive if offering other than full compliance to MANDATORY requirements. A non-mandatory pre-proposal meeting as well as a site(s) inspection will be conducted to further address any additional questions. 2.1 THE FOLLOWING WILL BE INCLUDED AS BASIC SERVICES FOR ALL PROJECT PHASES AND SPECIAL SERVICES: The Vendor shall provide a list of all deliverables for each phase of the project as well as a schedule for completing the project. The facilities must remain operational throughout the construction. The Engineer/Design Professional will break down each phase of the project as follows: 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 Programming Phase Schematic Design Phase Design Development Phase Construction Document Phase Bidding Phase Construction Administration Phase Final Completion Phase Commissioning Phase 2.1.9 An updated estimate of probable construction cost will be required at the beginning of each phase, 2.1.1. – 2.1.8. 2.1.10 The Vendor shall designate a single point of contact to serve as the Project Manager through the duration of the development of the project. 2.1.11 The designated Project Manager shall work closely with CNM/ITS staff in regards to all aspects of the project and provide oversight and coordination for all activities described in the Scope of Work. 2.1.12 The Vendor shall maintain in their employment at least one BiCSi RCDD/OSP certified engineer who is also trained and qualified by major OSP Cable Systems manufacturer's to provide engineering and design services throughout the project. CNM also requires that an Engineer/Design Professional that meets these requirements is assigned as the technical lead for the duration of the project. 2.1.13 The Vendor shall provide full construction inspection and certification services as required by the State of New Mexico Construction Industries Division (CID) and other entities having jurisdiction over the project. 2.1.14 The Vendor shall conduct campus meetings to seek input from stakeholders into the schedule and design of the Technology and Wellness Loop project. 2.1.15 The Vendor shall perform the services expeditiously as is consistent with the professional skill and care which is ordinarily applied by engineers of good standing with the New Mexico State Board of licensure for Engineers. 2.1.16 The Vendor shall provide a full Professional Team: For the performance of the services required by the Agreement. The Vendor shall employ the services of consulting engineers so as to provide a full professional design and construction administration team as dictated by the disciplines of engineering design involved in the Work. 2.1.17 The Vendor shall review and comply with laws, codes, and regulations applicable to the design incorporating requirements imposed by governmental authorities having jurisdiction over the project such as but not limited to NM CID. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 18 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.1.18 The Vendor shall consider and advise the Owner of the comparative values of alternative materials, and equipment relative to construction, maintenance, and life cycle costs to achieve a design appropriate for the Owner's program and suitable for the Project Budget. 2.1.19 All work shall be designed to fall within compliance of the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED), per the State of New Mexico Executive Order 2006-001, State of New Mexico Energy Efficient Green Buildings Standards for State Buildings. 2.1.20 Offeror's responding to this proposal and the successful offer awarded a contract, shall 1) have on staff a registered professional Engineer who is registered by the State Board of Registration for Professional Engineer's to practice Engineering services in the State of New Mexico, and who will be assigned responsible charge for each project; 2) have experience in all phases of Engineering design and construction; and 3) be able to demonstrate relative experience and expertise in design, construction administration and project management. 2.1.21 All plans and specifications shall be prepared by and be under the "responsible charge" of a registered professional Engineer who is registered by the State Board of Registration for Professional Engineer's to practice Engineering services in the State of New Mexico. Responsible charge means responsibility for the direction, control and supervision of Engineering services work to assure that the work product has been critically examined and evaluated for compliance with appropriate professional standards by a registrant in that profession and by sealing or signing the documents, the professional Engineer accepts responsibility for the Engineering services work represented by the documents and that applicable Engineering services standards have been met. 2.1.22 The Vendor acknowledges the importance of creating and implementing a quality assurance plan on this Project. Engineer/Design Professional agrees to develop and present to the Owner a quality assurance plan for the design of the Project, for Owner's review and approval, prior to starting work on the Project. 2.1.23 The services of Environmental and/or Geotechnical engineers, testing laboratories, and other consultants to provide professional evaluations and recommendations pertaining to conditions of the site and existing improvements, including, but not limited to, tests, and surveys required to ascertain and address surface and subsurface conditions, structural integrity of existing structures, the presence of hazardous materials and environmental issues. Such services will be the responsibility of the Engineer/Design Professional and shall be handled as a cost reimbursable. 2.1.24 The Vendor shall work with NM CID and other governmental authorities having jurisdiction over the project to determine and calculate impact fees associated with this project. 2.1.25 The Vendor shall review and comply with laws, codes, and regulations applicable to the design incorporating requirements imposed by governmental authorities having jurisdiction over the project such as EPA, AMAFCA, and City of Albuquerque. 2.1.26 The Vendor shall provide a complete and accurate survey of the construction site to include but not limited to: the rights, restrictions, easements, boundaries, topographical contours, existing utilities, and full information as to sewer, water, gas, electrical services and other utilities. 2.1.27 The Vendor shall obtain necessary construction permits, ingress/egress permits. 2.1.28 The Vendor shall provide complete Construction Inspections/Site Observations required for the Project and reporting and certification services as required by any governmental entity or code administration authority, including but not limited to the NM CID, City of Albuquerque, State, City of Albuquerque, County of Bernalillo, Federal Environmental Protection Agency (EPA), State of New Mexico Environmental Department and A.M.A.F.C.A. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 19 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.1.29 The Vendor shall, within 15 days of the award of a purchase order (PO) incorporating this Agreement, submit for CNM's approval a schedule for the performance of the Engineer's/Design Professional’s services, and shall include allowances for periods of time required for the review and approval of submissions to CNM and any other agency having jurisdiction and the orderly progress of the Project. Time limits established by this schedule as approved by CNM shall not be exceeded, except for reasonable cause. 2.1.30 The Vendor shall employ the services of consulting architects, engineers, surveyors, etc. so as to provide such professional services required by the Agreement. Such services may include civil engineering, electrical engineering, mechanical engineering, structural engineering, and surveyor. 2.1.31 The Vendor shall prepare a set of drawings updated to reflect actual construction known as record drawings and deliver, to Owner, a set of Record Documents drawings and an electronic documents file in AutoCAD and PDF format or as mutually agreed. 2.1.32 The Vendor shall work cooperatively and in partnership with any and all other contractors engaged to work on the Project including, but not limited to, the general construction contractor and any construction observation contractor. 2.1.33 The Vendor shall perform the services expeditiously as is consistent with the professional skill and care which is ordinarily applied by Engineer of good standing with the State Board of Registration for Professional Engineer's. The Engineer/Design Professional shall provide a full Professional Team for the performance of the services required by the Proposal. 2.1.34 The Vendor shall employ the services of consulting engineers so as to provide a full professional team as dictated by the disciplines of architectural and engineering design involved in the work. 2.1.35 CNM would like to have all the items constructed, completed, commissioned and ready to begin operational services by July 1, 2016. The Vendor shall review the feasibility of the completion date and advise CNM of any potential or real delays. 2.1.36 The Owner shall have use and rights to all electronic documents produced during all phases of the work. 2.2 BASIC SERVICES – PROJECT PHASES 2.2.1 PROGRAMMING PHASE The Engineer/Design Professional shall provide Programming Phase services which include, but are not limited to the following: 2.2.1.1 Develop a written program to ascertain the requirements of the Project and shall review the understanding of such requirements with the Owner. 2.2.1.2 Provide a complete Project Program listing the needs of the Owner, project cost, objectives, conferences, regulatory requirements, and Design Criteria. 2.2.1.3 Provide preliminary evaluation of the Owner's Scope of Work and project schedule, project site, budgeted cost of the Project, and available surveys, tests, and reports to ascertain that each is consistent and comparable with the others and the requirements of the Project. If the Engineer/Design Professional detects any inconsistencies or incompatibilities among the documents and information provided by the Owner, the Engineer/Design Professional shall promptly recommend reasonable adjustments. 2.2.1.4 Investigate existing conditions or existing facilities. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 20 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.1.5 Comply with CNM requirements for telephone and fiber lines as required by the Information Technologies Services (ITS) Department. 2.2.1.6 Obtain and list all design related permits and approvals required by governmental authorities having jurisdiction over the Project 2.2.1.7 Meet with all governmental agencies and utility providers to obtain prior approval. 2.2.2 SCHEMATIC DESIGN PHASE The Engineer/Design Professional shall provide Schematic Design Phase services which include, but are not limited to the following: 2.2.2.1 Schematic Drawings and Outline Specifications: Based on the Owner approved program, project schedule and delivery method, project site, budgeted cost of the work, and preparatory surveys, test, and contractors' reports and any agreed adjustments thereto, the Engineer/Design Professional shall prepare schematic drawings for schematic plan submittal. 2.2.2.2 Submit for Approval: The Engineer/Design Professional shall submit the schematic design documents for the approval of the Owner. The schematic design document written approved by the Owner shall constitute the approved Project Program which can then be revised only by written agreement of the Engineer/Design Professional and Owner. 2.2.2.3 The Engineer/Design Professional shall provide the Owner with a preliminary Estimate of Probable Construction Cost prior to beginning the Design Development Phase. 2.2.3 DESIGN DEVELOPMENT PHASE The Engineer/Design Professional shall provide Design Development Phase services which include, but are not limited to the following: 2.2.3.1 Drawings and Outline Specifications: Based upon the Schematic Design documents approved by the Owner, and any adjustments authorized by the Owner in the budgeted cost of the Project, Program Schedule, or delivery method, the Engineer/Design Professional shall prepare drawings, outline specifications, and other documents to fix and describe the size and character of the Project. 2.2.3.2 Submit to CNM a preliminary Estimate of Probable Construction Cost based on the current area, volume and other unit cost to CNM for review. The estimating method(s) and detail to be performed by the Engineer/Design Professional shall require the prior review and approval of CNM and must present and provide traceable, supportable information and data. 2.2.3.3 Prepare and distribute, within two (2) days of the occurrence, conference memoranda, meeting minimum summaries of telephone conversations, documentation of site visits and inspection reports as required to maintain a comprehensive record of the Project. The Project name shall be shown on all documents. 2.2.3.4 Obtain all design related permits and approvals required by governmental authorities having jurisdiction of the Project. 2.2.4 CONSTRUCTION DOCUMENT PHASE The Engineer/Design Professional shall provide Construction Document Phase services which include, but are not limited to the following: RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 21 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.4.1 Authorization: The Owner's written approval of the Engineer's/Design Professional’s Estimate of Probable Construction Cost and the Design Development drawings and outline specifications shall constitute authority for the Engineer/Design Professional to proceed with the completion of Bidding Documents. 2.2.4.2 Bidding Documents: Based on CNM approved design documents and any further adjustments in the scope, quality and the cost of work of the Project, the Engineer/Design Professional shall prepare Bidding Documents consisting of final drawings and specifications setting forth in detail the requirements for the construction of the Project, provide specifications in Master Format 2004. The Bidding documents shall incorporate the resolutions of CNM comments and shall be complete and ready for bidding. Any adjustments in the scope shall require the Engineer/Design Professional to update/revise the previously reviewed and approved Estimate of Probable Construction Cost for CNM's final review and approval. 2.2.4.3 The review of the construction documents by the Owner shall not relieve the Engineer/Design Professional of responsibility for code compliance, design deficiencies, errors and omissions. 2.2.4.4 Provide all local, State and Federal building officials having jurisdiction a complete set of construction documents to review, meet with the building officials, and determine any changes. Approval and signature from the officials is required prior to initiating the Bidding Phase. 2.2.4.5 Determine what code authorities, fire marshal, or other departments have jurisdiction over this project, and shall meet with the fire marshal or code authorities having jurisdiction over this project and provide that person or entity with a complete set of construction drawings. Engineer/Design Professional shall ensure that the fire protection plan for the project meets the applicable fire code, and at the end of construction shall provide CNM with a Certificate of Compliance, the fire marshal's inspection report, and any other documentation necessary to ensure that the project meets all applicable fire regulations. 2.2.4.6 Submit to CNM a revised Estimate of Probable Construction Cost based on the current area, volume and other unit cost to CNM for review. The estimating method(s) and detail to be performed by the Engineer/Design Professional shall require the prior review and approval of CNM and must present and provide traceable, supportable information and data. 2.2.5 BIDDING PHASE The Engineer/Design Professional shall provide Bidding Phase services which include, but are not limited to the following: 2.2.5.1 Follow the Owner's approval of the Construction Document Phase, and obtain all required local, State and Federal design and construction review approvals, assist the Owner in developing Bid Documents and obtaining bids and in the award and preparation of the Construction Contracts. 2.2.5.2 Furnish and distribute Bid Documents to prospective bidders in accordance with CNM's Purchasing Department procurement rules, regulations and direction. 2.2.5.2.1 Bid Document Deposit: The Engineer/Design Professional shall distribute sets of Bid Documents to bidders, upon receipt of a deposit for each set. The amount of the deposit shall be determined by the Owner as prescribed in the Bid Documents. 2.2.5.2.2 Distribution and refund of deposits: Bid sets shall be provided to the general contractor bidders upon receipt of the deposit and the deposit shall be refunded in full for each set returned in reusable condition within ten (10) days after bid opening. All refunds shall be paid within twenty (20) days after the opening of the bids. Any deposits not refunded will be sent to CNM's Purchasing Department noting the amount. Building exchanges and similar agencies may be provided Bid Documents without charge. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 22 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.5.2.3 Provide the Owner a certified tabulation showing the number of sets reproduced, disposition, and any payments and deposits received. 2.2.5.3 Pre-bid Conferences. The Engineer/Design Professional shall organize and conduct pre-bid conferences for prospective bidders. 2.2.5.4 Attend the bid opening and furnish to CNM's Purchasing Department a suitably detailed sheet for recording the name of the bidder, the bidder's business number, bid security, base bid, alternates, and remarks. The Engineer/Design Professional shall furnish sufficient tabulation sheets for all in attendance. Immediately after receipt of bids, the Engineer/Design Professional shall submit to CNM's Purchasing Department a certified tabulation of all bids received and opened, along with a recommendation as to the contract award(s). The recommendation for award(s) shall be in writing and directed to CNM's Purchasing Director. 2.2.5.5 The Engineer/Design Professional at the direction of and in concert with CNM's Purchasing Department shall prepare and submit to the Owner five (5) original sets of the Construction Contract, utilizing the forms prescribed by the Owner (which may be in the form of EXHIBIT F or some other form prescribed by the Owner including all the same provisions with respect to the Engineer/Design Professional as are in that EXHIBIT F, except as Engineer/Design Professional and Owner may agree to changes to those provisions with respect to the Engineer/Design Professional), complete with updated Construction Documents. Each set of the Construction Contract shall be marked OFFICIAL CONTRACT DOCUMENTS and shall include an executed bid response form, agreement, Performance and Payment Bonds, Certificate(s) of Insurance, all addenda, plans, drawings, specifications, and supplemental drawings, and wage rate determinations. Three (3) copies shall be retained by the Owner. One copy shall be for the Contractor and one copy shall be for the Engineer/Design Professional. 2.2.5.6 The Engineer/Design Professional shall review and approve, or take appropriate action upon, requests for substitutions submitted in accordance with the procedures in the Instruction to Bidders and as directed by CNM's Purchasing Department, and prepare responses to questions from prospective bidders pertaining to the Bid Documents. The Engineer/Design Professional shall prepare in a timely manner for CNM's review, approval and distribution, addenda responses to all prospective bidders identifying approved substitutions and providing clarifications and interpretations of the Bidding Documents. All Addenda shall be approved and distributed to all prospective bidders by CNM's Purchasing Department. 2.2.5.7 Be present and actively participate at the bid opening. 2.2.6 CONSTRUCTION ADMINISTRATION PHASE The Engineer/Design Professional shall provide Construction Administration Phase services which include, but are not limited to the following: 2.2.6.1 The Engineer/Design Professional shall perform construction contract administration consistent with the General Conditions of the Construction Contract and in accordance with CNM procurement procedures. The Engineer’s/Design Professional's construction contract administration duties shall commence when the contract between CNM and the selected contractor is fully executed and shall continue through final completion of the Project. 2.2.6.2 The Engineer/Design Professional will be a representative of the Owner during the construction and in this capacity will endeavor to (a) guard the Owner against variances from the Contract Documents by the Contractor, (b) encourage and direct within the Engineer/Design Professional authority, the Contractor to complete the construction of the Project within the time specified in the Construction Contract or subsequently extended by the Owner, but Contractor shall be responsible for means and methods for completing the Project, (c) and guard the Owner against defective work. The Engineer/Design Professional RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 23 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 will advise and consult with the Owner regarding the performance and progress of the Contractor and regarding solutions to conditions or problems that may arise due to the design or construction. The Engineer/Design Professional shall serve as an advisor to CNM and shall have limited authority to act on behalf of the Owner to the extent provided in the General Conditions of the Contract, which may only be modified in writing. 2.2.6.3 In response to questions from the Contractor or Owner about the Contract Documents, or as are required for the performance of construction services, the Engineer/Design Professional shall provide interpretations and clarification of the Contract Documents that are consistent with the intent of and reasonably inferable from the Contract Documents. Interpretations and clarifications shall be in the form of written explanation or directions and/or supplementary details or drawings, whichever is required to complete, explain or make definite and of the provisions of the Drawings and Specifications and give them due effect, subject to the prior review and written approval of CNM. 2.2.6.4 The Engineer/Design Professional shall respond to questions about the Contract Documents in a timely manner consistent with the terms of the Contract Documents. 2.2.6.5 Interpretations and clarifications of the Drawings, Specifications, or other Contract Documents, and directions, or decisions regarding performance of the construction work, shall be in writing and shall be advisory to the Contractor and Owner, and are subject to the review and prior written approval of CNM. 2.2.6.6 Project Record. The Engineer/Design Professional shall maintain the Project Record consisting of project related correspondence, memoranda, notes, Statement for Services, and related documents, Application and Certification for Payments and related documents, minutes of the meeting, and inspection reports issued or received by the Engineer/Design Professional. The Owner shall have access to the Project Record during the Engineer’s/Design Professional's normal office hours. If requested to reproduce the Project Record, or significant portions of it, for the Owner, the Engineer/Design Professional will do so. 2.2.6.7 Communications. So as to maintain continuity in the Engineer’s/Design Professional's administration of the Construction Contract and performance of the construction work by the Contractor, and to facilitate complete documentation of the Project Record, all communications between the Contractor and the Owner regarding matters of or related to the Construction Contract shall be directed through the Engineer/Design Professional with copy furnished to the Owner, unless direct communication is otherwise required to effect legal notifications. Unless otherwise authorized by the Engineer/Design Professional, communication by and with the Engineer’s/Design Professional's contractors shall be through the Engineer/Design Professional. Unless otherwise authorized by the Contractor, communications by and with subcontractors and material suppliers shall be through the Contractor. 2.2.6.8 Submittal review. The Engineer/Design Professional shall review the Contractor's submittals for conformance with requirements of, and the design concept expressed in, the Contract Documents and approve or take other appropriate action upon them. 2.2.6.8.1 This review is not intended to verify the accuracy and completeness of details such as dimensions and quantities or to substantiate installation instructions or performance of equipments and systems, all of which shall be the responsibility of the Contractor. However, the Engineer/Design Professional shall advise the Contractor of any errors or omissions which the Engineer/Design Professional may detect during this review. 2.2.6.8.2 The Engineer/Design Professional shall provide administration of the Construction Contract as provided for in the Terms and Conditions of the Construction Contract. The Engineer/Design Professional is not authorized to approve any deviations from the requirements of the Contract Documents. Deviations may be authorized only by the Owner through an approved written Change Order authorized by the Owner's Purchasing Department. