Central New Mexico Community College Purchasing Department 525 Buena Vista SE, Building A, Room #A128 Albuquerque, NM 87106 / 87196-4586 REQUEST FOR BIDS NUMBER: T-2752 DUE DATE: Friday, April 10, 2009 BUYER: Gil Rivera Telephone number: 505-224-4549 Fax number: 505-224-4548 E-mail address: [email protected] NUMBER OF RESPONSES REQUIRED: One (1) Original and One (1) Copy TITLE: On-Demand Structured Data Communications Cabling Services TIME: 4:00 PM local time (MDT) Mandatory Bidder’s Conference and Site Survey is scheduled for April 3, 2009, 10AM MDT. Bidders to meet at the Purchasing Office located at 525 Buena Vista SE, Building A, Room #A128 Albuquerque, NM 87106. FREIGHT TERMS: FOB Destination Freight Included PAYMENT TERMS: Net 30 Days INSTRUCTIONS TO BIDDERS: The Central New Mexico Community College (CNM) invites you to submit a bid on the material and/or services specified within this Request for Bids. Please read carefully all instructions, specifications, terms and conditions. Failure to comply with the instructions, specifications, terms and conditions of the Invitation may result in your bid being declared non-responsive. The purchase of materials and/or services awarded under this Invitation are subject to CNM's General Terms and Conditions as well as all statements contained in this Request for Bids. All terms and conditions of the Request for Bids will remain unchanged for the duration of any resultant agreement(s) and will supersede and take precedence over any bidder agreement forms. Additional or different terms proposed by the Vendor/Contractor are hereby rejected. New Mexico criminal law prohibits bribes, gratuities and kickbacks (13-1-28 through 13-1-199, NMSA 1978). To bid on the goods or services specified herein, type or print the information requested in the spaces provided on the response form. All blank spaces for bid prices, manufacturer’s name and product number offered, delivery, warranty, etc. must be written in ink or typed. Corrections shall be initialed in ink by person signing the bid. When bidder makes mistakes in calculating total price where quantities are involved, the unit price shall prevail. If you wish to offer more than one bid for a single item or group of items specified, copy the response form and fill in all spaces by typing or printing in ink. Clearly label the top as an alternate bid, and submit all responses in the same envelope as the original bid. Submit the number of copies of your bid specified above. Each copy is to include all supporting documentation. Failure to submit the required number of copies may result in your bid being considered non-responsive. The completed bid package must be placed in a sealed envelope and submitted to the above address no later than the time and date specified above. Failure to properly identify this RFB number and Bid Due Date and Time on the lower left outside corner of your sealed proposal envelope may result in either premature opening of your proposal or failure to open it upon the correct closing date and time. Note:Any and all clarifications of instructions, specifications, scope, requirements, terms and conditions, insurance, bonds, or bid preparation, etc. shall be made only by the Buyer listed above. All requests for clarification or exception to instructions, terms and conditions, specifications, requirements, scope, insurance, bonds, or bid preparation, etc. must be made in writing, addressed to the Buyer listed above, and submitted no later than five (5) days prior to the bid due date. Technical questions concerning the requirements of the requester should be directed to the technical clarification contact listed above. If appropriate, CNM Purchasing shall issue a written Amendment/Addendum which shall thereafter become part of this Request for Bids. No oral interpretations shall be binding upon CNM unless reduced to a written amendment issued by CNM Purchasing prior to the bid due date and time. TABLE OF CONTENTS: SECTION A: SECTION B: SECTION C: SECTION D: SECTION E: SECTION F: SECTION G: SECTION H: EXHIBIT A: EXHIBIT B: EXHIBIT E: EXHIBIT F: EXHIBIT G: EXHIBIT H: EXHIBIT I: EXHIBIT J: ATTACHMENT 1 ATTACHMENT 2 ATTACHMENT 3 ATTACHMENT 4 PAGE #: CNM Standard Bid Terms and Conditions CNM General Terms and Conditions Scope of Work Contractors General Requirements Instructions to Bidders Insurance Requirements Change Order Terms & Conditions Modification Change Request (MCR) and Change Order forms Scope of Work for Project #1 Response form for Project #1 Response form for Parts/Materials & Equipment Contractor Qualifications Statement Subcontractors Listing Contractor’s First Tier Subcontractors Payment and Performance Bond Requirements Signature of Firm’s Authorized Representative and Debarment/Suspension Status & Non-Collusion Affidavit Small and Small Disadvantage Business Certification form State of New Mexico Department of Labor Wage Rate Decision number: BE-09-0197 B – link on website AIA A101 – link on website CNM’S Communication Infrastructure Standards Manual (CISM) – link on website Drawing, “CNM Wireless Deployment Project” – link on website 1 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 2-9 10 11 – 26 27 – 35 36 37 38 – 40 41 – 47 48 – 51 52 – 53 54 55 – 56 57 58 59 – 60 61 SECTION A: CNM STANDARD BID TERMS AND CONDITIONS FOR BID #T-2752 1. ACCEPTANCE. Equipment and/or Services - Right to reject; specifications. (I) All equipment and/or services furnished will be subject to inspection and testing by buyer and buyer's agents upon arrival and after installation. Any equipment and/or services found by buyer in its sole discretion to be not in accordance with the specifications, drawings, plans, instructions, performance criteria, samples or other description furnished or adopted by buyer for the order or otherwise not in conformance with the terms of the order shall be subject to rejection, return and back charge as appropriate, together with the necessary costs of handling and shipping. Buyer's payment of all or any part of the purchase price prior to such inspection, testing and non-acceptance of the equipment and/or services involved shall not constitute a waiver of any of buyer's rights hereunder. (II) When supplier believes that the work and equipment are "finally completed", it shall notify buyer in writing and upon receipt of said notice, buyer shall inspect the work and either accept such work as being "finally completed" or identify in writing to supplier that the work is not finally completed in the opinion of buyer and state specifically why buyer believes the work is not finally completed. The work and equipment shall be considered finally completed following successful start-up of the equipment and full operation of such equipment for a reasonable number of days or for such period of time set forth in the applicable Purchase Order, and at that time supplier shall submit a final payment application for all amounts remaining due and owing to supplier under the applicable Purchase Order. 2. ACKNOWLEDGMENT OF AMENDMENT/ADDENDUM. Bidders shall acknowledge receipt of any amendments/Addenda to this Invitation by identifying the amendment number and date in the space provided on the form labeled “Signature of Firm’s Authorized Representative”. 3. ADDRESSES FOR NOTICES. Any notice required to be given or which may be given under this Invitation or the resultant price agreement shall be in writing and delivered in person or via first class mail to the following address: Central New Mexico Community College Purchasing Department 525 Buena Vista, SE Albuquerque, NM 87106 4. 5. 6. 7. AWARD OF BIDS. CNM reserves the right to award this bid based on price and any other evaluation criteria contained herein; to reject any and all bids or any part thereof, and to accept the bid that is in the best interest of CNM. 8. BID NEGOTIATION. Bidders will not be afforded an opportunity for discussion and revision of bids. 9. BID OPENING. Bid will be opened publicly on the bid due date and time specified on the bid cover sheet in the Purchasing Department Office. Anyone may attend the opening. 10. BID SECURITY. Bid security shall be required in a bond equal to 5% of the offered cost of both projects or the equivalent amount in a cashiers check. The bond shall be provided by a surety company authorized to do business in the State of New Mexico. The bid security will be returned to the successful contractor upon completion of the work. The bid security of the unsuccessful bidders will be returned upon award of the resultant price agreement. 11. CANCELLATION. CNM reserves the right to cancel without penalty this Invitation, the resultant price agreement or any portion thereof for unsatisfactory performance, unavailability of funds, or when it is in the best interest of CNM. 12. CHANGES/ALTERATIONS AFTER AWARD. Changes or alterations after the award can only be made if agreed to in writing by CNM. 13. CLAIMS FOR ADDITIONAL TIME. If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor's Claim shall include an estimate of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay only one Claim is necessary. 13.1 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction. 13.2 Injury or Damage to Person or Property. If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter. ALTERNATE BIDS. The brand names, part and or catalog numbers are used to describe the standard of quality, performance and characteristics desired and are not intended to limit or restrict competition. Alternate bids will be accepted and considered, unless otherwise specified in the supplementary bid terms and conditions, provided they are equal to and meet all specifications of this Invitation which may include all specifications of the Brand used to identify the quality of the goods and/or services requested. If offering a brand, part or catalog number other than that listed, please indicate items offered and include literature and or technical specifications. Failure to do so may cause offer to be declared non-responsive. CNM reserves the right to make the final determination of whether an alternate bid is equal. It is the contractor's responsibility to provide, as part of the bid, descriptive literature and specification information on all alternates bid. If the bid is not clearly identified as an alternate item, it is understood that the items are bid as specified. 14. CLEAN UP. It is the contractor's responsibility that the job site be kept clean and free of rubble while work is performed under the resultant price agreement. Upon completion of the work, all areas shall be cleared of all contractor's equipment, excess materials and rubble, and the site shall be left broom clean. Disposal of any debris shall be to an appropriate disposal site in accordance with any laws applicable to the type of material being disposed. 15. APPROVALS REQUIRED. The resultant agreement shall not be binding on CNM unless approved by the respective vice president and the comptroller prior to services being rendered. CONFIDENTIALITY. Any information provided to or developed by the Contractor in the performance of the resultant agreement shall be kept confidential and shall not be made available to any other individual or organization by the Contractor without prior written approval of CNM. 16. AWARDS. CNM reserves the right to make multiple awards of the items, projects and/or sections of this Invitation. Price agreements may be awarded on a unit basis for each individually numbered item to the lowest responsible bidder; or when a group of items have been consolidated for uniformity, it may be necessary to bid all inclusive items to receive consideration. CONSTRUCTION RECORD DRAWINGS. The successful contractor will be required to provide CNM, upon completion of the work, three (3) sets of record drawing(s) showing any changes from the contract drawings (especially electrical, plumbing, utility lines, etc.) added or affected by the work the contractor has performed, unless provisions for pre-approval of drawings is contained elsewhere in this Invitation. 17. CONTRACT. CNM’s purchase order shall be considered the binding agreement/contract. In the event of any inconsistent or incompatible 2 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. restored to their original condition at the contractor's expense, including but not limited to cleaning and painting. The contractor shall be responsible for security of all his/her equipment and for the protection of work done under the resultant price agreement until final acceptance of the work. provisions, the purchase order (excluding contractor’s bid) shall take precedence, followed by the provisions of the Request for Bids, and then lastly, the terms of the Vendor’s/Contractor’s bid response. 18. CONTRACTOR GUARANTEE. The contractor shall guarantee all materials, equipment and workmanship furnished and or installed to be free of defects and shall agree to replace solely at his/her expense any and all defective equipment, parts, etc. within a one year period after the date of acceptance of the items and or installation by CNM, unless otherwise agreed to in writing at the time of award. 19. CONTRACTOR SCHEDULE REQUIRED. The contractor shall include a proposed schedule for completion of work under this Invitation. It should contain an itemized break down of all items and projects, including testing dates if applicable. 20. CORRECTION OF WORK 20.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION. The Contractor shall promptly correct Work rejected by CNM or failing to conform to the requirements of the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated, installed or completed. Costs of correcting such rejected Work, including additional testing and inspections and compensation for CNM's services and expenses made necessary thereby, shall be at the Contractor's expense. 20.2 AFTER SUBSTANTIAL COMPLETION. In addition to the Contractor’s obligation under Warranty, if within one (1) year after the date of acceptance and approval of the Final Application for Payment of the work, or after the date for commencement of warranties established under partial use, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from CNM to do so, unless CNM has previously given the Contractor a written acceptance of such condition. 20.3 The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual performance of the Work. This obligation under this Subparagraph 20.3 shall survive acceptance of the Work under the Contract and termination of the Work under the Contract and termination of the contract. 20.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of CNM or separate contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements of the Contract Documents. 20.5 Nothing contained in this Section 20.5 shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Documents. Establishment of the one-year period for correction of Work as described in Section 20.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct the Work. 21. 22. COST ANALYSIS/BREAKDOWN REQUIRED. If requested, a cost analysis or cost breakdown of the offered cost shall be submitted with your response. The cost analysis information may be marked as confidential if it includes information you feel is proprietary to your operation. The total offered cost cannot be considered confidential. DAMAGE AND SECURITY OF CNM PROPERTY. The contractor shall be responsible for all damage to persons or property that occurs as a result of his/her fault or negligence, or that of any of his/her employees, agents and or subcontractors. He/she shall save and keep harmless CNM against all loss, cost, damage, claims, expense or liability in connection with the performance of the resultant price agreement. Any equipment or facilities damaged by the contractor's operations shall be repaired and or 3 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 23. DELIVERY. Delivery is an important consideration and may be a factor in determining any award. Delivery to be made at the campus and building per individual project. 24. DELIVERY DELAYS. If after award, the contractor becomes aware of possible problems that could result in delay in the agreed-to delivery schedule, the contractor must immediately notify the Buyer or the designated representative. The initial notification of the delay may be verbal with a written confirmation, giving the probable cause and effect, with recommendations for alternate action. Nothing in this paragraph will be interpreted as relieving the contractor of his/her contractual obligations. However, failure to notify CNM promptly will be a basis for determining the contractor responsibility in an otherwise excusable delay. 25. DISCREPANCIES. If any bidder is of the opinion that the bid specifications as written preclude him/her/it from submitting a response to this Invitation to Bid, it is specifically requested that the bidder’s opinion be made known to the Buyer, in writing, at least five (5) days prior to the established bid opening date. 26. DISRUPTION OF NORMAL ACTIVITY. All work shall be performed so as not to interfere with normal CNM activities. When it is necessary to disrupt normal activities, the schedule of work and the areas to be affected must be approved by CNM's authorized representative prior to commencement of the work. 27. EMPLOYEE CERTIFICATION. The contractor and all contractor's employees utilized on the work to be performed under this Invitation must have the proper certification(s) and license(s) to comply with State and local requirements connected to this invitation. The contractor shall use only fully qualified and approved service technicians to perform inspections, service and or repairs under this Invitation. 28. EQUIPMENT REQUIRED. The contractor shall be responsible for updating and maintaining all equipment and materials necessary to complete the work under this Invitation except as otherwise noted in the Specifications. 29. EXCLUSIVE RIGHTS. Under no circumstances shall this Agreement be construed or deemed to be a contract whereby CNM grants Contractor exclusive right to furnish CNM its needs or requirements for services described herein. 30. FINANCIAL STATEMENTS REQUIRED. If requested, all bidders may be required to submit their most recent Income Statement, Balance Sheet, and Statement of Cash Flows. 31. FORCE MAJEURE. Neither party to the resultant agreement will be liable to the other for any failure or delay in performance under the resultant agreement due to circumstances beyond its reasonable control including, but not limited to, acts of God, accidents, labor disputes, acts or omissions and defaults of third parties, and official, government or judicial action not the result of negligence of the party failing or late in performing. 32. GENERAL TERMS AND CONDITIONS. CNM's General Terms and Conditions are an equal and integral part of this Invitation. 33. GOVERNING LAW. This Invitation and the resultant price agreement will be interpreted and governed by the Laws of the State of New Mexico. 34. INDEMNIFICATION. To the fullest extent permitted by law, the Contractor shall indemnity and hold harmless the Owner (CNM), Architect, Architect’s consultants, and agents, officers, and employees of any of them, against liability, claims, damages, losses, and expenses, including but not limited to attorneys fees, arising out of or resulting from performance of the Work , provided that such claim, damage, loss, or expenses is attributable to bodily injury, sickness, disease, or death, or to The wording “will endeavor” is not acceptable. Contractor surety shall provide Owner with a transmittal letter stating that all insurance documents have been reviewed and have met or exceeded the contract document requirements. physical injury to real or personal property, including the loss of use resulting therefrom, but only to the extent that the liability, damages, losses, or costs are caused by, or arise out of, the acts or omissions of the Contractor or its officers, employees, or agents. Both parties to this Contract represent and agree that this indemnity provision is valid and enforceable and meets the requirements of N.M. Stat. Ann. § 56-7-1 (1978 as amended). In addition, Contractor, if requested by Owner, shall deliver to Owner (within 10 days of Owner's request) a certified copy of any policies called for herein. Contractor shall also immediately furnish Owner with copies of any endorsements, addenda, or amendments to such policies. If Owner is damaged by Contractor's failure to obtain and maintain the insurance called for herein, then Contractor shall be liable to Owner for all costs, expenses, and damages resulting therefrom. All insurance policies to be furnished by Contractor under the Contract Documents shall be subject to approval by Owner. All policies shall be on an occurrence (as opposed to claims made) basis. In claims against any person or entity indemnified under this Section 32 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Section 32 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts. 35. 36. INSPECTIONS. The contractor shall be responsible for securing at his/her expense, all required inspections to comply with Federal, State, and or local regulations governing the work performed under this Invitation. CNM will inspect all work done under this invitation to verify compliance with specifications contained herein. The contractor shall call for all required inspections and have a representative present at all inspections. INSURANCE REQUIREMENTS. The contractor is required to carry insurance meeting the requirements in the Exhibit labeled "INSURANCE REQUIREMENTS" or as noted in the specifications. Contractor must submit the Certificate of Insurance to the appropriate Buyer prior to commencing work under the resultant price agreement. Insurance must remain in effect for the entire term of the resultant price agreement and must be extended to coincide with any future price agreement extension. This Request for Bids Number must appear on the Certificate of Insurance. Note: A potential contractor or the Contractor agrees to comply with state laws and rules pertaining to workers’ compensation insurance coverage for its employees. If a contractor fails to comply with the Workers’ Compensation Act and applicable rules when required to do so, the contract may be canceled immediately. 37. INVITATION IS ENTIRE AGREEMENT. This Invitation constitutes the entire agreement between the parties with respect to its subject and shall not be modified, altered nor amended in any way except as provided for in this Invitation. 38. INVITATION TERMS PART OF CONTRACT. This Invitation along with its attachments will be considered to be part of the resultant price agreement and or purchase order and is to be incorporated by reference. 39. LATE SUBMISSIONS. Late submissions of bids will not be considered unless it is determined by CNM that the late receipt was due solely to mishandling by CNM or if the bid is the only one received. All other late submissions will be returned unopened. 40. LICENSES/PERMITS/EASEMENTS. The contractor shall be responsible for obtaining, at his/her expense, all easements, right-of-ways, accesses, licenses, permits, and utility locations required to perform the work under this Invitation. 41. MEDIATION. Notwithstanding any provision of any Contract Document to the contrary, any claim, dispute or other matter in question between the Contractor and the CNM and except to those which have been waived by the making or acceptance of final payment shall be subject to mediation pursuant to and under the provisions of the New Mexico Public Works Mediation Act, NMSA 1978 § 13 4C 1 et seq. as amended. A party seeking to resolve a dispute under this Agreement or any of the Contract Documents shall proceed under the procedures and provisions of the Public Works Mediation Act. 42. MODIFICATIONS. Only modifications received prior to the time specified for the closing will be accepted. No modifications will be accepted following the opening. Technical clarifications of the offer may be requested by the Buyer following the opening. 43. NEW MATERIALS REQUIRED. All materials and equipment delivered and or installed under this Invitation shall be new and be the standard products of a manufacturer regularly engaged in the production of the materials and equipment (unless otherwise specified in the supplementary bid terms and conditions). Where two or more units of the same class of materials and or equipment are required, the units shall be the products of the same manufacturer. Any manufacturer's data supplied with the items shall be submitted to CNM's authorized representative. 44. NON-PERFORMANCE PENALTIES. The contractor agrees to pay CNM $1,500.00 per day per individual project for each calendar day past the completion date specified in the resultant purchase order that completion or delivery is delayed. CNM may subtract this amount from any monies due to the contractor. 45. NUMBER FOR BID CLARIFICATION. The Bidder should include a local or toll-free number for bid clarifications. Failure to do so may result in the bid being declared non-responsive. 46. OPTION TO RENEW. CNM reserves the option to renew the resultant agreement, contingent upon fiscal funding and contractor performance as provided for within Section 13-1-150 NMSA 1978, if such renewal is found to be in the best interests of CNM. Renewal options will be The insurance required shall be written for not less than limits of liability specified in the Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from date of commencement of the Work until date of final payment and termination of any coverage required to be maintained after final payment. General Requirements: Contractor shall not commence nor continue to perform any Work unless he, at his own expense, has in full force and effect all insurance required by the Contract Documents. The Contractor shall not permit any Sub contractor to perform Work on the Project unless the Worker's Compensation Insurance requirement have been complied with by such Subcontractor. The types of insurance the Contractor shall obtain and maintain are set forth herein. Worker's Compensation Insurance and Liability Insurance shall be maintained in full force and effect for the full warranty period provided for in the Contract Documents. Insurers must be authorized to do business (and have an agent for service of process) in New Mexico and either (1) have an "A" policyholder's rating and a financial rating of at least Class XI in accordance with the most current Best's Rating; or (2) be acceptable to Owner as evidenced by Owner's written approval of such Insurer. If by the terms of any insurance to be provided herein, any mandatory deductibles are required, or if Contractor should so elect, with the written concurrence of Owner, to increase the mandatory deductible amounts or purchase insurance with voluntary deductible amounts, the Contractor shall be responsible (without entitlement to any reimbursement from Owner) for payment of the amount of the deductible in the event of a paid claim. Certificates of insurance (and endorsements) must be on forms acceptable to Owner delivered to Owner prior to commencement of the Work. The Contractor shall furnish a Certificate of Insurance under either AIA Document G705 or ACORD 25 S (11/85) Form. The Certificate shall include a 30 day cancellation clause. The Certificate must include the provision the insurance company will mail 30 day written notice to Owner. 4 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. exercised in increments of one-year terms unless otherwise agreed to by both parties. 