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 24 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.6.8.3 The Engineer/Design Professional will review and respond to all submittals with reasonable promptness to avoid delay in the Project or in the activities of the Owner, Contractor or separate contractors. 2.2.6.8.4 Within thirty (30) days after Substantial Completion by the Contractor, the Engineer/Design Professional will furnish the Owner one (1) complete set of the Contractor's approved submittals, organized in a logical manner. 2.2.6.9 Review of Construction Schedules. The Engineer/Design Professional shall review and approve/disapprove the Contractor's construction schedule, monitor the Contractor's progress, and consult with the Owner regarding appropriate action to be taken when it is apparent that the Contractor's progress is jeopardizing Substantial Completion within the Construction Contract Time Schedule. 2.2.6.9.1 The Engineer’s/Design Professional's review and approval of the Contractor's construction schedule shall be only for compliance with the specified format, Construction Contract Time Schedule, and suitability for monitoring progress, and such review and approval shall not be construed as a representation that the Engineer/Design Professional has analyzed the schedule to form opinions of sequences or durations of time represented in the schedule. 2.2.6.9.2 The Engineer/Design Professional may specify any scheduling method or format that the Engineer/Design Professional considers to be appropriate for the Project and which is acceptable to the Owner, but the Engineer/Design Professional shall also require the Contractor to prepare and update the progress schedule in accordance with the General Conditions of the Contract. The Engineer/Design Professional shall promptly deliver a copy of the Contractor's approved Progress Schedule and Report, and any revisions to it, to CNM. 2.2.6.9.3 The Engineer/Design Professional shall require the Contractor to update the Progress Schedule and Report with each monthly Application for Payment and shall otherwise monitor and keep the Owner appraised of the Contractor's progress. 2.2.6.9.4 If, in the Engineer’s/Design Professional's opinion, the Contractor's progress falls materially behind the approved construction schedule, the Engineer/Design Professional shall consult with the Owner and, with the Owner's concurrence, issue the Contractor a Notice to Correct the condition. 2.2.6.10 Inspections/Site Observations. The Engineer/Design Professional shall coordinate, schedule and conduct the scheduled inspections and conferences defined in the Contract Documents and as are appropriate to the scope of the Project and as required by all regulatory bodies. The Engineer/Design Professional shall perform periodic Inspections defined in the Contract Documents. The Engineer/Design Professional shall attend specified inspections and tests defined in the Contract Documents when attendance by the Engineer/Design Professional is specified or is otherwise appropriate. The Engineer’s/Design Professional's "Inspection" means the service performed by the Engineer/Design Professional through which the Engineer/Design Professional: 2.2.6.10.1 Becomes generally familiar with the in-progress and completed Project and the quality of the work on the Project. 2.2.6.10.2 Determines whether the construction work is progressing in general accordance with the Contractor's schedule and is likely to be complete within the Construction Contract Time Schedule. 2.2.6.10.3 Visually compares readily accessible elements of the construction work to the requirements of the Contract Document to determine, in general, if the Contractor's performance of the construction work indicates that the construction work will confirm to the requirements of the Contract Documents when completed. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 25 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.6.10.4 Endeavors to guard the owner against defective work, but does not include making exhaustive investigations or examinations of the in-progress or completed portions of the Project to expose the presence of the Defective Work. 2.2.6.10.5 Reviews and addresses with the Contractor any problems in implementing the requirements of the Contract Documents that the Contractor may have encountered. 2.2.6.10.6 Keeps the Owner fully informed about the Project. 2.2.6.10.7 Such "Inspections/Site Observations" shall commence when the contractor for when work begins on Project. Engineer/Design Professional and Owner will establish a reasonable period of time construction. The Engineer/Design Professional will handle contract administration from the time Contractor commences work through the issuance of the Certificate of Substantial Completion of entire Project. 2.2.6.11 Coordination with the CNM Facilities/ITS Representative. When scheduling scheduled inspections and conferences, the Engineer/Design Professional shall first contact the Facilities Representative by telephone, establish with the Facilities Representative a mutually acceptable time for the inspection or conference, and confirm the agreed date and time in writing at least seven (7) days prior to the date of the inspection or conference. 2.2.6.12 Inspection by Registered Professional: Inspections may be performed by a representative of the Engineer/Design Professional to whom the Owner has no objection; however, the Engineer/Design Professional or a member of the Engineer’s/Design Professional's staff who is a New Mexico Registered Professional Engineer shall perform inspections at least once per week and as frequently as needed or as directed by the Owner during construction. This requirement may be waived by the Owner in writing during periods in which weather or other construction delay progress, or during slow phases of the construction, making inspections during such period unwarranted. 2.2.6.13 Reporting. The Engineer/Design Professional shall promptly prepare a complete report of each inspection by the Engineer/Design Professional, Engineer’s/Design Professional's representative, or consulting engineer and promptly furnish a copy of each report to the Owner and Contractor. The Engineer/Design Professional shall prepare and distribute an inspection report weekly during the construction period. 2.2.6.14 Notification of Deficiencies: The Engineer/Design Professional shall promptly notify the Contractor and Owner in writing of any Defective Work, inadequate progress that may jeopardize timely completion of the Project, or other departures from the requirements of the Contract Documents observed by the Engineer/Design Professional. 2.2.6.15 Stopping the Work: The Engineer/Design Professional shall notify the Owner of a need to stop work when, in the Engineer/Design Professional's opinion, such stoppage is necessary to avoid Defective Work. 2.2.6.16 Certification for Payment: The Engineer/Design Professional shall review and approve as appropriate the Contractor's monthly and final Applications for Payment and issue certifications for payments in accordance with the General Conditions of the Construction Contract. The Engineer/Design Professional shall be required to withhold certification for payment for completed or partially completed construction work for which compliance with the Construction Contract Documents remain to be determined by Specified Inspections or Final Inspections to be performed by their proper sequence. If payment is being requested on an Application for Payment including such construction work in question, the Engineer/Design Professional will notify the Contractor and the Owner and the amount in question will be transferred into an escrow account in accordance with the New Mexico Retainage Act. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. the for the the Page 26 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.6.17 Contract Change Orders. The Engineer/Design Professional shall administer the Change Order Procedures provided in the General Conditions of the Construction Contract. 2.2.6.17.1 The Engineer/Design Professional is authorized to make minor changes in the construction work by written order to the Contractor. Minor changes in the construction work are defined as those which are in the interest of the Owner and do not alter the quality, price, and performance of the finished work. Changes that involve an increase or decrease to the contract cost shall only be authorized by the Owner through an approved written Contract Change Order/Modification Change Request (MCR) approved by the Owner's Purchasing Department. 2.2.6.17.2 The Engineer/Design Professional shall prepare details, supplemental drawings, specifications, or other descriptive documents necessary to sufficiently delineate, for Contractor pricing and performance, proposed changes in the construction work directed or authorized by the Owner. If the proposed change is initiated by the Owner, or result from field conditions, the services of the Engineer/Design Professional shall be considered to fall within the description of "Special Services" if the proposed change results from Engineer’s/Design Professional's oversight, Engineer’s/Design Professional's services shall constitute part of Basic Services, at the Engineer’s/Design Professional's own expense. 2.2.6.17.3 The Engineer/Design Professional (and the Engineer’s/Design Professional's contractor, when appropriate) will review and evaluate change order proposals and claims for extra work as may be submitted by the Contractor. 2.2.6.17.4 Using the Change Order/Modification Change Request (MCR) form, the Engineer/Design Professional shall recommend the Contractor's proposals for acceptance or rejection by the Owner. Each recommendation of acceptance will be based upon the Engineer’s/Design Professional's professional opinion that a proposal is complete, in conformance with the Contract Documents, represents fair and reasonable pricing, and justifies change order action. The authorization to approve a change order shall be performed solely through review and approval prescribed in the Construction Contract and communicated to all interested parties through the issuance of a formal written Change Order approved and distributed by CNM's Purchasing Department. 2.2.6.17.5 The Engineer/Design Professional shall prepare construction Change Orders for acceptance and execution by the Contractor and Owner. Construction Change Orders shall sufficiently describe the change(s) in the construction work so that the requirements of the Contract Documents are clearly determinable with reasonable ease. The preparation of details, supplemental drawings, specification, or other documents to describe a change in the work shall be included in Basic Services. If the proposed change is initiated by the Owner or results from field conditions, the Engineer/Design Professional shall be compensated in accordance with negotiated rates. If the proposed change results from Engineer’s/Design Professional's oversight, Engineer’s/Design Professional's services shall constitute part of Basic Services, at the Engineer’s/Design Professional's own expense. 2.2.6.18 Record Documents: Record Documents shall be prepared and furnished by the Contractor in accordance with the General Conditions of the Construction Contract. Prior to preparing bid documents, the Engineer/Design Professional shall consult with the Owner to determine the Owner's requirement for Record Documents and shall incorporate them into the Conditions of the Bid Document. Construction Documents. If they differ from those of the General Conditions, The Engineer/Design Professional shall administer the Record Documents requirement of the Contract Documents, periodically verifying the Contractor's compliance during construction and reviewing the Contractor's final documents for conformance Contract Documents. 2.2.6.19 Engineer/Design Professional shall issue Certificate of Substantial Completion when all work called for by the drawings and specifications of the Construction Documents has been substantially completed and the Project can be occupied by CNM. Engineer/Design Professional shall review for compliance with the RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 27 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 Contract Documents the warranties, guarantees, Record Documents and other closeout items required by the Contract Documents to be delivered by the Contractor(s) as a condition to final payment to the Contractor(s). The Construction Administration Phase shall terminate upon Substantial Completion of the Project. 2.2.6.20 Prior to final payment, the Engineer/Design Professional shall prepare and deliver to the Owner all record drawings and final report to the Owner. 2.2.7 FINAL COMPLETION PHASE The Engineer/Design Professional shall provide Final Completion Phase services which include, but are not limited to the following: 2.2.7.1 Engineer/Design Professional shall prepare a punch list for final completion, establish a market value of the punch list items, conduct site visits/observations to determine the estimated date of final completion, receive and forward to CNM any written warranties and related documents required by the Contract Documents and assembled by the Contractor to include any required LEEDS documentation. 2.2.7.2 Within sixty (60) days after final completion of the Project, the Engineer/Design Professional shall furnish CNM, at no additional cost, one reproducible copy of the final record drawings and specifications incorporating all changes, and one complete electronic documents file in AutoCAD or as mutually agreed. These copies shall be of the final working drawings. Revisions and changes shall be annotated and crossreferenced. Each sheet shall be prominently noted "Record Drawings". 2.2.7.3 Engineer/Design Professional shall make an inspection of the Project prior to expiration of the warranty or guarantee period and report observed discrepancies under the warranties or guarantees provided by the Contract Documents. Engineer/Design Professional shall provide final inspection at the end of one-year warranty. 2.2.7.4 Engineer/Design Professional shall provide support and analysis as needed by CNM with respect to any warranty or guaranty claims. 2.2.7.5 The Final Completion Phase shall terminate upon the last to occur of: expiration of the last to expire oneyear warranty period, completion of all punch list items, or settlement of all warranty or guaranty claims, whichever occurs last. 2.2.8 COMMISSIONING PHASE The Engineer/Design Professional shall provide commissioning services to test and verify that the entire OSP telecommunications system is fully functional and meets or exceeds all design requirements. It is not CNM’s intention that the commissioning phase be conducted by an independent firm, however it should meet the same expectations it terms of thoroughness as would be expected by an independent commissioning process. 2.2.8.1 Engineer/Design Professional shall work with CNM/ITS to develop and document a test plan that will validate that all components installed as part of this project are operationally sound and meet or exceed design requirements. 2.2.8.2 Engineer/Design Professional shall coordinate with CNM/ITS to conduct a complete execution of the test plan prior to placing any component of the OSP telecommunications system into production service. 2.2.8.3 Engineer/Design Professional shall work with CNM/ITS to evaluate the test results and address any areas of deficiencies that are identified. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 28 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.2.8.3.1 Deficiencies that are identified that can be corrected without impacting production services may be corrected after the system has been placed in production so long as they have been adequately addressed within the one year warranty period. 2.2.8.3.2 Deficiencies that are identified that cannot be corrected without impacting production services shall be corrected immediately upon identification and prior to the system being placed into production. 2.2.8.3.3 The Engineer/Design Professional shall coordinate all work to correct deficiencies with the Contractor. If the deficiencies prove to be a result of engineering services provided by the Engineer/Design Professional, then any work required to correct the deficiencies shall be included as part of the Engineer’s/Design Professional’s Basic Services at no additional cost to CNM. The Engineer/Design Professional shall provide any updates to the Record Documents resulting from correction of any deficiencies. 2.2.8.3.4 2.3 SPECIAL SERVICES 2.3.1 CNM has the right to require, and Engineer/Design Professional agrees to perform, services related to the Project other than those services identified as Basic Services. 2.3.2 For services required by CNM, other than those identified as Basic Services, Engineer/Design Professional shall be required to submit a detailed written proposal for performing the Special Services and a "not to exceed" fee proposal for such Special Services to CNM for its review and written approval, incorporating a declaration as to the suitability of performing work. The "not to exceed" fee proposal shall be broken down into specific hours and shall identify all subcontractor costs to perform the services and accomplish the work. CNM's approval of such proposal shall be in writing and communicated through the issuance of an approved purchase order revision issued through CNM's Purchasing Department. No payment for Special Services and no reimbursement for reimbursables in connection with such Special Services shall be made except for such Special Services performed in accordance with CNM's advance written approval. 2.3.3 For special inspections as required by government agencies to include the code (International Building Code, chapter 17). 2.4 REIMBURSABLE EXPENSES 2.4.1 Reimbursable expenses of Engineer/Design Professional shall include the following items when approved in writing and in advance by CNM: (1) transportation and subsistence of principals and employees on special trips at least fifty (50) miles one-way beyond the City of Albuquerque and related to the Project at the prevailing rate of travel reimbursement being paid by CNM; (2) cost of reproduction of plans, drawings and specifications required for bidding documents [Note: drawing sets for Engineer’s/Design Professional's in-house use and CNM review sets are not reimbursable.]; (3) reasonable plan checks/review fees and permits charged by appropriate governmental authority(s); (4) the services of geotechnical engineers, testing laboratories, and other subcontractors (not employees of Engineer/Design Professional) to provide professional evaluations, recommendations and services pertaining to conditions of the site and existing improvements, including, but not limited to, tests, and surveys required to ascertain and address surface and subsurface conditions, structural integrity of existing structures, the services of Environmental Engineers for the presence of Hazardous Materials and environmental issues; (5) land surveys for property boundaries, topographical data, legal description, etc. (6) special inspections or testing; (7) LEEDS commissioning by third parties as required by government entities. 2.4.2 Payment of reimbursable expenses to Engineer/Design Professional shall be paid by CNM at Engineer’s/Design Professional's direct cost. All requests for reimbursement of expenses shall be accompanied by copies of original invoices. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 29 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 2.5 MINIMUM QUALIFICATIONS 2.5.1 Offerors shall be licensed in the state of New Mexico for all engineering and design services requested per this RFP. 3 EVALUATION CRITERIA 3.1.1 STEP 1: Written proposals shall be reviewed and evaluated in accordance with the evaluation criteria established below per 3.5.3.1 Section I. through 3.5.3.4 Section IV. CNM reserves the right to reject all offers and issue a new RFP if necessary. An evaluation committee shall evaluate written proposals based on the weighted evaluation criteria. Rankings will be based upon an average tabulation of all individual committee member scores. If interviews are not conducted, then the score based ranking shall be the basis for awarding the top scored Offeror. 3.1.2 STEP 2 (optional): If interviews are to be conducted, then the score based rankings of the written offers shall be used as the basis to create a short list of those top ranked firms. Interviews shall be scored in accordance with the evaluation criteria taking into account the information provided in the written response and any additional questions related to the scope of the RFP. Additional questions related to the scope of this RFP may be submitted to shortlist in advance or during interviews. Information and/or factors gathered during interviews, negotiations, and any reference checks, in addition to the evaluation criteria rankings, may be utilized in the final award decisions. References may or may not be reviewed at the discretion of CNM. CNM reserves the right to contact references other than, or in addition to, those furnished by a Respondent. Final rankings will be based upon an average tabulation of all individual committee member scores after interviews and will not be averaged with STEP 1 scores. 3.2 CRITERIA 3.2.1 SECTION I. SPECIALIZED DESIGN AND TECHNICAL COMPETENCE - 25 POINTS POSSIBLE A) Describe your organization, including a joint venture or association. Provide the name of the firm's owner(s) and/or principal officer(s), and state the date of incorporation (or partnership), current annual dollar volume, and number of employees. Provide the firm's organizational chart. B) Provide a current resume for the following: 1) the Engineer(s) who will or may be assigned Responsible Charge, 2) the project manager(s) who will be assigned to this project and 3) each additional employee who will or may provide services under the proposed agreement. C) Provide proof of registration for the registered professional engineer(s). D) Provide a current resume for 1) all proposed sub-consultant surveyors, architects or engineers who will or may be contracted to provide or perform professional services under this project. Provide proof of registration and licensure for all proposed professional surveyors, architects and engineers. 3.2.2 SECTION II. CAPACITY AND CAPABILITY - 35 POINTS POSSIBLE A) Describe your firm's approach to providing and managing the required services as identified within RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 30 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 this Request for Proposals. B) Provide information that demonstrates your firm's and that of your firm's proposed sub-consultants, capacity and capability to perform work of the nature and scope of the RFP project. Detail your firm's and that of your proposed sub-consultant's ability, depth of knowledge, skills, experience and expertise as it relates to the services requested and required to be performed as described and outlined within this Request for Proposal. Discuss how your firm will coordinate or provide particular services which may not be available in house. C) Identify any specialized services you feel may be required to complete performance of the proposed projects and describe how your firm proposes to meet those identified needs. D) Describe techniques planned to assure that schedule dates will be met. Review recent projects to demonstrate ability to meet project budget and schedule. E) Provide a summary of current work and statement regarding ability to assign adequate staff and resources to meet project schedules. F) Provide a proposed project timeline, broken down by labor category and level of effort to perform the services described within this RFP. The proposed timeline must identify all services to be performed; inclusive of all services proposed to be performed by any and all sub-consultants by phase as follows: Identify the number of weeks to perform each of the following phases: 1. Programming Phase 2. Schematic Design Phase 3. Design Development Phase 4. Construction Document Phase 5. Bidding Phase 6. Construction Administration Phase 7. Final Completion Phase 8. Commissioning Phase The final agreed to schedule may be subject to review and approval by CNM’s Committees selected for this Project in addition to CNM’s Owner representatives. The Contractor for the Design Professional may be subject to Liquidated Damages if they cause delays to the completion of the Phases and/or the Project. G) Provide a written narrative outlining and completely describing your firms commitment and guarantee for the successful completion of the project. H) Provide a written narrative outlining and completely describing the approach your firm will take to ensure that all specifications, drawings, bid, construction and design documents will be thorough, accurate and complete. How does your firm propose to address any deficiencies uncovered in the above documents? What commitment and guarantee will your firm extend to CNM and its contractors in this regard? I) State knowledge, experience and approach to designing facilities in accordance with U.S. Green Building Council's LEED rating system as presented in EXHIBIT "E". RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 31 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 3.2.3 SECTION III. RECORD OF PERFORMANCE - 25 POINTS POSSIBLE A) Identify and provide your firms' three (3) most recent project examples indicating your past record of performance on contracts with government agencies with respect to such factors as providing accurate Estimates of Probable Construction Costs, value engineering, cost control and avoidance, quality of work, and ability to meet schedules. B) Describe your firm's quality assurance program regarding, but not limited to, design, code compliance, and coordination of work. Identify those regulatory agencies, governing bodies and utility providers, as you understand, are aware or anticipate shall become involved in the permitting, review, approval, certification, etc. processes connected to the project described within this RFP. Provide a short narrative summation of the anticipated involvement for each organization identified. C) Present your firm's five (5) most recently completed project examples. For each case, describe the project and the work performed, and provide the client's and general contractor's name, address, contact person's name and a telephone number. Identify and provide a point of contact and phone number for all sub-consultants used on each of the five (5) projects. Note, references listed must be willing to provide information about your firm's control of cost, quality of work, and ability to meet schedules. Do not list CNM as a reference. D) For each of the five (5) projects identified above, provide a project summary breakdown for each showing (a) final cost estimates compared to actual final construction costs; (b) number of change orders processed for each project providing (i) reason for each change, (ii) construction costs associated with each change order, (iii) actual average constriction cost per square foot to construct each project, and (iv) amount of time extensions granted to contractor (provide a very brief reason/description for basis of granting each time extension). Has your firm or is your firm currently in any legal dispute, mediation or arbitration hearings regarding dispute resolution with an owner or contractor? If yes, provide detail information. 3.2.4 SECTION IV. PROXIMITY TO OR FAMILIARITY WITH THE AREA - 5 POINTS POSSIBLE A) Provide a narrative describing your firm's proximity to and/or familiarity with the project location. 3.2.5 SECTION V. NEW MEXICO BUSINESS- 5 POINTS POSSIBLE A) Provide a narrative describing the amount of the design work for this project that will be produced by a New Mexico business within this state. 3.2.6 SECTION VI. VOLUME OF WORK - 5 POINTS POSSIBLE A) State the volume of work previously done for CNM which is not 75% complete with respect to basic professional design services. Points will be determined as follows: 1. None to $5 2. $1 to $25,000 3. $25,001 to $50,000 4. $50,001 to $75,000 5. $75,001 to $100,000 6. $100,000 or more RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 32 of 70 SECTION D: SCOPE OF SERVICES & EVALUATION CRITERIA FOR RFP # P-357 Proposals should include all charges associated for services requested. Provide rates of all individuals who may work on the services identified in this proposal. Additional charges, if required, for various types of help (telephone support, on-site-support) should also be included. If the price or hourly rates are to change in subsequent yearly contract renewals, indicate the maximum annual increase per year, expressed as a percentage. Cost increase/adjustments will only be reviewed once a year at time of renewal. If contractor requests a price adjustment/increase supporting documentation must accompany the request. The quoted hourly rates offered in response to this RFP may be decreased for future projects on a project-by-project basis upon written mutual agreement between the awarded Price Agreement holder and CNM. Costs for Services required for which the successful Offeror does not identify shall be borne by the Offeror and will shall not be charged to CNM. Indicate for what period of time these costs will be effective. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 33 of 70 SECTION E: SIGNATURE OF FIRM'S AUTHORIZED REPRESENTATIVE ANY MODIFICATIONS TO THIS SECTION E SIGNATURE OF FIRM’S AUTHORIZED REPRESENTATIVE RESPONSE FORM OTHER THAN FILLING IN THE FORM FIELDS IS NOT ACCEPTABLE AND WILL RESULT IN DISQUALIFICATION OF THE OFFEROR’S RESPONSE. THE GENERAL TERMS AND CONDITIONS ON THE REVERSE SIDE OF CNM’S PURCHASE ORDER ARE AN EQUAL AND INTEGRAL PART OF THIS REQUEST FOR PROPOSALS (RFP) AND ARE NOTED IN SECTION C. THE TERMS, CONDITIONS AND SPECIFICATIONS CONTAINED IN THIS RFP ALONG WITH ANY ATTACHMENTS AND THE OFFEROR’S RESPONSE ARE HEREBY INCORPORATED INTO ALL PURCHASE ORDERS ISSUED AS A RESULT OF THIS RFP, INCLUDING ANY ADDENDA. CNM RESERVES THE RIGHT TO NEGOTIATE WITH A SUCCESSFUL OFFEROR (CONTRACTOR) PROVISIONS IN ADDITION TO THOSE STIPULATED IN THIS RFP. THE CONTENTS OF THIS RFP, AS REVISED AND/OR SUPPLEMENTED, AND THE SUCCESSFUL OFFEROR’S PROPOSAL WILL BE INCORPORATED INTO THE CONTRACT. SHOULD AN OFFEROR OBJECT TO ANY OF THE CNM STANDARD TERMS AND CONDITIONS THAT OFFEROR MUST PROPOSE SPECIFIC ALTERNATIVE LANGUAGE THAT WOULD BE ACCEPTABLE TO CNM. GENERAL REFERENCES TO THE OFFEROR’S TERMS AND CONDITIONS OR ATTEMPTS AT COMPLETE SUBSTITUTIONS ARE NOT ACCEPTABLE TO CNM AND WILL RESULT IN DISQUALIFICATION OF THE OFFEROR’S PROPOSAL. OFFERORS SHOULD PROVIDE A BRIEF STATEMENT OF THE PURPOSE AND IMPACT, IF ANY, OF EACH PROPOSED CHANGE FOLLOWED BY THE SPECIFIC PROPOSED ALTERNATE WORDING. By signing below, contractor acknowledges that it is a competent firm capable of providing the items and/or services requested, is properly licensed for providing the items or services specified, has read this Request for Proposals (RFP), understands it, and agrees to be bound by its terms and conditions. Contractor hereby agrees to furnish items and/or services, at the prices quoted, pursuant to all requirements and specifications contained in this document, upon receipt of an authorized purchase order from the purchasing department, and further agree that the language of this document shall govern in the event of a conflict with its bid. The undersigned, being duly authorized to sign bidding documents and act on behalf of the contractor in an official capacity, certifies that the items and/or services offered on this RFP meets or exceeds all specifications, terms and conditions as described in this RFP without exceptions. I understand that items and/or services not meeting all specifications, terms and conditions will be rejected and all costs shall be borne by the contractor. Please fill in all spaces below: Legal Company Name Address City, State, Zip Phone Number FAX Number Email Contact Person for Clarification of Bid Response NM Tax ID Federal Tax ID Applicable NM License Numbers ALL NEW MEXICO LICENSE NUMBERS LISTED HEREIN OR PURPORTED BY THE VENDOR MUST BE ISSUED IN THE OFFERING FIRM’S LEGAL COMPANY NAME. LICENSE NUMBERS LISTED UNDER A NAME OTHER THAN THE LEGAL COMPANY NAME MAY RENDER THE OFFER AS BEING NON-RESPONSIVE. NON-RESPONSIVE OFFERS WILL NOT BE CONSIDERED FOR AWARD. OFFERORS WISHING TO RECEIVE THE RESIDENTIAL PREFERENCE AS APPLICABLE PER NMSA 13-1-21 MUST SUBMIT A VALID RESIDENTIAL PREFERENCE CERTIFICATE WITH THEIR SEALED RESPONSE. OFFERORS WISHING TO RECEIVE THE VETERAN RESIDENT BUSINESS PREFERENCE AS APPLICABLE PER NMSA 13-1-22 MUST SUBMIT A VALID RESIDENT VETERAN’S PREFERENCE CERTIFICATE WITH THEIR SEALED RESPONSE Acknowledgment of Amendment/Addendum Specify Number(s) and Date(s) # date # date # date # date # date Signature of Member Authorized to Sign for Firm Printed/Typed Name and Title of Individual Signing RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 34 of 70 SECTION F: DEBARMENT/SUSPENSION STATUS & NON-COLLUSION AFFIDAVIT FORM DEBARMENT/SUSPENSION STATUS 1. The vendor/contractor certifies that it is not suspended, debarred or ineligible from entering into contracts with the Executive Branch of the Federal Government, or in receipt of a notice of proposed debarment from any State agency or local public body. 2. The vendor/contractor agrees to provide immediate notice to CNM's Purchasing Department in the event of being suspended, debarred or declared ineligible by any State or Federal department or agency, or upon receipt of a notice of proposed debarment that is received after the submission of this bid but prior to the award of the purchase order/contract. NON-COLLUSION AFFIDAVIT The undersigned, duly authorized to represent the persons, firm and/or corporation joining and participating in the submission of the foregoing bid (such persons, firm and/or corporation hereinafter being referred to as the vendor/contractor), being duly sworn, on his/her oath, states that to the best of his/her belief and knowledge no person, firm, or corporation, nor any person duly representing the same joining and participating in the submission or the foregoing bid/proposal, has directly or indirectly entered into any agreement or arrangement with any other vendor/contractors, or with any employee of CNM, or any person, firm or corporation under contract with CNM whereby the contractor, in order to induce the acceptance of the foregoing bid by CNM has paid or is to pay any other vendor/contractor or to the aforementioned persons anything of value whatsoever, and that the vendor/contractor has not directly or indirectly entered into any agreement or arrangement with any other vendor/contractor which tends to or does lessen or destroy free competition in the letting of the contract sought for by the foregoing bid. CERTIFICATION The undersigned hereby certifies that he/she has read the above Non-Collusion Affidavit and Debarment/Suspension Disclosure Statement and that he/she understands and will comply with these requirements. The undersigned further certifies that he/she have the authority to certify compliance for the vendor/contractor named below. Signature Printed/Typed Name Title Date Legal Company Name Address City/State/Zip RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 35 of 70 SECTION G: RESIDENT VETERANS PREFERENCE CERTIFICATION __________________________________________ (NAME OF CONTRACTOR) hereby certifies the following in regard to application of the resident veterans' preference to this procurement: PLEASE CHECK ONLY ONE BOX FROM THE FOUR (4) CHECK BOXES LISTED BELOW: I declare that my firm is ineligible to receive New Mexico Resident Veterans Preference. The following three (3) checkboxes are applicable to ONLY those vendors eligible to receive New Mexico Resident Veterans Preference AND who have included a valid New Mexico Resident Veterans Preference certificate with their sealed response. No preference will be extended unless a valid certificate is included in your sealed response. Submitted certificates shall be validated by CNM with New Mexico Tax & Revenue. I declare under penalty of perjury that my business prior year revenue starting January 1 ending December 31 is less than $1M allowing me the 10% preference discount on this solicitation. I understand that knowingly giving false or misleading information about this fact constitutes a crime. I declare under penalty of perjury that my business prior year revenue starting January 1 ending December 31 is more than $1M but less than $5M allowing me the 8% preference discount on this bid or proposal. I understand that knowingly giving false or misleading information about this fact constitutes a crime. I declare under penalty of perjury that my business prior year revenue starting January 1 ending December 31 is more than $5M allowing me the 7% preference discount on this bid or proposal. I understand that knowingly giving false or misleading information about this fact constitutes a crime. "I agree to submit a report, or reports, to the State Purchasing Division of the General Services Department declaring under penalty of perjury that during the last calendar year starting January 1 and ending on December 31, the following to be true and accurate: "In conjunction with this procurement and the requirements of this business' application for a Resident Veteran Business Preference/Resident Veteran Contractor Preference under Sections 13-1-21 or 13-1-22 NMSA 1978, when awarded a contract which was on the basis of having such veterans preference, I agree to report to the State Purchasing Division of the General Services Department the awarded amount involved. I will indicate in the report the award amount as a purchase from a public body or as a public works contract from a public body as the case may be. "I understand that knowingly giving false or misleading information on this report constitutes a crime." I declare under penalty of perjury that this statement is true to the best of my knowledge. I understand that giving false or misleading statements about material fact regarding this matter constitutes a crime. ______________________________________________________________________________ (Signature of Business Representative)* (Date) *Must be an authorized signatory for the Business. The representations made in checking the boxes constitutes a material representation by the business that is subject to protest and may result in denial of an award or unaward of the procurement involved if the statements are proven to be incorrect. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 36 of 70 SECTION H: AFFIDAVIT FORM STATE OF NEW MEXICO COUNTY OF (___________________________________) I, ________________________________, being a registered Design Professional, New Mexico Registration No. ___________, ______________________(title) of ___________________________________ (Corporation/business/partnership), hereby state and affirm as follows: 1. I have responded to the Central New Mexico Community College (“CNM”) Request for Proposal for Design Professional Services. 2. In connection with responding to said Request for Proposal, I submit herewith additional information regarding my ability to perform Design Professional services. A. I currently have professional liability (errors and omissions) insurance with (carrier), ____________________ (policy number), _______________________________ (effective date) ___/____/____, in the amount of $_____________________ which provides coverage for injury to persons or property (including client’s) arising out of the negligent performance of professional services rendered by me, my agents or employees. B. I have notified my errors and omissions carrier of the following problems or potential claims against me or the above named business during the last three (3) years: Name of Claimant:_____________________________ Amount of Claim: _____________________________ Nature of Claim: _____________________________________________________ 3. The following legal actions have been filed against me during the last three (3) years: Name of Case: _________________________________________ Court in which filed:_____________________________________ Date of Filing: ________/_____/______ Disposition: ______________________________________________________________ 4. The following judgments have been entered against me or the above referenced during the last three (3) years. 5. I or the above referenced business possess sufficient financial resources and Design Professional personnel and support personnel to properly perform the services requested by CNM in its Request for Proposal for Design Professional Services. ____________________________________ (Name) ____________________________________ (Title) ____________________________________ (Date) RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 37 of 70 EXHIBIT A: INSURANCE REQUIREMENTS CERTIFICATES OF INSURANCE The AWARDED Contractor shall furnish UPON REQUEST, one copy each of Certificates of insurance herein required for each copy of the resultant Agreement, showing the coverage, limits of liability, covered operation, effective dates of expiration of policies of Insurance carried by the Contractor. The Contractor shall furnish to the Owner copies of limits. The Certificates of Insurance shall be in the form of AIA Document G-705 or similar format acceptable to the Owner. Such certificates shall be filed with the Owner and shall also contain the following statements: 1. The Governing Board of Central New Mexico Community College, Central New Mexico Community College, its agents, servants and employees are held as additional insured. 2. "The insurance coverage certified herein shall not be canceled or materially changed except after forty five (45) days written notice has been provided to the Owner." COMPENSATION INSURANCE: The Contractor shall procure and shall maintain during the life of any resultant agreement Worker's Compensation insurance as required by applicable State law for all of the Contractor's employees to be engaged at the site referred to in this solicitation in case of any such work sublet, the Contractor's Worker's Compensation insurance. In case any class of employee engaged in work on the project under this contract is not protected under a Worker's Compensation Statute, the Contractor shall provide and shall cause each subcontractor or sub-subcontractor to provide Employer's Insurance in an amount of not less than $500,000. CONTRACTOR'S PUBLIC LIABILITY INSURANCE: The Contractor shall maintain insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-4-1 et.seq. NMSA 1978". The insurance must remain in force for the life of the contract including all contract extension or renewals. The limits effective July 1, 1992 are: $400,000 per person/$750,000 per occurrence plus $300,000 for medical and $100,000 for property damage for a total maximum liability of $1,150,000 per occurrence. VENDOR’S PROFESSIONAL LIABILITY INSURANCE: The Vendor shall maintain professional liability insurance in the amount of at least $1,000,000. CONTRACTOR'S VEHICLE LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contact Vehicle Liability Insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-1-1 et. seq. NMSA 1978". The insurance must remain in force for the life of the contract including all contract extensions or renewals. The limits effective July 1, 1992 are: Bodily Injury: Property Damage: $750,000. Each Occurrence $100,000. Each Occurrence SUBCONTRACTOR'S AND SUB-SUBCONTRACTOR'S PUBLIC AND VEHICLE LIABILITY INSURANCE: The Contractor shall either: (1) Require each subcontractor or sub-subcontractor to procure and maintain during the life of the subcontract or sub- subcontract Public Liability Insurance of the types and amounts specified above or, (2) Insure the activities of the subcontractors or sub-subcontractors in the Contractor's policy as required under this Article. GENERAL: All insurance policies are to be issued by companies authorized to do business under the laws of the state in which the work is to be done and acceptable to Owner. The Contractor shall not violate, or permit to be violated, any conditions of any said policies, and shall at all times satisfy the requirements of the insurance companies writing said policies. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 38 of 70 EXHIBIT B: CAMPAIGN CONTRIBUTION DISCLOSURE FORM Pursuant to the Procurement Code, Sections 13-1-28, et seq., NMSA 1978 and NMSA 1978, § 13-1-191.1 (2006), as amended by Laws of 2007, Chapter 234, any prospective contractor seeking to enter into a contract with any state agency or local public body for professional services, a design and build project delivery system, or the design and installation of measures the primary purpose of which is to conserve natural resources must file this form with that state agency or local public body. This form must be filed even if the contract qualifies as a small purchase or a sole source contract. The prospective contractor must disclose whether they, a family member or a representative of the prospective contractor has made a campaign contribution to an applicable public official of the state or a local public body during the two years prior to the date on which the contractor submits a proposal or, in the case of a sole source or small purchase contract, the two years prior to the date the contractor signs the contract, if the aggregate total of contributions given by the prospective contractor, a family member or a representative of the prospective contractor to the public official exceeds two hundred and fifty dollars ($250) over the two year period. Furthermore, the state agency or local public body may cancel a solicitation or proposed award for a proposed contract pursuant to Section 13-1-181 NMSA 1978 or a contract that is executed may be ratified or terminated pursuant to Section 13-1-182 NMSA 1978 of the Procurement Code if: 1) a prospective contractor, a family member of the prospective contractor, or a representative of the prospective contractor gives a campaign contribution or other thing of value to an applicable public official or the applicable public official’s employees during the pendency of the procurement process or 2) a prospective contractor fails to submit a fully completed disclosure statement pursuant to the law. The state agency or local public body that procures the services or items of tangible personal property shall indicate on the form the name or names of every applicable public official, if any, for which disclosure is required by a prospective contractor. THIS FORM MUST BE INCLUDED IN THE REQUEST FOR PROPOSALS AND MUST BE FILED BY ANY PROSPECTIVE CONTRACTOR WHETHER OR NOT THEY, THEIR FAMILY MEMBER, OR THEIR REPRESENTATIVE HAS MADE ANY CONTRIBUTIONS SUBJECT TO DISCLOSURE. The following definitions apply: “Applicable public official” means a person elected to an office or a person appointed to complete a term of an elected office, who has the authority to award or influence the award of the contract for which the prospective contractor is submitting a competitive sealed proposal or who has the authority to negotiate a sole source or small purchase contract that may be awarded without submission of a sealed competitive proposal. “Campaign Contribution” means a gift, subscription, loan, advance or deposit of money or other thing of value, including the estimated value of an in-kind contribution, that is made to or received by an applicable public official or any person authorized to raise, collect or expend contributions on that official’s behalf for the purpose of electing the official to either statewide or local office. “Campaign Contribution” includes the payment of a debt incurred in an election campaign, but does not include the value of services provided without compensation or unreimbursed travel or other personal expenses of individuals who volunteer a portion or all of their time on behalf of a candidate or political committee, nor does it include the administrative or solicitation expenses of a political committee that are paid by an organization that sponsors the committee. “Family member” means spouse, father, mother, hild, father-in-law, mother-in-law, daughter-in-law or son-in-law. “Pendency of the procurement process” means the time period commencing with the public notice of the request for proposals and ending with the award of the contract or the cancellation of the request for proposals. “Person” means any corporation, partnership, individual, joint venture, association or any other private legal entity. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 39 of 70 EXHIBIT B: CAMPAIGN CONTRIBUTION DISCLOSURE FORM “Prospective contractor” means a person who is subject to the competitive sealed proposal process set forth in the Procurement Code or is not required to submit a competitive sealed proposal because that person qualifies for a sole source or a small purchase contract. “Representative of a prospective contractor” means an officer or director of a corporation, a member or manager of a limited liability corporation, a partner of a partnership or a trustee of a trust of the prospective contractor. Name(s) of Applicable Public Official(s) if any: CNM's Governing Board including, District 1 Mr. Robert P. Matteucci, District 2 Ms. Janet W. Saiers, District 3 Ms. Deborah Moore, District 4 Mr. Mark Armijo, District 5 Mr. Blair L. Kaufman, District 6 Ms. Penelope S. Holbrook, and District 7 Mr. Michael DeWitte. DISCLOSURE OF CONTRIBUTIONS BY PROSPECTIVE CONTRACTOR: Contribution Made By: ______________________________________________________ Relation to Prospective Contractor: ______________________________________________________ Date Contribution(s) Made: ______________________________________________________ Amount(s) of Contribution(s) ______________________________________________________ Nature of Contribution(s) ______________________________________________________ Purpose of Contribution(s) ______________________________________________________ ____________________________ Signature _______________________ Date ____________________________ Title (position) --OR— NO CONTRIBUTIONS IN THE AGGREGATE TOTAL OVER TWO HUNDRED FIFTY DOLLARS ($250) WERE MADE to an applicable public official by me, a family member or representative. ______________________________ Signature _______________________ Date ______________________________ Title (Position) (Attach extra pages if necessary) RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 40 of 70 EXHIBIT C: SAMPLE NON-DISCLOSURE AGREEMENT Confidentiality Agreement – for Design Professional and any and all staff, consultants, etc. that will have access to Confidential material under your contract with CNM This is an Agreement between Central New Mexico Community College (“CNM”) and [Contractor/Vendor name] (“Contractor”) concerning the confidentiality and nondisclosure of information relating to CNM, its students and employees. References in this Agreement to “CNM” mean CNM together with its students and employees. WITNESSETH: WHEREAS, Contractor has contracted with CNM to provide _______________________ services, as described in Request for Proposal(s) No. _____ and related documents (the “Contract”), the terms and conditions of which Contract are incorporated herein by reference; and WHEREAS, Contractor acknowledges and recognizes that in performing the Contract it may have access to data and information contained within or about CNM’s resources and systems; and WHEREAS, Contractor acknowledges and recognizes that in performing the Contract it may have access to sensitive and/or proprietary and/or nonpublic data and information which is or may be subject to state and/or federal laws and regulations, including but not limited to privacy laws and regulations, which must be kept confidential pursuant to those laws and/or regulations; and WHEREAS, Contractor recognizes that CNM has a compelling need to maintain confidentiality and prohibit disclosure of data and information contained within CNM’s resources and systems, and further recognizes that its Contract with CNM places Contractor in a position of special trust and confidence with respect to data and information concerning CNM and its operations; and WHEREAS, Contractor recognizes and acknowledges that a breach of this Agreement would cause substantial, grave and irreparable harm to CNM and its interests; and WHEREAS, Contractor agrees to the terms and conditions set forth below. NOW, THEREFORE, for the reasons stated above, Contractor, as a precondition to its Contract with CNM and in partial consideration thereof, agrees and covenants with CNM as follows: RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 41 of 70 EXHIBIT C: SAMPLE NON-DISCLOSURE AGREEMENT 1. Contractor agrees to perform services under the Contract pursuant to any and all privacy and confidentiality requirements contained in state and federal laws and regulations applicable to CNM, as well as those state and federal laws and regulations applicable to Contractor. 