47. OWNERSHIP OF MATERIAL. During the term of the resultant agreement, ownership of all data, material, and documentation originated and prepared by the contractor for CNM shall belong exclusively to CNM. 48. PACKAGING. Packaging of materials shall be suitable to insure that the materials are received in an undamaged condition. All material returns will be at the contractor's expense. 49. PAYMENTS AND COMPLETION. 49.1 CONTRACT SUM. The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by CNM to the Contractor for performance of the Work under the Contract Documents. 49.2 SCHEDULE OF VALUES. Before the first Application for Payment, the Contractor shall submit to CNM a schedule of values allocated to various portions of the Work, prepared in such form and supported by such data to substantiate its accuracy as CNM may require. This schedule shall be used as a basis for reviewing the Contractor's Applications for Payment. 49.3.2.1 49.4 PROGRESS PAYMENTS. After CNM has issued a Certificate for Payment, CNM shall make payment in the manner and within the time provided in the Contract Documents. The schedule provided by Contractor under Subparagraph 65. shall not be effective unless also submitted to CNM and not objected to within a reasonable time. 49.4.1 49.3 CERTIFICATES FOR PAYMENT. CNM will, within Seven days after receipt of the Contractor's Application for Payment, either issue a Certificate for Payment, with a copy to the Contractor, for such amount as CNM determines is properly due, or notify the Contractor in writing of CNM's reasons for withholding certification in whole or in part provided in Section 49.3.2. 49.3.1 49.3.2 The issuance of a Certificate for Payment will constitute a representation by CNM based on CNM's evaluation of the Work and the data comprising the Application for Payment, that the Work has progressed to the point indicated and that, to the best of CNM's knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to correction of minor deviations from the Contract Documents prior to completion and to specific qualifications expressed by CNM. The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a Certificate for Payment will not be a representation that CNM has (1) made exhaustive or continuous onsite inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by CNM to substantiate the Contractor's right to payment, or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum. The Contractor shall promptly pay each Subcontractor, upon receipt of payment from CNM, out of the amount paid to the Contractor on account of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar manner. 49.5 FAILURE OF PAYMENT. If CNM does not issue a Certificate for Payment, through no fault of the Contractor, within the time allowed by law and provided in the Contract Documents after receipt of the Contractor’s Application for Payment, or if CNM does not pay the Contractor within seven (7) days after the date established in the Contract Documents the amount certified by CNM or awarded by a final judgment of a court of competent jurisdiction, then the Contractor may, upon seven (7) additional days written notice to CNM, stop the Work until payment for the amount owing has been received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor’s reasonable cost of shutdown, delay and start up. 49.6 SUBSTANTIAL COMPLETION. The date of Substantial Completion of the work or designated portion thereof shall be determined by CNM's Representatives signing the AIA Document #G704 Certificate of Substantial Completion or agreed to document. This date shall commence on or before a date to be specified in a written "Notice to Proceed" of CNM; and the construction is to be sufficiently complete, in accordance with the Contract Documents, so CNM can occupy or utilize the area or designated portion thereof for the use for which it is intended. For new construction, the Certificate of Substantial Completion shall not issue before the final Certificate of Occupancy is issued by the appropriate code authority. DECISIONS TO WITHHOLD CERTIFICATION. CNM may withhold a Certificate for Payment in whole or in part, if in CNM's opinion the representations required by Section 49.3.1 cannot be made. If CNM is unable to certify payment in the amount of the Application, CNM will notify the Contractor as provided in Section 49.3. If the Contractor and CNM cannot agree on a revised amount, CNM will promptly issue a Certificate for Payment for the amount for which CNM is able to make. CNM may also withhold a Certificate for Payment or, because of subsequently discovered evidence, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be necessary in CNM's opinion to protect CNM from loss for 5 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. which the Contractor is responsible, including loss resulting from acts and omissions, because of: a) defective Work not remedied; b) third party claims filed or reasonable evidence indicating probable filing of such claims unless security acceptable to CNM is provided by the Contractor; c) failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; d) reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; e) damage to CNM or another contractor; f) reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or g) persistent failure to carry out the Work in accordance with the Contract Documents. When the above reasons for withholding certification are removed or satisfied, certification will be made for amounts previously withheld. 49.6.1 When the Contractor considers that the Work, or a portion thereof which CNM agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to CNM a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. 49.6.2 Upon receipt of the Contractor's list, CNM will make an inspection to determine whether the Work or unless these potential additional costs have been identified in the original offer. designated portion thereof is substantially complete. If CNM's inspection discloses any item, whether or not included on the Contractor's list, which is not sufficiently complete in accordance with the Contract Documents so that CNM can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by CNM. In such case, the Contractor shall then submit a request for another inspection by CNM to determine Substantial Completion. 49.6.3 55. 55.2 SAFETY OF PERSONS AND PROPERTY. The Contractor shall be responsible for taking reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: 55.2.1 employees on the Work and other persons who may be affected thereby; 55.2.2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Subsubcontractors; and 55.2.3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction and the Contractor shall be responsible for paying for the repair or replacement of any such lost, or stolen, or damaged Work, materials, equipment or property. When the Work or designated portion thereof is substantially complete, CNM will prepare a Certificate of Substantial Completion which shall establish the date of Substantial Completion, shall establish responsibilities of CNM and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. 55.3 The Work and materials and equipment to be incorporated therein, stored on site, under care, custody or control of the Contractor or Contractor's Subcontractors or Sub subcontractors; and 49.7 FINAL COMPLETION AND FINAL PAYMENT. Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, CNM will promptly make such inspection and, when CNM finds the Work acceptable under the Contract Documents and the Contract fully performed, CNM will promptly issue a final Certificate for Payment stating that to the best of CNM's knowledge, information and belief, and on the basis of CNM's onsite visits and inspections, the Work has been completed in accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor and noted in the final Certificate is due and payable. 50. 51. 52. 53. 54. 55.4 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. 55.5 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. PAYMENT DISCOUNTS. CNM will take advantage of payment discounts offered whenever possible; however, payment discounts will not be used as a means to determine the lowest responsible bidder. 55.6 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. PERFORMANCE AND PAYMENT BONDS. A performance bond and a payment bond, covering materials and labor, each in the amount of 100% of the resultant price agreement cost is required. The bond must be executed by the bidder with a surety company authorized to do business in New Mexico or other suitable sureties approved by the State Board of Finance. The performance and payment bonds must be received by the buyer issuing the award prior to the commencement of work, or within 14 days of the award, whichever is soonest, and must reference this Request for Bids Number on the face of the documents. 55.7 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Section 55.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Section 55.3, except damage or loss attributable to acts or omissions of CNM or anyone directly or indirectly employed by them, or by anyone for whose acts may be liable, and not attributable to the fault or negligence of the Contractor. PERIOD FOR BID ACCEPTANCE. The Bidder agrees, if his/her bid is accepted within 90 calendar days of the closing date, to furnish the goods and services at the prices set forth in his/her bid, delivered to the designated point(s) within the specified time in the delivery schedule. Failure to comply may result in removal from the bidlist. An additional time period may be requested elsewhere in this Invitation. 55.8 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to CNM. POTENTIAL COSTS UNSPECIFIED. The contractor shall include in his/her bid all material and labor costs known to be required to complete the work under this Invitation including any materials, labor or other costs that are not specifically identified in the specifications. Any unspecified costs should be identified and included as a separate item in the price bid. 55.9 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety. 55.10 HAZARDOUS MATERIALS. If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to CNM in writing. POTENTIAL COSTS-UNSPECIFIED, RENTAL. The contractor shall include as a separate item any unspecified additional cost which may be incurred by CNM as a result of a rental under this Invitation. This may include but should not be limited to responsibility for damages to equipment, excessive wear charges, insurance, etc. Please note that no additional costs will be paid by CNM on rentals under this Invitation 6 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. PROTECTION OF PERSONS AND PROPERTY. 55.1 SAFETY PRECAUTIONS AND PROGRAMS. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract. 55.10.1 55.10.2 bidder (i.e., prove that his/her financial resources, production or service facilities, personnel, service reputation and experience are adequate to make satisfactory delivery of the services, construction or items of tangible personal property described in the invitation for bids). Bidder shall provide audited financial statements if requested by CNM. CNM shall obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to verify that it has been rendered harmless. Unless otherwise required by the Contract Documents, CNM shall furnish in writing to the Contractor the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor will promptly reply to CNM in writing stating whether or not either has reasonable objection to the persons or entities proposed. If the Contractor has an objection to a person or entity proposed by CNM, CNM shall propose another to whom the Contractor has no reasonable objection. When the Material or substance has been rendered harmless, Work in the affected area shall resume upon written agreement of CNM and Contractor. The Contract Time shall be extended appropriately and the Contract Sum shall be increased in the amount of the Contractor’s reasonable additional costs of shut-down, delay and start-up, which adjustments shall be accomplished as provided in SECTION G. EMERGENCIES. In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in SECTION G. 56. PUBLIC INFORMATION. All information, except that marked as confidential, will become public information at the time that the Bid is opened. Confidential information must be marked "CONFIDENTIAL" in red letters in the upper right hand corner of the sheets containing the confidential information. Price and information concerning the specifications cannot be considered confidential. 57. PUBLIC WORKS BONDS. Performance bonds must meet the requirements of 13-4-18 NMSA, 1978. 58. REFERENCES REQUIRED. Bidder may be asked to furnish the minimum number of references requested herein. Failure to submit the information may result in your bid being considered non-responsive. Bidder, by furnishing these references, agrees to allow CNM to contact any person or organization listed, and to utilize information obtained in the evaluation of the bid response. 59. RELEASES. Upon final payment of the amount due under the terms of the resultant agreement, the Contractor shall release CNM, its officers and employees from all liabilities, claims and obligations arising from or under the terms of the resultant agreement. The Contractor agrees not to purport to bind CNM to any obligation not assumed herein by CNM unless CNM has expressly authorized the Contractor to do so and then only within the strict limits of that authority. 60. REPLACEMENT PARTS. The quality of all replacement parts shall be equal or greater than the quality of the original parts being replaced. All replacement parts shall be new unless otherwise agreed to in writing. 61. REPORTS AND INFORMATION. At such times and in such forms as CNM may require, there shall be furnished to CNM such statements, records, reports, data and information, as CNM may request pertaining to matters covered by all resultant agreements to this Request for Bids. 62. RESIDENTIAL PREFERENCE. In evaluating bids for purchases over $20,000 using State funds, residential preference of 5% will be used in compliance with Sections 13-1-21 of the New Mexico Statutes 1978 Annotated, Chapter 13. Federal law prohibits the use of residential preference when the expenditure involves Federal funds. 63. RESPONSIBLE BIDDER. CNM reserves the right to conduct any investigations deemed necessary to determine the responsibility of a 7 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 64. RESPONSIVENESS OF BIDS. Bidders are hereby expressly instructed that all bids in response to this solicitation shall meet all specifications and requirements of this solicitation. 65. SCHEDULE DELAYS. If after award, the contractor becomes aware of possible problems that could result in delay in completion of the work on the agreed-to schedule, the contractor must immediately notify the Buyer or the designated representative. The initial notification of the delay may be verbal with a written confirmation per Section 13, giving the probable cause and effect, with recommendations for alternate action. Nothing in this paragraph will be interpreted as relieving the contractor of his/her contractual obligations. However, failure to notify CNM promptly will be a basis for determining the contractor responsibility in an otherwise excusable delay. 66. SEVERABILITY. If any provision of the resultant agreement is found invalid or unenforceable, the remainder of the resultant price agreement will be enforced to the maximum extent permissible and the legality and enforceability of the other provisions of the resultant agreement will not be affected. 67. SIGNATURE. The response must be signed by an authorized representative in order for bid to be considered responsive. Compete and return the form labeled “Signature of Firm’s Authorized Representative” with bid response. 68. SITE FAMILIARITY. The contractor shall be responsible for thoroughly inspecting the site and work to be done prior to submitting a bid. The contractor warrants by this submission that he/she has had the opportunity to inspect the site and work to be done and that his/her offer includes all costs required to complete the work. The failure of the contractor to be fully informed regarding the requirements of this Invitation will not constitute grounds for any claim, demand for adjustment or the withdrawal of a bid after the opening. 69. SITE INSPECTION. The site(s) referenced in this document are available for inspection. Arrangements can be made by calling the contact for Technical Clarification shown on the cover page. Note, bidders shall not consider any comments made by employees of CNM to be modifications to the bid specifications unless distributed as a written amendment to this bid by CNM’s Purchasing Department. All requests for clarification must be submitted in writing to CNM’s Purchasing Department to receive consideration. Such requests must be submitted no later than five (5) days prior to the bid due date. 70. STATE AND LOCAL ORDINANCES. The contractor shall perform work under the resultant price agreement in strict accordance with the latest version of all State and local codes, ordinances, and regulations governing the work involved. All materials and labor necessary to comply with the rules, regulations and ordinances shall be provided by the contractor. Where the drawings and or specifications indicate materials or construction in excess of the code requirements, the drawings and or specifications shall govern. The contractor shall be responsible for the final execution of the work to meet these requirements. In the event of a conflict between various codes and standards, the more stringent shall apply. 71. STATUS OF CONTRACTOR. The Contractor is an independent contractor performing services for CNM and neither he/she nor his/her agents or employees shall, as a result of the resultant agreement, accrue leave, retirement, insurance, bonding authority, use of CNM vehicles, or any other benefits, prerequisites or allowances normally afforded only to employees of CNM. The contractor acknowledges that all sums received under the resultant agreement are personally reportable by him/her/her for income, self-employment and other applicable taxes. 72. SUBCONTRACTORS. Any work subcontracted by the contractor shall require the prior written approval of the subcontractor by CNM. 72.1 DEFINITIONS. A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor. 72.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subsubcontractor or an authorized representative of the Subsubcontractor. 72.3 AWARD OF SUBCONTRACTORS. All awards of subcontracts shall be in accordance with the New Mexico Subcontractors Fair Practices Act as applicable. 73. 74. 75. 76. 77. SUBCONTRACTUAL RELATIONS. By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents, assumes toward CNM. Each subcontract agreement shall preserve and protect the rights of CNM under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against CNM. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors. TELEGRAPHIC/FACSIMILE BIDS. Telegraphic/Facsimile bids will not be considered. However, bids may be modified by telegraphic/facsimile notice, provided that the notice is received by the time and date specified for the closing. 79. TERMINATION. Termination for cause. If the contractor, for any cause, fails or omits to carry out the work in an acceptable manner, CNM may give notice in writing of such failure or omission and of a reasonable time within which to cure the deficiency. Contractor shall be required to take corrective measures within such time. Contractor's failure to comply with such notice and to cure the deficiency as provided in the notice shall subject the Agreement to immediate termination by CNM. In the event of a for-cause termination, CNM shall terminate the Agreement by delivering to the Contractor a written notice of termination. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the date of delivery of the notice. Upon delivery of such notice, Contractor shall have the right to receive payment for services performed prior to termination date, including reimbursement then due. Termination for convenience of CNM. On fifteen (15) business days written notice to Contractor, CNM may terminate the Agreement in whole or in part for its own convenience in the absence of any default by Contractor. In the event of a no-cause termination, CNM shall terminate the Agreement by delivering to Contractor notice of termination without cause specifying the extent to which performance of work under the Agreement is terminated and the date upon which such termination becomes effective. The effective date of termination shall be the date stated in the notice or, if no date is stated, then the fifteenth (15) business day after delivery of the notice. Within ten (10) calendar days of the effective date of termination, Contractor shall deliver to CNM all documents and any other materials developed under the Agreement. Upon delivery of such notice, the Contractor shall have the right to receive payment for services performed to termination date, including reimbursement then due. 80. TESTS AND INSPECTIONS. Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to CNM, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give CNM timely notice of when and where tests and inspections are to be made so that CNM may be present for such procedures. SUBMISSIONS OF SAMPLES/DRAWINGS/LITERATURE. It may be necessary to test samples or have demonstrations to make an award. All samples, when required, shall be furnished free of expense to CNM. Returns shall only be made at the Bidder’s request and expense. Bid samples or descriptive literature should not be submitted unless expressly requested; and, regardless of any attempt by a bidder to condition the bid, unsolicited bid samples or descriptive literature shall be submitted at the Bidder’s risk. 80.1 The Contractor shall notify CNM 48 hours in advance before covering up any concealed work, or conducting any tests by any trade on the Work. 80.2 Tests and inspections not explicitly assigned to CNM are Contractor’s responsibility. Unless otherwise indicated, Contractor shall provide quality-control services specified and those required by authorities having jurisdiction, whether specified or not. SUCCESSORS AND ASSIGNS. CNM and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. Neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. 80.3 If such procedures for testing, inspection or approval under Sections 80 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary by such failure including those of repeated procedures shall be at the Contractor's expense. 80.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to CNM. TAXES. CNM is exempt from Federal Excise Taxes and from New Mexico Sales Taxes on Materials, except construction materials used by a contractor. Services are not exempt. Taxes on services should be included as a separate line item and not included in your base price bid. Applicable taxes are excluded from the evaluation of the bid. 81. TIME. Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work. TECHNICALITIES. CNM reserves the right to waive any technical irregularities in the form of the bid of the low bidder which do not alter price, quality or quantity of the services, construction or items of tangible personal property bid. 8 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 78. 81.1 The date of commencement of the Work is the date established in the Agreement. The date shall not be postponed by the failure to act of the Contractor or persons or entities for whom the Contractor is responsible. 81.2 The date of Substantial Completion is the date certified by CNM in accordance with Section 49.6. 81.3 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. 81.4 Work required to be performed after regular working hours shall be done without additional cost to CNM. The Contractor shall include the cost of all overtime work necessary to complete the Contract in his original Bid. After substantial completion, the Contractor and his Subcontractors shall employ all of the measures prescribed for safeguarding the continuous and satisfactory operation of the building, as interruption of such service will be considered a breach of contract. 82. WAGE RATES. Jobs with an estimated cost greater than $60,000 done under this Invitation will be subject to the Public Works Minimum Wage ACT (13-4-11 through 14-4-17, NMSA 1978) and per exhibit labeled "MINIMUM WAGE RATES". Minimum wages will be supplied at time of award or may be obtained from the Labor and Industrial Commission, 1596 Pacheco Street, Santa Fe, NM 87501. 83. WARRANTY. Bidder warrants the materials, supplies or services furnished to be exactly as specified in the order, free from defects in bidder's design, labor, materials and manufacture, and to be in compliance with any drawings or specifications incorporated herein and with any samples furnished by bidder. All applicable UCC warranties, express and implied, are incorporated herein. 84. WITHDRAWAL OF BIDS. Bids may be withdrawn by written notice, telegram or in person by a bidder or an authorized representative any time prior to the award. Bids requiring bid security may result in forfeiture of the security if the bid is withdrawn following the opening. 85. WORKMANSHIP/COOPERATION. All work shall be done in a neat, workman-like manner using acceptable equipment and methods. The contractor will cooperate with CNM and other contractors and coordinate his/her work involving other contractors through CNM's authorized representative. 9 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Central New Mexico Community College GENERAL TERMS AND CONDITIONS SECTION B. 1. Inspection and Audit. a. CNM may inspect, at any reasonable time, any part of Seller's plant or place of business which is related to performance of this Purchase Order. Acceptance of delivery shall not be considered acceptance of the materials, supplies or services furnished. Final inspection of product and services will be made at the destination. Any testing or inspection procedures required by the specification are in addition to CNM's rights under this paragraph. b. The Contractor shall maintain detailed time records which indicate the date, time and nature of services rendered. Contractor shall maintain detailed records of all materials or supplies delivered to CNM under this Purchase Order, including serial numbers and other appropriate identifiers. These records shall be subject to internal and external audit. CNM shall have the right to audit billings both before and after payment. Payment under the resultant Agreement shall not preclude CNM from recovering excessive, erroneous or illegal payments previously made to the Contractor. 9. Patent and Copyright Indemnity. Seller shall pay all royalty and license fees relating to deliverables and other items covered hereby. In the event any third party shall claim that the reproduction, manufacture, use, or sale of goods or items covered hereby infringes any copyright, trademark, patent, or other intellectual property rights, Seller shall indemnify and hold CNM harmless from any cost, expense, damage, or loss resulting therefrom. 10. Discounts. Any discount time will not begin until the materials, supplies, or services have been received and accepted and correct invoice received by CNM's Purchasing Department. In the event testing is required, the discount time shall begin upon the completion of the tests. 11. Penalties. The Procurement Code, Section 13-1-28 et seq., imposes civil and criminal penalties for its violation. In addition, the New Mexico criminal statutes impose felony penalties for bribes, gratuities and kickbacks. 