2. Contractor agrees that it will keep in strictest confidence all CNM data and information to which it may have access in performing its duties under the Contract, in computerized form or otherwise, and that neither it nor anyone operating on its behalf will disclose or use, in any manner, CNM data and information, except to the extent necessary to carry out the Scope of Work in the Contract. No other use of the data and information by Contractor is permissible. 3. Contractor agrees to indemnify and hold harmless CNM from any and all liability, injury and damages resulting or arising from any intentional or unintentional disclosure of data and/or information stored on or contained within CNM resources and systems by Contractor, its agents and representatives. 4. Contractor agrees and acknowledges that at all times during the Contract it is operating and shall operate as an independent contractor and not as an agent or employee of CNM. 5. Contractor agrees that information contained within CNM resources and systems shall be accessed, if at all, only as may be necessary to carry out the Contract. Contractor agrees to reasonably limit access to information contained within CNM resources and systems to those among its employees, officers or directors for whom disclosure is necessary to further the purpose of the Contract. 6. Contractor agrees that, upon the termination or conclusion of the Contract, it will deliver promptly to CNM all data, information, documentary and other materials relating to CNM, and any and all copies of electronic records thereof, within its custody or control or within the custody or control of its agents or representatives, that it or anyone operating on its behalf created, produced or obtained in the course of Contractor’s Contract with CNM. 7. Contractor agrees that if any person or entity requests, subpoenas, or otherwise attempts to obtain any data, information or material relating to CNM within Contractor’s custody or control, or within the custody or control of anyone operating on its behalf, it will notify CNM immediately and will cooperate fully in any legal action by CNM seeking protection against disclosure of such data, information or material. RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 42 of 70 EXHIBIT C: SAMPLE NON-DISCLOSURE AGREEMENT 8. If Contractor knows or has reason to believe that there has been an improper use or any disclosure of CNM’s data or information, Contractor shall orally notify CNM as soon as practicable and shall send written notice within five (5) business days of discovery. Such notification shall set forth in detail the known or suspected use or disclosure. 9. Contractor acknowledges and agrees that if it breaches this Agreement, CNM, in addition to terminating the Contract and taking other action available to it, may obtain preliminary and permanent court injunctions to stop the breach, and may also sue to recover from Contractor an amount equal to the damages caused by the breach and the revenues Contractor or anyone operating on its behalf derived from the breach, together with all costs and expenses, including attorneys’ fees, incurred by CNM in taking such actions. 10. Contractor agrees that the terms of this Confidentiality Agreement will survive the expiration or termination of the Contract. 11. This Agreement and obligations hereunder shall be binding on the representatives, assigns, and successors of the Contractor and shall inure to the benefit of the assigns and successors of CNM. 12. If any of the provisions of this Agreement are not enforceable, in whole or in part, the remaining provisions set forth in this Agreement shall nonetheless remain in full force and effect. 13. This Agreement constitutes the entire understanding of the parties about the subject matter hereof and may not be amended or modified except in writing signed by each of the parties to the Agreement. IN WITNESS WHEREOF, each of the undersigned has caused this Confidentiality Agreement to be executed by their duly authorized representatives. Central New Mexico Community College [Contractor/Vendor Name] Print Name: _________________________ Pint Name: ____________________ Signature: __________________________ Signature: _____________________ Title: ______________________________ Title: _________________________ Date: ______________________________ Date: _________________________ Contractor Employees who will have access: RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 43 of 70 EXHIBIT C: SAMPLE NON-DISCLOSURE AGREEMENT Print Name: _____________________ Signature: _______________________ Title: ___________________________ Date: ____________________________ Print Name: ______________________ Signature: _______________________ Title: ___________________________ Date: ____________________________ Print Name: ______________________ Signature: _______________________ Title: ___________________________ Date: ____________________________ RFP # P-357, Advertised Monday, September 30, 2013 Copyright CNM 2013. All rights reserved. Page 44 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT ENTER DESCRIPTION OF SERVICES THIS AGREEMENT, including all exhibits thereto (“Agreement”), made this ENTER DAY of ENTER MONTH, ENTER YEAR, by and between Central New Mexico Community College ("CNM" or “Owner”) and ENTER NAME ("Vendor"). Recitals: WHEREAS with CNM’s Request for certain related services in connection with ENTER TYPE OF SERVICES, “ENTER TYPE OF SERVICES” Services (the “Project” or “Services”); WHEREAS CNM selected Vendor’s proposal as being the most advantageous and awarded the work to Vendor; WHEREAS CNM and Vendor desire to enter into a written agreement for ENTER TYPE OF SERVICES related services; NOW, THEREFORE, the parties agree as follows: ARTICLE ONE STATEMENT OF WORK 1.0 ENTER DESCRIPTION SERVICES SCOPE OF WORK 1.1 Engineer/Architect shall provide engineering/architectural and related services related to the design and development of the Engineering/Architectural Services for the Technology Loop and Wellness path at CNM, as more fully described in this Agreement (the “Work”). ARTICLE TWO CNM’S RESPONSIBILITIES 2.0 CNM agrees to contract with and does hereby contract with the Engineer/Architect, under the terms and conditions of this Agreement, to perform for CNM professional engineering/architectural and related services as described in this Agreement, including without limitation the scope of work described in Exhibit 1, and incorporated herein by reference.. 2.1 CNM shall designate a representative (“ITS Representative”) and/or a Facilities representative to communicate on its behalf with the Architect. The ITS and/or Facilities Representative, or his designee, shall have authority to give general direction to the Engineer/Architect, to answer questions with respect to the Project, to review and process pay applications subject to other required approvals, and to initiate the change order process. CNM by and through its Facilities Representative, Purchasing Officer, Office of Vice President for Administrative Services, and/or the Budget Office shall administer this Agreement and shall have the authority to 1) modify or interpret this Agreement, 2) to authorize the Engineer/Architect to perform special services as defined in Article V of this Agreement, or 3) to approve change orders, all of which are decisions which are to be made by CNM.. 2.2 CNM shall give thorough consideration to all sketches, estimates, working drawings, specifications, proposals and other documents submitted by the Engineer/Architect. 2.3 CNM shall give Engineer/Architect written notice of any change in the quality and scope of the Project. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 45 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT ARTICLE THREE VENDOR’S SERVICES 3.0 For all of the services in this Article 3 of the Agreement, the Engineer/Architect shall be compensated per the terms set forth in Exhibit B, Section I of this Agreement, except for those items described as special services, described in Article 5 which shall be compensated per the terms set forth in Exhibit B, Section II of this Agreement or identified as reimbursable services under Article 6 or Section 1, Exhibit A. All Services are considered basic services unless otherwise indicated or agreed to; 3.1 The scope of the project will be as follows: The scope is to include Engineering/Architectural Services related to [ENTER PROJECT NAME]. All preconstruction work including selection of contractor must be complete on or before June 30, 2012. The Engineer/Architect shall only be responsible for the Engineer’s/Architect’s immediate scope of work as described in the attached Exhibit 1. The Engineer/Architect will endeavor to complete that scope with sufficient time for bidding and construction. This time frame may not include CNM’s internal review requirements or review time by C.I.D. Completion of the entire project will primarily be the responsibility of the General Contractor. Reference Exhibit 1 for additional detail on the scope. As part of this project The Architect firm shall also provide the following: 1. Full construction observation services as required by agency having jurisdiction on the property. 2. The Vendor shall provide full construction inspection and certification services as required by the State of New Mexico Construction Industries Division (CID) and other entities having jurisdiction over the project. 3. Conduct various campus meetings to seek input from stakeholders into the design of the Project. 4. An updated estimate of probable construction cost will be required at the beginning of each phase. 5. The Engineering/Architectural firm shall designate a single point of contact to serve as the Project Manager through the duration of the development of the Project. 6. The Engineering/Architectural firm shall maintain in their employment at least one BiCSi RCDD/OSP certified engineer who is also trained and qualified by major OSP Cable Systems manufacturer's to provide engineering and design services throughout the project. CNM also requires that an engineer that meets these requirements is assigned as the technical lead for the duration of the Project. 7. The Engineering firm shall perform the services expeditiously as is consistent with the professional skill and care which is ordinarily applied by engineers of good standing with the New Mexico State Board of Registration for Professional Engineers. Within 15 days of the award of a purchase order, the Engineer/Architect shall submit for CNM’s approval a schedule for the performance of the Engineer’s/Architect’s service, and shall include allowances for periods of time required for the review and approval of submissions to CNM and any other agency having jurisdiction and the orderly progress of the Work. Time limits established by this schedule and approved by CNM shall not be exceeded, except for reasonable cause. OR 8. The Architectural firm shall perform the services expeditiously as is consistent with the professional skill and care which is ordinarily applied by architects of good standing with the New Mexico Board for Registration of Architects. Within 15 days of the award of a CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 46 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT purchase order, the Engineer/Architect shall submit for CNM’s approval a schedule for the performance of the Engineer’s/Architect’s service, and shall include allowances for periods of time required for the review and approval of submissions to CNM and any other agency having jurisdiction and the orderly progress of the Work. Time limits established by this schedule and approved by CNM shall not be exceeded, except for reasonable cause. 9. The Engineer/Architect shall provide a full Professional Team: As appropriate to the scope of the work and for the performance of the services required by the Agreement. The Engineer/Architect will employ the services of consulting engineers so as to provide a full professional team as dictated by the disciplines of architectural and engineering design involved in the Work. 10. The Engineer/Architect shall employ the services of consulting engineers so as to provide a full professional team as dictated by the disciplines of architectural and engineering design involved in the work. 11. Review and comply with laws, codes, and regulations applicable to the design incorporating requirements imposed by governmental authorities having jurisdiction over the project such as but not limited to NM CID, EPA, AMAFCA, State of New Mexico, City of Albuquerque, and County of Bernalillo. 12. Consider and advise the Owner of the comparative values of alternative materials, and equipment relative to construction, maintenance, and life cycle costs to achieve a design appropriate for the Owner’s program and suitable for the Project Budget, within the reasonable limits of the attached scope “Exhibit1”. 13. A web based project management site that includes on-line document management and sharing of all construction related documents for the duration of the project. The Architects shall use BaseCamp for online document management and sharing. 14. Engineering/Architectural firm shall 1) have on staff a registered professional Engineer who is registered by the State Board of Registration for Professional Engineer's to practice Engineering services in the State of New Mexico, and who will be assigned responsible charge for each project; 2) have experience in all phases of Engineering design and construction; and 3) be able to demonstrate relative experience and expertise in design, construction administration and project management. 15. All plans and specifications shall be prepared by and be under the "responsible charge" of a registered professional Engineer who is registered by the State Board of Registration for Professional Engineer's to practice Engineering services in the State of New Mexico. Responsible charge means responsibility for the direction, control and supervision of Engineering services work to assure that the work product has been critically examined and evaluated for compliance with appropriate professional standards by a registrant in that profession and by sealing or signing the documents, the professional Engineer accepts responsibility for the Engineering services work represented by the documents and that applicable Engineering services standards have been met. 16. Engineering/Architectural firm acknowledges the importance of creating and implementing a quality assurance plan on this Project. Engineer/Architect agrees to develop and present to the Owner a quality assurance plan for the design of the Project, for Owner's review and approval, prior to starting work on the Project. 17. Engineering/Architectural firm shall provide a complete and accurate survey of the construction site to include but not limited to: the rights, restrictions, easements, boundaries, topographical contours, existing utilities, and full information as to sewer, water, gas, electrical services and other utilities. 18. Engineering/Architectural firm shall obtain necessary construction permits, ingress/egress permits. 19. Engineering/Architectural firm shall employ the services of consulting architects, engineers, surveyors, etc. so as to provide such professional services required by the Agreement. Such services may include civil engineering, electrical engineering, mechanical engineering, structural engineering, and surveyor. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 47 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 20. Engineering/Architectural firm shall prepare a set of drawings updated to reflect actual construction known as record drawings and deliver, to Owner, a set of Record Documents drawings and an electronic documents file in AutoCAD and PDF format or as mutually agreed. 21. Engineering/Architectural firm shall work cooperatively and in partnership with any and all other contractors engaged to work on the Project including, but not limited to, the general construction contractor and any construction observation contractor. 22. CNM would like to have all the items constructed, completed, commissioned and ready to begin operational services by July 1, 2016. The Engineering/Architectural firm shall review the feasibility of the completion date and advise CNM of any potential or real delays. 23. The Owner shall have use and rights to all electronic documents produced during all phases of the work. A. Programming Phase The Engineering/Architectural firm shall provide Programming Phase services which include, but are not limited to the following: a. The Engineer/Architect shall develop a written program to ascertain the requirements of the Project and shall review the understanding of such requirements with the Owner. i. The Engineer/Architect shall investigate existing conditions or existing facilities and list spaces that will be affected. ii. The Engineer/Architect shall comply with CNM requirements for telephone and fiber lines as required by the Office of Information Technology Services. All Fiber lines and conduit shall be included in this project. The project will also include termination of all lines back to the Computer file server room located in the existing facility. b. Obtain and list all design related permits and approvals required by governmental authorities having jurisdiction over the Project. c. Meet with local governmental agencies to obtain prior approval. B. Design Phase The Engineering/Architectural firm shall provide Schematic Design Phase services which include, but are not limited to the following: a. Drawings and Specifications. Based on the program, project schedule and delivery method, Project site, Budgeted Cost of the Work, and preparatory surveys, test, and consultants’ reports, and any agreed adjustments thereto, the Engineer/Architect shall prepare schematic drawings for the Design Phase Plan Submittal. b. Submit for Approval. The Engineer/Architect shall submit the design phase documents for the approval of the Owner. The design phase document approved by the Owner shall constitute the Approved Project Program which can them only be revised only by written agreement of the Engineer/Architect and Owner. c. The Engineer/Architect shall provide the Owner with a preliminary estimate of construction cost prior to beginning the Construction Document Phase. Based upon the Engineer’s/Architect’s statement of probable cost, the Owner shall provide the Engineer/Architect with an Approved Budget for the project. C. Design Development Phase The Engineering/Architectural firm shall provide Design Development Phase services which include, but are not limited to the following: CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 48 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT a. Drawings and Outline Specifications: Based upon the Schematic Design documents approved by the Owner, and any adjustments authorized by the Owner in the budgeted cost of the Project, Program Schedule, or delivery method, the Engineer shall prepare drawings, outline specifications, and other documents to fix and describe the size and character of the Project. b. Submit to CNM a preliminary Estimate of Probable Construction Cost based on the current area, volume and other unit cost to CNM for review. The estimating method(s) and detail to be performed by the Engineer shall require the prior review and approval of CNM and must present and provide traceable, supportable information and data. c. Prepare and distribute, within two (2) days of the occurrence, conference memoranda, meeting minimum summaries of telephone conversations, documentation of site visits and inspection reports as required to maintain a comprehensive record of the Project. The Project name shall be shown on all documents. d. Obtain all design related permits and approvals required by governmental authorities having jurisdiction of the Project. D. Construction Document Phase The Engineering/Architectural firm shall provide Construction Document Phase services which include, but are not limited to the following: a. Authorization. The Owner's written approval of the Engineer's/Architect’s Estimate of Probable Construction Cost and the Design Development drawings and outline specifications shall constitute authority for the Engineer/Architect to proceed with the completion of Bidding Documents. b. Bidding Documents: Based on CNM approved design documents and any further adjustments in the scope, quality and the cost of work of the Project, the Engineer/Architect shall prepare Bidding Documents consisting of final drawings and specifications setting forth in detail the requirements for the construction of the Project, and provide specifications in Master Format 2004. The Bidding documents shall incorporate the resolutions of CNM comments and shall be complete and ready for bidding. Any adjustments in the scope shall require the Engineer/Architect to update/revise the previously reviewed and approved Estimate of Probable Construction Cost for CNM's final review and approval. c. Construction documents shall confirm to the Construction Specifications Institute’s Master Format 2004. d. Final Drawing and Specifications. Based on CNM Design phase documents, any further adjustments in the scope quality and the Cost of work, the Engineer/Architect shall prepare Construction documents consisting of final plans and specifications setting forth in detail the requirements for the construction of the Project. The drawings shall incorporate the resolutions of CNM comments and shall be complete as required for the entire project. e. The Engineer/Architect shall be responsible, for obtaining all design related permits and approvals required by the governmental authorities having jurisdiction over the projects. f. The Review of the Construction Documents by the Owner shall not relieve the Engineer/Architect of responsibility for code compliance, design deficiencies, omissions and errors. g. Provide all local, State and Federal building officials having jurisdiction a complete set of construction documents to review, meet with the building officials, and determine any changes. Approval and signature from the officials is required prior to initiating the Bidding Phase. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 49 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT h. Determine what code authorities, fire marshal, or other departments have jurisdiction over this project, and shall meet with the fire marshal or code authorities having jurisdiction over this project and provide that person or entity with a complete set of construction drawings. Engineer shall ensure that the fire protection plan for the project meets the applicable fire code, and at the end of construction shall provide CNM with a Certificate of Compliance, the fire marshal's inspection report, and any other documentation necessary to ensure that the project meets all applicable fire regulations. i. The Engineer/Architect shall endeavor to manage the design to stay within the approved budget determined at the end of the Design Phase. The Engineer/Architect shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager. j. The Engineer/Architect shall meet with the State Fire Marshall and provide the Fire Marshall with a complete set of the construction documents. The Engineer/Architect shall provide CNM with the Following i. Meeting notes documenting FireMarshal’s review and general approval. k. The Engineer/Architect shall advise the Owner on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, construction time period and other construction issues appropriate for the project. l. The Engineer/Architect shall assist the Owner in the preparation of the necessary bidding information, bidding forms, RFP information, and Conditions of the Contract. E. Bidding Phase The Engineering/Architectural firm shall provide Bidding Phase services which include, but are not limited to the following: a. Follow the Owner's approval of the Construction Document Phase, and obtain all required local, State and Federal design and construction review approvals, assist the Owner in developing Bid Documents and obtaining bids and in the award and preparation of the Construction Contracts. b. Furnish and distribute Bid Documents to prospective bidders in accordance with CNM's Purchasing Department procurement rules, regulations and direction. c. Bid Document Deposit: The Engineer/Architect shall distribute sets of Bid Documents to bidders, upon receipt of a deposit for each set. The amount of the deposit shall be determined by the Owner as prescribed in the Bid Documents. d. Distribution and refund of deposits: Bid sets shall be provided to the general contractor bidders upon receipt of the deposit and the deposit shall be refunded in full for each set returned in reusable condition within ten (10) days after bid opening. All refunds shall be paid within twenty (20) days after the opening of the bids. Any deposits not refunded will be sent to CNM's Purchasing Department noting the amount. Building exchanges and similar agencies may be provided Bid Documents without charge. e. Provide the Owner a certified tabulation showing the number of sets reproduced, disposition, and any payments and deposits received. f. Pre-bid Conferences. The Engineer/Architect shall organize and conduct pre-bid conferences for prospective bidders. g. Attend the bid opening and furnish to CNM's Purchasing Department a suitably detailed sheet for recording the name of the bidder, the bidder's CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 50 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT business number, bid security, base bid, alternates, and remarks. The Engineer/Architect shall furnish sufficient tabulation sheets for all in attendance. Immediately after receipt of bids, the Engineer/Architect shall submit to CNM's Purchasing Department a certified tabulation of all bids received and opened, along with a recommendation as to the contract award(s). The recommendation for award(s) shall be in writing and directed to CNM's Purchasing Director. h. The Engineer/Architect at the direction of and in concert with CNM's Purchasing Department shall prepare and submit to the Owner five (5) original sets of the Construction Contract, utilizing the forms prescribed by the Owner (which may be in the form of EXHIBIT F or some other form prescribed by the Owner including all the same provisions with respect to the Engineer as are in that EXHIBIT F, except as Engineer and Owner may agree to changes to those provisions with respect to the Engineer), complete with updated Construction Documents. Each set of the Construction Contract shall be marked OFFICIAL CONTRACT DOCUMENTS and shall include an executed bid response form, agreement, Performance and Payment Bonds, Certificate(s) of Insurance, all addenda, plans, drawings, specifications, and supplemental drawings, and wage rate determinations. Three (3) copies shall be retained by the Owner. One copy shall be for the Contractor and one copy shall be for the Engineer. i. The Engineer/Architect shall review and approve, or take appropriate action upon, requests for substitutions submitted in accordance with the procedures in the Instruction to Bidders and as directed by CNM's Purchasing Department, and prepare responses to questions from prospective bidders pertaining to the Bid Documents. The Engineer/Architect shall prepare in a timely manner for CNM's review, approval and distribution, addenda responses to all prospective bidders identifying approved substitutions and providing clarifications and interpretations of the Bidding Documents. All Addenda shall be approved and distributed to all prospective bidders by CNM's Purchasing Department. j. Be present and actively participate at the bid opening. F. Construction Observation The Engineering/Architectural firm shall provide Construction Administration Phase services which include, but are not limited to the following: a. The Construction phase shall commence with the acceptance of the Construction Managers Guaranteed Maximum Price and issuance of the notice to commence on site work or notice to proceed with construction services and terminate when all the project Engineer’s/Architect’s services have been satisfactorily performed. b. The Engineer/Architect shall perform Construction Contract Administration consistent with the General Conditions of the Contract and in accordance with CNM procurement procedures. c. The Engineer/Architect shall assist the Owner in making arrangements for the Pre-construction conference and shall assist in the pre-construction conference and shall distribute copies to all parties. d. The Engineer/Architect shall provide engineering certification as required by the State CID. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 51 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT e. The Engineer/Architect will be a representative of the Owner during the construction and in this capacity will endeavor to (a) guard the Owner against variances requirements of the Contract Documents by the Contractor, (b) require the Contractor to complete the work within the time specified in the Construction Contract or subsequently extended by the Owner, (c) and guard the Owner against defective work. The Engineer/Architect will advise and consult with the Owner regarding the performance and progress of the Contractor and regarding solutions to conditions or problems that may arise throughout the design or construction. The Engineer/Architect shall have authority to act on behalf of the Owner to the extent provided in the General Conditions of the Contract, which may only be modified in writing. f. Instructions to the General Contractor shall be communicated through the Engineer/Architect. g. In response to questions from the Contractor or Owner about the Contract Documents, or as the Engineer/Architect deems appropriate, the Engineer/Architect shall provide interpretations and clarification of the Contract Documents that are consistent with the intent of and reasonably inferable from the Contract Documents. Interpretations and clarifications shall be in the form of written explanation or directions and/ or supplementary details or drawings, whichever is required to complete, explain or make definite and of the provisions of the Drawings and Specification and give them due effect. h. The Engineer/Architect shall respond to questions about the Contract Documents in a timely manner consistent with the terms of the Contract Documents. i. Decisions by the Engineer/Architect, including interpretations and clarifications of the Drawings, Specification, or other Contract Documents, and directions, or decisions regarding performance of the work, shall be in writing and shall be advisory to the Owner. j. Project Record. The Engineer/Architect shall maintain the Project Record consisting of project related correspondence, memoranda, notes, Statement for Services, and related documents, Application and Certification for Payments and Related Documents, minutes of the meeting, and inspection reports issued or received by the Engineer/Architect. The Owner shall have access to the Project Record during the Engineer’s/Architect’s normal office hours. If requested to reproduce the project record, or significant portions of it, for the Owner, the Engineer/Architect will do so as a Reimbursable Expense. k. Communications: So as to maintain continuity in the Engineer’s/Architect’s administration of the Construction Contract and performance of the work by the Contractor, and to facilitate complete documentation of the project record, all communications between the Contractor and the Owner regarding matters of or related to the Contract shall be directed through the Engineer/Architect with copy furnished to the Owner, unless direct communication is otherwise required to effect legal notifications. Unless otherwise authorized by the Engineer/Architect, communication by and with the Engineer’s/Architect’s consultants shall be through the Engineer/Architect. Unless otherwise authorized by the Contractor, communications by and with Subcontractors and material suppliers shall be through the Contractor. l. Submittal review: The Engineer/Architect shall review the Contractor’s submittals for conformance with requirements of, and the design concept CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 52 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 1. 2. 3. 4. 5. 6. m. 1. expressed in, the Contract Documents and approves or takes other appropriate action upon them. This review is not intended to verify the accuracy and completeness of details such as dimensions and quantities or to substantiate installation instructions or performance of equipment and systems, all of which shall be the responsibility of the Contractor. However the Engineer/Architect shall advise the Contractor of any errors or omissions which the Engineer/Architect may detect during this review. As provided in the General Conditions of the Contract, the Engineer/Architect is not authorized to approve any deviations from the requirements of the Contract Documents. Deviations may be authorized only by the Owner through a Change Order. The Engineer/Architect will review and respond to all submittals with reasonable promptness to avoid delay in the work or in the activities of the Owner, Contractor or separate contractors. Within thirty days after Substantial completion of the Work by the Contractor the Engineer/Architect will furnish the Owner one complete set of the Contractor’s approved submittals, organized in a logical manner. The Engineer/Architect may specify any scheduling method or format that the Engineer/Architect considers to be appropriate for the Project and which is acceptable to the Owner, but the Engineer/Architect shall also require the Contractor to prepare and update the progress schedule in accordance with the General Conditions of the Contract. The Engineer/Architect shall promptly deliver a copy of the Contractor’s approved Progress Schedule and Report, and any revisions to it, to CNM. The Engineer/Architect shall require the Contractor to update the Progress Schedule and Report with each monthly Application for Payment and shall otherwise monitor and keep the Owner appraised of the Contractor’s progress. Observations: The Engineer/Architect shall coordinate, schedule and conduct the Scheduled Observations and conferences defined in the Contract Documents and as are appropriate to the scope of the Work. The Engineer/Architect shall perform periodic Observations defined in the Contract Documents. The Engineer/Architect shall attend Specified Inspections and Tests defined in the Contract Documents when attendance by the Engineer/Architect is specified or is otherwise appropriate. Definitions. The Engineer’s/Architect’s “observation” means the service performed by the Engineer/Architect through which the Engineer/Architect: i. Becomes generally familiar with the in-progress and completed Work and the quality of the Work. ii. Determines whether the Work is progressing in general accordance with the Contractor’s schedule and is likely to be complete within the Contract Time. iii. Visually compares readily accessible elements of the Work to the requirements of the Contract Document to determine, in general, if the contractor’s performance of the Work indicates that the Work will confirm to the requirements of the Contract Documents when completed. iv. Endeavors to guard the owner against Defective Work, but does not include making exhaustive investigations or CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 53 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 2. 3. 4. 5. 6. 7. 8. 9. 10. examinations of the in-progress or completed portions of the Work to expose the presence of the Defective Work. v. Reviews and addresses with the Contractor any problems in implementing the requirements of the Contract Documents and the Contractor may have encountered, vi. Keeps the Owner fully informed about the Project Coordination with the CNM ITS or Facilities Representative. When scheduling Scheduled Inspections and Conferences, the Engineer/Architect shall first contact CNM’s Representative by telephone, establish with the CNM Representative a mutually acceptable time for the inspection or conference, and confirm the agreed date and time in writing at least seven days prior to the date of the inspection or conference. Inspection by Registered Professional: Inspections may be performed by a representative of the Engineer to whom the Owner has no objection; however, the Engineer or a member of the Engineer's staff who is a New Mexico Registered Professional Engineer shall perform inspections at least once per week and as frequently as needed or as directed by the Owner during construction. This requirement may be waived by the Owner in writing during periods in which weather or other construction delay progress, or during slow phases of the construction, making inspections during such period unwarranted Frequency. The Engineer’s/Architect’s periodic Observations shall be at intervals appropriate to the stage of the of the Contractor’s operation and consistent with the size and nature of the Work. But not less than an average of once per week while construction is on- going. The performance of the requirement may be waived during periods in which weather or other conditions delay progress, or during slow phases of the construction, making weekly inspections unwarranted. Observations by Registered Professional: Observations may be performed by a representative of the Engineer/Architect to whom the Owner has no objection; Reporting. The Engineer/Architect shall promptly prepare a complete report of each Observations by the Engineer/Architect, Engineer’s/Architect’s representative, or consulting engineer and promptly furnish a copy of each report to the Owner and Contractor. The Engineer/Architect shall prepare and distribute a field observation report weekly during construction, for weeks during which observations are unwarranted, the Architect shall state in the report that no inspection was performed and why. Notification of Deficiencies: The Engineer shall promptly notify the Contractor and Owner in writing of any Defective Work, inadequate progress that may jeopardize timely completion of the Project, or other departures from the requirements of the Contract Documents observed by the Engineer Stopping the Work: The Engineer/Architect shall notify the Owner of a need to stop work when, in the Engineer’s/Architect’s opinion, such stoppage is necessary to avoid defective work. Certification for Payment: The Engineer/Architect shall review and approve as appropriate the Contractor’s monthly and final Application for Payment and issue Certification for payments for payment in accordance with the General Conditions of the Contract. The Engineer/Architect shall be required to withhold payment for completed or partially completed Work for which compliance with the Contract Documents remain to be determined by Specified Inspections or CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 54 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 11. 12. 13. 14. 15. 16. 17. 18. 19. Final Inspections to be performed by their proper sequence. If payment is being requested on an Application for Payment including the Work in Questions, The Engineer/Architect will notify the Contractor and the Owner and the amount in question will be transferred into an escrow account in accordance with the New Mexico Retain age Act. Contract Change Orders. The Engineer/Architect shall administer the Change Order Procedures provided in the General Conditions of the Contract. The Engineer/Architect is authorized to make minor changes in the work by written order to the Contractor. Minor changes in the Work are defined as those which are in the interest of the Owner do not materially alter the quality price, and performance of the finished work. Changes that involve an increase to the contract cost are authorized only by the Owner through a Contract Change Order. The Engineer/Architect shall prepare details, supplemental drawings, specifications, or other descriptive documents necessary to sufficiently delineate, for Contractor pricing and performance, proposed changes in the Work directed or authorized by the Owner. The Engineer/Architect (and the Engineer’s/Architect’s consultant, when appropriate) will review and evaluate change order proposals and claims for extra work as may be submitted by the Contractor. Using the change modification form, the Engineer/Architect shall recommend, as applicable, the Contractor’s proposals for acceptance by the Owner. Each recommendation of acceptance will be based upon the Engineer’s/Architect’s professional opinion that a proposal is complete, in conformance with the Contract Documents, represents fair and reasonable pricing, and justifies change order action in the case of claims for extra work or does not warrant procurement by competitive bid in the case of added work. Determination of the legality of a change order shall be the responsibility of CNM Purchasing Department and CNM legal Advisor. The Engineer/Architect shall prepare Contract Change orders for acceptance and execution by the Contractor and Owner. Construction Change orders shall sufficiently describe the change(s) in Work so that the requirements of the Contract Documents are clearly determinable with reasonable ease. The reasonable preparation of details, supplemental drawings, specification, or other documents to describe a change in the work shall be included in the Engineer’s/Architect’s Basic Fee. As-Built Documents: “As Built” Documents shall be prepared and furnished by the Contractor in accordance with the General Conditions of the contract. Prior to preparing bid documents, the Engineer/Architect shall consult with the owner to determine the Owner’s requirement for “As Built” Documents and shall incorporate them into the Conditions of the Contract, if they differ from those of the General Conditions, The Engineer/Architect shall administer the “As Built” Documents requirement of the Contracts Documents, periodically endevour to verifying the Contractor’s compliance during construction and reviewing the Contractor’s final documents for conformance to Contract Requirements. As-Builts are considered basic services. Record Documents: Record Documents shall be prepared and furnished by the Contractor in accordance with the General Conditions of the Construction Contract. Prior to preparing bid documents, the Engineer/Architect shall consult with the Owner to determine the Owner's CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 55 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 20. 21. 22. 23. 24. requirement for Record Documents and shall incorporate them into the Conditions of the Bid Document. Construction Documents. If they differ from those of the General Conditions, The Engineer/Architect shall administer the Record Documents requirement of the Contract Documents, periodically verifying the Contractor's compliance during construction and reviewing the Contractor's final documents for conformance Contract Documents. Engineer/Architect shall issue Certificate of Substantial Completion when all work called for by the drawings and specifications of the Construction Documents has been substantially completed and the Project can be occupied by CNM. Engineer/Architect shall review for compliance with the Contract Documents the warranties, guarantees, Record Documents and other closeout items required by the Contract Documents to be delivered by the Contractor(s) as a condition to final payment to the Contractor(s). The Construction Administration Phase shall terminate upon Substantial Completion of the Project. Upon completion of the project, the Engineer/Architect shall furnish corrected Auto Cad 2000 compatible drawings. For building additions or renovations project, CAD drawings must be furnished for the entire floor(s) affected by the work in order for the Owner to maintain a single complete and integrated set of existing condition drawings. The Construction Contract Administration phase shall terminate upon expiration of the Warranty period or settlement of all Warranty claims, whichever occurs last. Prior to final payment, the Engineer/Architect shall prepare and deliver to the Owner all record drawings and final report to the Owner. Evaluations of the Owner’s Approved Budget after the Design Phase shall be the MACC for the project, Statements of Probable Construction Cost, and detailed estimates of construction costs prepared by the Engineer/Architect represent the Engineer’s/Architect’s best judgment as a professional familiar with the construction industry. It is recognized, that the Engineer/Architect does not have control over the cost of labor, materials, equipment: over the Contractor’s methods of determining BID/RFP or other method of procuring the construction under New Mexico State Procurement Code; over the Contractor’s method of determining their price offered, market, or negotiating conditions G. Final Completion Phase The Engineering/Architectural firm shall provide Final Completion Phase services which include, but are not limited to the following: a. Engineer/Architect shall prepare a punch list for final completion, establish a market value of the punch list items, conduct site visits/observations to determine the estimated date of final completion, receive and forward to CNM any written warranties and related documents required by the Contract Documents and assembled by the Contractor to include any required LEEDS documentation. b. Within sixty (60) days after final completion of the Project, the Engineer/Architect shall furnish CNM, at no additional cost, one reproducible copy of the final record drawings and specifications incorporating all changes, and one complete electronic documents file in AutoCAD release 2011 or later or in format as mutually agreed. These copies shall be of the final working drawings. Revisions and changes CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 56 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT shall be annotated and cross-referenced. Each sheet shall be prominently noted "Record Drawings". c. Engineer/Architect shall make an inspection of the Project prior to expiration of the warranty or guarantee period and report observed discrepancies under the warranties or guarantees provided by the Contract Documents. Engineer/Architect shall provide final inspection at the end of one-year warranty. d. Engineer/Architect shall provide support and analysis as needed by CNM with respect to any warranty or guaranty claims. e. The Final Completion Phase shall terminate upon the last to occur of: expiration of the last to expire one-year warranty period, completion of all punch list items, or settlement of all warranty or guaranty claims, whichever occurs last. H. Commissioning Phase The Engineering/Architectural firm shall provide Commissioning services which include, but are not limited to the following: a. The Engineer/Architect shall provide commissioning services to test and verify that the entire OSP telecommunications system is fully functional and meets or exceeds all design requirements. It is not CNM’s intention that the commissioning phase be conducted by an independent firm, however it should meet the same expectations it terms of thoroughness as would be expected by an independent commissioning process. b. Engineer shall work with CNM/ITS to develop and document a test plan that will validate that all components installed as part of this project are operationally sound and meet or exceed design requirements. c. Engineer/Architect shall coordinate with CNM/ITS to conduct a complete execution of the test plan prior to placing any component of the OSP telecommunications system into production service. d. Engineer/Architect shall work with CNM/ITS to evaluate the test results and address any areas of deficiencies that are identified. e. Deficiencies that are identified that can be corrected without impacting production services may be corrected after the system has been placed in production so long as they have been adequately addressed within the one year warranty period. f. Deficiencies that are identified that cannot be corrected without impacting production services shall be corrected immediately upon identification and prior to the system being placed into production. g. The Engineer/Architect shall coordinate all work to correct deficiencies with the Contractor. If the deficiencies prove to be a result of engineering services provided by the Engineer/Architect, then any work required to correct the deficiencies shall be included as part of the Engineer’s/Architect’s Basic Services at no additional cost to CNM. h. The Engineer/Architect shall provide any updates to the Record Documents resulting from correction of any deficiencies. ARTICLE FOUR MACC 4.0 The MACC “Maximum Allowable Construction Cost” for this project shall be determined, with Owner approval, what materials, equipment, component systems, and types of CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 57 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT construction are to be included in the Construction documents to bring the cost within the MACC. With the written consent of the Owner, which consent shall not be unreasonably withheld, the Engineer/Architect may also include additive alternate and additive deducts bids to adjust the construction to a fixed limit. ARTICLE FIVE SPECIAL SERVICES 5.0 CNM has the right to require, and Engineer/Architect agrees to perform, services related to the Project other than those services identified as Basic Services. 