2 Warranties. Seller warrants the materials, supplies or services furnished to be exactly as specified in this order, free from defects in Seller's design, labor, materials and manufacture, and to be in compliance with any drawings or specifications incorporated herein and with any samples furnished by Seller. All applicable UCC warranties, express and implied, are incorporated herein. 12. Title and Delivery. Title to the materials and supplies passed hereunder shall pass to CNM at the F.O.B. point specified subject to the right of CNM to reject upon inspection. For any exception to the delivery date specified, Seller shall give prior notification and obtain approval from CNM's Purchasing Department. Time is of the essence and the order is subject to termination for failure to deliver on time. 3. Acceptance and Rejection. If prior to final acceptance, any materials, supplies or service are found to be defective or not as specified, or, if CNM is entitled to revoke acceptance of them, CNM may reject or revoke acceptance, require Seller to correct without charge within a reasonable time, or require delivery at an equitable reduction in price at CNM's option. Seller shall reimburse CNM for all incidental and consequential costs related to unaccepted materials, supplies or service. Notwithstanding final acceptance and payment. Seller shall be liable for latent defects, fraud, or such gross mistakes as amount to fraud. Acceptance of performance shall not waive CNM's right to claim damages for breach. 13. Payment Charges. Late payment charges shall be paid in the amount and under the conditions stated in Section 13-1-158, NMSA 1978. 14. 4. Assignment. This order is assignable by CNM. Except as to any payment due hereunder, this order is not assignable by Seller without written approval of CNM. . 15 OSHA Regulations. The contractor shall abide by Federal Occupational Safety and Health Administration (OSHA) regulations and the State of New Mexico Environmental Improvement Board Occupational Health and Safety regulations that apply to the work performed under this Invitation. ALL PRODUCTS CONTAINING HAZARDOUS SUBSTANCES MUST BE PROPERLY LABELED AND ACCOMPANIED BY MATERIAL SAFETY DATA SHEETS. The contractor shall defend, indemnify and hold CNM free and harmless against any and all claims, loss, liability and expense resulting from any alleged violations of said regulations including but not limited to fines, penalties, judgments, court costs and attorney fees. 5. Changes. CNM’s Purchasing department may make changes within the general scope of this order by giving notice to Seller and subsequently confirming such changes in writing. If such changes affect the cost of, or the time required for performance of this order, an appropriate equitable adjustment shall be made. No change by Seller shall be recognized without prior written approval of CNM.’s Purchasing department. Any claim of Seller for an adjustment under this paragraph must be made in writing within thirty (30) days from the date of receipt of Seller of notification of such change, unless CNM waives this condition. Nothing in this paragraph shall excuse Seller from proceeding with performance of the order as changed hereunder. 16. Debarment/Suspension. In performing the services and/or furnishing the goods specified within this purchase order, the vendor/contractor certifies that it is not suspended, debarred or declared ineligible from entering into contracts with the Executive Branch of the Federal Government, any State agency or local public body; nor is in receipt of a notice of proposed debarment or suspension from the Executive Branch of the federal Government, any State agency or local public body. 6. Termination and Delays. CNM, by written notice stating the extent and effective date may terminate this order for convenience in whole or in part, at any time. CNM shall pay Seller as full compensation for performance until such termination: (1) the unit or pro rata order price for the delivered and accepted portion; and (2) a reasonable amount to be approved by CNM, and not otherwise recoverable from other sources by Seller, with respect to the undelivered or unaccepted portion of this order. Provided, however, compensation hereunder shall in no event exceed the total order price. Such amount will be limited to Seller's actual cost and may not include anticipated profits. CNM may terminate this order by written notice in whole or in part for Seller's default if Seller refuses or fails to comply with the provision of this order, or fails to make progress so as to endanger performance and does not cure such failure within a reasonable period of time. In such event, CNM may otherwise secure the materials, supplies or services ordered, and Seller shall be liable for damages suffered by CNM, including incidental and consequential damages. If, after notice of termination, CNM determines Seller was not in default, or if Seller's default is due to failure of CNM, termination shall be deemed for the convenience of CNM. The rights and remedies of CNM provided in this article shall not be exclusive and are in addition to any other rights and remedies provided by law or under this order. As used in this paragraph, the word "Seller" includes Seller and its subsuppliers at any tier. SECTION 2 GOVERNMENT SUBCONTRACT PROVISIONS If this order is subcontract under a U.S. Government Prime Contract, the applicable clauses listed below are incorporated into, and form a part of, the terms and conditions of this order. In the event of any conflict between the terms and condition of Section 2 and any other provisions of this order the terms and conditions of Section 2 shall prevail. The clauses contained in the following paragraphs of the Federal Acquisition Regulations are incorporated herein by reference. For purposes of this Purchase Order, in the following clauses, the term "contract" shall mean "this order", the term "contractor" shall mean "Seller" and the term "Government" and "Contracting Officer" shall mean " CNM" and the "Director of Purchasing," respectively. The following provisions of the Federal Acquisition Regulations (FAR) apply regardless of the amount of this order: * Anti-kickback Procedures: 52.203-7 Buy American Act 52.225-1 * Contract Work Hours and Safety Standards Act-Overtime Comp. 52.222-4 * Equal Employment Opportunity 52.222-26 Notice to the Government of Labor Disputes 52.222-1 Preference for U.S. Flag Air Carriers (For internal air travel) 52.247-63 Restriction on Subcontractor Sales to the Government 52.203-6 Service Contract Act of 1965 (Reserved) 52.222-41 * Termination for Convenience of Government (Education and other Nonprofit Institutions) 52.249-5(a)(f) 7. Equal Employment Opportunity. Contractor shall not discriminate with regard to hiring, termination or other incidents of employment on the basis of race, sex, national origin, religion, age or handicap. 8. Indemnification and Insurance Seller assumes the entire responsibility and liability for losses, expenses, damages, demands and claims in connection with or arising out of any actual or alleged personal injury (including death) and/or damage or destruction to property sustained or alleged to have been sustained in connection with or arising out of the performance of the work by Seller, its agents, employees, subcontractors or consultants, except to the extent of liability arising out of the negligent performance of the work by or willful misconduct of CNM. In any event, CNM's liability shall be subject to the limitations of the New Mexico Tort Claims Act. Seller shall indemnify and hold harmless CNM, its officers, agents, and employees from any and all liability for such losses, expenses, damages, demands, and claims and shall defend any suit or action brought against any or all of them based on any actual or alleged personal injury or damage and shall pay any damage costs and expenses including attorneys fees, in connection with or resulting from such suit or action. Seller agrees that it and its subcontractors will maintain public liability and property damage insurance in reasonable amounts covering the above obligation and will maintain workers' compensation coverage covering all employees performing this order. CNM reserves all administrative, contractual, and legal remedies against Seller in case of any breaches of the contract. * On contracts funded by federal grants, only the Special Terms and Conditions clauses identified by the asterisk (*) are incorporated 10 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Other Applicable Laws. Any provision required to be included in a contract of this type by any applicable and valid Executive order, federal, state or local law, ordinance, rule or regulation shall be deemed to be incorporated herein. SECTION C: SCOPE OF WORK FOR BID #T-2752 INTRODUCTION: CNM is the largest community college in the State of New Mexico providing year around instruction. CNM has an enrollment of approximately 25,000 students in both the fall and spring semesters with approximately 14,000 students enrolled in the summer term. CNM serves its students at the following campuses: Main Campus is comprised of 78 acres of land located at 525 Buena Vista SE. The Joseph M. Montoya Campus (JMMC) is situated on 40 acres of land along the Bear Canon Arroyo on 4700 Morris NE. The South Valley Campus is located in Albuquerque’s South Valley on 5816 Isleta Blvd. SW. The Westside Campus is located at 10549 Universe Blvd NW. The Workforce Training Center (WTC) is located at 5600 Eagle Rock Road, NE. There are twenty one major and many smaller buildings of various sizes totaling over 946,000 gross square feet. Building construction ranges from 1926 to present. There are potential future sites for CNM buildings in Rio Rancho and on the South Mesa. Central New Mexico Community College (CNM) Purchasing Department is soliciting bids for On Demand Structured Data Communications Cabling Services including all labor, materials, and equipment necessary to support CNM’s ITS Department in compliance with requirements noted below, on an as needed basis, at any of the CNM campuses. CNM will select three (3) to six (6) low bid technically qualified contractors by using the bid responses submitted for one (1) project: Structured Data Communications Cabling in support of its Wireless Network Overlay deployment project. This project consists of up to 327 access point locations within twenty (20) buildings located on four (4) campuses – Main, Montoya, Westside and Workforce Training Center located in Albuquerque NM. This RFB also includes the mounting of up to 327 pre-configured access points that will be provided by CNM. A one-year price agreement (PA) will be awarded to each of the selected qualified contractors with the option to renew in one-year increments per NMSA 13-1-150 contingent upon funding and Contractor performance and if is determined to be in the best interest of CNM. Assuming renewal, CNM will request updated wage rates. No single project issued under the resulting Price Agreements shall exceed $200,000.00. Projects exceeding this figure normally encompass new buildings or major remodeling projects and are bid separately. Such projects will not typically be a part of this contract. Contractor should note, CNM expends considerable effort to maintain functionality and perform minor renovations at their facilities. As such, CNM reserves the right to bid any project that is in the best interest of CNM. Prior to issuance of any Purchase Order (PO), CNM will meet with the Contractors to review the scope of work per individual project and to establish a reasonable price. Factors to be considered in this review shall include but not be limited to the nature and urgency of the Work, coordination with CNM’s needs, coordination with other construction contracts in the area, impact of previously issued PO’s, and lead time for delivery of materials. Technical questions regarding individual projects are to be directed to CNM’s Project Manager specific to that individual project. Each time a new project is to be undertaken CNM Purchasing Department will request quotations from each of the awarded PA Contractors. The price quotes are to be submitted to the Purchasing Department on the date and time specified, and the lowest priced contractor will be authorized to perform construction services for that specific project. Late quotations received after the due date and time may not be considered for award. CNM will issue an individual PO under the Contract Documents for on-call Structured Data Communications Cabling work as needs arise. CNM’s PO will authorize the work per the agreed upon Scope of Work, lump sum amount, implementation time and completion date. Scope of Work could include, but not limited to, a broad range of services as defined in the “Common Project Requirements” Section. Work may be in any location within the City of Albuquerque, Bernalillo County and/or future CNM campuses locations. 11 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. COMMON PROJECT REQUIREMENTS: Objective: CNM will request quotations from the selected qualified communications cabling contractors for the installation, testing, and acceptance of the structured data communications cabling components described in the attached specifications and drawings by interested persons (hereinafter known as “The Contractor”). Prices quoted shall be all-inclusive and represent complete installation at the sites identified in the project drawings per the below specifications. The Contractor shall be responsible for all parts, labor, and all other associated apparatus necessary to completely install, test, and turnover for acceptance to CNM the structured data communications cabling detailed herein. CNM has recently established a comprehensive Communications Infrastructure Standards Manual (CISM) that provides specifications and installation guidelines for all aspects of a cabling project that are not otherwise specified in the project Statement Of Work or construction documents. All Contractors performing communications related installations shall be expected to adhere to CNM’s CISM. CISM sections listed within this Statement Of Work are intended to assist the Contractor in locating applicable installation information within the CISM and are not intended to limit the Contractor’s responsibility of adhering to the CISM in its entirety Schedule of Events: The following is the anticipated schedule of events for each project. The schedule may change depending on the results of the responses and a final schedule will be established prior to contracting with the successful Contractor. Milestone Events 1. Release of RFQ to Bidders 2. Bidders’ Conference 3. Site Survey 4. Response from Bidders 5. Evaluation of Responses 6. Project Award 7. Written Notice to Proceed 8. 9. 10. 11. 12. 13. Installation Start Installation Complete End-to-End Testing Review of Testing Final Punch List Acceptance by CNM Mandatory Bidders’ Conference: A Bidders’ Conference will be announced for each project and held at 525 Buena Vista SE, Albuquerque, NM, 87106 for the purpose of reviewing the specific project requirements and receiving questions from The Contractors that intend to respond to the RFQ. Attendance at this conference is mandatory. If The Contractor does not attend the Bidders’ Conference, then The Contractor will not be allowed to attend the Site Survey or respond to the RFQ. Drawings reflecting the proposed work will be provided to the companies attending. Only one set of drawings will be allocated per company. Because of space allocations, only two representatives from each Contractor will be allowed to attend. The Contractors will be required to sign in to verify attendance. Subcontractors will not be allowed to represent The Contractor. An employee of The Contractor firm planning to respond must attend. The second person can be a subcontractor. Site Survey: A Site Survey will be conducted on the same day as the Bidders’ Conference. Attendance at the Site Survey is mandatory. If a Contractor does not attend the Site Survey, then that Contractor will not be allowed to respond to the RFQ. 12 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Subcontractors: Should The Contractor use subcontractors for portions of the work, CNM reserves the right to reject any subcontractor without explanation or recourse by The Contractor or subcontractor. Warranty: Warranty on Structured Data Communications Cabling Projects shall be based on a Permanent Link installation for the following conditions: • Minor expansion and or modification of existing cable installations for which CNM does not have a Channel Link warranty in place. Warranty on Structured Data Communications Cabling Projects shall be based on a Channel Link installation for the following conditions: • New construction • Extensive building re-cable projects • Expansion and or modification of existing cable installations for which CNM has a Channel Link warranty in place. Materials and workmanship hereinafter specified and furnished shall be fully guaranteed by The Contractor for a minimum of twenty-five (25) years from transfer of title against any defects. Defects which may occur as the result of faulty materials or workmanship within the warranty period after installation and acceptance by CNM shall be corrected by The Contractor at no additional cost to CNM. The Contractor shall promptly, at no cost to CNM, correct or re-perform (including modifications or additions as necessary) any nonconforming or defective work within the warranty period after completion of the project of which the work is a part. The period of The Contractor’s warranty(ies) for any items herein are not exclusive remedies, and CNM has recourse to any warranties of additional scope given by The Contractor to CNM and all other remedies available at law or in equity. The Contractor’s warranties shall commence with acceptance of/or payment for the work in full. If The Contractor procures equipment or materials under the Contract, The Contractor shall obtain for the benefit of CNM equipment and materials warranties against defects in materials and workmanship to the extent such warranties are reasonably obtainable. The Contractor shall pass along to CNM any additional warranties offered by the manufacturers, at no additional costs to CNM, should said warranties extend beyond the twenty-five (25) year period specified herein. This warranty shall in no manner cover equipment that has been damaged or rendered unserviceable due to negligence, misuse, acts of vandalism, or tampering by CNM or anyone other than employees or agents of The Contractor. The Contractor’s obligation under its warranty is limited to the cost of repair of the warranted item or replacement thereof, at The Contractor’s option. Insurance covering said equipment from damage or loss is to be borne by The Contractor until full acceptance of equipment and services. Inspection, Acceptance, and Title: Inspection and Acceptance will be at destination and upon successful installation unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the successful Contractor until acceptance by CNM, unless loss or damage results from negligence by CNM. If the materials or services supplied to CNM are found to be defective or do not conform to the specifications, CNM reserves the right to cancel the contract upon written notice to The Contractor and return products at The Contractor’s expense, based upon the terms of the Contract. CNM shall at all times have access to the work wherever it is in preparation or progress, and The Contractor shall provide proper facilities for such access and for inspection. The Contractor shall not close up any work until CNM has inspected the work. Should The Contractor close up the work prior to inspection by CNM, The Contractor shall uncover the work for inspection by CNM at no cost to CNM, and then recover the work according to the specification contained herein. 13 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. The Contractor shall notify CNM in writing when the work is ready for inspection. CNM will inspect the work as expeditiously as possible after receipt of notification from The Contractor. Price Quotations: Price quotations are to include the furnishing of all materials, equipment, maintenance and training manuals, tools, and the provision of all labor and services necessary or proper for the completion of the work, except as may be otherwise expressly provided in the Contract Documents. CNM will not be liable for any costs beyond those proposed herein and awarded. Time and materials quotes will be unacceptable. The Contractor shall include all applicable sales, consumer, use, and other similar taxes in the price quotations. For the purposes of budgeting future projects, each bidder is requested to quote pricing per installed cable, and for off-hours work. In case of discrepancy in computed quoted prices, the lowest combined value of individual unit prices shall prevail. Variation in Quantities and Configurations: Equipment and capacity requirements are the best estimates currently available. CNM reserves the right to modify quantity and configuration requirements. The Contractor agrees to sell CNM the revised quantity of items at the unit price as stated in the RFB regardless of quantity changes. Project Manager: The Contractor will provide an on-site, full-time, Project Manager who will act as a single point of contact for all activities for each Cabling project. The Project Manager will be required to make on-site decisions regarding the scope of the work and any changes required by the work. The Project Manager must be on the job at any time work is being performed or workers are present. The Project Manager will be totally responsible for all aspects of the work and shall have the authority to make immediate decisions regarding implementation or changes to the work. Construction Manager: CNM shall provide a Construction Manager who shall act as a single point of contact for all activities regarding this project. The Construction Manager will be responsible for all decisions required of CNM and shall coordinate with all departments during installation activities. The Construction Manager shall coordinate any inspections between The Contractor and CNM. The Contractor Qualifications: Experience The selected Contractor shall be fully capable and experienced in the information transport system (ITS) specified. To ensure the system has continued support, CNM will contract only with Contractors having a successful history of sales, installation, service, and support. During the evaluation process, CNM may, with full cooperation of The Contractors, visit The Contractors’ places of business, observe operations, and inspect records. The Contractor must have a minimum of five (5) years of experience. The Contractor must have an RCDD® (Registered Communications Distribution Designer) on staff that will be ultimately responsible for this project. The RCDD must have sufficient experience in this type project as to be able to lend adequate technical support to the field forces during installation, during the warranty period, and during any extended warranty periods or maintenance contracts. A resume of the responsible RCDD must be attached to The Contractor’s response for evaluation by CNM. Should the RCDD assigned to this project change during the installation, the new RCDD assigned must also submit a resume for review by CNM. If, in the opinion of CNM, the RCDD does not possess adequate qualifications to support the project, CNM reserves the right to require The Contractor to assign an RCDD who, in CNM’s opinion, possesses the necessary skills and experience required of this project. The Contractor must also have BICSI Registered Installers and Technicians on staff and assign them to this 14 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. project. The project shall be staffed at all times by Installers and Technicians who, in the role of lead crafts-persons, will be able to provide leadership and technical resources for the remaining crafts-persons on the project. A minimum of 30 percent of personnel shall be BICSI Registered Information Transport Systems Installers. Of that number 15 percent shall be registered at the Technician Level, at least 40 percent shall be registered at the Installer Level 2, and the balance shall be registered at the Installer Level 1. A copy of their registrations should be submitted in The Contractor’s response to this RFQ. Failure to submit BISCI registration information may make the offer non-responsive. References CNM may, with full cooperation of The Contractors, visit client installations to observe equipment operations and consult with references. Specified visits and discussion shall be arranged through The Contractors; however, The Contractor personnel shall not be present during discussions with references. The Contractor must provide a minimum of three (3) reference accounts at which similar work, both in scope and design, have been completed by The Contractor within the last two (2) years. Compliance with Laws and Regulations: The Contractor performance of the work shall comply with applicable federal, state, and local laws, rules, and regulations. The Contractor shall give required notices, shall procure necessary governmental licenses and inspections, and shall pay without burden to CNM, all fees and charges in connection therewith unless specifically provided otherwise. In the event of violation, The Contractor shall pay all fines and penalties, including attorney’s fees, and other defense costs and expenses in connection therewith. Codes, Standards, and Ordinances All work shall conform to the latest edition of the National Electrical Code®, the Building Code, and all local codes and ordinances, as applicable. ANSI/TIA/EIA-568-B.1 through ANSI/TIA/EIA-568-B.3, TIA-569-B, TIA/EIA-606-A, ANSI-J-STD-607-A, NECS/BICSI-5682006 and shall be adhered to during all installation activities. Methodologies outlined in the latest edition of the BICSI Telecommunications Distribution Methods Manual shall also be used during all installation activities. Should conflicts exist with the foregoing, the authority having jurisdiction for enforcement will have responsibility for making interpretation. Safety: The Contractor shall take the necessary precautions and bear the sole responsibility for the safety of the methods employed in performing the work. The Contractor shall at all times comply with the regulations set forth by federal, state, and local laws, rules, and regulations concerning “OSHA” and all applicable state labor laws, regulations, and standards. The Contractor shall indemnify and hold harmless CNM from and against all liabilities, suits, damages, costs, and expenses (including attorney’s fees and court costs) which may be imposed on CNM because of The Contractor, subcontractor, or supplier’s failure to comply with the regulations stated herein. Special Conditions: CNM is an administrative and instructional facility that provides services to the customers of CNM. As such, activities in all buildings are critical to the provisioning of services to the customers and shall not be interrupted by The Contractor’s work activities. The computer systems associated with this work will not be taken off-line or removed from service during normal working hours. Arrangements must be made by The Contractor to coordinate any such activities. The Contractor will be required to work around all of the conditions listed above, as well as working with CNM staff to minimize disruptions to normal CNM activities. Installation Guidelines: 15 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. All work performed per Cabling project will be installed in accordance with CNM’s Communication Infrastructure Standards Manual (CISM). In addition, all work performed will be installed in accordance with the current edition of the National Electrical Code®, the current edition of the The National Electrical Safety Code® the current issue of the National Electrical Code®, the ANSI/NECA/BICSI-568-2006 Standard for Installing Commercial Building Telecommunications Cabling, the current edition of the BICSI Telecommunications Distribution Methods Manual, the current edition of the BICSI Cabling Installation Manual, the latest issue of the ANSI/TIA/EIA Standards as published by Global Engineering Documents as ANSI/TIA/EIA Telecommunications Building Wiring Standards, and all local codes and ordinances. Current CNM Inside Plant Cable Environment: CNM is made up of five (5) campuses: Main, Montoya, South Valley, Workforce Training Center, and West Side. Each location maintains a dual cable plant design using Unshielded Twisted Pair (UTP) cable to support separate voice and data applications. Dependent on the age of individual building installations the Category of existing cable and related hardware varies as does the installation standards. CNM is in a continuous process to upgrade its cable plants to current standards, as defined by the CISM, that are maintained for all new installations and additions. As a result older buildings at CNM often contain a mix of cable types. Newer buildings contain a dedicated central Entrance Room (ER) with dedicated Telecommunication Rooms (TR) located as necessary to overcome distance limitations inherent with UTP Ethernet cabling. Voice and data cabling is generally terminated at different locations within the ER and TRs. CNM’s ERs house copper and fiber trunks that connect to the campus Out Side Plant (OSP) and provide for inter-building communications. ERs are connected to TRs within each building using fiber. Older buildings have been modified to accommodate this central distribution model to the extent that it is possible. In older buildings not all ER and TR locations are dedicated and in some cases TRs do not exist. In these cases switching devices are mounted in semi-secure locations near the equipment that they provide service for. Cable trays, distribution conduits and other distribution hardware that is commonly associated with current cable plant design has been incorporated to some extent into the design of all CNM buildings that have been constructed or remodeled after 1995. Older buildings and areas of older buildings that have not experienced a recent major remodel do not include or have limited provisions for cable distribution. CNM adheres to BiCSi specifications for all new cable installations. In addition to BiCSi specifications, CNM maintains its own standards and preferences as defined in the Communications Infrastructure Standards Manual (CISM). All contractors performing communications related installations shall be expected to adhere to CNM’s CISM. Building Design & Construction Over time a variety of construction methods and materials has been incorporated in the design of CNM’s buildings. Construction methods and material may significantly impact cable distribution. Site visits and thorough examination of construction documents should be considered prior to responding to all Project RFQ’s. 16 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Common Project Scope of Work The successful Contractor will install and terminate 23 AWG Category 6 UTP cable between designated ERs/TRs and Telecommunication Outlet (TO) locations and construct cable distribution pathways as necessary in adherence with CNM’s CISM. CNM’s CISM document shall be considered the primary source for all installation specifications that are not otherwise noted in this Statement Of Work. Drawings will be provided to Contractors at the Bidders’ Conference that designate ER/TR locations and TO locations. The Contractor will work closely with CNM’s designated Construction Manager to determine the exact routing of cabling and to develop solutions for the construction of any necessary distribution pathways. The contractor will be responsible for updating existing construction documents to indicate installed cable routing. Project Goals: 1. The Contractor shall be responsible for the following pre-installation requirements: a. The Contractor shall be available for project review meeting involving members of CNM’s Telecommunication and Facilities staff. The purpose of this meeting will be: i. To allow the Contractor and CNM to jointly review construction documents and requirements for the project. ii. Jointly conduct a thorough walk through of all areas where cable is to be installed. iii. Develop a mutually agreed upon installation schedule that will be adhered to through out the project. iv. Develop a mutually agreed upon schedule of weekly project status meetings that will be adhered to through out the project. b. The Contractor shall work closely with CNM’s Construction Manager, Telecommunication staff and other CNM contractors that may be involved in any specific project to determine any detailed design specifications that may be required prior to installation. Any and all specifications produced must clearly define responsible parties, materials that may be involved, changes to the scope of work and itemization of any additional costs involved. c. The Contractor shall present to CNM’s Construction Manager all available design considerations and options prior to installation. d. The Contractor shall work closely with CNM’s Construction Manager during all aspects of the project in order to ensure close project coordination. e. The Contractor shall obtain all required building permits and arrange for necessary inspections. CNM’s Construction Manager will accompany the Contractor during any permit related inspections that take place. 2. The Contractor shall be responsible for the following requirements during the installation process: a. b. c. d. The Contractor shall provide all required cable and materials for specified cable installations. The Contractor shall provide cable installation and construct necessary distributions pathways in accordance with the specifications defined in the contract and CNM’s CISM. The Contractor shall work jointly with CNM’ Construction Manager, Telecommunication’s staff and other CNM contractors that may be involved in any specific project to evaluate and determine solutions for any issues that arise that were not identified as part of the pre-installation requirements. Any and all solutions must be jointly agreed to by both the Contractor and CNM’s Construction Manager and must clearly define responsible parties, materials that may be involved, changes to the scope of work and itemization of any additional costs involved. All work performed will be in accordance with CNM’s CISM, TIA/EIA standards, all applicable building codes and BiCSi Telecommunications Distribution Methods. 3. The Contractor shall be responsible for the following post installation requirements: 17 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. a. b. c. The Contractor, with CNM’s Construction Manager will jointly perform a thorough inspection upon project completion and/or completion of any one building to provide CNM the opportunity to identify any items of concern. If any items of concern are identified the Contractor is responsible for their correction. The Contractor shall provide updated “as built” construction documentation indicating actual routes of cable placement, locations of installed components and any modifications to the original construction documents. The Contractor shall repair or replace at CNM’s discretion any cabling that is determined not to meet minimum specifications as determined in CNM’s CISM. Technical Specifications: A. PART 1 - GENERAL 1. SUMMARY a. Section Includes: Equipment, materials, labor, and services to provide a functional data distribution system including between designated ER/TR facilities and wireless access points, but not limited to: 1) Raceway, boxes, and cable tray 2) Data cabling terminations 4) Telecommunications outlets 5) Terminal blocks/cross-connect systems 6) Equipment racks and cabinets 7) System testing 8) Documentation and submissions 9) Removal of abandoned cable, if required b. Provide all equipment, materials, labor, and services, not specifically mentioned or shown, which may be necessary to complete or perfect all parts of the installation. Ensure that they are in compliance with requirements stated or reasonably inferred by the CISM or contract documents. c. Work not included: 1) The following work will be done by others: (a) Off-site services. (b) Providing electrical wiring and outlets. (c) Providing wireless access points, data concentrators, hubs, switches, servers, computers, and other active devices such as Power Over Ethernet (POE) components. 2) Painting will be done by CNM 3) Removal of hazardous materials, if required 18 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 2. REFERENCES a. Design, manufacture, test, and install telecommunications cabling networks per manufacturer’s requirements and in accordance with NFPA-70 (2005 edition of the National Electrical Code®), IEEE C2 2007(NESC 2007), state codes, local codes, requirements of authorities having jurisdiction. b. Refer to CNM’s Communications Infrastructure Standards Manual (CISM) for a comprehensive listing of all applicable ANSI/NECA/BICSI-568-2006 Standards for Installing Commercial Building Telecommunications Cabling. c. Federal, state, and local codes, rules, regulations, and ordinances governing the work, are as fully part of the specifications as if herein repeated or hereto attached. If the contractor should note items in the drawings or the specifications, construction of which would be code violations, promptly call them to the attention of CNM's representative in writing. Where the requirements of other sections of the specifications are more stringent than applicable codes, rules, regulations, and ordinances, the specifications shall apply. 3. PERMITS, FEES, AND CERTIFICATES OF APPROVAL a. The Contractor shall obtain all required building permits and arrange for necessary inspections. b. As prerequisite to final acceptance, supply to CNM certificates of inspection from an inspection agency acceptable to CNM and approved by the local municipality and utility company serving the project. 4. SYSTEM DESCRIPTION 1) If existing Category 6, T568B wired rack mounted patch panels with 48 ports are in use and have spare capacity then available spare ports shall be used for termination not to exceed 25% of total capacity. If 25% of total capacity is to be exceeded an additional patch panel shall be installed. 2) If existing Category 6, T568B wired rack mounted patch panel with 48 ports are in use and do not have sufficient spare capacity, as defined above, then additional Category 6, T568B wired rack mounted patch panels, with 48 ports shall be provided by the Contractor and installed in accordance with the CISM and coordination from CNM’s Construction Manager. In the event existing racks do not have the necessary capacity for additional patch panels CNM shall provide and install an additional rack at CNM’s expense. 3) If existing Category 6, T568B wired rack mounted patch panels are not in use then termination shall proceed as per CISM CNM STD DWG 005 10DEC2007, Detail D3, using a Honeywell QuickPort or equivalent approved and mounted as directed by CNM’s Construction Manager. 5. SUBMITTALS a. Submit to CNM shop drawings, product data (including cut sheets and catalog information), and samples required by the contract documents. Submit shop drawings, product data, and samples with such promptness and in such sequence as to cause no delay in the work or in the activities of separate contractors. CNM’s Construction Manager will indicate approval of shop drawings, product data, and samples submitted by stamping such submittals "APPROVED" with a stamp. Submitted shop drawings shall be initialed or signed by the contractor, showing the date and the contractor's legitimate firm name. 1) By submitting shop drawings, product data, and samples, the Contractor represents that he or she has carefully reviewed and verified materials, quantities, field measurements, and field construction criteria related thereto. It also represents that the Contractor has checked, coordinated, and verified that information contained within shop drawings, product data, and samples conform to the 19 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. requirements of the work and of the contract documents. 2) CNM’s approval of shop drawings, product data, and samples submitted by the Contractor shall not relieve the Contractor of responsibility for deviations from requirements of the contract documents, unless the Contractor has specifically informed CNM in writing of such deviation at time of submittal, and CNM has given written approval of the specific deviation. The Contractor shall continue to be responsible for deviations from requirements of the contract documents not specifically noted by the Contractor in writing, and specifically approved by CNM in writing. 3) CNM’s approval of shop drawings, product data, and samples shall not relieve the Contractor of responsibility for errors or omissions in such shop drawings, product data, and samples. 4) CNM’s review and approval, or other appropriate action upon shop drawings, product data, and samples, is for the limited purpose of checking for conformance with information given and design concept expressed in the contract documents. CNM’s review of such submittals is not conducted for the purpose of determining accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the contract documents. The review shall not constitute approval of safety precautions or of construction means, methods, techniques, sequences, or procedures. CNM’s approval of a specific item shall not indicate approval of an assembly of which the item is a component. b. Perform no portion of the work requiring submittal and review of shop drawings, product data, or samples, until the engineer/designer has approved the respective submittal. Such work shall be in accordance with approved submittals. c. Submit shop drawings, product data, and samples as a complete set within ten (10) days of award of contract. 1) For initial submission and for resubmission required for approval, submit two (2) copies of each item. CNM will only return one copy. Make reproductions as required for your use and distribution to subcontractors 2) Illegible submittals will not be checked by CNM. d. General: Submit the following: 1) Bill of materials, noting long lead time items 2) Product specifications for products not specifically defined in the CISM 3) Project schedule including all major work components that materially affect any other work on the project e. Shop drawings: Submit the following: 1) Proposed cable pathways and routing 2) Alternative ER/TR locations if ER/TR locations designated by CNM prove inaccessible or technically unfeasible. 3) Interface requirements, including connector types and pin-outs, to external systems and systems or components not supplied by the contractor 20 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 4) Fabrication drawings for custom-built equipment f. Product Data -- Provide catalog cut sheets and information for the following: 1) Wire and cable 2) Outlets, jacks, faceplates, and connectors 3) All metallic and nonmetallic raceways, including surface raceways, outlet boxes, and fittings 4) Terminal blocks and patch panels 5) Enclosures, racks, and equipment housings g. Project record drawings: 1) Drawings shall be submitted in electronic format and saved as AutoCad compatible files. 2) Submit project record drawings at conclusion of the project and include: (a) Approved shop drawings (b) Plan drawings indicating locations and identification of work area outlets, nodes, ERs/TRs (c) Labeling and administration documentation. (d) Warranty documents for equipment. (e) Copper certification test result printouts and CDs. 6. QUALITY ASSURANCE a. The following manufacturer’s cabling systems are approved for the work of this section are defined in CISM Section 271500, 2.1 b. The Contractor shall have worked satisfactorily for a minimum of five (5) years on systems of this type and size. c. Furnish a list of references with specific information regarding type of project and involvement in providing of equipment and systems. d. Equipment and materials of the type for which there are independent standard testing requirements, listings, and labels, shall be listed and labeled by the independent testing laboratory. e. Where equipment and materials have industry certification, labels, or standards (i.e., NEMA - National Electrical Manufacturers Association), this equipment shall be labeled as certified or complying with standards. f. Material and equipment shall be new, and conform to grade, quality, and standards specified. Equipment and materials of the same type shall be a product of the same manufacturer throughout. g. Subcontractors shall assume all rights and obligations toward the Contractor that the Contractor assumes toward CNM. 21 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 7. WARRANTY a. Unless otherwise specified, unconditionally guarantee in writing the materials, equipment, and workmanship for a period of not less than twenty-five (25) years from date of acceptance by CNM. CNM shall deem acceptance as beneficial use. b. Transfer manufacturer's warranties to CNM in addition to the General System Guarantee. Submit these warranties on each item in list form with shop drawings. Detail specific parts within equipment that are subject to separate conditional warranty. Warranty proprietary equipment and systems involved in this contract during the guarantee period. Final payment shall not relieve you of these obligations. 8. DELIVERY, STORAGE, AND HANDLING Protect equipment during transit, storage, and handling to prevent damage, theft, soiling, and misalignment. Coordinate with CNM for secure storage of equipment and materials. Do not store equipment where conditions fall outside manufacturer's recommendations for environmental conditions. Do not install damaged equipment; remove from site and replace damaged equipment with new equipment. 9. SEQUENCE AND SCHEDULING Submit schedule for installation of equipment and cabling. Indicate delivery, installation, and testing for conformance to specific job completion dates. As a minimum, dates are to be provided for bid award, installation start date, completion of station cabling, completion of riser cabling, completion of testing and labeling, cutover, completion of the final punch list, start of demolition, CNM acceptance, and demolition completion. 10. USE OF THE SITE a. Use of the site shall be at CNM’s direction in matters in which CNM deems it necessary to place restriction. b. Access to building wherein the work is performed shall be as directed by CNM. c. CNM will occupy the premises during the entire period of construction for conducting his or her normal business operations. Cooperate with CNM to minimize conflict and to facilitate CNM’s operations. d. Schedule necessary shutdowns of plant services with CNM, and obtain written permission from CNM. Refer to article - CONTINUITY OF SERVICES herein. e. Proceed with the work without interfering with ordinary use of streets, aisles, passages, exits, and operations of CNM. 11. CONTINUITY OF SERVICES a. Take no action that will interfere with, or interrupt, existing building services unless previous arrangements have been made with CNM’s Construction Manager. Arrange the work to minimize shutdown time. b. CNM's personnel will perform shutdown of operating systems. The contractor shall give three (3) days’ advance notice for systems shutdown. c. Should services be inadvertently interrupted, immediately furnish labor, including overtime, material, and equipment necessary for prompt restoration of interrupted service. 22 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. B. PART 2 - PRODUCTS 1. MANUFACTURERS a. CNM’s CISM, provides product specifications and manufacturers that shall be used in CNM projects.. b. Where no manufacturer is specified, provide products of manufacturers in compliance with requirements. 2. FABRICATION Fabricate custom-made equipment with careful consideration given to aesthetic, technical, and functional aspects of equipment and its installation. 3. SUITABILITY Provide products that are suitable for intended use, including, but not limited to environmental, regulatory, and electrical. 4. DATA STATION CABLE (Copper Patch Cords) Refer to CISM Section 271101, 2.15. (Must be CMP for plenum installations.) 5. DATA ONLY WORK AREA OUTLET Refer to CISM Section 271543, 2.2 E. 6. TERMINATION BLOCKS Refer to CISM Section 271119, 2.1 7. PATCH PANELS a. Rack Mount Patch Panels: Refer to CISM Section 271101, 2.7 & 271119, 2.2 b: Surface Mount Break-Out Boxes: Refer to CISM CNM STD DWG 005 10DEC2007, Detail D3, using a Honeywell QuickPort or equivalent as approved. 8. SPARE CAPACITY a. Provide for the following spare capacity: 1) Utilize existing patch panels up to 25% of fill capacity. If 25% of fill capacity is exceeded an additional 48 port patch panel shall be installed. 2) Utilize existing Surface Mount Break-Out Boxes up to 25% of fill capacity. If 25% of fill capacity is exceeded an additional Surface Mount Break-Out Box shall be installed. 3) Fill ratios for conduits, cable trays and other distribution pathways are defined in CISM Section 270528 and 271513 Table 1 & 2. If fill ratios are to be exceeded Contractor shall provide additional distribution pathway capacity. 9. EXTRA MATERIAL 23 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. a. Furnish the following spare equipment and parts: 1) Five (5) percent of base bid quantity of each type of eight conductor jack (modules) shall be provided 2) Five (5) percent of base bid quantity of each type of faceplate 3) Five (5) percent of base bid quantity rounded up to the nearest thousand feet of UTP horizontal cable 4) Five (5) percent of base bid quantity of station cable (patch cords) 10. WIRELESS COMMUNICATIONS a. All wireless access points shall be installed as per locations and mounting instructions provided by the wireless implementation contractor. b. All wireless access points shall be positioned so as to avoid sources of EMI and RFI c. All wireless access points shall be placed to be aesthetically compatible With their environment d. All wireless access point enclosures shall be UL Listed for use within a plenum space C. PART 3 EXECUTION 1. PRE-INSTALLATION SITE SURVEY a. Prior to start of systems installation, meet at the project site with CNM's representative and representatives of trades performing related work to coordinate efforts. Review areas of potential interference and resolve conflicts before proceeding with the work. b. Examine areas and conditions under which the system is to be installed. Do not proceed with the work until satisfactory conditions have been achieved. 2. HANDLING AND PROTECTION OF EQUIPMENT AND MATERIALS a. Be responsible for safekeeping of your own and your subcontractors' property, such as equipment and materials, on the job site. CNM assumes no responsibility for protection of above named property against fire, theft, and environmental conditions. 3. PROTECTION OF CNM’S FACILITIES a. Effectively protect CNM's facilities, equipment, and materials from dust, dirt, and damage during construction. b. Remove protection at completion of the work. 4. INSTALLATION a. Receive, check, unload, handle, store, and adequately protect equipment and materials to be installed as part of the contract. Store in areas as directed by CNM's representative. Include delivery, unloading, setting in place, fastening to walls, floors, ceilings, or other structures where required, interconnecting wiring of system components, equipment alignment and adjustment, and other related work whether or not expressly defined herein. b. Install materials and equipment in accordance with CNM’s CISM and all applicable standards, codes, 24 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. requirements, and recommendations of national, state, and local authorities having jurisdiction, and National Electrical Code® (NEC) 2005 and with manufacturer's printed instructions. 1) THIS ITEM IS SPECIFIC TO THE ”WIRELESS CABLE OVERLAY PROJECT”: CISM Sections 270500, 270528, 270553, 271119, 271500, 271513 and 271543 address the primary activities to be performed within this statement of work. Each section of the CISM references other related sections. The sections listed here are intended to assist the Contractor in locating applicable installation information within the CISM and are not intended to limit the Contractor’s responsibility of adhering to the CISM in its entirety. c. Adhere to manufacturer's published specifications for pulling tension, minimum bend radii, and sidewall pressure when installing cables. Refer to CISM Section 271500, 3.4. 1) Where manufacturer does not provide bending radii information, comply with BICSI TDNN, Ch. 4, “Pulling Cable”. Arrange and mount equipment and materials in a manner acceptable to the engineer and CNM. d. Penetrations through floor and fire-rated walls shall utilize intermediate metallic conduit (IMC) or galvanized rigid conduit (GRC) sleeves and shall be fire stopped after installation and testing, utilizing a fire stopping assembly approved for that application. Refer to CISM Section 270500. e. Install horizontal cabling to the telecommunications room (TR/ER) designated in the provided drawings. f. Installation shall conform to the following basic guidelines: 1) Use of approved wire, cable, and wiring devices 2) Neat and uncluttered wire termination g. Attach cables to permanent structure with suitable attachments at intervals of 48 to 60 inches. Support cables installed above removable ceilings. h. Install cables in one continuous piece. Splices shall not be allowed. 5. GROUNDING a. Grounding shall conform to ANSI-J-STD607(A) - Commercial Building Grounding and Bonding Requirements for Telecommunications, National Electrical Code® (2005), ANSI/NECA/BICSI-568-2006 and manufacturer's grounding requirements as minimum. b. Refer to CISM Section 270526 for detailed grounding specifications. 6. LABELING a. Labeling shall conform to CISM Section 270553. b. Mark up floor plans showing outlet locations, type, and cable marking of cables. Turn these drawings over to CNM two (2) weeks prior to move in to allow CNM's personnel to connect and test CNM-provided equipment in a timely fashion. c. Two (2) sets of as-built drawing shall be delivered to CNM within four (4) weeks of acceptance of project by CNM. A set of as-built drawings shall be provided to CNM in electronic form and utilizing CAD software that is acceptable to CNM. The electronic media shall be delivered to CNM within six (6) weeks of acceptance of project by CNM. 25 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 7. TESTING Testing shall conform to CISM Section 271500, 3.8, & 271513, 3.7. 