5.1 For services required by CNM, other than those identified as Basic Services, Engineer/Architect shall be required to submit a detailed written proposal for performing the Special Services and a “not to exceed” fee proposal for such Special Services to CNM for its review and written approval, incorporating a declaration as to the suitability of performing work. The “not to exceed” fee proposal shall be broken down into specific hours and shall identify all subcontractor costs to perform the services and accomplish the work. CNM’s approval of such proposal shall be in writing and communicated through the issuance of an approved purchase order revision issued through CNM’s Purchasing Department. No payment for Special Services and no reimbursement for reimbursables in connection with such Special Services shall be made except for such Special Services performed in accordance with CNM’s advance written approval. 5.2 Engineer/Architect may be required provide interior design services associated with the design specifications, selection, and installation of the fixtures, furniture, and equipment for the Project. 5.3 The Engineer/Architect may be required to provide a complete and accurate traffic impact study noting the impact of traffic in surrounding areas. The study should note and list potential offsite traffic improvements 5.4 Other additional services may include but not be limited to the following: Additional on-site construction administration services above and beyond basic service; additional civil engineering beyond the basic services, additional programming beyond basic services, additional as-built drawings beyond basic services, other services to be conducted through the Engineering/Architectural Firm ARTICLE SIX REIMBURSABLE EXPENSES 6.0 Reimbursable Expenses. Reimbursable expenses of Engineer/Architect shall include the following items when approved in writing and in advance by CNM: (1) transportation and subsistence of principals and employees on special trips at least fifty (50) miles one-way beyond the boundaries of the CNM District which are related to the Project, to be paid at the prevailing rate of travel reimbursement being paid by CNM; (2) cost of reproduction of progress sets of plans, drawings and specifications as required for submittals and reviews (3) reasonable plan checks/review fees charged by appropriate governmental authority(s); (4) the services of geotechnical engineers, testing laboratories, and other subcontractors (not employees of Engineer/Architect) to provide professional evaluations, recommendations and services pertaining to conditions of the site and existing improvements, including, but not limited to, tests, and surveys required to ascertain and address surface and subsurface conditions, structural integrity of existing structures, the presence of Hazardous Materials and environmental issues; (5) land surveys for property boundaries, topographical data, legal description, etc. (6) special inspections or testing, (7) CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 58 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT specialized consulting including but not limited to the furniture or other specialized consultants, (8) reimbursable services associated with LEEDS enhance commissioning if requested ,(9) meals for charettes subject to prior approval by CNM. (10) traffic impact study (11) as-built drawings that are above and beyond basic services (Note: on site “as builts” that include field measurements are part of basic services) (12) ) Fundamental and Enhanced Services of the commissioning agent. (13) Other similar services through third parties. 6.1 Payment of reimbursable expenses to Engineer/Architect shall be paid by CNM at Engineer’s/Architect’s actual direct cost, up to a maximum amount agreed to by CNM. All requests for reimbursement of expenses shall be accompanied by copies of original invoices. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 59 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 6.2 For all expenses incurred under this “Reimbursable Expenses” portion of the Architectural Agreement, CNM may require Engineer/Architect to obtain three quotes when practicable and reasonable. Expenses incurred under this section may be obtained by competitive bids. CNM reserves the right to accept, reject, or modify any of the reimbursable quotes or bids. CNM reserves the right to use any of the quotes or bids submitted for any particular reimbursable expense. CNM may require the Engineer/Architect to obtain three quotes for any testing performed on the Project under this “Reimbursable Expenses” section. ARTICLE SEVEN TERM 7.0 The term of this Agreement begins immediately upon delivery to Engineer/Architect of a CNM purchase order incorporating this Agreement and extends through the end of the last Final Completion Phase as described above. ARTICLE EIGHT EMPLOYMENT OF CONSULTANTS 8.0 Engineer/Architect agrees to employ competent and New Mexico licensed and registered structural, mechanical, electrical, civil, landscape, interior designer, surveyor, or cost estimating consultants not otherwise employed by CNM for the Project, as might be necessary for the proper design and construction of the Project. Engineer/Architect shall furnish to CNM a list of these consultants for prior approval before engaging them for the Project. Engineer/Architect represents that services performed by the design professionals under this Agreement will be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing under the same or similar conditions. Engineer/Architect represents that the performance of any consultant assigned by Engineer/Architect to work on the Project shall be in accordance with sound professional standards, and the requirements of this Agreement. ARTICLE NINE PROFESSIONAL LIABILITY INSURANCE 9.0 At its own expense, Engineer/Architect shall procure and maintain during the life of this Agreement professional liability insurance in an amount not less than One Million Dollars ($1,000,000.00) for each claim and in the aggregate. Insurance coverage shall not be canceled or materially changed except after thirty (30) days written notice has been provided to CNM. Engineer/Architect shall furnish CNM copies of certificates of insurance showing the coverage, limits of liability, covered operations, effective dates and dates of expiration of policies of insurance carried by Engineer/Architect . ARTICLE TEN INDEMNIFICATION AND INSURANCE 10.0 Engineer/Architect shall indemnify and hold harmless CNM, its officers, employees and agents, against all liability, claims, damages, losses or expenses, including reasonable attorney’s fees, arising out of bodily injury to persons or damage to property, only to the extent that the liability, damages, losses or costs are caused by, or arise out of, the acts or omissions of the Architect or its officers, employees or agents. This hold harmless clause is subject to the immunities, provisions and limitations of the New Mexico Tort Claims Act (Sections 41-4-1 et seq. N.M.S.A. 1972) and Section 56-7-1, N.M.S.A. 1978 and any amendments thereto. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 60 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 10.1 Engineer/Architect shall comply with all requirements of Exhibit C, Insurance Requirements, hereto. ARTICLE ELEVEN ASSIGNMENT AND SUCCESSORS 11.0 Engineer/Architect agrees not to sublet, sell or assign neither this Agreement nor any portion of the Work included herein, and not to enter into a partnership for the performance of the services and work contemplated by this Agreement with any person or persons without the prior written permission of CNM. Any approved successors or assignees shall be bound to and by the same terms and conditions as Engineer/Architect, and shall accept in writing the delegation of Engineer’s/Architect’s duties and responsibilities under this Agreement. Engineer/Architect remains responsible for completion of the Project and warranties. Engineer/Architect remains responsible for design integrity. ARTICLE TWELVE TIMELINESS AND PERFORMANCE 12.0 Engineer/Architect shall perform its duties and services under this Agreement with all reasonable diligence and continuous effort, and shall not delay this Work in order to perform under contracts entered into after this Agreement. 12.1 Engineer/Architect shall continue to perform the Work under this Agreement through all disputes, with the Owner and/or the Contractor, including but not limited to payment disputes and disputes regarding the scope of the Engineer’s/Architect’s obligations under the Agreement. 12.2 Timeline: It is anticipated that this Project is to have construction completed by TBD ARTICLE THIRTEEN OWNERSHIP OF INSTRUMENTS OF SERVICE 13.0 The Owner shall have use and rights to all electronic documents during all phases of the work. Drawings and specifications become the property of CNM. Before receiving final payment, Engineer/Architect shall deliver to CNM the original Construction Documents. CNM does not have the right to use the working drawings and specifications for other building projects except as may be required for reference without Engineer’s/Architect’s consent. CNM does not have the right to sell the drawings and specifications. Engineer/Architect shall be permitted to reuse parts of the drawings for other projects, but shall not use them as a whole without CNM's prior written permission. ARTICLE FOURTEEN RECORDS AND AUDIT 14.0 Engineer/Architect shall maintain detailed time records that show the date, time and nature of services rendered. These records shall be subject to inspection by the CNM, its representatives, and the State Auditor. CNM, its representatives, and the State Auditor shall have the right to audit billings both before and after payment. Payment under this Agreement shall not foreclose the right of CNM to recover excessive and/or illegal payments. CNM, its representatives and the State Auditor shall have access to and the right to examine and/or audit any directly pertinent records, books, documents and papers of Engineer/Architect involving transactions related to this Agreement for a period of three (3) years after final payment. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 61 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT ARTICLE FIFTEEN APPLICABLE LAWS 15.0 Engineer/Architect shall comply with all federal, state, and local laws and ordinances applicable to the Work called for herein. 15.0 Engineer/Architect shall adhere to all applicable State, Federal, local and CNM rules, laws, regulations, guidelines, the New Mexico Procurement Code, CNM’s Procurement Regulations, New Mexico’s Public Works Act (N.M. Stat. Ann. § 13-4-1, et. seq.), the New Mexico Prompt Payment Act, and all other applicable laws, statutes, codes, regulations, and the like, the policies and procedures associated with the Work to be performed. ARTICLE SIXTEEN TERMINATION 16.0 Termination for Cause. If Engineer/Architect, for any cause, fails or omits to carry out the Work in an acceptable manner CNM may give notice in writing of such failure or omission and of a reasonable time within which to cure the deficiency. Engineer/Architect shall take corrective measures within such time. Engineer’s/Architect’s failure to comply with such notice and to cure the deficiency as provided in the notice shall subject this Agreement to immediate termination by CNM. 16.1 In the event of a for-cause termination, CNM shall terminate this Agreement by delivering to Engineer/Architect a written notice of termination. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the date of delivery of the notice. Upon such termination, the Engineer/Architect shall deliver to CNM all design plans, construction estimates, drawings, documents, survey books, and all other materials developed under this Agreement. CNM shall then have the right to retain the services of other design professionals to complete the Engineer’s/Architect’s Work under this Agreement, and shall have no obligation to seek bids for that replacement design professional(s). The cost of completing the Engineer’s/Architect’s Work under this Agreement shall be paid for by applying the balance of the contract amount remaining on this Agreement at the time of termination. If the cost to complete the Work under this Agreement is less than the remaining contract amount, the remaining contract amount shall be paid to the Engineer/Architect. If the cost of completing the Work under this Agreement exceeds the contract amount, then the Engineer/Architect shall pay CNM for the difference between the contract amount and the cost to complete the Engineer’s/Architect’s Work. 16.2 Termination for convenience of CNM. On fifteen (15) business day’s written notice to Engineer/Architect, CNM may terminate this Agreement in whole or in part for its own convenience in the absence of any default of Engineer/Architect. 16.3 In the event of a termination for convenience, CNM shall terminate this Agreement by delivering to Engineer/Architect notice of termination without cause specifying the extent to which performance of Work under this Agreement is terminated and the date upon which such termination becomes effective. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the sixteenth (16th) business day after delivery of the notice. Within ten (10) calendar days of the effective date of termination, Engineer/Architect shall deliver to CNM all design plans, construction estimates, drawings, documents, survey books and any or all other materials developed under this Agreement. Upon delivery of such notice, the Engineer/Architect shall have the right to receive payment for services satisfactorily performed to termination date, including reimbursement then due. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 62 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT ARTICLE SEVENTEEN APPROPRIATIONS 17.0 The terms of this Agreement are contingent upon sufficient appropriations and authorizations being made by the Legislature of the State of New Mexico and/or CNM for the performance of this Agreement. If sufficient appropriations and authorizations are not made by the Legislature and/or CNM, this Agreement shall terminate upon written notice being given by CNM to Engineer/Architect. CNM's decision as to whether sufficient appropriations are available shall be accepted by Engineer/Architect and shall be final. ARTICLE EIGHTEEN RELEASE 18.0 Engineer/Architect, upon final payment to it of the amounts due for the Project, releases CNM, its governors, officers and employees, and the State of New Mexico from all liabilities, claims and obligations whatsoever arising from or under this Agreement as pertains to the Project. 18.1 Engineer/Architect agrees not to purport to bind CNM or the state of New Mexico to any obligation not assumed herein by CNM or the State of New Mexico, unless Engineer/Architect has express written authority to do so, and then only within the strict limits of that authority. ARTICLE NINETEEN CONFIDENTIALITY 19.0 Any confidential information provided to or developed by Engineer/Architect in the performance of this Agreement shall be kept confidential and shall not be made available to any individual or organization by Engineer/Architect without prior written approval of CNM. ARTICLE TWENTY CONFLICT OF INTEREST 20.0 Engineer/Architect warrants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required under this Agreement. Engineer/Architect shall comply with the provisions of Section 10-16-12 N.M.S.A. 1978 which requires disclosure in writing to the office of the Secretary of State of the State of New Mexico amounts received under state contracts when and if such provisions become applicable. ARTICLE TWENTY-ONE GOVERNING LAW/INTERPRETATION 21.0 The laws of the State of New Mexico shall govern this Agreement. In no event shall any portion of this Agreement be interpreted against a party on the grounds that such party drafted the provision in question. Both parties acknowledge having had ample opportunity for review and comment by their attorneys and both parties having participated in drafting this Agreement as a whole. ARTICLE TWENTY-TWO MODIFICATION OF THE AGREEMENT CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 63 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT 22.0 This Agreement shall not be altered, changed, amended, or modified except by an instrument in writing executed by the authorized representative(s) for the Engineer/Architect and CNM. The Engineer/Architect and CNM may negotiate changes to this Agreement pursuant to this Article 22. ARTICLE TWENTY-THREE MERGER 23.0 This Agreement with its exhibits and schedules incorporates all of the agreements, covenants and understandings between the parties thereto concerning the subject matter thereof. No prior agreements or understanding, verbal or otherwise, of the parties or their agents shall be valid or enforceable unless embodied in this Agreement. ARTICLE TWENTY-FOUR CERTAIN PENALTIES 24.0 The State of New Mexico Procurement Code, Sections 13-128 through 13-1-199 N.M.S.A. 1978, imposes civil and criminal penalties for its violation. In addition the New Mexico criminal statutes impose felony penalties for illegal bribes, gratuities and kickbacks. ARTICLE TWENTY-FIVE NOTICES 25.0 Any notice required to be given under this Agreement shall be deemed sufficient, if given in writing and hand delivered to the following address or sent by first class mail, properly franked and addressed as follows: If to CNM: Central New Mexico Community College 525 Buena Vista, SE Albuquerque, NM 87106-4096 Attn: Director, Purchasing If to Vendor: ENTER VENDOR NAME ENTER VENDOR ADDRESS ENTER VENDOR CONTACT ARTICLE TWENTY-SIX MISCELLANEOUS 26.0 Certain Definitions. “Detailed Estimate of Construction Cost” means a forecast of construction costs prepared on the basis of the Architect’s detailed analysis of materials and labor for all items of construction work. “Estimate of Probable Construction Costs” means a forecast of construction cost; may be a preliminary estimate of construction cost or a detailed estimate of construction cost. “Preliminary Estimate of Construction Cost” means cost forecasts prepared by the Architect during the schematic design, design development, and construction documents phases of basic services for the owner, prepared prior to the detailed estimate of construction costs. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 64 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT The terms “Construction Costs” and “Actual Construction Costs” are to be construed to be one and the same and mean the actual contract amount to be paid by CNM to the General Contractor(s) to construct the structure or facilities designed and described within the construction bidding documents. Construction costs do not include costs associated with furniture and equipment not specified within the construction bid documents. “As-built” and “Record Documents” are to be interpreted to be one and the same and are defined as construction drawings revised to show all significant changes to the construction documents made during the construction process, usually based on marked up prints, drawings, and other data furnished by the General Contractor to the Architect. “Project Program” means the written and graphic description of the Project objectives, including intended us of facilities and site, design constraints and criteria, physical parameters, spatial requirements and relationships, and requirements for special equipment, systems and materials, the results of which are to be documented in a written Construction Contract Documents are the documents that constitute the Agreement between the owner and the General Contractor to construct the Project(s) in accordance with the bidding documents. “Telegraphic notice” means notice provided via Facsimile or E-mail transmission. “MACC” means Maximum Allowable Construction Cost is the total sum, excluding gross receipts tax, available for construction purposes and may include furnishings, fixtures and equipment as approved and authorized by CNM’s Governing authority. MACC shall not include professional fees, Project contingency funds, acquisition costs or other soft costs. 26.1 Attorney’s Fees. In the event of litigation with respect to or related to this Agreement or the Project, such action shall be brought in the County of Bernalillo, State of New Mexico. The prevailing party shall be entitled to recover reasonable attorney’s fees. The law of the State of New Mexico shall govern these matters. 26.2 Insurance Requirements. The Vendor shall be required to carry insurance meeting the requirements in the Exhibit C hereto labeled "INSURANCE REQUIREMENTS" and as noted in the specifications. The Vendor will be required to submit the Certificates of Insurance to CNM’s Purchasing Director prior to commencing Work under the Agreement. Insurance must remain in effect for the entire term of the Agreement. 26.3 The General Conditions attached hereto as Exhibit A are hereby incorporated to the extent they are not inconsistent with other provisions of this Agreement. In Exhibit A, “Seller” and “Contractor” mean “Engineer” or “Architect.” 26.4 Contact documents. The following are contract documents which form the contract between CNM and Engineer/Architect for the Project, and are incorporated by reference herein as if fully set forth herein: A) This Engineering/Architectural Services Agreement between CNM and Engineer/Architect, and all exhibits thereto. B) Engineer’s/Architect’s attached proposal dated TBD C) CNM Purchase Order No. P018XXXX, dated month, day, year and all exhibits thereto. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 65 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT IN WITNESS THEREOF, the parties hereto have executed this Agreement the day and year last set forth below. CENTRAL NEW MEXICO COMMUNITY COLLEGE ENTER FIRM’S LEGAL NAME OWNER (Signature) FIRM (Signature) GILBERT M. RIVERA, SR. BUYER (Printed name and title) ENTER AUTHORIZED PERSON’S NAME (Printed name and title) Date: _____________________________________ Date: ______________________________________ CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 66 of 70 EXHIBIT E: SAMPLE SERVICES AGREEMENT EXHIBIT A, GENERAL TERMS AND CONDITIONS 1. Inspection and Audit. a. CNM may inspect, at any reasonable time, any part of Seller's plant or place of business which is related to performance of this Purchase Order. Acceptance of delivery shall not be considered acceptance of the materials, supplies or services furnished. Final inspection of product and services will be made at the destination. Any testing or inspection procedures required by the specification are in addition to CNM's rights under this paragraph. b. The Contractor shall maintain detailed time records which indicate the date, time and nature of services rendered. Contractor shall maintain detailed records of all materials or supplies delivered to CNM under this Purchase Order, including serial numbers and other appropriate identifiers. These records shall be subject to internal and external audit. CNM shall have the right to audit billings both before and after payment. Payment under the resultant Agreement shall not preclude CNM from recovering excessive, erroneous or illegal payments previously made to the Contractor. 2 Warranties. Seller warrants the materials, supplies or services furnished to be exactly as specified in this order, free from defects in Seller's design, labor, materials and manufacture, and to be in compliance with any drawings or specifications incorporated herein and with any samples furnished by Seller. All applicable UCC warranties, express and implied, are incorporated herein. 3. Acceptance and Rejection. If prior to final acceptance, any materials, supplies or service are found to be defective or not as specified, or, if CNM is entitled to revoke acceptance of them, CNM may reject or revoke acceptance, require Seller to correct without charge within a reasonable time, or require delivery at an equitable reduction in price at CNM's option. Seller shall reimburse CNM for all incidental and consequential costs related to unaccepted materials, supplies or service. Notwithstanding final acceptance and payment. Seller shall be liable for latent defects, fraud, or such gross mistakes as amount to fraud. Acceptance of performance shall not waive CNM's right to claim damages for breach. 4. Assignment. This order is assignable by CNM. Except as to any payment due hereunder, this order is not assignable by Seller without written approval of CNM. 5. Changes. CNM may make changes within the general scope of this order by giving notice to Seller and subsequently confirming such changes in writing. If such changes affect the cost of, or the time required for performance of this order, an appropriate equitable adjustment shall be made. No change by Seller shall be recognized without written approval of CNM. Any claim of Seller for an adjustment under this paragraph must be made in writing within thirty (30) days from the date of receipt of Seller of notification of such change, unless CNM waives this condition. Nothing in this paragraph shall excuse Seller from proceeding with performance of the order as changed hereunder. 