8. FIELD QUALITY CONTROL a. Employ job superintendent or project manager during the course of the installation to provide coordination of work of this specification and of other trades, and provide technical information when requested by other trades. This person shall maintain current RCDD® (Registered Communications Distribution Designer) registration and shall be responsible for quality control during installation, equipment set-up, and testing. b. At least 30 percent of installation personnel shall be BICSI Registered Telecommunications Installers. Of that number, at least 15 percent shall be registered at the Technician Level, at least 40 percent shall be registered at the Installer Level 2, and the balance shall be registered at the Installer Level 1. c. Installation personnel shall meet manufacturer’s training and education requirements for implementation of extended warranty program. Examination of Contract Documents and site: Before submitting his quote, each Bidder must: a. Examine the Contract and CISM Documents thoroughly. b. Visit the site to familiarize himself with local conditions that may in any manner affect the performance of the work and employment of labor thereon. c. Familiarize himself with CNM’s CISM, federal, state, and local laws, ordinances, rules and regulations affecting performance of the work and employment of labor thereon. d. Carefully correlate his observations with the requirements of the Contract Documents. Contract Documents: The below stated SECTION D constitutes the contract documents. The Bidder signature signifies his full understanding of the terms and conditions of this bid. The award of the contractor shall be made by CNM Purchasing Department. This agreement will be referenced and Purchase Agreements will be assigned with regular CNM PO’s (as a release under the Purchase Agreements) issued per project basis that shall bind the Contractor to the terms of the Contract Documents. Emergency 24-hour Service: Emergency 24-Hour Service may be determined by CNM to be appropriate in some instances when urgent public need or safety is involved. Any such work shall require Contractor mobilization and start of the work with 24 hours of receipt of written authorization. Contractor will be expected to commence work on the date designated in the PO. If an emergency occurs and Contractor is unavailable, CNM’s Project Manager will be permitted to approach the subcontractor. CNM will notify the Contractor of such action the next business day. NOTE: The total cost of each individual On Demand Construction Project will not exceed two hundred thousand dollars ($200,000.00). 26 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. SECTION D: CONTRACTOR GENERAL REQUIREMENTS FOR BID #T-2752 Contract Documents: The bidding information included in this packet and listed below constitute the Contract Documents for both this Bid and for each individual project. The bidder's signature signifies his full understanding of the terms and conditions of this bid. The award of the contract shall be made by CNM issuing Price Agreements (PA’s) to three (3) to six (6) qualified vendors, and Purchase Orders (PO’s) to the selected PA contractor on a project by project basis following a Request for Quotation. The PA’s and PO’s and shall bind the contractor to the terms of the Contract Documents. List of contract documents in order of precedence: CNM’s Purchase Agreement CNM’s Purchase Order for award of a specific project CNM’s Standard Bid and General Terms and Conditions Contractor General Requirements Project Scope of Work (SOW) Bid Scope of Work (SOW) Drawings and Specifications Pricing: a. Request for Bid form b. Parts/Materials/Equipment-Pricing Subcontractors Listing Performance and Labor bonds (to include Performance bonds for first tier subcontractors) Insurance requirements State of New Mexico, Department of Labor, Wage Rate (Decision number BE-09-0197 B). AIA A101 as amended by CNM. Bid #T-2752 Bidder shall also construe this provision to incorporate any necessary investigation and/or monitoring during the life of the contract to enforce any current policy of CNM such as, but not limited to, no alcohol, no drugs, no guns, etc on CNM property. As a general rule, any such regulation or law applying to CNM personnel shall be deemed to be in force for Contractors work force occupying any work site. Bidders shall carefully examine the proposed contract documents to obtain first-hand knowledge of all proposed work. Contractors will not be entitled to any additional compensation or any extension of the contract time for conditions which can be determined by examining current work requirements and the proposed contract documents. Submission of a bid constitutes a representation by the bidder that the bidder has made all appropriate examinations, investigations and analyses and has made provision as to the cost thereof in his bid. Bid Security: Bidder shall provide with this bid, a Bid Bond (Security) issued by a surety duly authorized to conduct business in the State of New Mexico and acceptable to Central New Mexico Community College (CNM) in the amount of five percent (5%) of the initial project, “Project 1” costs as shown in the bid response form (13-1-146, NMSA 1978). Bid Security shall be payable by a certified check, cashier's check, money order or bid bond payable without condition to CNM, 525 Buena Vista SE, Albuquerque, New Mexico, 87106. Bid security will be returned as soon as practical after the opening of bids and the successful bidder has furnished the performance and payment bonds, or if no award has been made within 30 days after the opening of bids, upon demand of the bidder at anytime thereafter, so long as he has not been notified of the acceptance of his bid. Such surety shall be named in the Federal Register by the Audit Staff Bureau of Accounts, US Treasury Department. Bid Security is submitted as a guarantee the Bidder, if awarded the contract: a. Will promptly execute such contract in accordance with the Bid submittal and in the manner and form required by the Contract Documents 27 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. b. Will furnish good and sufficient bond for the faithful performance of the same and for the payment of all labor and materials. c. And furnish required certificates of insurance. The Bid Bond (Security) of the six (6) lowest Bidders will be retained until the contract is awarded or other disposition is made. The Bid Bond (Security) of all Bidders except the six (6) lowest will be returned after the award of bids. CNM shall have the right to retain the bid security of the six (6) apparent lowest Bidders until either: a. the Contract has been executed and the Labor and Material Payment Bond, the Performance Bond and all required certifications of insurance have been furnished to CNM; b. the time specified in the Bidding Documents has elapsed so that Bidder may withdraw the Bid Response: c. all bids have been rejected, whichever occurs first. Should the Bidder refuse to enter into such Contract or fail to furnish such Bonds or certificates of insurance, the amount of the Bid Security shall be forfeited to CNM as liquidated damages, not as a penalty. Bid submittals without the required Bid Security will not be considered. Bonding Requirements: For each project over $25,000.00 (NMSA 13-4-18) the successful bidder, upon notification of the award of the Contract, shall deliver the required performance and payment bonds in the amount of 100% of the total project cost, within 14 business days after issuance of a PO or prior to the commencement of any work. Bond must be payable to CNM, executed by a surety company authorized to do business in the state of New Mexico. The bond shall stay in full force and effect until final acceptance of all projects initiated under the agreement. If the total of the projects accomplished under this contract shall exceed $25,000, contractor shall be responsible to bond all additional amounts. Should the surety company become insolvent or cease to do business in New Mexico, notice will be given the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to CNM. No payment will be made under the contract until the new surety is qualified and bond accepted by CNM. The sureties on such bonds shall be duly authorized to conduct business in the State of New Mexico and acceptable to the CNM, and shall be named in the current list of “Surety Companies Acceptable on Federal Bonds” as published in the Federal Register by the Audit Staff Bureau of Accounts, US Treasury Department. In addition, the contractor shall furnish certificate of insurance as required by the General Conditions of this bid. Contractor will not start work prior to the effective date of Insurance coverage: Contractor shall not knowingly, except by agreement or instruction of CNM in writing, prematurely commence operations on a site or elsewhere prior to the effective date of insurance required by SECTION F, “Insurance Requirements” to be furnished by the Contractor. The date of commencement of the Work shall not be changed by the effective date of such insurance. Unless the date of commencement is established by a notice to proceed given by the CNM, the Contractor shall notify CNM in writing not less than five (5) days or other agreed period before commencing the Work to permit the timely filing of mortgages, mechanic’s liens and other security interests. The contractor shall, at his own expense, carry and maintain during the entire performance period of this contract at least the kinds and minimum amounts of insurance listed: A. Workers' Compensation Insurance: As required by the Labor Laws and the New Mexico Statutes. B. Public Liability Insurance: Reference Section F. Listing of subcontractors; requirements (reference EXHIBIT H & I): A. Some Public Works Projects may be subject to the provisions of the State of New Mexico “Subcontractors Fair Practices Act”, Sections 13-4-31 through 13-4-42 NMSA 1978. When this Act is applicable, each bidder shall comply with the requirements set forth in these Bidding Documents. B. Any using agency taking bids for any public works construction project shall provide in the bidding documents prepared for that project a listing threshold which shall be five thousand dollars ($5,000.00) or one-half of one percent of the architect’s or engineer’s estimate of the total project cost, not including alternates, whichever is greater. Any person submitting a bid shall in his bid set forth: 28 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 1. The name and the city or county of the place of business of each subcontractor under subcontract to the contractor who will perform work or labor or render service to the contractor in or about construction of the public works construction project in an amount in excess of the listing threshold; and 2. The category of work that will be done by each subcontractor. The contractor shall list only one subcontractor for each category as defined by the contractor in his bid. C. A bid submitted by a contractor who fails to comply with the provisions of this section may be determined as a nonresponsive bid which may not be accepted. D. If a contractor fails to list a subcontractor in excess of the listing threshold and he does not state that no bid was received or that only one bid was received, he represents that he is fully qualified to perform that portion of the work himself and that he shall perform that portion of the work himself. If after award of the contract the contractor subcontracts any portion of the work, except as provided in the Subcontractors Fair Practices Act [13-4-31 to 13-442 NMSA 1978], the contractor shall be guilty of violation of the Subcontractors Fair Practices Act and subject to the penalties provided in Section 13-4-41 NMSA 1978. E. The Bidder shall define the categories of work done by each subcontractor in the bid and shall list on EXHIBIT H of the Bid no more then one subcontractor for each such category, provided however, that such listing shall not include subcontractors whose work does not exceed the threshold dollar amount given. Such list shall give the name and city or county of the place of business of each subcontractor under subcontract to the Bidder who will perform work or labor render service to the Bidder in an amount exceeding the threshold stated. Those subcontractors whose work does not exceed the amount given shall be listed. State Wage Rates: It is the Contractor's responsibility to become acquainted with and comply with State Regulations regarding payment of wages on Public Projects (13-4-11 through 13-4-17, NMSA 1978). Wage rates as established by the New Mexico State Department of Labor are attached as ATTACHMENT 1 and will be paid by the contractor for every job whose total cost exceeds $60,000.00 per Project that is performed under this contract. The Contractor shall pay all laborers employed on the site of the project, unconditionally and not less often than once a week, and without subsequent unlawful deduction or rebate on any account the full amounts accrued at time of payment, computed at wage rates not less than those stated in the advertised specifications. In the event it is found by the State Labor Commission, that any laborer or mechanic employed by the Contractor or Subcontractor on the site of a project covered by this contract has been or is being paid, as a result of a willful violation, a rate of wages less than the rate of wages required by the Contract, CNM may, by written notice to the Contractor and his Subcontractor (if the violation involves a subcontractor) terminate their right to proceed with the work, or such part of the work as to which there has been a willful failure to pay the required wages, and CNM may prosecute the work to completion by contract or otherwise, and the Contractor and his sureties shall be liable for any excess cost occasioned thereby. Any party receiving notice of termination of his contract or subcontract under the provisions of this section may appeal the finding to the State Labor Commissioner as provided in the Public Works Minimum Wage Act. GENERAL OPERATING PROCEDURES Contractor Licensing Requirements. This project is primarily covered by the ES-3 classification. If the telecommunications includes telephones then ES-7 would be required for that installation and cabling. EE-98 covers all work. All conduit and raceways require the EE-98 and must be subbed out if the prime contractor has only the ES-3. The Contractor will be properly licensed with the appropriate ES-3, ES-7 or EE-98 classification per the State of New Mexico Construction Industries Division (CID) regulations. The Contractor will use personnel directly employed or qualified sub-contractors that are licensed and registered by the State of New Mexico Construction Industries Division (CID). Licensing and Personnel Qualifications: Contractor and all subcontractors shall be properly licensed and registered, under the State of New Mexico Construction Industries Division (CID) Regulations, for all aspects of work requirements. Actual work shall be performed by workmen properly licensed or appropriately skilled in applicable trade. A GB-98 license is required for the prime contractor. Bidders are encouraged to submit other licenses as may be considered appropriate. 29 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Contractor must have been duly licensed a minimum of Five (5) years: Contractor must have been in business with experience in providing structured data communications cabling for a minimum of five (5) years. Contractor must be financially stable: Contractor may be required to submit a copy of their latest certified audited financial statements showing contractor to be a financially stable company. Contractor is responsible for reviewing Project Requirements: Contractor shall carefully study the project requirements and drawings, and shall at once report to CNM errors, inconsistencies or omissions discovered. Contractor shall not be liable to CNM for damage resulting from errors, inconsistencies or omissions unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to CNM. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the project documents without notifying CNM, Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction. Contractor agrees to proceed with Work regularly: It is hereby understood and mutually agreed that the date for beginning, rate of progress, and time for completion for Work to be done hereunder are ESSENTIAL CONDITIONS of the resultant Contract. Contractor agrees that said work shall be prosecuted regularly, diligently, and uninterruptedly at such rate of progress as will insure full completion thereof within time specified. Contractor shall notify CNM in writing: At least ten (10) days prior to the date on which the Work will be ready for final inspection Contractor will provide notification to CNM. Final inspection will not be performed until all Work is completed. CNM will also designate a representative to make final inspection on date requested, but any delay in making final inspection shall not relieve the Contractor of responsibility for the Work, nor shall CNM be held responsible for damages or claims for compensation on account of continuing overhead, maintenance, etc., occasioned by such delay. If CNM’s representative making final inspection finds the Work so far from completion as to make a later visit necessary, or that undue delay in making final inspection is incurred, Contractor shall, if determined by CNM, to be liable for expense to CNM incurred by reason of such delay or re-inspection. Contractor agrees that CNM may charge liquidated damages: CNM shall charge liquidated damages on a per project basis. If Contractor neglects, fails or refuses to substantially complete the Work within time specified for the completion of each project, then said Contractor does hereby agree, as part consideration for awarding of this contract, to pay to CNM $1,500.00 per day per individual project for each calendar day past the completion date specified in the resultant purchase order that completion or delivery is delayed, not as a penalty but as liquidated damages for such breach of contract. Provided, that Contractor shall not be charged with liquidated damages or any excess when delay in completion of the Work is due: 1. To any performance, priority or allocation order duly issued by the government; 2. To unforeseeable cause beyond Contractor's control and without fault or negligence of Contractor including but not limited to acts of God or public enemy, acts of CNM, acts of another contractor in performance of a different contract with CNM, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather; and Contractor agrees that CNM has the right to carry out work: If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven (7) day period after receipt of written notice from CNM to commence and continue correction of such default or neglect with diligence and promptness, CNM may after such seven (7) day period give the Contractor a second written notice to correct such deficiencies within a second seven (7) day period. If the Contractor within such second seven (7) day period after receipt of such second notice fails to commence and continue to correct any deficiencies, CNM may, without prejudice to other remedies CNM may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such deficiencies, including compensation for CNM’s additional services and expenses made necessary by such default, neglect or failure. Such action by CNM and amounts charged to 30 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. the Contractor are both subject to prior approval of CNM. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to CNM. Supervision: The work shall be performed under the direction of a qualified foreman with a minimum of five (5) years project management experienced in the trade who shall be thoroughly familiar with the complete requirements of the project and shall normally be present on the site during the execution of the work. The cost of such a foreman will be considered as a part of the contractor's overhead and may not be billed as a separate charge. If the foreman actually works on the site as a crewmember, his/her hours may be billed at the appropriate level. Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instructions concerning these matters. Estimating, takeoffs and the like will also be considered as overhead not to be billed separately. Contractor shall enforce strict discipline: Contractor will enforce strict discipline and good order among the Contractor’s employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. More stringent standards will govern: In the event of a conflict between the various specifications, codes and standards, the more stringent shall govern. On completion of the various parts of the work, the installation shall be tested by the constituted authorities and approved; and, once approved, contractor shall obtain and deliver to the CNM final certificates of acceptance. Contractor shall hold and save the CNM Governing Board free and harmless from liability of any kind arising from his failure to comply with these requirements. Standards: Contractor must insure that all work and materials shall comply with the recommendations and standards as set forth in the latest edition(s) of pertinent City, State, County and National Codes and Ordinances. CNM may also have specifications which may apply to any given project. CNM specifications will be provided by the CNM Project Manager as applicable. If materials, equipment, or systems are installed in a manner which is not in conformance with the requirements of these specifications and for which the Contractor has not received written approval, removal of all the unauthorized materials plus installation of those indicated or specified shall be provided at no extra cost to CNM. Specifications Deviation: General Specifications are binding. However, in instances where there is a deviation between the General Specifications and the Job Specifications, the Job Specifications or the more stringent shall rule. On any job where there is doubt as to the process of installation to be used, the final decision will be made by the CNM representative or designee. Substitutions. In the construction of any Project, if CNM has a preference for any process, type of equipment or kind of material, it will be indicated in the appropriate Drawing or Specification; otherwise, CNM will consider all processes, types of equipment or kinds of material offered on an or equal performance competitive basis if they are in fact the equal to that specified and will accomplish the purpose intended. CNM reserves the right to be the sole judge as to whether or not a different process, type of equipment or kind of material offered is in fact the or equal performance is to the specification. Inspections: Contractor shall contact the CNM Project Manager, when work is ready for inspection by the authority having jurisdiction. Payment is contingent upon passing all inspections. CNM will not reimburse contractor for work/materials needed to remedy "no pass" work. CNM may inspect projects at any time with or without prior notification to the contractor. CNM shall have the right to observe all framing, electrical or plumbing work before it is covered. Should any work be covered contrary to request or to any requirement of the contract documents, CNM designee may order it uncovered for his observation. Contractor shall uncover and replace all such work at his own expense. Any work or materials installed contrary to the requirements of the contract documents or rejected as defective by CNM shall promptly be removed, replaced or corrected as may be applicable. The cost of this work shall be borne by the Contractor. Contractor shall notify CNM 24 hours in advance before covering up any concealed work or conducting tests by any authority. Reference Section A, clause 80. 31 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Guarantee: Contractor shall guarantee all materials, equipment and workmanship furnished and installed under this contract to be free from all defects and shall agree to replace at his/her expense, without expense to CNM, any and all defective equipment, parts, etc., for a period of twenty-five (25) years after accepted by CNM approval of final payment. This excludes normal maintenance and daily servicing of equipment which is CNM's responsibility. Protection of the Work: The Contractor is responsible for the protection and security of all materials, tools, equipment, and installed work until the final acceptance of the work by CNM designee. Clean-up: The Contractor shall keep the site reasonably clean and neat during the execution of the work, shall remove accumulations of debris at the end of each work day, and shall leave all surfaces and areas completely clean at final completion. Pre-Construction Conference: After bid award, but prior to starting construction of each or any project, Contractor shall meet with CNM Project Manager to outline procedures such as location, scheduling, paper flow, and inspections. Projects: If CNM elects to utilize this contract, the work to be performed under this contract is subject to strict CNM internal controls. Execution of any project will commence with CNM preparing for the contractor a Scope of Work, drawings, specifications, Request for Bid Response form (reference EXHIBIT B and D). The contractor will prepare an acceptable bid with plans and/or a description. The bid shall be completed by the contractor, listing a description of the work to be completed, materials required, estimated quantity, estimated hours per man-hour classification and total bid. Site visits will be conducted as necessary. Contractor shall submit the bid to CNM Purchasing Department Representative for review. Based upon CNM's calculations, Architect’s/Engineer's estimates etc. of the work to be done, bid will be approved or discrepancies negotiated with the contractor. Bids are to be prepared at no additional charge to CNM for either site visit(s)/inspection(s) or actual bid preparation. Issuance of a CNM PO for each project shall authorize the contractor to proceed with the work. Change orders will follow the same guidelines. A decision will be made to do the work with CNM crews or to utilize this contract for all or any portion of the work. Contractor shall not enter into CNM administrative decisions. Submittals: Contractor shall submit shop drawings when either required by CNM or when necessary. Submittal’s shall include manufacturer’s technical data and/or samples as required by CNM Representative with the technical specifications delivered to CNM representative within five (5) working days of Notice to Proceed (issuance of a CNM regular PO). Contractor shall perform to PO’s from CNM. Because coordination of permits, final inspections and the collection and updating of utility records fall within CNM PPD/Facilities responsibilities, no work may be contracted without the issuance of a PO from CNM Purchasing Department. After issuance of a PO, a CNM Representative will assign work directly with the contractor for the duration of that project. The following personnel have been designated as authorized Representative contacts for purposes of this contract. 1. 2. 3. Ray Barela, CNM Facilities Project Manager/ Physical Plant Richard Mazon, CNM ITS/ Infrastructure Support Manager Any CNM Buyer This list is subject to CNM’s revision at any time. Work NOT defined in individual Project Scope of Work: Contractor shall NOT perform work beyond the defined Scope of Work for individual Projects prior to receipt and acceptance of a fully executed change in compliance with Section G. CNM is under no obligation to make payment on unauthorized change requests. Alternates: When Alternates are to be accepted by CNM, the contract will be awarded to the Responsible Bidder who bids the lowest combined bid of the Based Bid and all accepted Alternates. New Mexico Gross Receipts Tax (NMGRT) 32 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. shall be shown as a separate entry after the subtotal, using the method described above, for each Alternate, followed by a total derived by adding the subtotal and NMGRT amounts. Alternates, if any, and if accepted, will be accepted in ascending order as numbered in the Bid Response form. Work Scheduling: All work shall be, insofar as possible, performed during normal working hours (7:00 A.M. to 5:00 P.M.) Monday through Friday. However, all work shall be coordinated with both the Contractor and CNM ITS/Infrastructure, Construction Manager to avoid interference with any facility schedule. CNM ITS/Infrastructure, Representative will sign appropriate form verifying that the work has been completed. A list of worker's name(s) and job classification(s) shall be included on the form. Response Time: Contractor will be expected to respond to the approved purchase order within five (5) days for routine requests and within one (1) day for emergency requests. Interrupting Services: The contractor shall coordinate the execution of all work within the building in order to minimize interference with the operation of existing mechanical, electrical, plumbing, and utility systems during construction or repair work. Connections to existing systems requiring the interruption of service within the building shall be carefully coordinated with the CNM ITS/Infrastructure, Representative to minimize system down times. Absolutely no interruption of the existing services will be permitted without the prior approval of CNM. A minimum of 48 hours notice shall be given to CNM ITS/Infrastructure, Representative. Cancellation: Failure to comply with the terms of the contract documents and/or unsatisfactory performance/product will constitute grounds for cancellation of the contract. If, after consultation between CNM users, CNM Purchasing Department, and the contractor, grounds for cancellation still exist, immediate notification of cancellation will be provided in writing by the CNM Purchasing Department. Upon such notification, the contractor shall cease work immediately and shall submit an invoice for work satisfactorily completed to date. No allowance will be made for anticipated work or profits. Safety: The contractor shall take all necessary precautions to protect the site occupants from hazardous conditions. The contractor shall abide by all Occupational Safety and Health Administration (OSHA) regulations and all State of New Mexico Environmental Improvements Board Occupational Health and Safety regulations that apply to this contract. Reference Section A, clause 55 and Section B, Clause 15. The contractor shall defend, indemnify, and hold the CNM Governing Board and its agents, officers, administrators, and employees free and harmless against all claims, loss, liability, and expense resulting from any alleged violations of said regulations, including, but not limited to, fines or penalties, judgments, court costs, and attorneys' fees. The contractor also shall be responsible for damage to persons or property that occurs as a result of his fault or negligence, or that of his employees and/or agents, in connection with this contract. Reference Section A, clause 34. Contractor shall barricade or otherwise separate the work site from students. Workers will not leave hand or power tools unattended. The CNM Safety Director or CNM Representative has the authority to stop any unsafe job and to require safety precautions such as evacuation from the area to protect students and staff. Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: 1. employees on the Work and other persons who may be affected thereby; 2. the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor’s Subcontractors or Sub-subcontractors; and 3. other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 33 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. Hazardous Materials. Asbestos, and lead-based paint removal or handling is not within the scope of this contract. If the Contractor should discover or expose lead-based paint or asbestos at any time, work is to stop immediately and CNM Project Manager is to be notified immediately and will take the appropriate action to rectify the problem and the inconvenience to the Contractor. Contractor time will be adjusted appropriately in order to prevent the Contractor from being assessed liquidated damages. Reference Section A, clause 55. Operation Prior to Acceptance: CNM shall have the right to operate any and all apparatus as soon as and as long as it is in operating condition whether or not such apparatus has been accepted as complete and satisfactory. This shall not be construed to mean acceptance before any required alterations or repairs have been made and does not indicate acceptance of the work by CNM. Contractor bears the burden for flagging/posting work areas not to be utilized. When the contractor enters into a contract with CNM, he/she agrees to the above. Progress Reports: The Contractor shall submit a progress report once each calendar month showing the status of all outstanding work. These reports shall include the following: a. Purchase Order (PO) number and date PO issued to Contractor. b. Project name. c. Scheduled start and completion date for each individual project. d. Percentage (%) completed. e. If construction exceeds time allowed or requires re-scheduling, the reason therefore shall be indicated by the Contractor in writing. Final Acceptance: The contractor shall notify the CNM Project Manager, or his designee when each Project is complete, and submit all as-built drawings and project documentation as required. CNM shall then arrange for a prompt inspection by appropriate CNM Representatives who shall either accept the project as complete and satisfactory or provide a written list of items to be corrected and/or completed. Reference Section A, clause 49. Releases of Lien: If applicable, the contractor shall provide unconditional releases of lien from all subcontractors and major material suppliers when submitting his final invoice at the end of each project. Invoice and Purchase Order Procedures: Upon project award, CNM will issue a Purchase Order (PO) which will be in effect for the duration of the contract, and which will accommodate multiple billings as work is completed. Itemized nvoices, clearly referencing appropriate Project name, and PO number shall be submitted in duplicate to the CNM’s ITS Representative. Copies of the completed PO shall be attached to the invoice to substantiate charges for auditor tracking purposes. Charges for personnel shall indicate the wage rate, job classification and the name of personnel performing the work with reference to the appropriate time records. Charges for materials, if any, shall indicate the kinds and quantities, unit prices and manufacturer's list price and the appropriate quoted percent discount or per an agreed to price. When applicable, final invoice for each project shall be accompanied by all required guarantees, operations manuals, releases of lien and/or other submittal required by the Contract Documents. EXAMPLES OF POTENTIAL WORK PROJECT Repair/replacement/relocation or new installation of Structured communications cabling components as described in CNM’s CISM. Potential work may also include installation of active devices such as wireless access points, wireless antennas and POE components. Installation of active devices shall be limited to physical installation and shall not involve software configurations. Codes, Fees and Permits: Contractor shall secure all permits and licenses for the required work and shall pay all fees in connection with such permits and licenses. All work shall be executed in accordance with the current International Building Code (IBC) of 2003, National Fire Protection Association (NFPA), local (to include Fire Marshall review when 34 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. required), state ordinances, and regulations governing the particular class of work involved. Contractor shall be responsible for the final execution of the work under this heading to suit these requirements. In the event of a conflict between the various specifications, codes and standards, the more stringent shall govern. On completion of the various parts of the work, the installation shall be tested by the constituted authorities and approved; and, once approved, contractor shall obtain and deliver to the CNM final certificates of acceptance. The contractor shall hold and save the CNM free and harmless from liability of any kind arising from his failure to comply with these requirements. Protection of Adjacent Surfaces: The contractor shall take all measures necessary during the course of work to protect existing property including adjacent surfaces, equipment, electrical systems, piping, furnishings, and landscaping from damage during the course of the work and shall repair promptly any such damage at his own expense and to the satisfaction of CNM Project Representative. Protection of the Work: The contractor is responsible for the protection and security of all materials, tools, equipment, and installed work until the final acceptance of the work by CNM designee. MATERIALS: Materials Supply and Quality: Contractor shall maintain at all times (or have access to) an ample stock of various materials necessary to complete specified projects within the required time frame(s). All materials shall be of equal or greater quality as compared to the original. Any manufacturer's data supplied with the materials shall be submitted to the CNM Representative or designee. All materials shall be new, unused, and in perfect condition. However, if conditions would necessitate utilizing used/rebuilt materials, prior approval must be secured from the Project Manager. Procurement of Other Materials: CNM reserves the right to procure any materials through normal procurement channels and to furnish such materials to contractor for installation. Materials, so procured shall not be marked up by the contractor in any manner. Installation shall be in strict accordance with the recommendations of the manufacturer or as may be required by code. If such recommendations conflict with plans and specifications, the contractor shall report such conflicts to CNM. Changes shall be made as mutually agreed or necessary. 35 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. SECTION E: INSTRUCTIONS TO BIDDERS FOR BID #T-2752 Bidders are encouraged to submit prices on any or all items as their ability to furnish dictates. All prices shall be F.O.B. Destination and shall include all charges that may be imposed in fulfilling the terms of this agreement. All freight, insurance, and other associated costs are to be included in the unit costs bid. The bidder should present in detail all products and services offered in response to this invitation. It is the bidder’s responsibility to make sure all products proposed are adequately described. Any offer which proposes like quality, design or performance will be considered, providing sufficient descriptive literature, specification sheets, etc. are included to properly evaluate the equivalency. NOTE: CNM WILL BE THE SOLE JUDGE OF EQUIVALENCY. It should not be assumed that the buyer has specific knowledge of the products proposed, but has sufficient technical background to conduct an evaluation when presented complete information. Sample products and/or additional information to support an “or approved equal” may be required at no charge to. Such items shall be delivered to the Purchasing Department within three (3) working days of the request. Submittals: The following items MUST be with your bid; • EXHIBIT B: Response Form for Project #1, “Communications Cable Installation for CNM Wireless Network Overlay”. o Bid Bond (Security) at 5% of the bid price for EXHIBIT A/Project #1 only. • EXHIBIT E: Response Form for Parts/Materials and Equipment Pricing (for Bid). • EXHIBIT F: Contractor qualifications Statement (for Bid). • EXHIBIT G: Sub-Contractors Listing (for EXHIBIT A & B). • EXHIBIT I: Signature of Firm’s Authorized Representative and Debarment Suspension Status &Non• Collusion Affidavit Form (for Bid). • Resume(s) of RCDD staff assigned to project • Copy of Contractor’s BISCI registrations • Three (3) reference for similar work within the last two (2) years in scope and design in either the Albuquerque metro area, Bernalillo county or in the State of New Mexico. Include the Company name, address, contact name, and telephone & fax number, and e-mail address. Do not state CNM as a reference. • EXHIBIT J: Small and Small Disadvantage Business Certification Form (for Bid). Retain all remaining pages for your files. Technical questions concerning the requirements of the end user should be directed to CNM’s buyer. NOTE: Bid security and Subcontractor listing are statutory requirements. METHOD OF AWARD FOR THE BID CNM will to award three (3) to six (6) Purchase Agreements (PA’s) to the lowest responsible bidders based on the bid responses submitted on Project # 1, “Communications Cable Installation for CNM Wireless Network Overlay.” The awarded PA contractor with the lowest bid for project #1 will receive a purchase order for that project. All Contractors with awarded PA’s will provide quotations for future projects in accordance with the RFB. METHOD OF AWARD PER PROJECT: The low bid contractor will be awarded projects unless the contractor’s capacity is overextended. The over extension will be defined in one of three (3) ways: 1. The projects will cause the contractor to exceed his bonding capacity. 2. If two or more projects under contract are behind on an approved schedule. 3. In the Contractor’s own opinion (Contractor provides written justification why refusing additional projects). In the case of over extension, the second lowest bid will be awarded the project. If the second lowest bid is overextended the project will be awarded to the third lowest bid. 36 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. SECTION F: INSURANCE REQUIREMENTS CERTIFICATES OF INSURANCE The Contractor shall furnish CNM one copy each of Certificates of insurance herein required for each copy of the resultant Agreement, showing the coverage, limits of liability, covered operation, effective dates of expiration of policies of Insurance carried by the Contractor. The Contractor shall furnish to CNM copies of limits. The Certificates of Insurance shall be in the form of AIA Document G-705 or similar format acceptable to CNM. Such certificates shall be filed with CNM and shall also contain the following statements: 1. The Governing Board of Central New Mexico Community College, Central New Mexico Community College, its agents, servants and employees are held as additional insured. 2. "The insurance coverage certified herein shall not be canceled or materially changed except after forty five (45) days written notice has been provided to CNM." COMPENSATION INSURANCE: The Contractor shall procure and shall maintain during the life of any resultant agreement Worker's Compensation insurance as required by applicable State law for all of the Contractor's employees to be engaged at the site referred to in this solicitation in case of any such work sublet, the Contractor's Worker's Compensation insurance. In case any class of employee engaged in work on the project under this contract is not protected under a Worker's Compensation Statute, the Contractor shall provide and shall cause each subcontractor or subsubcontractor to provide Employer's Insurance in an amount of not less than $500,000. CONTRACTOR'S PUBLIC LIABILITY INSURANCE: The Contractor shall maintain insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-4-1 et.seq. NMSA 1978". The insurance must remain in force for the life of the contract including all contract extension or renewals. The limits effective July 1, 1992 are: $400,000 per person/$750,000 per occurrence plus $300,000 for medical and $200,000 for property damage for a total maximum liability of $1,150,000 per occurrence. CONTRACTOR'S VEHICLE LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contact Vehicle Liability Insurance coverage "equal to the maximum liability amounts set forth in the New Mexico Tort Claims Act Section 41-1-1 et. seq. NMSA 1978". The insurance must remain in force for the life of the contract including all contract extensions or renewals. The limits effective July 1, 1992 are: Bodily Injury : Property Damage: $750,000. Each Occurrence $200,000. Each Occurrence SUBCONTRACTOR'S AND SUB-SUBCONTRACTOR'S PUBLIC AND VEHICLE LIABILITY INSURANCE: The Contractor shall either: (1) Require each subcontractor or sub-subcontractor to procure and maintain during the life of the subcontract or sub-subcontract Public Liability Insurance of the types and amounts specified above or, (2) Insure the activities of the subcontractors or sub-subcontractors in the Contractor's policy as required under this Article. GENERAL: All insurance policies are to be issued by companies authorized to do business under the laws of the state in which the work is to be done and acceptable to CNM. The Contractor shall not violate, or permit to be violated, any conditions of any said policies, and shall at all times satisfy the requirements of the insurance companies writing said policies. 37 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. SECTION G: CHANGE ORDER TERMS AND CONDITIONS The Contractor will submit a properly itemized Lump Sum Change Order Proposal covering the additional work or work to be deleted. This proposal will be itemized for the various components of Work and segregated by labor, material, and equipment. CNM will require itemized change orders and contractor pricing certifications on all Change Order proposals from the Contractor, subcontractors, sub-subcontractors regardless of tier, and major material suppliers. Details to be submitted will include a material and labor quantity take-off and related pricing information and extensions (by drawing if applicable). CHANGES IN THE WORK 1. GENERAL 1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, or an Order for a minor change in the Work as issued by CNM, subject to the limitations stated in SECTION G and elsewhere in the Contract Documents. 1.2 A Change Order shall be based upon agreement among CNM and Contractor; an order for a minor change in the Work may be issued by CNM alone. 1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order, or order for a minor change in the Work issued by CNM. CHANGE ORDERS 2. Modification Change Request: A Modification Change Request (“MCR”) is a form which initiates the change order process. The MCR is form which is provided to the Contractor by CNM. The MCR shall be completed and signed by CNM and Contractor prior to the Contractor starting work on any proposed change order. The MCR is utilized for the purpose of authorizing work prior to the execution of a fully completed change order. 3. A Change Order is a written instrument prepared by CNM, and signed by CNM and the Contractor, stating their agreement upon all of the following: a) change in the Work; b) the amount of the adjustment, if any, in the Contract Sum; and c) the extent of the adjustment, if any, in the Contract Time. 4. Every Change Order in excess of $3,000.00 or three day extension shall be initiated by an agreement by CNM and Contractor to a Modification Change Request (MCR) on the form provided by the CNM. An MCR is a form which initiates the Change Order process. The MCR is a form which is provided to the Contractor by CNM. The MCR shall be completed and signed by CNM and Contractor prior to Contractor starting work on any proposed Change Order. The MCR is a written document utilized for the purposes of authorizing work prior to the execution of a fully completed Change Order Document. 5. Methods used in determining adjustments to the Contract Sum may include: a) Price Plus proposal; or b) unit price proposal as defined in the following provisions. 5.1 Price Plus Change Order Proposals 5.1.1 The Contractor will submit a properly itemized Price Plus Change Order Proposal covering the additional work or work to be deleted. This proposal will be itemized for the various components of Work and segregated by labor, material, and equipment using the attached Change Order Forms. CNM requires itemized change orders and contractor pricing certifications on all Change Order proposals over $3,000.00 from the Contractor, subcontractors, sub subcontractors regardless of tier, and major material suppliers. Details to be submitted will include a material and labor quantity take off and related pricing information and extensions (by drawing if applicable). Upon final approval of the MCR, the Contractor shall perform such authorized extra Work at actual cost for direct labor (working foremen, journeymen, apprentices, helpers, etc.), actual cost of labor burden, actual cost of material used to perform the extra Work, and actual cost of rental of major equipment (without any charge for administration, clerical expense, general supervision or superintendence of any nature whatsoever, including general foremen, or the cost or rental of small tools, minor equipment, or plant) plus the approved Markup Percentage Fee. CNM and Contractor shall agree in advance in writing on a maximum price for this Work and CNM shall not be liable for any charge in excess of the maximum. 38 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 5.1.2 Labor: Estimated labor costs to be included for self performed Work shall be based on the actual cost per hour paid by the Contractor for those workers or crews of workers whom the Contractor reasonably anticipates will perform the Change Order Work. Estimated labor hours shall include hours only for those workmen and working foremen directly involved in performing the Change Order Work. Supervision above the level of working foremen (such as general foremen, superintendent, project manager, etc.) is considered to be included in the agreed upon Markup Percentage Fee. 5.1.3 Labor Burden: Labor burden allowable in Change Orders shall be defined as employer's net actual cost of payroll taxes (FICA, Medicare, SUTA, FUTA), net actual cost for employer's cost of union benefits, and net actual cost to employer for worker's compensation insurance taking into consideration adjustments for experience modifiers, premium discounts, dividends, rebates, expense constants, assigned risk pool costs and assigned risk rebates. Contractor shall reduce their standard payroll tax percentages to properly reflect the effective cost reduction due to the estimated impact of the annual maximum wages subject to payroll taxes. Labor burden shall not be considered to include costs of small tools, comprehensive general liability insurance, auto insurance, or umbrella insurance all of which shall be considered covered by the Markup Percentage Fee. 5.1.4 Material: Estimated material Change Order prices shall reflect the Contractor's reasonably anticipated net actual cost for the purchase of the material needed for the Change Order Work. Estimated material prices shall reflect the Contractor's reasonably anticipated cost reductions due to available trade discounts and/or volume rebates. 5.1.5 Equipment: Allowable Change Order estimated costs may include appropriate amounts for rental of major equipment specifically needed to perform the Change Order Work (defined as tools and equipment with an individual purchase cost of more than $750). However, the aggregate rentals chargeable for any one piece of equipment shall be limited to 75% of its fair market value at the time the Change Order is priced. 5.1.6 Markup Percentage Fee: With respect to Price Plus Change Order Proposals, the Markup Percentage Fee to be paid to any Contractor (regardless of tier) on self performed work shall be a single markup percentage not to exceed 15% of the net amount of (1) direct labor and allowable labor burden costs applicable to the Change Order or extra Work; (2) material and equipment incorporated into the change or extra Work, and (3) rental cost of major equipment necessary to complete the change in the Work. 5.1.7 The Markup Percentage Fee to be paid to any Contractor (regardless of tier) on any Subcontractor Work shall be a single percentage not to exceed 5% of the total allowable cost of sublet Work. 5.1.8 Sales and use tax (if applicable) shall not be subject to any Markup Percentage Fee. Any sales or use tax properly payable by the Contractor shall be added after computing the Change Order amount before tax. 5.1.9 As a further clarification, the agreed upon Markup Percentage Fee is intended to cover the Contractor's profit and all indirect costs associated with the Change Order Work. Items intended to be covered by the Markup Percentage Fee include, but are not limited to: home office expenses, branch office and field office overhead expense of any kind; project management; superintendents, general foremen; engineering; coordination; expediting; purchasing; detailing; legal, accounting, data processing or other administrative expenses; shop drawings; permits; general liability and excess umbrella insurance; pick-up truck costs. The cost for the use of small tools is also to be considered covered by the Markup Percentage Fee. Small tools shall be defined as tools and equipment (power or non power) with an individual purchase cost of less than $750). 5.1.10 The application of the markup percentages referenced in the preceding Subparagraphs 5.1.7 and 5.1.8 will apply to additive Change Orders. In those instances where changes involved both additive and deductive work, the additions and deductions will be netted and the markup percentage will be applied to the net additive amount. 5.1.11 In no event will any amounts for "contingency" be allowed to be added as a separate line item in change order estimates. Variables attributable to labor hours will be accounted for when estimating labor hours anticipated to do the work. 5.1.12 The Contractor's proposals and proposed MCR for changes in the Contract Sum or Contract Time shall be submitted within seven (7) calendar days of the CNM's request, unless CNM extends such period of time due to the circumstances involved. If such proposals are not received in a timely manner, if the proposals are not acceptable to CNM, or if the changed Work should be started immediately to avoid damage to the Project or costly delay, CNM may direct the Contractor to proceed with the changes without waiting for the Contractor's proposal. Such directions to the Contractor 39 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. by CNM shall be confirmed in writing. The cost, credit, and time extensions, if any, will be determined by negotiations as soon as practicable thereafter and incorporated in a Change Order to the Contract. 5.1.13 Contractor agrees that it is responsible for submitting accurate cost and pricing data to support its Price Plus Change Order Proposals or other contract price adjustments under the Contract containing the information identified on the attached Change Order or Modification Change Request Forms. Contractor further agrees that it will certify that to the best of his knowledge and belief, the cost and pricing data submitted was accurate, complete, current and in accordance with the terms of the Contract with respect to pricing of Change Orders. Contractor will also further represent that he has made reasonable good faith inquiries to appropriate individuals within his organization to confirm that the data submitted was accurate, complete and current. It is agreed that such certifications will be required for all contract price adjustments. The Contractor shall provide backup documentation or Contractor will not be paid for the changed work. The Contractor shall not bill or invoice for changed work until the formal Change Order is agreed to and executed by CNM and Contractor. 