6. Termination and Delays. CNM, by written notice stating the extent and effective date may terminate this order for convenience in whole or in part, at any time. CNM shall pay Seller as full compensation for performance until such termination: (1) the unit or pro rata order price for the delivered and accepted portion; and (2) a reasonable amount to be approved by CNM, and not otherwise recoverable from other sources by Seller, with respect to the undelivered or unaccepted portion of this order. Provided, however, compensation hereunder shall in no event exceed the total order price. Such amount will be limited to Seller's actual cost and may not include anticipated profits. CNM may terminate this order by written notice in whole or in part for Seller's default if Seller refuses or fails to comply with the provision of this order, or fails to make progress so as to endanger performance and does not cure such failure within a reasonable period of time. In such event, CNM may otherwise secure the materials, supplies or services ordered, and Seller shall be liable for damages suffered by CNM, including incidental and consequential damages. If, after notice of termination, CNM determines Seller was not in default, or if Seller's default is due to failure of CNM, termination shall be deemed for the convenience of CNM. The rights and remedies of CNM provided in this article shall not be exclusive and are in addition to any other rights and remedies provided by law or under this order. As used in this paragraph, the word "Seller" includes Seller and its subsuppliers at any tier. 7. Affirmative Action. Seller shall not discriminate with regard to hiring, termination or other incidents of employment on the basis of race, sex, national origin, religion, age or handicap. Seller agrees to: a) adhere to the principles set forth in Executive Order 11246 and 11375, and to undertake specifically to maintain employment policies and practices that affirmatively promote equality of opportunity for handicapped persons, minority group persons and women; b) take affirmative steps to hire and promote women and minority group persons at all job levels and in all aspects of employment; c) communicate this policy in both English and Spanish to all persons concerned within the company, with outside recruiting services and the minority community at large; d) provide CNM on request a breakdown of labor force by ethnic group, sex, and job category; and e) discuss with CNM its policies and practices relating to its affirmative action program. 8. Indemnification and Insurance Seller assumes the entire responsibility and liability for losses, expenses, damages, demands and claims in connection with or arising out of any actual or alleged personal injury (including death) and/or damage or destruction to property sustained or alleged to have been sustained in connection with or arising out of the performance of the work by Seller, its agents, employees, subcontractors or consultants, except to the extent of liability arising out of the negligent performance of the work by or willful misconduct of CNM. In any event, CNM's liability shall be subject to the limitations of the New Mexico Tort Claims Act. Seller shall indemnify and hold harmless CNM, its officers, agents, and employees from any and all liability for such losses, expenses, damages, demands, and claims and shall defend any suit or action brought against any or all of them based on any actual or alleged personal injury or damage and shall pay any damage costs and expenses including attorneys fees, in connection with or resulting from such suit or action. Seller agrees that it and its subcontractors will maintain public liability and property damage insurance in reasonable amounts covering the above obligation and will maintain workers' compensation coverage covering all employees performing this order. CNM PO # TBD Copyright CNM, 2013. All rights reserved. 9. Patent and Copyright Indemnity. Seller shall pay all royalty and license fees relating to deliverables and other items covered hereby. In the event any third party shall claim that the reproduction, manufacture, use, or sale of goods or items covered hereby infringes any copyright, trademark, patent, or other intellectual property rights, Seller shall indemnify and hold CNM harmless from any cost, expense, damage, or loss resulting therefrom. 10. Discounts. Any discount time will not begin until the materials, supplies, or services have been received and accepted and correct invoice received by CNM's Purchasing Department. In the event testing is required, the discount time shall begin upon the completion of the tests. 11. Penalties. The Procurement Code, Section 13-1-28 et seq., imposes civil and criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities and kickbacks. 12. Title and Delivery. Title to the materials and supplies passed hereunder shall pass to CNM at the F.O.B. point specified subject to the right of CNM to reject upon inspection. For any exception to the delivery date specified, Seller shall give prior notification and obtain approval from CNM's Purchasing Department. Time is of the essence and the order is subject to termination for failure to deliver on time. 13. Payment Charges. Late payment charges shall be paid in the amount and under the conditions stated in Section 13-1-158, NMSA 1978. 14. Other Applicable Laws. Any provision required to be included in a contract of this type by any applicable and valid Executive order, federal, state or local law, ordinance, rule or regulation shall be deemed to be incorporated herein. 15. OSHA Regulations. The contractor shall abide by Federal Occupational Safety and Health Administration (OSHA) regulations and the State of New Mexico Environmental Improvement Board occupational health and safety regulations that apply to the work performed under this Invitation. ALL PRODUCTS CONTAINING HAZARDOUS SUBSTANCES MUST BE PROPERLY LABELED AND ACCOMPANIED BY MATERIAL SAFETY DATA SHEETS. The contractor shall defend, indemnify and hold CNM free and harmless against any and all claims, loss, liability and expense resulting from any alleged violations of said regulations including but not limited to fines, penalties, judgments, court costs and attorney fees. 16. Debarment/Suspension. In performing the services and/or furnishing the goods specified within this purchase order, the vendor/contractor certifies that it is not suspended, debarred or declared ineligible from entering into contracts with the Executive Branch of the Federal Government, any State agency or local public body; nor is in receipt of a notice of proposed debarment or suspension from the Executive Branch of the federal Government, any State agency or local public body. 17. Applicable Law. Each party acknowledges that the New Mexico Procurement Code, NMSA 1978 13-1-28 through -199, as amended, applies to every CNM purchase or contract agreement of tangible personal property, services and construction, including participation made pursuant to this purchase order. Further, each party acknowledges that it will be responsible for claims or damages arising from personal injury or damage to persons or property to the extent they result from negligence of its employees or agents and that the liability of CNM shall be subject in all cases to the immunities and limitation of the New Mexico Tort Claims Act, NMSA 1978 41-4-1 through -2 7, as amended. SECTION 2 GOVERNMENT SUBCONTRACT PROVISIONS If this order is subcontract under a U.S. Government Prime Contract, the applicable clauses listed below are incorporated into, and form a part of, the terms and conditions of this order. In the event of any conflict between the terms and condition of Section 2 and any other provisions of this order the terms and conditions of Section 2 shall prevail. The clauses contained in the following paragraphs of the Federal Acquisition Regulations are incorporated herein by reference. For purposes of this Purchase Order, in the following clauses, the term "contract" shall mean "this order", the term "contractor" shall mean "Seller" and the term "Government" and "Contracting Officer" shall mean "Albuquerque CNM" and the "Director of Purchasing," respectively. The following provisions of the Federal Acquisition Regulations (FAR) apply regardless of the amount of this order: * Anti-kickback Procedures: 52.203-7 Buy American Act and Balance of Payments Program 52.225-7001 * Contract Work Hours and Safety Standards Act-Overtime Comp. 52.222-4 * Equal Employment Opportunity 52.222-26 Integrity of Unit Prices 52.215-26(a)(b) Notice to the Government of Labor Disputes 52.222-1 Preference for U.S. Flag Air Carriers (For internal air travel) 52.247-63 Restriction on Subcontractor Sales to the Government 52.203-6 Service Contract Act of 1965 (Reserved) 52.222-41 * Termination for Convenience of Government (Education and other Nonprofit Institutions) 52.249-5(a)(f) CNM reserves all administrative, contractual, and legal remedies against Seller in case of any breaches of the contract. * On contracts funded by federal grants, only the Special Terms and Conditions clauses identified by the asterisk (*) are incorporated into this contract. Page 67 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT EXHIBIT B ENGINEER’S/ARCHITECT’S COMPENSATION SECTION I Architect’s compensation for Basic Services is as follows: [ENTER PROJECT NAME]: [ENTER PROJECT AMOUNT] For compensation under this Section I, CNM shall make payments for the Engineer’s/Architect’s services, after acceptance and approval by CNM of each of the following Phases for the Project, in an amount not to exceed the percentages set forth below for the applicable Phase: Pre-design Phase Schematic Design Phase Design Document Phase Construction Document Phase Bidding and Negotiation(preconstruction) Construction Observations TBD% TBD% TBD% TBD% TBD% TBD% The following provisions A and B are applicable to both Sections I and II Compensation set forth above: A. Firm may add any applicable gross receipts tax to the fees and other payments payable hereunder. Firm shall use and require the use of nontaxable transaction certificates by all other parties with whom it does business in connection with performing its services under this Agreement whenever allowed by law. In all events, Firm shall not include gross receipts taxes paid to others as a part of the base dollar amount upon which Firm calculates gross receipts taxes when billing its fees and expenses to CNM. B. Firm shall present separate monthly detailed invoices and statements of the services rendered for each Part (I and II). Architect's invoices shall reference the CNM purchase order number and be submitted in a format that has been reviewed and approved in writing by CNM. Payments shall be made subject to CNM's approval of the statement of the services. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 68 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT SECTION II Hourly Rates by Personnel Type for Special Services (NMGRT is not included.) OFFICE/FIELD PERSONNEL TITLE HOURLY RATE The following provisions are applicable to both Sections I and II Compensation set forth above: A. Vendor may add any applicable gross receipts tax to the fees and other payments payable hereunder. Vendor shall use and require the use of nontaxable transaction certificates by all other parties with whom it does business in connection with performing its services under this Agreement whenever allowed by law. In all events, Vendor shall not include gross receipts taxes paid to others as a part of the base dollar amount upon which Vendor calculates gross receipts taxes when billing its fees and expenses to CNM. B. Vendor shall present a monthly detailed invoice and statement of the services rendered. Vendor's invoices shall reference the CNM purchase order number and be submitted in a format that has been reviewed and approved in writing by CNM. Payments shall be made subject to CNM's approval of the statement of the services rendered. For compensation under Section I or Section II hereof, CNM shall make payments NET 30 days following the completion of each phase. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 69 of 70 EXHIBIT D: SAMPLE SERVICES AGREEMENT EXHIBIT C, INSURANCE REQUIREMENTS CERTIFICATES OF INSURANCE: The Vendor shall furnish the Owner one copy each Certificates of Insurance herein required for each copy of the resultant Agreement, showing the coverage, limits of liability, covered operation, effective dates of expiration of policies of insurance carried by the Vendor. The Vendor shall furnish to the Owner copies of limits. The Certificates of Insurance shall be in the form of AIA Document G-705 or similar format acceptable to the Owner. Such certificates shall be filed with the Owner and shall also contain the following statements: 1. The Governing Board of Central New Mexico Community College, Central New Mexico Community College, its agents, servants and employees are held as additional insured. 2. "The insurance coverage certified herein shall not be canceled or materially changed except after forty five (45) days written notice has been provided to the Owner." COMPENSATION INSURANCE: The Vendor shall procure and shall maintain during the life of this Agreement Worker's Compensation insurance as required by applicable State law for all of the Vendor’s employees , and in case of any such work being sublet, shall require the subcontractors to maintain such Worker's Compensation insurance. In case any class of employee engaged in work on the Project under this Agreement is not protected under a Worker's Compensation Statute, the Vendor shall provide and shall cause each subcontractor or sub-subcontractor to provide Employer's Insurance in an amount of not less than $500,000. VENDOR’S PROFESSIONAL LIABILITY INSURANCE: The Vendor shall maintain professional liability insurance in the amount of at least $1,000,000. VENDOR'S PUBLIC LIABILITY INSURANCE: The Vendor shall maintain insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-4-1 et.seq. NMSA 1978". The insurance must remain in force for the life of the Agreement including all extension or renewals. The limits effective July 1, 1992 are: $400,000 per person/$750,000 per occurrence plus $300,000 for medical and $100,000 for property damage for a total maximum liability of $1,150,000 per occurrence. VENDOR'S VEHICLE LIABILITY INSURANCE: The Vendor shall procure and shall maintain during the life of this contact Vehicle Liability Insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-1-1 et. seq. NMSA 1978". The insurance must remain in force for the life of the Agreement including all extensions or renewals. The limits effective July 1, 1992 are: Bodily Injury Property Damage $750,000 Each Occurrence $100,000 Each Occurrence SUBCONTRACTORS’ AND SUB-SUBCONTRACTORS’ PUBLIC AND VEHICLE LIABILITY INSURANCE: The Vendor shall either: (1) Require each subcontractor or sub-subcontractor to procure and maintain during the life of the subcontract or subsubcontract Public Liability Insurance of the types and amounts specified above or, (2) Insure the activities of the subcontractors or sub-subcontractors in the Vendor's policy as required under this Article. GENERAL: All insurance policies are to be issued by companies authorized to do business under the laws of the state in which the Work is to be done and acceptable to Owner. The Vendor shall not violate, or permit to be violated, any conditions of any said policies, and shall at all times satisfy the requirements of the insurance companies writing said policies. CNM PO # TBD Copyright CNM, 2013. All rights reserved. Page 70 of 70 P-357 EXHIBIT N MAIN CAMPUS COMMUNICATIONS LOOP LOGICAL CONCEPT KEY FIBER ZONE C PRIMARY DISTRIBUTION FACILITY PRIMARY FIBER ROUTE FIBER ZONE B SECONDARY DISTRIBUTION FACILITY SECONDARY FIBER ROUTE PUBLIC STREET CROSSING/ ZONE INTERCONNECT FIBER ZONE A P-357 Exhibit P (page 1 of 5) CNM: WAN/Core/Internet Overview Date: Mar 13 2012 Version: P-357 Prepared by: rm WESTSIDE CAMPUS MJG 2nd Fl West 3760 MJG North 3750 MJG West 3560 A ATC Rio Rancho Campus JMMC CAMPUS Workforce Training Center WDC Dist01-VSS MJG 192 3750 Stack ATC 129 3750 Stack WTC 200 3750 Stack RRC 129 3750 Stack I-6509 MJG 292G 3750 MJG 2nd Fl Faculty 3560 WS Dist Switch 1 MJG ATC Catalyst 6506 WSII 3750 Stack RRC 217 3750 Stack ATC 129 3750 Stack WS Dist Switch 2 ATC 129 3750 Stack RRC Catalyst 6506 Switch 1 Switch 2 Switch 3 WTC 100i 3750 Stack RRC 2229 3750 Stack TW-3750 3750 Stack H Bldg WTC 6509 WTC 133 WTC 128 3500 J-4006 WSC EF WSII 2nd Fl 3750 Stack WS 2 JMMC Catalyst 6509 G Bldg WSII3750 H-3750 K-4006 Stack 3750G ASA 5520 Internet Firewalls WSI 2nd 3750 Stack GWSW02WSC ASR1001 Router GW01WSC WSC 6509 EF WSI 3rd 3750 Stack 100 Mbps WSI 3750 WS 1 Century Link Internet SOUTH VALLEY CAMPUS SV22 3750 100 Mbps South Valley Network Room 100 Mbps 100 Mbps 100 Mbps SV37 3750 SV44 3500 SV57 3750 200 Mbps SV40 3750 SV49 3750 SVC 6509 SV 112 MAIN CAMPUS SRC MDC SV70 3750 DMZ WLC VSL 2x10GE CX4 Wire01 6506 Wire02 6506 Dist01-VSS 100 Mbps Catalyst 6509 10G LR SS Bldg 6509 10G LR SRC EF MS 3750 Stack 100 Mbps ASR1001 Router GW02Main TW INTERNET 3750G GWSW02 Main 10G LR ASA 5520 Internet Firewall s 10G LR KC 3750 Stack Core01-VSS Switch 2 VSL 2x10GE LR A106 EF 200 Mbps SBDC 2nd ST. JS 3750 Stack Century MOE 10 Mbps 3750 Stack 3750G ASR1001 Router GW01Main SBDC 3750 ASA 5520 Internet Firewalls GWSW01Main N 3750 Stack Router Damien SBDC Yale ASA 5540 Internet Firewalls Core01-VSS Switch 1 T1 PS 3750 Stack A106 3750 Catalyst 3750 Cisco Router 2811 SB 3750 Stack E113 3560 LSA 3750 PPD 3560 West 3750 S Bldg 3750 Stack L Bldg 3560 TC 3750 Stack JS_TR1-RK2_3750X Time Warner KC18_3750 Remote Campuses SB_TR1-2_3750 66.194.1.102 TW S_204D1_3750X Default Gateway is 66.194.1.101 BGP router id 10.32.1.1 Internet Rtr gw01main 198.133.178.129 Jordan_6509 BVI1 198.133.178.136 PPD_South_3560 JMMC_6509 Internet Sw 198.133.178.132 SVC_6509 SV_SBDC_3750G N_4006 198.133.178.134(135)/25 MS394_3750G VPN-ASA CHUCK L_2Fl_Clos_3560_A W DMZ L WLC C TC_3750 Core-VSS West_15B_3560 A106_3750 Qwest QMoE WS-C3750G-24PS A106a_3750_Phone CORE-VSS .2 LSA_BASEMENT_3750 .1 Management IP: VLAN 960 – Legacy Prod FW Uplink GLOBAL VLAN 968 – DMZ FW Uplink VLAN 970 – SRC FWSM Outside Uplink SRC_EF_3750 A106B_3750 legacy_prod 968 970 dev 970 960 admin 970 Damien_3925 970 971 SBDC_YALE_2811 970 970 E113_3560 shared Failover FW_heartbeat - Vlan 961 FW_state - Vlan 962 WIRE01MAIN n5020-1-mdc-d-1 c3750-stk-mdc-c-0 SRC – ROW D c3750-stk-mdc-f-0 FWSM FWSM 978 VLAN 2240 – MDC-NetMgmt VLAN 2244 – MDC-ServerMgmt VLAN 2248 – MDC-VMWareMgmt VLAN 2252 – MDC-PowerMgmt VLAN 2254 – MDC-Utility VLAN 2002 – Dev FE VLAN 2003 – Dev BE VLAN 2004 – Dev SS 975 n5020-1-mdc-d-0 legacy_prod VRF dev VRF VLAN 2240 - MGMT c3750-stk-mdc-b-0 mgmt VRF 974 VLAN 2300 – Meti system system dmz 963 NAMs Switch 2 Slot 2 Proc 1 prod 973 meti VRF SVR MGMT SWITCHES NAMs Switch 1 Slot 2 Proc 1 972 IDSMs Switch 2 Slot 1 Proc 1 977 979 IDSMs Switch 1 Slot 1 Proc 1 qual mgmt meti WIRE01MAIN dmz VRF VLAN 180 - ISN VLAN 181 - CSN qual VRF VLAN 182 - ASN prod VRF VLAN 183 - FSN VLAN 2006 – Qual FE n5010-1-mdc-b-0 n5010-2-mdc-b-0 SRC – ROW B n5010-1-mdc-c-0 n5010-2-mdc-c-0 SRC – ROW C n5010-1-mdc-f-0 n5010-2-mdc-f-0 SRC – ROW F shared VRF VLAN 2010 – Qual BE ACEs Switch 1 Slot 3 Proc 0 ACEs Switch 2 Slot 3 Proc 0 VLAN 700 - APC VLAN 900 – ADN_A VLAN 901 – CDN_A VLAN 903 – UDN_E VLAN 910 – ADN_E VLAN 911 – CDN_E VLAN 920 - SDN VLAN 2022 - FE VLAN 2014 - FE VLAN 2018 - BE SRC – Row D – DIST-VSS Exhibit P (page 2 of 5) CNM: WAN/Core/Internet Topology Date: Mar 13 2012 Version : P-357 Prepared by: rm Qwest Remote Campuses 67.148.226.182/30 Default Gateway is 67.148.226.181 BGP router id 10.32.1.2 gw01wsc Internet Rtr 198.133.179.249/29 WTC_6509 ATC_6506 RRC_TR1_6506 gwsw01wsc Internet Sw 198.133.179.250/29 198.133.179.251(252)/29 ASA01WSC WSC_6509 WSC_6509_Core .2 .1 Management IP: VLAN 968 – DMZ FW Uplink GLOBAL VLAN 970 – FW Outside Uplink mgmt admin VLAN 3244 – SVR MGMT 970 970 qual 970 970 970 970 968 shared Failover FW_heartbeat - Vlan 961 FW_state - Vlan 962 system system dmz dev prod 977 973 978 FWSM FWSM qual VRF 972 974 975 dmz VRF NAMs Switch 1 Slot 2 Proc 1 NAMs Switch 2 Slot 2 Proc 1 ACEs Switch 1 Slot 3 Proc 0 ACEs Switch 2 Slot 3 Proc 0 mgmt VRF SVR MGMT SWITCHES VLAN 179 – WSDC DMZ prod VRF VLAN 3240 - MGMT dev VRF VLAN 3244 -MgmtServers VLAN 3248 -Mgmt VM VLAN 3252 -PWR-UPS VLAN 3254 -UTILITY shared VRF VLAN 3002 - FE VLAN 3003 - BE VLAN 3004 - SS VLAN 3022 - Shared IDSMs Switch 1 Slot 1 Proc 1 n5020-wsdc-NDR-01 n5020-wsdc-NDR-02 c3750-stk-wsdc-NAR2-1 IDSMs Switch 2 Slot 1 Proc 1 WSDC-ROW A (NAR01) n5010-wsdc-NAR3-01 n5010-wsdc-NAR2-01 Row D- not onsite yet Not onsite yet VLAN 3006 - FE n5010-wsdc-NAR3-02 VLAN 3010 - BE n5010-wsdc-NAR2-02 VLAN 3014 - FE Not onsite yet VLAN 3018 - BE WSDC – ROW B (NAR03) Exhibit P (page 3 of 5) CNM: WAN/Core/Internet Topology Date: Mar 13 2012 Version : P-357 Prepared by: rm c3750-stk-wsdc-NAR3-1 WSDC – Row A – DIST-VSS WSDC – ROW C (NAR02) WSDC – ROW D (NAR01) Advertise 198.133.178.0/24 and 198.133.180.0/22 via BGP Internet TWTC AS 4323 CenturyLink AS 209 198.133.178.0/24 gw01main_a 198.133.178.136 AS 4869 rtr Core_VSS 10.254.213.245 Route Reflector 198.133.179.0/24 rtr gw02main_src 198.133.178.193 rtr rtr gw01wsc 198.133.179.249 WSC_VSS 10.254.213.228 Route Reflector rtr DMZ: 198.133.180.0/22 DMZ: 198.133.180.0/24 rtr WTC_6509 10.254.213.225 rtr SVC_6509 10.254.213.229 BGP Design Detail CNM - Internet Redundancy Design 2012 rtr rtr JMMC_6509 10.254.213.232 SV_SBDC_3750G 10.254.213.241 rtr rtr RRC_TR1_6506 10.254.213.244 ATC_6506 10.254.213.247 Exhibit P (page 4 of 5) CNM: Internet BGP Design Detail Date: Mar 13 2012 Version : P-357 Prepared by: rm JMMC Network Topology Exhibit P (page 5 of 5) CNM: Typical Edge Network Topology Date: Mar 13 2012 Version : P-357 Prepared by: rm Mgt. IP 10.0.1.2 Vlan 100 100 201 204 206 208 210 212 MOE G Bldg 3750 Mgt. IP 10.0.1.12 WAN_Uplink Core_Uplink Uplink_J_Bldg Uplink_K_Bldg Uplink_TW_Bldg Uplink_I-Bldg Uplink_H-Bldg IP 10.143.0.4 IP 10.1.2.1 IP 10.1.4.1 IP 10.1.6.1 IP 10.1.8.1 IP 10.1.10.1 IP 10.1.12.1 Fiber Patch Cords Blue 50 mic MM Orange 62.5 mic MM Yellow SM Port Channel G Bldg 6509-E Admin Instru Wireless Security Vlan 10 Vlan 11 Vlan600 Vlan700 Network 10.2.2.X Network 10.3.2.X Network 10.5.2.X Network 10.7.3.X On Interface Vlan 212 10.1.12.2 Mgt. IP 10.0.6.2 H Bldg 3750 Stack On Interface Vlan 208 10.1.8.2 Mgt IP 10.0.4.1 On Interface Vlan 206 10.1.6.2 Mgt. IP 10.0.3.1 TW Bldg 3750G Stack Admin Instru Testing Wireless Security Vlan 40 Vlan 41 Vlan 42 Vlan608 Vlan708 Network 10.2.8.X Network 10.3.8.X Network 10.4.8.X Network 10.5.8.X Network 10.7.8.X Admin Vlan 60 Network 10.2.12.X Instru Vlan 61 Network 10.3.12.X Wireless Vlan612 Network 10.5.12.X On Interface Vlan 204 10.1.4.2 On Interface Vlan 210 10.1.10.2 Mgt IP 10.0.5.1 Mgt. IP 10.0.2.2 K Bldg 4006 J_Bldg-4006 Admin Vlan 30 Network 10.2.6.X Instru Vlan 31 Network 10.3.6.X Wireless Vlan606 Network 10.5.6.X Admin Vlan 20 Network 10.2.4.X Instru Vlan 21 Network 10.3.4.X Wireless Vlan604 Network 10.5.4.X I Bldg 6509 Admin Vlan 50 Network 10.2.10.X Instru Vlan 51 Network 10.3.10.X Wireless Vlan610 Network 10.5.10.X EXHIBIT Q: PHONE SYSTEM TOPOLOGY CNM Main Site PSTN G430 V1 SYSTEM IPSI G430 Gateway V2 W AN 10/2 LAN 1 0/4 USB MDM AUD IO ALM CPU PW R R ST A SB 1 V3 COMPACT FLASH 2 CCA 10/1 SERVICES CAR D IN U SE LAN 10/3 ASBDC CLANs G430 V1 SYSTEM MedPro IPSI Ma in CCA 10/1 SERVICES CAR D IN U SE LAN 10/3 S8800 ESS Server S8800 MAS server COMPACT S8800 SES server COMPACT CMS Server COMPACT CNM Smith Brasher V3 COMPACT FLASH AUD IO 2 S8800 CM Server B COMPACT MedPro LAN 1 0/4 A SB SBDC S8800 CM Server A COMPACT Ca mp us R ST 1 COMPACT G430 Gateway V2 W AN 10/2 USB MDM ALM CPU PW R IPSI CNM Westside Campus CCE Server COMPACT G650s MedPro IPSI PSTN h Bra sher MedPro Wan CNM Ken Chappy Hall ll US B CONSSERVI OLE CES M AL D CP M PW U R US B CONSSERVI V2 V6 OLE CES ET R CC A ETH WAN ETH LAN ET R CC A ETH WAN ETH LAN RS AS T B V1 V5 IPSI SYST EM M AL D CP M PW U R US B CONS SERVI OLE CES ET R CC A ETH WAN ETH LAN G45 0 RS AS T B V1 V5 SYSTE M M D AL CP M PW U R MedPro SYSTE M MD M ALM CPU PW R USB CONSOSERVIC ES LE ETR SYSTE M USB MD M ALM CPU PW R SYSTE M CNM LAN Control Network A/B ETH LAN RSTASB MD M ALM CPU PW R CONSOSERVIC LE V1 ESV5 V2 Backup Trunking ETH WAN CCA G45 0 USBV3 V4 ETR ETH WAN CCA G45 0 ETH LAN RSTASB V6 V1 V5 CONSOSERVIC V7 ES LE V2 V6 ETR CCA ETH WAN G45 0 ETH LAN RSTASB V8 V3 V7 V1 V5 V4 V8 V2 V6 V3 V7 V4 V8 US B CONSOSERVIC LE ES ET R CC A ETH WAN G45 0 ETH LAN RS AS T B V1 V5 V2 V6 V3 V7 V4 V8 SVC PROJECT: ET R CC A ETH WAN ETH LAN RS AS T B V1 V5 WTC V3 V7 V1 V5 V4 V8 Rio Rancho RS AS T B G4 50 M AL D CP M PW U R US B CONSSERVI OLE CES M AL D CP M PW U R US B CONSSERVI V2 V6 OLE CES ET R CC A ETH WAN ETH LAN ET R CC A ETH WAN ETH LAN RS AS T B V1 V5 V3 V7 RS AS T B G4 50 G4 50 V1 V5 V4 V8 V2 V6 V3 V7 V2 V6 V4 V8 V3 V7 V4 V8 V2 V6 V3 V7 V4 V8 SRC ATC JMMC PSTN G450 Gateways CONFIDENTIAL NETWORK DESIGN PREPARED FOR: <Location Names and/or Addresses> 2 CONSSERVI OLE CES G4 50 V4 V8 LOCATION: REVISION US B V3 V7 V2 V6 Main Trunking M AL D CP M PW U R G4 50 SYST EM M AL D CP M PW U R SYST EM Ha SYST EM ap py SYST EM Ch SYST EM Ke n Smit REVISED March 19, 2012 PAGE LOCAL AVAYA ACCOUNT TEAM: DRAWN BY: Chavez/Alvarez <Name> EXHIBIT R: FUTURE TECHNOLOGY ENVIRONMENT P-357 Exhibit R: 2013 CNM Future Information Technology Environment Future Environment: CNM