5.1.14 Contractor also understands that CNM has the right to audit the Contractor's records to verify the accuracy and appropriateness of the pricing data used to price Change Order Proposals. Even after a Change Order Proposal has been approved, Contractor agrees that if it is later determined by audit or otherwise that the cost and pricing data submitted was inaccurate, incomplete, not current or not in compliance with the terms of the Contract regarding pricing of Change Orders; then an appropriate Contract Sum revision will be made. 5.1.15 Contractor also agrees that it will incorporate the provisions of this Subparagraph 5.1 into all agreements with subcontractors and major material suppliers. It is understood that the Change Order, pricing terms outlined in this Subparagraph 5.1 will apply to Contractor, all Subcontractors, all sub subcontractors and all major material suppliers, unless specific modifications are approved in advance by CNM and documented in a written amendment to this Contract. 5.1.16 Contractor agrees to provide and require all subcontractors to provide labor and labor burden cost and pricing information as outlined in the Change Order and MCR Forms. This information will be used to evaluate the potential cost of labor and labor burden related to Change Order Work. It is intended that this information represent the Contractor's best estimate of its actual costs at the time the estimate is presented. It is anticipated that this information or similar cost and pricing data may be used from time to time for the pricing of Change Orders. This information is not intended to establish fixed billing or Change Order pricing labor rates. At the time Change Order or MCR are priced, CNM and Contractor may agree to use the submitted data to price Change Order Work. It is intended for all such pricing data to be subject to audit and adjustment at a later date if the information was not accurate and in accordance with the Contract terms. 5.2 Unit Price Change Order Proposals 5.2.1 As an alternative to Price Plus Change Order Proposals, CNM may choose the option to use Contract Unit Prices, if unit prices are stated in the Contract Documents. The Contractor will submit within seven (7) calendar days after receipt of CNM's written request for a Unit Price Proposal, a written Unit Price Proposal itemizing the quantities of each item of Work for which there is an applicable Contract Unit Price on the attached Change Order Forms. The quantities must be itemized in relation to each specific contract drawing. Contract Unit Prices will be applied to net differences of quantities of the same item. Such Contract Unit Prices will be considered to cover all direct and indirect costs of furnishing and installing the item including the Contractor's Markup Percentage Fee. 5.3 MINOR CHANGES IN THE WORK 5.3.1 CNM will have authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents as directed by CNM. Such changes shall be effected by written order and shall be binding on CNM and Contractor. The Contractor shall carry out such written orders promptly. 40 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. SECTION H: CNM MODIFICATION CHANGE REQUEST (MCR) AND CHANGE ORDER FORMS Project Name: CNM _____________________________________________________________________________________________________ Contract Date: _______________________________________________ Current Date: ______________________________________________ CNM PO# _____________ MCR Log Number: _____________________ Contractor: ________________________ Project A/E: ____________________________ CNM Project Manager: _________________________ Phone: (_____) _________________________ Who Has Requested Work Be Done: Initial _____________ (ie, contractor, subcontractor, CNM, etc.) Description and reason for Change: First why, then how Attachment(s) Yes No____ Requested Time Adjustment: _______ Days Reasons for changes: Field Conditions ______ CNM Request ______ A/E Error/Omission ______ Regulatory ______ Other ______ (The Project Manager as well as the Purchasing Director must approve change requests that exceed $3,000.00. Note: Any change requests that involve time extensions beyond three (3) days shall require signature of Purchasing Director.) Contractors Cost: (Include backup.) Not-to-exceed Amount $___________ Initial__________ (CNM Project Manager) (Includes all parts, labor, material, equipment, overhead, markup, insurance, etc.) Date ______________ ______ Do Not Proceed _______ Proceed with Estimate of Construction Costs Only! _______ Proceed with the Work, Change Order Documents to Follow, A.S.A.P.! Change orders must be submitted using change order forms. No change orders shall be binding upon CNM unless signed by the CNM Purchasing Director. Change orders in excess of $100,000.00 are not binding upon CNM unless also signed by the CNM Comptroller and the CNM Vice President for Administrative Services. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request supporting documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Modification Change Request to be submitted with five (5) originals. CNM - Review of Content and/or Feasibility: ____________________________ Contractor __________ Date _______________________________ CNM Executive Director of Facilities ___________ Date ____________________________ Architect/Engineer ___________ Date ________________________________ CNM Buyer ____________ Date _________________________ CNM Project Manager __________ Date ________________________________ CNM Director of Purchasing ____________ Date 41 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CENTRAL NEW MEXICO COMMUNITY COLLEGE 525 BUENA VISTA SE ALBUQUERQUE, NM 87106 CHANGE ORDER FORM Project Name: CNM __________________________________________________________ Contract Date: ______________ Project No. ________________ CNM Project Manager: _____________________________ Phone: (______) ______________________ Change Order No. _______ P.O. No. _________ Contractor: ________________________ Project A/E: ______________________________ Notice to Proceed: ________________________________ ****************************************************************************************** Original Contract Amount Net Change by Previous Change Order Total Contract Amount by Previous Change Orders Net Change This Change Order Contract Sum to Date $______________________ $______________________ $______________________ $______________________ $______________________ Original Contract Time (Consecutive Calendar Days) Previous Contract Time Adjustment This Change Order Revised Contract Time ____________________days ____________________days ____________________days ____________________days Original Completion Date Previous Completion Date Revised Completion Date _______________, 200____ _______________, 200____ _______________, 200____ CHANGE ORDER DESCRIPTION: _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ Reason for Change(s): Field Conditions ________CNM Request Emergency ________ ________A/E Oversight ________Regulatory ________Other _________ In accordance with the contract between Central New Mexico Community College (Owner) and _______________________________________ (Contractor) dated ___________________________, 200______, this document inclusive of the attached pricing worksheets constitutes a binding contractual modification and comprises the total compensation due to the Contractor for the work and contract time defined in this change order. This change order consists of this page and all attachments, which have been given consecutive page numbers. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. (mm/dd/yy) Submitted by Contractor:_____________________________________________________________________ Date: ___________________ Submitted by Architect:_____________________________________________________________________ Date: ___________________ Reviewed by CNM Project Manager:_________________________________________________________ Date: ___________________ Approved by CNM Director of Purchasing & Mats Mgt : _________________________________________ Date: ___________________ Approved by CNM Comptroller:______________________________________________________________ Date: ___________________ Approved by CNM VP Administrative Services: _______________________________________________ Date: ___________________ No change orders shall be binding upon CNM unless signed by the CNM Purchasing Director. Change orders in excess of $100,000.00 are not binding upon CNM unless also signed by the CNM Comptroller and the CNM Vice President for Administrative Services. 42 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CHANGE ORDER WORKSHEET AND PRICING CERTIFICATION Project Name: CNM ______________________________________________________________________ Change Order No. _________________________________ P.O. No. __________________________ Contractor Name: _________________________________________ Phone No. (____) __________________ CONTRACTOR’S SUMMARY OF COSTS Contractors Labor: (Work Performed by Contractor’s Employees) Job Class ___________________ No. of hours __________ Hourly Rate: _____________ = Labor Burden _________% $_______________ = $_______________ Job Class ___________________ No. of hours __________ Hourly Rate: _____________ = $_______________ Labor Burden _________% = $_______________ Job Class ___________________ No. of hours __________ Hourly Rate: _____________ = $_______________ Labor Burden _________% = Labor Total: $_______________ $____________________ Material Costs: $____________________ Equipment Costs: $____________________ Total Direct Costs: $____________________ Overhead & Profit: ________________% $____________________ Subtotal: $____________________ Subcontractor’s Costs: $____________________ Contractor’s Overhead & Profit on Subcontractor Work: ________________% $____________________ Subtotal: Bond Premium: ________________% $____________________ $____________________ TOTAL COST: $____________________ The undersigned hereby certifies, warrants and represents that to the best of Contractor’s knowledge, the cost or pricing data submitted is true and accurate as of the submitted date, and in accordance with the contract agreement. The price to CNM, including profit or fee, shall be adjusted to exclude any significant sums by which CNM reasonably finds that such price was increased because the contractor furnished cost or pricing data was inaccurate, incomplete, or not current as of the date of submittal. The undersigned further certifies that he/she has the authority to certify compliance for the contractor named below. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Signature________________________________________________________ Title_______________________________________ Name Typed____________________________________________________________________ Date________________________ Company___________________________________________________________________________________________________ Address____________________________________________________________________________________________________ City/State/Zip_______________________________________________________________________________________________ 43 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CHANGE ORDER WORKSHEET AND PRICE CERTIFICATION Project Name: CNM ________________________________________________________________________ Change Order No. ________________________________ P.O. No. __________________________________ Contractor Name: ________________________________________ Phone No. (____) ___________________ ****************************************************************************************** CONTRACTOR’S LABOR BURDEN BREAKDOWN Work Performed by Contractor’s Employees: Job Class ___________________________ Hourly Rate: _______________________ Union benefits: Net Actual Cost to Employer for Employee Union Benefits……………………………….__________% Payroll Taxes: FICA………………………………………………………………………………………..___6.2_____% Medicare……………………………………………………………………………………___1.45____% State Unemployment Tax…………………………………………………………………..__________% Federal Unemployment Tax………………………………………………………………..__________% Insurance: Worker’s Comp. Insurance…………………………………………………………………__________% General Liability Insurance…………………………………………………………………__________% TOTAL: ______________________% ****************************************************************************************** The undersigned hereby certifies, warrants and represents that to the best of Contractor’s knowledge, the cost or pricing data submitted is true and accurate as of the submitted date, and in accordance with the contract agreement. The price to CNM, including profit or fee, shall be adjusted to exclude any significant sums by which CNM reasonably finds that such price was increased because the contractor furnished cost or pricing data was inaccurate, incomplete, or not current as of the date of submittal. The undersigned further certifies that he/she has the authority to certify compliance for the contractor named below. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Signature________________________________________________________ Title_____________________________________ Name Typed____________________________________________________________________ Date________________________ Company___________________________________________________________________________________________________ Address____________________________________________________________________________________________________ City/State/Zip_______________________________________________________________________________________________ *This form should be submitted for each Job Class 44 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CHANGE ORDER WORKSHEET AND PRICING CERTIFICATION Project Name: CNM ______________________________________________________________________ Change Order No. ________________________________ P.O. No. _______________________________ Contractor Name:_________________________________________ Phone No. (____) __________________ ****************************************************************************************** CONTRACTOR’S MATERIAL COSTS Item Qty Unit Price Ext. Price Discount Total Cost * Above pricing information is developed or based upon: ____________________________________________________________ (Attach supporting documentation if required) TOTAL: $ ****************************************************************************************** The undersigned hereby certifies, warrants and represents that to the best of Contractor’s knowledge, the cost or pricing data submitted is true and accurate as of the submitted date, and in accordance with the contract agreement. The price to CNM, including profit or fee, shall be adjusted to exclude any significant sums by which CNM reasonably finds that such price was increased because the contractor furnished cost or pricing data was inaccurate, incomplete, or not current as of the date of submittal. The undersigned further certifies that he/she has the authority to certify compliance for the contractor named below. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Signature________________________________________________________ Title_______________________________________ Name Typed___________________________________________________________________ Date________________________ Company___________________________________________________________________________________________________ Address____________________________________________________________________________________________________ City/State/Zip_______________________________________________________________________________________________ 45 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CHANGE ORDER WORKSHEET AND PRICING CERTIFICATION Project Name: CNM _______________________________________________________________________ Change Order No. ________________________________ P.O. No. _______________________________ Contractor Name:_________________________________________ Phone No. (____) __________________ ****************************************************************************************** CONTRACTOR’S EQUIPMENT COSTS Item Qty Unit Price Ext. Price Discount Total Cost * Above pricing information is developed or based upon: ____________________________________________________________ (Attach supporting documentation if required) TOTAL: $ ****************************************************************************************** The undersigned hereby certifies, warrants and represents that to the best of Contractor’s knowledge, the cost or pricing data submitted is true and accurate as of the submitted date, and in accordance with the contract agreement. The price to CNM, including profit or fee, shall be adjusted to exclude any significant sums by which CNM reasonably finds that such price was increased because the contractor furnished cost or pricing data was inaccurate, incomplete, or not current as of the date of submittal. The undersigned further certifies that he/she has the authority to certify compliance for the contractor named below. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Signature________________________________________________________ Title_______________________________________ Name Typed___________________________________________________________________ Date________________________ Company___________________________________________________________________________________________________ Address____________________________________________________________________________________________________ City/State/Zip_______________________________________________________________________________________________ *This form may only be submitted for rental or major equipment with an individual purchase cost of more than $750. 46 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. CHANGE ORDER WORKSHEET AND PRICING CERTIFICATION Project Name: CNM _______________________________________________________________________ Change Order No. _________________________________ P.O. No. __________________________ Contractor Name: _________________________________________ Phone No. (____) __________________ ****************************************************************************************** SUBCONTRACTOR’S SUMMARY OF COSTS Subcontractors Labor: (Work Performed by Subcontractor’s Employees) Job Class _________________ No. of hours __________ Hourly Rate: _____________ = $_______________ Labor Burden _________% = $_______________ Job Class _________________ No. of hours __________ Hourly Rate: _____________ = $_______________ Labor Burden _________% = $_______________ Job Class __________________No. of hours __________ Hourly Rate: _____________ = $_______________ Labor Burden _________% = $_______________ Labor Total: $_________________________ Material Costs: $_________________________ Equipment Costs: $_________________________ Total Direct Costs: $_________________________ Overhead & Profit: ________________% $_________________________ $_________________________ TOTAL PROPOSAL: ****************************************************************************************** The undersigned hereby certifies, warrants and represents that to the best of Contractor’s knowledge, the cost or pricing data submitted is true and accurate as of the submitted date, and in accordance with the contract agreement. The price to CNM, including profit or fee, shall be adjusted to exclude any significant sums by which CNM reasonably finds that such price was increased because the contractor furnished cost or pricing data was inaccurate, incomplete, or not current as of the date of submittal. The undersigned further certifies that he/she has the authority to certify compliance for the contractor named below. Supporting documentation is required, i.e. quotes, invoices, etc., for change orders exceeding $3,000.00. CNM reserves the right to request documentation for change orders less than $3,000.00. Actual invoices, payroll reports, quotes, etc. may be requested by CNM to support the not to exceed amount of change order. Signature________________________________________________________ Title_______________________________________ Name Typed____________________________________________________________________ Date________________________ Company___________________________________________________________________________________________________ Address____________________________________________________________________________________________________ City/State/Zip_______________________________________________________________________________________________ 47 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT A: SCOPE OF WORK FOR PROJECT #1 FOR BID #T-2752 PROJECT 1: Communications Cable Installation for CNM Wireless Network Overlay As noted above, CNM will select three (3) to six (6) low bid technically qualified contractors based on the bid responses to this project. This project consists of up to 327 access point locations within twenty (20) buildings located on four (4) campuses – Main, Montoya, Westside and Workforce Training Center located in Albuquerque NM. This RFB also includes the mounting of up to 327 pre-configured access points that will be provided by CNM. Schedule of Events: The following is the required schedule of events for this project. The schedule may change depending on the results of the responses and a final schedule will be established prior to contracting with the successful Vendor. Event 1. Release of RFQ to Bidders 2. Bidders’ Conference 3. Site Survey 4. Response from Bidders 5. Evaluation of Responses 6. Contract Award 7. Written Notice to Proceed 8. Installation Start 9. Substantial Completion 10. End-to-End Testing 11. Review of Testing 12. Final Punch List 13. Acceptance by CNM Date March 27, 2009 April 3, 2009 April 3, 2009 April 10, 2009, 4PM MDT April 17, 2009 April 24, 2009 May 1, 2009 5/1/08 8/29/08 Upon completion of each building or Campus Upon completion of each building or Campus 9/02/08 10/02/08 Mandatory Bidders’ Conference and Site Survey: A Bidders’ Conference and Site Survey will be held on April 3, 2009. Bidders shall meet at CNM’s Purchasing Department, 525 Buena Vista Drive SE, Building A, Room 128 at 10AM MDT. Campuses, buildings and estimated number of drop locations for each building included in the scope of this project are as follows: Main Campus (MAIN) – 525 Buena Vista SE Administration Building (A) Pre-1995 Est. 15 drop locations North Building (N) Pre-1995 Est. 18 drop locations East Building (E) Pre-1995 Est. 6 drop locations West Building (W) Pre-1995 Est. 6 drop locations Main Building (M) Pre-1995 Est. 3 drop locations Jeanette Stromberg Hall (JS) Pre-1995 Est. 30 drop locations L Building (L) Pre-1995 Est. 15 drop locations Ted Chavez Hall (TC) Pre-1995 Est. 28 drop locations Trades Building (T) Pre-19995 Est. 9 drop locations Physical Plant Building (PPD) Post-1995 Est. 9 drop locations Student Services Center (SSC) Pre-1995 Est. 18 drop locations TC Portables (TC 141-152) 7 – portable building units adjacent to TC 48 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. ST Portables (ST 10-24 & 101) 9 – portable building units between KC & PPD Early College Academy (ECA) 4 – portable building units West of University (Estimate one (1) drop location per portable) Main Campus Outdoor Areas Pasuela (PAS Pedestrian walkway from MS to JS) Est. 9 drop locations North Campus Courtyard (NCT) Est. 6 drop locations South Campus Courtyard (SCT) Est. 3 drop locations Montoya Campus (JMMC) – 4700 Morris Ave. NE Tom Wiley Hall (TW) Pre-1995 Est. 6 drop locations H Building (H) Pre-1995 Est. 9 drop locations K Building (K) Pre-1995 Est. 15 drop locations J Building (J) Pre-1995 Est. 21 drop locations I Building (I) Post-1995 Est. 18 drop locations G Building (G) Pre-1995 Est. 3 drop locations Westside Campus (WSC) – 10549 Universe Blvd. NW Westside Phase I (WSPI) Post-1995 Est. 32 drop locations Westside Portables (WT) 2 – portable building units adjacent to WSPI (Estimate one (1) drop location per portable) Workforce Training Center (WTC) – 5816 Isleta Blvd. SW Workforce Training Center (WTC) Post 1995 Est. 26 drop locations Estimated Total Drop Locations = 327 Scope of Work Specific to PROJECT 1: Communications Cable Installation for CNM Wireless Network Overlay In addition to the Common Scope of Work the following shall be required: Access Point Locations: Access point locations have been determined by a survey. Specific mounting locations are indicated in the provided construction documents. The survey was conducted by an independent contractor that is responsible for wireless equipment implementation. It is a requirement of the wireless equipment implementation contractor to locate all access points in locations that are readily accessible for both cabling and maintenance requirements. Project Goals: Technical Specifications: A. PART 1 - GENERAL 1. SUMMARY – No project specific requirements. 2. REFERENCES - No project specific requirements. 3. PERMITS, FEES, AND CERTIFICATES OF APPROVAL - No project specific requirements. 4. SYSTEM DESCRIPTION a. For the purpose of providing network connectivity, the typical Access Point Drop Location shall consist of a singlegang plate with two standards compliant work area outlets typically mounted to structural steel (“red iron”) above the 49 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. ceiling. b. Access Point Drop Locations shall be positioned within 15 feet of the Access Point Mounting Location and positioned to be reasonably accessible for maintenance. c. One Access Point Drop Location shall consist of two (2) four-pair Category 6 UTP cables, installed from the Access Point Drop Location to the designated ER/TR. Data cables shall be terminated on wall or rack mounted modular patch panels determined as follows: d. Access points shall be mounted as per manufacturer’s and CNM’s implementation mounting instructions. Specific locations shall be determined by the survey produced by the implementation contractor. Access Points and mounting hardware shall be provided by CNM. Typical interior Access Point installations shall be attached to standard lay-in ceiling grids. Details for non-typical Access Point installations shall be field coordinated by the Contractor and CNM’s Construction Manager. e. Specific installation requirements and mounting hardware for exterior Access Points and antennas shall be provided by CNM as determined by CNM’s wireless implementation contractor. Details for exterior Access Point installations shall be field coordinated by the Contractor and CNM’s Construction Manager. 5. SUBMITTALS - No project specific requirements. 6. QUALITY ASSURANCE - No project specific requirements. 7. WARRANTY - No project specific requirements. 8. DELIVERY, STORAGE, AND HANDLING - No project specific requirements. 9. SEQUENCE AND SCHEDULING - No project specific requirements. 10. USE OF THE SITE - No project specific requirements. 11. CONTINUITY OF SERVICES - No project specific requirements. B. PART 2 - PRODUCTS 1. MANUFACTURERS a. CNM’s CISM, provides product specifications and manufacturers that shall be used in CNM projects.. b. *CNM’s CISM, Sections 270528, 271119, 271500, 271513 & 271543 provide products of manufacturers that shall be used in this project. Sections 270528, 271119, 271500, 271513 & 271543 of the CISM cover the majority of work involved in this project, however other sections of the CISM may be applicable as well. c. Where no manufacturer is specified, provide products of manufacturers in compliance with requirements. 2. FABRICATION - No project specific requirements. 3. SUITABILITY - No project specific requirements. 4. DATA STATION CABLE (Copper Patch Cords) - No project specific requirements. 6. DATA ONLY WORK AREA OUTLET - No project specific requirements. 6. TERMINATION BLOCKS - No project specific requirements. 7. PATCH PANELS - No project specific requirements. 50 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. 8. SPARE CAPACITY - No project specific requirements. 9. EXTRA MATERIAL - No project specific requirements. 10. WIRELESS COMMUNICATIONS a. All wireless access points shall be installed as per locations and mounting instructions provided in the construction documents. b. All wireless access points shall be positioned so as to avoid sources of EMI and RFI c. All wireless access points shall be placed to be aesthetically compatible With their environment d. All wireless access point enclosures shall be UL Listed for use within a plenum space C. PART 3 EXECUTION 1. PRE-INSTALLATION SITE SURVEY - No project specific requirements. 2. HANDLING AND PROTECTION OF EQUIPMENT AND MATERIALS - No project specific requirements. 3. PROTECTION OF CNM’S FACILITIES - No project specific requirements. 4. INSTALLATION a. CISM Sections 270500, 270528, 270553, 271119, 271500, 271513 and 271543 address the primary activities to be performed within this statement of work. Each section of the CISM references other related sections. The sections listed here are intended to assist the Contractor in locating applicable installation information within the CISM and are not intended to limit the Contractor’s responsibility of adhering to the CISM in its entirety. END OF SECTION Reference the attached drawings: 51 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT B: RESPONSE FORM PROJECT #1, “Communications Cable Installation for CNM Wireless Network Overlay” BID #T-2752 Company name _____________________________________ Residential Preference number:_________________________ The following is an example of an average general construction project and will be used to evaluate bids. Description of Project: BID FOR LUMP SUM CONTRACT Date of Bid (Month, date and year):______________________________________________________________ Central New Mexico Community College (CNM) Project name: Communications Cable Installation for CNM Wireless Network Overlay. Company name______________________________________________________________________________ (hereinafter refered to the “Bidder”) organized and existing under the laws of the State of ____________________ New Mexico State Contractor’s License No._____________________________ The undersigned, as an authorized representative for the Bidder named above, in compliance with the Advertisement for Bid #T-2752, On Demand Structured Data Communications Cabling Services, having examined the drawings and specification, with related documents, and having examined the site of the proposed work, and being familiar with all of the conditions surrounding the implementation of the proposed project, including the availability of labor, materials and supplies, hereby proposes to furnish all labor, materials and supplies, and to construct the project in accordance with the contract documents at the price(s) stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this Bid is a part. The undersigned Bidders’ representative also acknowledges receipt of the following Addenda: Addendum No. ______, dated ____________, Addendum No. ______, dated ____________ Addendum No. ______, dated ____________, Addendum No. ______, dated ____________ BASE BID: The Bidder agrees to perform all work for the implementation of, PROJECT 1: Communications Cable Installation for CNM Wireless Network Overlay, as described in the Project Manual and as shown on the Drawings of the following lump sum . Amounts to be shown in both words and figures. In case of a discrepancy, the amount shown in words will govern, please print. All sums will exclude New Mexico Gross Receipts Tax (NMGRT). Total Base Bid Lump Sum:____________________________________________________________________ (written) ____________________________________, Dollars, ($_____________________________________________). 52 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT B: RESPONSE FORM PROJECT #1, “Communications Cable Installation for CNM Wireless Network Overlay” BID #T-2752 The Bidder understands that the contractor will be awarded in accordance with the provisions of the Instructions to Bidders and that the CNM reserves the right to reject any or all bids and to waive any formalities in the bidding. The Bidder aggress that this bid will be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of acceptance of this bid, Bidder will execute the Performance and Payment Bonds as required per Section A, prior to the commencement of work, or within 14 days of the award, whichever is soonest, and must reference this Request for Bids Number on the face of the documents . The BID SECURITY (over $25,000.00) attached in the sum of five percent (5%) of the bid amount is:________________________________________________________________________________________ (written) ($_____________________________________________) and will become the property of CNM in the event (figure) the contract and bonds are not executed within the time set forth herein, as liquidated damages for the delay and additional expenses to CNM caused thereby. Respectfully Submitted, By:__________________________________________________ Date:_______________________________ (Authorized Signature) By (same name, printed or typed):______________________________________________________________ Title:______________________________________________________________________________________ Company:__________________________________________________________________________________ Address:____________________________________________________________________________________ City:_________________________________________, State:______________, Zip Code:__________________ Telephone number:_____________________________ Fax number:___________________________________ E-mail address: ______________________________________________________________________________ NOTE: Bid dollar figures must be submitted in alpha and numeric form. In case of a discrepancy between the two, alphabetic will take precedence over numeric. 53 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT E: RESPONSE FORM FOR PARTS/MATERIALS & EQUIPMENT PRICING FOR BID #T-2752 Company name ___________________________________ Due to the variety of parts/materials and equipment which will be required under this contract and the need for auditor trackable charges, bidder must be prepared to submit detailed invoices for proof of contract compliance. Materials and rented equipment will be provided at contractor's cost, plus quoted percentage overhead factor. Materials over $500.00 will require documentation attached to invoices clearly indicating contractors actual Price Plus quoted overhead percentage. Contractor shall also be prepared to substantiate charges of items under $500.00 should audit require verification. Note that zero percent (0%) mark-up is a valid quote for either materials or equipment rental. CNM reserves the right to negotiate additional discounts at any time during the life of the contract should it occur that a bulk quantity is required for any reason. Parts/Materials Item QTY Description Unit Price Discount Extended Discounted Price Equipment Rental Item QTY Description Unit Price Discount Extended Discounted Price Attach a copy of your equipment rental inventory, if applicable, and quote a price per hour, day, and week for use of the equipment on CNM projects. LABOR PRICING Overtime/holiday rates will be allowable only in emergency situations and only with prior approval of the CNM Project Manager or designee. Define in the provided space your company's policy on overtime payment (over 40 hours over 8 hours, etc.) If your firm has an apprenticeship program, discuss the program you have. Said program must be registered with the State of New Mexico. Identify the number of periods and the percentages of journeyman rates which apply. Invoices will identify apprentices and bill at the quoted rates. 54 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT F: CONTRACTOR QUALIFICATIONS STATEMENT FOR BID #T-2752 Business name & address: ______________________________________________ Telephone number: __________________________ _____________________________________________ Fax number #: ____________________________ _____________________________________________ Federal Tax ID ____________________________ How long have you operated under this company name? ____________Years____________Months______________ Under what other or former names has your organization operated? _______________________________________ New Mexico ES-3, ES-7 or EE-98 License Number: ___________________________________________________ Other New Mexico License(s) held, and Number(s): ____________________________________________________ Specific scope and class(es) of work allowed under these licenses: _________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ If awarded a contract, the following responses will assist CNM in determining which projects to assign to your firm. Attach separate sheets if necessary: 1) Are there any judgments, litigations or complaints for cause, proceedings or suits pending against your company or any of its officers? If so, indicate where, when and why: ______________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ 2) Has your company ever failed to complete any work/contracts awarded to it? If yes, note when, where and why: _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ 3) Has your company ever been found liable for inadequate work? If yes, note when, where and why: _____________________________________________________________________________________________ 55 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ 4) Has your company ever been contacted by the New Mexico Registrar of Contractor's Office for any complaints for cause? If yes, note when, where, and why: ___________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ _____________________________________________________________________________________________ 5) Has your company ever performed work of this type for CNM in the past? If yes, note when, where, and what: _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ 6) The Contractor must have an RCDD® (Registered Communications Distribution Designer) on staff that will be ultimately responsible for this project. Full-Time, on-site, RCDD Project Manager name:____________________________________________________ Yes No RCDD Engineer Resumes Provided: (NOTE: Failure to submit RCDD Resume(s) may make the offer non-responsive). 7) The project shall be staffed at all times by Installers and Technicians who, in the role of lead crafts-persons, will be able to provide leadership and technical resources for the remaining crafts-persons on the project. A minimum of 30 percent of personnel shall be BICSI Registered Information Transport Systems Installers. Of that number 15 percent shall be registered at the Technician Level, at least 40 percent shall be registered at the Installer Level 2, and the balance shall be registered at the Installer Level 1. Total number of project staff: __________________________ Total number of Transport System Installers: ______ Total number of installers at Technician Level:_____ Total number of installers at Installer Level 2:_____ Total number of installers at Installer Level 1:_____ Percent of Total Project Staff:___ % Percent of Total Transport System Installers: ___% Percent of Total Transport System Installers: ___% Percent of Total Transport System Installers: ___% Yes No BISCI Registrations Provided: (NOTE: Failure to submit BISCI registrations may make the offer non-responsive). 8) The Contractor must provide a minimum of three (3) reference accounts at which similar work, both in scope and design, have been completed by The Contractor within the last two (2) years. Yes No References Provided: (NOTE: Failure to submit References may make the offer non-responsive). 56 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT G: SUBCONTRACTORS LISTING FOR BID #T-2752 Company name ___________________________________ Pursuant to Section 13-4-34 of the New Mexico Procurement Code, the listing threshold for this Public Works Project is established at $5,000.00. Any person submitting a bid shall set forth: 1. The name and location of the place of business of each subcontractor under subcontract to the contractor who will perform work or labor or render service to the contractor in or about the construction of the Public Works Construction Project in an amount in excess of the listing threshold; and 2. The nature of the work which will be done by each subcontractor. List only one subcontractor for each category as defined in your bid. If my proposal is accepted, the following subcontractors may perform work under this contract. (If you do not plan to utilize subcontractors, write "none"). COMPANY NAME ADDRESS NATURE OF THE WORK _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ CNM must be notified of and must approve of any changes of proposed subcontractors) which may occur during the life of the contract. The general contractor shall be fully responsible for the work of the subcontractors), at any tier, to the full extent of the requirements of the contract. Subcontractors: The contractor may subcontract portions of the work to qualified and licensed subcontractors. The contractor shall be fully responsible for the work of the subcontractors, at any tier, to the full extent of the requirements of the contract. (Submit list on page 27). Nominal mark-up will be negotiated with each contractor for subcontracted work to allow for administration I hours for supervising subcontracted work. Any subcontracted work shall be incidental. Listing threshold is established as $5,000. Provide the name and location of place of business of each subcontractor who will perform work or labor or render service to the contractor in or about the construction of this public works construction project in any amount in excess of $5,000. State also the nature of the work to be done by each subcontractor. List only one subcontractor for each category as defined by you. 57 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT H: CONTRACTOR’S FIRST TIER SUBCONTRACTOR PAYMENT AND PERFORMANCE BONDS REQUIREMENTS FOR BID #T-2752 A. Senate Bill 227 (“SB 227”) (effective July 1, 2007) modifies the New Mexico Procurement Code to require that subcontractors whose contract for work to be performed on a project is One Hundred Twenty Fifty Thousand Dollars ( $125,000) or more are required to provide a payment and performance bond. Contractors performing work on CNM Projects shall comply with SB 227 as follows: 1. All entities and persons doing business with CNM shall comply with SB 227. 2. Any subcontractors whose work to be performed on a CNM Project is $125,000.00 or more must provide payment and performance bonds. 3. Subcontractor is defined as a contractor who contracts directly with the general contractor (hereinafter “First Tier Subcontractor”). 4. CNM requires payment and performance bonds from all First Tier Subcontractors whose contracts, as determined by their bids submitted on bid day, are $125,000 or more. 5. The First Tier Subcontractor shall include in their payment and performance bond amounts, monies for any contractors, subcontractors, or suppliers with whom they contract for any CNM Project. 6. The subcontractor payment and performance bonds shall be issued by a corporate surety authorized to do business in New Mexico in accordance with the New Mexico Insurance Code, shall be sureties listed in the most current U.S. Treasury Circular 570, and shall name both the prime/general contractor and Albuquerque Technical Vocational Institute as obligees. 7. The performance and payment bonds required under this section shall be provided to the general contractor at the time the subcontract is executed. The general contractor is required to provide CNM with certified copies of payment and performance bonds for all subcontracts of $125,000.00 or more prior to the (general contractor/subcontractor) starting work on any CNM Project. 8. The payment and performance bond shall be in the amount 100% of the subcontractor’s contract as determined by the bid submitted by the subcontractor on bid day. 9. The payment and performance bonds required by this section shall be provided at the expense of the subcontractor, who may include the bond premium in their bid. CNM will not pay additional monies, over and above the bid amount, for payment and performance bonds. 10. Nothing in this section relieves the general/prime contractor from its obligation to provide payment and performance bonds pursuant to N.M. Stat. Ann. §§ 13-4-18 and 19, New Mexico’s Little Miller Act. 11. The subcontractor payment and performance bonds required by this section shall be provided on AIA surety bond forms AIA document A312. 58 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT I: SIGNATURE OF FIRM'S AUTHORIZED REPRESENTATIVE FOR BID #T-2752 By signing below, contractor acknowledges that it is a competent firm capable of providing the items and/or services requested, is properly licensed for providing the items or services specified, has read this Request for Bids, understands it, and agrees to be bound by its terms and conditions. Contractor hereby agrees to furnish items and/or services, at the prices quoted, pursuant to all requirements and specifications contained in this document, upon receipt of an authorized purchase order from the purchasing department, and further agree that the language of this document shall govern in the event of a conflict with its bid. The undersigned, being duly authorized to sign bidding documents and act on behalf of the contractor in an official capacity, certifies that the items and/or services offered on this Request for Bids meets or exceeds all specifications, terms and conditions as described in this Request for Bids without exceptions. I understand that items and/or services not meeting all specifications, terms and conditions will be rejected and all costs shall be borne by the contractor. Fill in all spaces below: Company Name: ________________________________________________________________________________ Address: ______________________________________________________________________________________ City, State, and Zip code number: __________________________________________________________________ Contact Person for Clarification of Bid Response: ______________________________________________________ Telephone Number: _____________________________ FAX Number: ___________________________________ Cell Number: __________________________________ E-mail address: __________________________________ Residential Preference Number (Applies to BIDS over $20,000 only): ______________________________________ NM Tax ID: ___________________________________ Federal Tax ID:__________________________________ Applicable NM License Numbers Is your firm a "New York state business enterprise"? Yes______ No______ If yes, provide supporting documentation. Acknowledgment of Amendment/Addendum Specify Number(s) and Date(s): # date # date # date # date # date Printed/Typed Name and Title of Individual Signing: ____________________________________________________ Signature of Member Authorized to Sign for Firm: ______________________________________________________ 59 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. DEBARMENT/SUSPENSION STATUS & NON-COLLUSION AFFIDAVIT FORM DEBARMENT/SUSPENSION STATUS 1. The vendor/contractor certifies that it is not suspended, debarred or ineligible from entering into contracts with the Executive Branch of the Federal Government, or in receipt of a notice of proposed debarment from any State agency or local public body. 2. The vendor/contractor agrees to provide immediate notice to CNM's Purchasing Department in the event of being suspended, debarred or declared ineligible by any State or Federal department or agency, or upon receipt of a notice of proposed debarment that is received after the submission of this bid but prior to the award of the purchase order/contract. NON-COLLUSION AFFIDAVIT The undersigned, duly authorized to represent the persons, firm and/or corporation joining and participating in the submission of the foregoing bid (such persons, firm and/or corporation hereinafter being referred to as the vendor/contractor), being duly sworn, on his/her oath, states that to the best of his/her belief and knowledge no person, firm, or corporation, nor any person duly representing the same joining and participating in the submission or the foregoing bid/proposal, has directly or indirectly entered into any agreement or arrangement with any other vendor/contractors, or with any employee of CNM, or any person, firm or corporation under contract with CNM whereby the contractor, in order to induce the acceptance of the foregoing bid by CNM has paid or is to pay any other vendor/contractor or to the aforementioned persons anything of value whatsoever, and that the vendor/contractor has not directly or indirectly entered into any agreement or arrangement with any other vendor/contractor which tends to or does lessen or destroy free competition in the letting of the contract sought for by the foregoing bid. CERTIFICATION The undersigned hereby certifies that he/she has read the above Non-Collusion Affidavit and Debarment/Suspension Disclosure Statement and that he/she understands and will comply with these requirements. The undersigned further certifies that he/she have the authority to certify compliance for the vendor/contractor named below. Signature: ___________________________________________________________________________________________ Title: _______________________________________________________________________________________________ Printed/Typed Name: __________________________________________________________________________________ Month/Date and year:__________________________________________________________________________________ Company: ___________________________________________________________________________________________ Address: ____________________________________________________________________________________________ City/State/Zip: _______________________________________________________________________________________ Telephone Number: ____________________________________ Fax Number: ___________________________________ Cell Number: _________________________________________ Email: _______________________________________________ 60 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved. EXHIBIT J: SMALL AND SMALL DISADVANTAGED BUSINESS CERTIFICATION 1.0 Small Business - An enterprise independently owned and operated, not dominant in its field and meets employment and/or sales standards developed by the Small Business Administration. See 13 CFR 121.201 1.a Small Disadvantaged Business - a Small Business Concern owned and controlled by socially and economically disadvantaged individuals; and (1) Which is at least 51% owned by one or more socially and economically disadvantaged individuals; or in the case of any publicly owned business, at least 51% of the stock of which is owned by one or more socially and economically disadvantaged individuals and (2) Whose management of daily operations is controlled by one or more such individuals. The contractor shall presume Black Americans, Hispanic Americans, Native Americans (such as American Indians, Eskimos, Aleuts and Native Hawaiians), Asian-Pacific Americans and other minorities or any other individual found to be disadvantaged by the Administration pursuant to Section 8 (a) of the Small Business Act and (3) Is certified by the SBA as a Small Disadvantaged Business. 1.b Women-Owned Business Concern - A business that is at least 51% owned by a woman or women who also control and operate it. Control in this context means exercising the power to make policy decisions. Operate in this context means being actively involved in the day-to-day management. 1.c HUBZone Small Business Concern - A business that is located in historically underutilized business zones, in an effort to increase employment opportunities, investment and economic development in those areas as detem-lined by the Small Business Administration's (SBA) List of Qualified HUBZone Small Business Concerns. 1.d Veteran-Owned Small Business Concern - A business that is at least 51% owned by one or more veterans; or in the case of any publicly owned business, at least 51% of the stock of which is owned and controlled by one or more veterans and the management and daily business operations of which are controlled by one or more veterans. 1.e Service Disabled Veteran-Owned Small Business - A business that is at least 51% owned by one or more service disabled veterans; or in the case of any publicly owned business, at least 51% of the stock of which is owned and controlled by one or more service disabled veterans and the management and daily business operations of which are controlled by one or more service disabled veterans. Service disabled veteran means a veteran as defined in 38 U.S.C. 101 (2) with a disability that is service connected as defined in 13 U.S.C 101(16). ___________________________________________________________________________________________________________________________ Company Name: ____________________________________________________ Telephone: __________________________________________ Street Address: _____________________________________________________ County: ____________________________________________ City: _____________________________________________________________ State & Zip: _________________________________________ Is this firm a (please check): ): Division Subsidiary Affiliated? Primary NAICS Code _________________________________ If an item above is checked, please provide the name and address of the Parent Company below: Signature and Title of Individual Completing form::_______________________________________________________ Printed/Typed Name:___________________________________________ Check All Categories That Apply: Date: _______________________________________________________ Please return this form to: CNM Community College Purchasing Department A Bldg, Room A-128 525 Buena Vista SE Albuquerque, NM 87106 (505) 224-4546 (voice) (505) 224-4548 (fax) 1. Small Business 2. Small Disadvantaged Business (Must be SBA Certified) 3. Woman Owned Small Business 4. HUBZone Small Business Concern (Must be SBA Certified) 5. Veteran Owned Small Business 6. Disabled Veteran Owned Small Business 7. Historically Black College/University or Minority Institution 8. Large Business NOTE: This certification is valid for a one-year period. It is your responsibility to notify us if your size or ownership status changes during this period. After one year, you are required to recertify with us. Notice: In accordance with U.S.C. 645(d)., any person who misrepresents a firm's proper size classification shall (1) be punished by imposition of a fine, imprisonment, or both; (2) be subject to administrative remedies; and (3) be ineligible for participation in programs conducted under the authority of the Small Business Act. If you have difficulty determining your size status, you may contact the Small Business Administration at 1-800-U-ASK-SBA OR 202-205-6618, You may also access the SBA website at www.sba.gov/size or you may contat the SBA Government Contracting Office at 817-684-530 1. (Rev. 3/8/04) 61 BID #T-2752, Advertised, Friday, March 27, 2009 Copyright CNM, 2009. All rights reserved.
© Copyright 2026 Paperzz