is continuously engaged in the implementation of new technology that provides the Institute with growth and accessible services while ensuring adequate security. The project needs to take into consideration the following major projects that are in preliminary stages of planning or implementation: Campus Safety (In Progress) – CNM is currently implementing a number of technology projects engineered to improve campus safety. All of these projects place greater demands on the capacity and availability of CNM’s communication infrastructure. Campus Safety initiatives are as follows: o Access Control (In Progress) – CNM is currently implementing the first phase of its automated Access Control project that include six buildings. Phased implementations will continue until all buildings are completed. At some point it is feasible that CNM’s intrusion detection system will be integrated with Access Control. o Surveillance (In Progress) – Beginning with parking lots CNM is in the process of implementing a video surveillance system that will be expanded to include all outdoor areas and interior spaces where additional security is required. o Emergency Notification System (In Progress) – Preliminary phase to identify requirements, design, procure and implement an Emergency Notification system. CNM Main Campus Communications Loop (Kick off 4/2013) – Design and installation of a multi-zone underground communications utility duct bank that will replace existing Out Side Plant (OSP) fiber and copper and establish redundant communications pathways from Main Campus primary and secondary distribution facilities to campus buildings. Wireless Upgrade (Scheduled for FY2014) – Upgrade and replacement of CNM’s aging wireless network and increase capacity and manageability to meet the current instructional requirements and the needs of an increasingly mobile student population. Major Building Renovations, New Construction & Inside Plant Communications Cable Upgrades (Ongoing) – CNM is continuously involved in new construction and the renovation of existing facilities. These projects offer opportunities to expand services and update aging technology. Communication Services Renewal (Pending RFP) – The majority of CNM’s communication services (Internet, WAN, PRI, etc.) are approaching their final contract year and an new price agreements and contracts must be established through an RFP process. This may result in changes in current service providers and possible introduction of new Page 1 of 2 Last modified on: 09/04/2013 rm EXHIBIT R: FUTURE TECHNOLOGY ENVIRONMENT technologies. It is anticipated that aggressive pricing will allow CNM to increase bandwidth and deploy additional redundant communications routes. Desktop and Application Virtualization (In Planning Phase) – A pilot project is under way to implement server based hosting of desktop applications allowing increased utilization of limited application licenses and paving the way for future delivery to mobile devices. Data Center Monitoring (In Planning Phase) – Implement tools and procedures to monitor mission critical systems and services related to effective data center operations to ensure reliable delivery to customers. Mobile Communications Plan (Proposed, Pending Approval ) – Expansion and reconfiguration of CNM’s existing radio and mobile communications infrastructure to improve the effectiveness and availability of the system. CNM Southwest Mesa Campus (Property Acquired, Development Pending Approval) – What is likely to become CNM’s 8th campus location. The undeveloped property is located approximately ¾ miles west of Atrisco Heritage High School on Dennis Chavez Road. Building Management (Proposed) – Implementation of an enterprise wide automated building management system. Page 2 of 2 Last modified on: 09/04/2013 rm EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ITS ChangeManagementProcess Lead:ITSAssociateDirector Stakeholders: ITS Technical Leads & ITS Management Team Last Update: 09‐24‐09 The ITS Change Management Process describes the philosophy and procedures to introduce change into the IT environment. It is designed to minimize the impact of change to our user community and facilitate communications. Page 1 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS TableofContents Table of Contents ................................................................................................................................................................... 2 Introduction: ......................................................................................................................................................................... 3 Final Flow CM......................................................................................................................................................................... 4 ITOM and CMM Process Flow ................................................................................................................................................ 5 Procedure: Change Implementation .................................................................................................................................... 6 Change Management Categories Chart (Assigning Risk to a Change) ................................................................................... 8 Backout .................................................................................................................................................................................. 8 Change Management Categories Chart (Assigning Risk to a Change) ................................................................................. 9 Change Management Categories Chart (Assigning Risk to a Change) ............................................................................... 10 Procedure: Assigning Risk to a Change Procedure ............................................................................................................. 12 Scheduling a Change ............................................................................................................................................................ 14 ChangeManagementImplementationRequirementsChart .......................................................................................... 15 Change Management Implementation Requirements Chart .............................................................................................. 16 Change Man. Entry .............................................................................................................................................................. 18 Monthly Calendar ................................................................................................................................................................ 19 Presentation to Change Advisory Board .............................................................................................................................. 20 Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 2 of 20 Page 2 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS Introduction: The mission of our Change Management Process is to manage the introduction of change into the IT environment. The intent is to eliminate or reduce disruptions to business services resulting from the change. This considered approach is essential to maintain a proper balance between the need for change against the impact of the change. It is particularly important that the Change Management Process maintain a high level of visibility and open channels of communication in order to promote smooth transitions when changes eventually take place. The guiding principles of our Change Management System are: 1. Assessment of potential risk (High, Medium or Low). 2. Minimize the impact of change to our users 3. Meet or exceed service level commitments 4. Minimize impact to other systems & each other 5. Improve the way we do business 6. Efficiency, Productivity 7. Foster teamwork 8. Communicate, Communicate, Communicate… Each week proposed changes are presented to the Change Advisory Board (ITOM). Among the items discussed are: • Technical issues • Security concerns • Communications to users • Timing • Change conflicts… Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 3 of 20 Page 3 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeManagementProcessFlow Change Management Flow Last Update: 09-02-09 Change is needed Assess Risk/Assign Category (Use Assigning Risk to a Change) Change category? Emergency One person takes lead and pulls in anyone else needed Team assesses situation Once assessed, someone from team communicates nature of emergency to SC and Management High Risk Medium Risk Enter change into Change Calendar ASAP, but at least prior to 2 ITOM meetings. (Use Invite Attendee Option) Communication to users required? Low Risk Communicate with Peer and Those Being Affected By Change No Yes Enter change into Change Calendar prior to 2 ITOM meetings (Use invite attendee option) ITOM Process ITOM Process CMM Process Enter Change into Change Calendar before Mon. Noon prior to 1 CMM (Invite Attendee option not needed) CMM Process Carry Out Change At Appropriate Time Perform Post Mortem and Documentation as appropriate Team obtains management involvement if necessary Support Center enters change into Change Calendar Carry out change ASAP or during scheduled off hours if appropriate Tech. Emails detail info. To SC for comm. to users & Change Calendar Work with Support Center For communications to users CMM Process Work with Support Center For communications to users Carry out change within window Perform post mortem and document as appropriate Carry out change within window Perform post mortem and document as appropriate Perform post mortem EXIT Legend: CMM -- Change Management Meeting ITOM –IT Operations Meeting SC -- Support Center Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 4 of 20 Page 4 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ITOperationsMeetingandChangeManagementMeetingProcessFlow No ITOM PROCESS CMM PROCESS Review Task List at ITOM meeting Review proposed change at CMM No Conflict identified? Yes Yes Resolve outside of ITOM with appropriate parties Conflict resolved? Conflict identified? Resolve outside of CMM with appropriate parties No Reschedule and review as appropriate Conflict resolved? Yes Yes Continue to next step Continue to next step Reschedule and review as appropriate No Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 5 of 20 Page 5 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS Procedure:ChangeImplementation A change is needed: 1. The risk is assessed using the Procedure: Assigning Risk to a Change. 2. Determine the Change Category. 3. Proceed as follows: EMERGENCY 1. One Person takes the lead and pulls in anyone else needed for the emergency. 2. The team will assess the situation. 3. Once assessed, someone from the team communicates the nature of the emergency to the Support Center and Management. 4. The team obtains management involvement if it is necessary. 5. The Emergency change is carried out as soon as possible or during scheduled OFF hours if possible. 6. The team makes a follow-up communication to the Support Center. 7. The Support Center enters the Emergency change into the Change Calendar. 8. A post mortem is performed by the team. 9. Exit HIGH Risk 1. The high risk change is entered into the change calendar as soon as possible, but at least prior to 2 ITOM meetings. 2. Begin ITOM Process 3. Review presentation with Change Advisory Board at ITOM. 4. Has a conflict been identified at the ITOM meeting? 5. If YES, a conflict has been identified at the ITOM meeting, resolve outside of ITOM with appropriate parties. 6. If the conflict IS resolved with the appropriate parties, move on to CMM process. 7. If the conflict IS NOT resolved with the appropriate parties, the change must be rescheduled and reviewed again at the ITOM meeting. 8. If a conflict has NOT been identified at the ITOM meeting, move on to CMM process. 9. Begin CMM Process. 10. Has a conflict been identified at the CMM meeting? 11. If yes, conflict has been identified at the CMM meeting, resolve outside of CMM with appropriate parties. 12. If the conflict IS resolved with the appropriate parties, go to step 15. 13. If the conflict IS NOT resolved, the change must be rescheduled and reviewed again at the CMM meeting. Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 6 of 20 Page 6 of 20 14. 15. 16. 17. 18. EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS If a conflict HAS NOT been identified at the CMM meeting, move on to next step. Relay information to Support Center for communication to users. Carry out change within Change Window (Saturday 6 pm to Sunday 12 noon). Perform Post Mortem and Documentation as appropriate. Exit MEDIUM Risk 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. First determine if communication is required to users in advance. If communication is required, enter change into Change Calendar as soon as possible, but at least prior to 2 ITOM meetings then begin ITOM PROCESS. If communication is NOT required, enter change into Change Calendar prior to 1 Change Management Meeting then begin CMM PROCESS. Begin ITOM Process Review “Presentation with Change Advisory Board at ITOM. Has a conflict been identified at the ITOM meeting? If YES, a conflict has been identified at the ITOM meeting, resolve outside of ITOM with appropriate parties. If the conflict IS resolved with the appropriate parties, move on to CMM process. If the conflict IS NOT resolved with the appropriate parties, the change must be rescheduled and reviewed again at the ITOM meeting. If a conflict has NOT been identified at the ITOM meeting, move on to CMM process. Begin CMM Process. Has a conflict been identified at the CMM meeting? If yes, a conflict has been identified at the CMM meeting, resolve outside of CMM with appropriate parties. If the conflict IS resolved with the appropriate parties, go to step 17. If the conflict IS NOT resolved, the change must be rescheduled and reviewed again at the CMM meeting. If a conflict HAS NOT been identified at the CMM meeting, move on to next step. Relay information to Support Center for communication to users. Carry out change within Change Window (Saturday 6 pm to Sunday 12 noon). Perform Post Mortem and Documentation as appropriate. Exit. LOW Risk 1. 2. 3. 4. Communicate to Peer and with those being affected by the low level change. Carry out change at the appropriate time. Perform Post Mortem and Documentation as appropriate. Exit. Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 7 of 20 Page 7 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeManagementCategoriesChart(AssigningRisktoaChange) (Last Update: 09‐02‐09) (Page 1 of 2) E – EMERGENCY 1 – HIGH Risk 2 – MEDIUM Risk 3 – LOW Risk (with or without comm.) Impact -Major -Major -Significant -None Visibility (# users affected) -Many users or -Safety issue or -Security issue -Potentially visible to many users -Potentially visible to a few users -Potentially visible to few or no users -Difficult or impossible to back out -Involved backout Backout -Backout is not an option -Quick and easy backout Planning -Unanticipated -Not a project Severity -Production down or -Critical resources at risk -Planned -Major Project -Lengthy Install -Effects a mission critical service (i.e., Payroll…) -General system administration -Not a project -Not mission critical Impact -Major -Major -Planned -Not necessarily a project -Not a mission Critical service, backout is involved -A mission critical service, backout is trivial -Significant -Router down Examples -Network Upgrade -Change IP’s on RAS -Activating or deactivating a port -Adding a Web Page or changing it’s content (ability to back out) -Service Offline Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team -IPX to IP Cutover -Replace a perimeter server i.e., server in 1 classroom (not serving a core function -None Last Updated: 09‐24‐09 Page 8 of 20 Page 8 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS Change Management Categories Chart (Assigning Risk to a Change) E – EMERGENCY 1 – HIGH Risk Examples, continued -Banner Upgrade -Service Pack -IIS server hacked -Deactivating a server -Email Server infected with a virus -Windows Service Pack for an OS; Service Release for an application -Upgrading to a new version of an application or OS -Relocating or moving a riser cable in building -Replacing a broken machine in part or in whole -Carrier on phone switch burned out or bad -Cut voice tie line 3 – LOW Risk -Upgrade of a Server to a new level -Move a service onto a new server -Moving a printer -Writing a Banner script/report -Moving data from one server to another -Downing a server, for PM -Running new CAT5/ Fiber tie lines to switches & hubs -Relocating or moving a Tie Line -Hardware Tie links to other campus go down -Cut or broken fiber (Page 2 of 2) 2 – MEDIUM Risk (with or without comm.) -Changing permissions -Stopping/Starting a NT service -Windows security patch (when an immediate threat is not present) -Ghosting a computer lab machine -Unlocking audix box -Bad jack on the wall -Bad patch cord/line cord/ hand set cord -Malfunctioning phone -T1 down Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 9 of 20 Page 9 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS Change Management Categories Chart (Assigning Risk to a Change), continued E – EMERGENCY 1 – HIGH Risk 2 – MEDIUM Risk 3 – LOW Risk Impact -Major -Major -Significant -None Visibility -Many users or -Safety issue or -Security issue -Potentially visible to many users -Potentially visible to a few users -Potentially visible to few or no users -Backout is not an option -Difficult or impossible to back out -Involved backout -Quick and easy backout Planning -Unanticipated -Not a project Severity -Production down or -Critical resources at risk -Planned -Major Project -Lengthy Install -Effects a mission critical service (i.e., Payroll…) -Planned -Not necessarily a project -Not a mission critical service -Backout is involved -A mission critical service, backout is trivial -General system administration -Not a project -Not mission critical -Change IP’s on RAS -Activating or deactivating a port -Adding a Web Page or changing it’s content (# users affected) Backout (ability to back out) Examples -Network Upgrade -Router down -Service Offline -IPX to IP Cutover -Service Pack -Banner Upgrade -IIS server hacked -Deactivating a server -Email Server infected with a virus -Windows Service Pack for an OS; Service Release for an application -Upgrading to a new version of an application or OS -Replacing a broken machine in part or in whole Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team (Page 3 of 3) -Replace a perimeter server i.e., server in 1 classroom (not serving a core function -Upgrade of a Server to a new level -Move a service onto a new server -Moving a printer -Moving data from one server to another -Downing a server, for PM -Writing a Banner script/report -Changing permissions -Stopping/Starting a NT service -Windows security patch (when an immediate threat is not present) -Ghosting a computer lab Machine Last Updated: 09‐24‐09 Page 10 of 20 Page 10 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS E – EMERGENCY -Carrier on phone switch burned out or bad -Cut voice tie line -Cut or broken fiber 1 – HIGH Risk 2 – MEDIUM Risk Examples, continued -Relocating or moving -Running new CAT5/ a riser cable in building Fiber tie lines to switches & hubs -Relocating or moving a Tie Line -Hardware Tie links to other campus go down -T1 down 3 – LOW Risk -Unlocking audix box -Bad jack on the wall -Bad patch cord/line cord/ hand set cord -Malfunctioning phone Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 11 of 20 Page 11 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ProceduretoAssignRisktoaChange (Determining the Change Category) What constitutes an EMERGENCY change? 1. Impact: Major 2. Visibility: Many users will be affected by the change. There is a safety issue involved. There is a security issue involved. 3. Backout: Back out of the change is not an option. 4. Planning: The change was unanticipated. The change is not a project. 5. Severity: Production is down and needs to be brought back up. Critical Resources are at risk. What constitutes a HIGH Risk change? 1. Impact: Major 2. Visibility: Potentially many users could be affected. 3. Backout: It may Difficult or Impossible to back out. 4. Planning: The change is planned. The change is a Major Project The change could be a Lengthy Install. 5. Severity: The change affects a mission critical service. Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 12 of 20 Page 12 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS What constitutes a MEDIUM Risk change? 1. Impact: Significant 2. Visibility: Potentially a few users could be affected. 3. Backout: Could be either involved or trivial (look at Severity). 4. Planning: The change is planned The change is not necessarily a project. 5. Severity: Not a mission critical service; however backout is involved. Is a mission critical service; however, backout is trivial. What constitutes a LOW Risk change? 1. Impact: None 2. Visibility: Potentially a few or no users could be affected. 3. Backout: Back out is quick and easy. 4. Planning: Usually general system administration. Not a project. 5. Severity: Not mission critical. Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 13 of 20 Page 13 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS SchedulingaChange Scheduling a Change Implement Change H M/C M M T W R F S S M T W R F S S M T W R F S S M T W R F S S I T O M I T O M I T O M I T O M C M M C M M C M M C M M ITOM – IT Operations Meeting Each Thursday CMM – Change Management Meeting Each Thursday H – High Risk M – Medium Risk M/C – Medium requiring communication to users 1 Last Update: 09-02-09 Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 14 of 20 Page 14 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeManagementImplementationRequirementsChart Last Update: 09-03-09) (Page 1 of 2) Change Calendar Tech. Review Communications Management Review Timing -N/A*-4 -One person takes the lead and pulls in anyone else needed -Support Center before & after the change -Management responsible to get information & communicate to users -Technical Lead delegates communications -Management approval (if not available, contact Support Center) -ASAP -Anytime or scheduled off hours -Not necessarily during the window -2 weeks or more -Core Group -Other appropriate staff -Appropriate vendors -Advanced notices to those effected -Project Manager is responsible for communication inside & outside group -Change Meeting -Formal manager review required -Change window or -Scheduled E E M E R G E N C Y 1 H I G H Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 15 of 20 Page 15 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeManagementImplementationRequirementsChart,continuedPage2 of 3 Change Calendar Tech. Review Communications Management Review Timing 2 -1 week or more -At least peer -Maybe vendor -Lead Technician communicates with all parties involved -Change Meeting -Managers are notified -No formal review is required -Change window -N/A -Maybe Peer if appropriate -Person making change to whoever necessary if applicable -N/A -Appropriate time M E D I U M 3 L O W Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 16 of 20 Page 16 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS Change Management Implementation Requirements Chart, continued Test Plan Documentation Post Review (Page 3 of 3) E -N/A -Historical data, tracked for vendor accountability -Documentation kept in area by the Team -Post mortem -Appropriate process improvements -Communicate with management and peers -Monitor results of change -Document test procedure and present to all -Dry run offline if possible -Post docs on test results -Repeat if necessary -Project Manager develops & collects all documentation at central location -Project Manager will determine documentation requirements: layout, content… -Tie up loose ends/post mortem -Appropriate process improvements -Communicate with management and peers -Formally monitor change results -Devise a test procedure & share with Peers -Implement test & analyze results -Determined by & kept in area of the Team -Audience is peers -Appropriate process improvements -Technician monitors results of change -N/A -N/A -Monitor or test change as appropriate E M E R G E N C Y 1 H I G H 2 M E D I U M 3 L O W Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 17 of 20 Page 17 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeCalendarEntry Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 18 of 20 Page 18 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS ChangeCalendar‐MonthlyView Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 19 of 20 Page 19 of 20 EXHIBIT N: ITS CHANGE MANAGEMENT PROCESS PresentationtoChangeAdvisoryBoard Change Title: XYZ Revision: 2009-09/11 Author: Problem/Description: text Impact: Change Category: INFO|Low|Medium without communication| Medium with Communication|High Disaster Recovery: System/Environmental: Users: Security: PCI Implications?: Other: This change will have Y impact on Disaster Recovery or n/a. This change will have X impact on Banner or n/a. This affects the users by Y or n/a. This change has Z potential security issues (Steps taken to mitigate risks…) or n/a. Goal: text Schedule: text Implementation Plan: text Test Plan: text Backout Plan: text Lead: ITS Associate Director Stakeholders: ITS Technical Leads & Mgmt. Team Last Updated: 09‐24‐09 Page 20 of 20 Page 20 of 20
© Copyright 2026 Paperzz