Purchasing Department 525 Buena Vista SE Bldg A, Room #128 Albuquerque, NM 87106 (505) 224-4546 Amendment/Addendum # 3 DATE: TO: FROM: SUBJECT: Friday, January 18, 2013 All Bidders of Record Greg Van Wart, CNM Sr. Buyer Amendment/Addendum #3 to T-2852 “Mechanical System Water Treatment”. This addendum becomes part of the Contract Documents. Bidders are required to acknowledge receipt of this addendum in the space provided on page 14, Section E.1. Changes, Additions and Clarifications as follows: QUESTION: What is the tonnage of refrigeration of each of the cooling tower systems? ANSWER: SEE ATTACHMENT QUESTION: What months of the year does each cooling tower system operate? ANSWER: SEE ATTACHMENT QUESTION: Please clarify whether the closed loops, geothermal loops, and glycol loop are to be tested twice per month or once per month. ANSWER: TEST ONCE PER MONTH QUESTION: Are the closed loops, geothermal loops, and glycol loop to be tested only during operation (circulation) or every month? ANSWER: TEST ONCE PER MONTH QUESTION: What is the glycol concentration required by the equipment manufacturer? ANSWER: 35% QUESTION: The way the bid is written the water treatment contractor is required to maintain corrosion inhibitor and/or glycol in the closed loops when fluid is lost from the systems. What exclusions to this requirement are there if a system leaks? It is unreasonable to expect the water treatment contractor to maintain corrosion inhibitor and glycol concentration no matter how much each system leaks. ANSWER: THE CONTRACTOR SHALL NOTIFY CNM WHENEVER A LEAK IS OBSERVED IN ANY OF THE SYSTEMS COVERED UNDER THIS CONTRACT. CNM WILL ADDRESS THE LEAK WITHIN FOURTEEN DAYS. IF THE LEAK PERSISTS, CNM T-2852 Amendment #3 1 WILL REIMBURSE THE CONTRACTOR FOR THE COST OF ADDITIONAL WATER TREATMENT CHEMICAL REQUIRED TO RETURN SYSTEM TO NORMAL LEVELS OF CONCENTRATION. QUESTION: #22-Main Campus Condenser. Is this a cooling tower system or closed loop? ANSWER: REVISE ITEM #22 TO READ AS FOLLOWS, “Main Campus/Jeanette Stromberg Hall – H.W.S. / 1 ea. CH.W.S. w/ Cooling Tower, 1 ea. CH.W.S. (air-cooled) If a cooling tower system, what is tonnage of refrigeration? SEE ATTACHMENT. NOTE: Due date and time has been Extended to January 29, 2013 at 3:00PM T-2852 Amendment #3 2 WTR SYSTEM DATA.xlsx MARK CAMPUS/BUILDING/SYSTEM CHILLED WTR HEAT PUMP TONS TONS (COOLING (EVAPORATIVE FLUID COOLER) TWR.) 1. Main Campus/East Building – Primary/secondary H.W.S. including, A Bldg, S Bldg., East Bldg./CH.W.S, 1ea. Cooling Tower, 1ea. Evaporative Fluid Cooler (LSA Bldg. heat pump loop and H.W.S. system above) 97 2. Main Campus/Max Salazar Hall, H.W.S./CH.W.S. and Cooling Tower 200 3. Main Campus/Trades Building (east) - H.W.S. ~ HP-1 BTU TON EACH TOTALS 52000 4.33 8 34.66667 HP-2 44000 3.67 1 3.666667 HP-3 44000 3.67 1 3.666667 42 ~ ~ 42 ~ ~ 5. Main Campus/Smith Brasher Hall - H.W.S./CH.W.S. and Cooling Tower. 120 ~ 6. Main Campus/Student Services Building - H.W.S./CH.W.S. and Cooling Tower 244 ~ 7. Main Campus/Ken Chappy Bldg. - H.W.S./CH.W.S. and Cooling Tower. 113 ~ 8. Main Campus/Student Resource Bldg. - H.W.S./CH.W.S. and Cooling Tower 598 ~ 9. JMMC/G Building - H.W.S. ~ ~ 10. JMMC/H Building – unit-mounted Boiler Glycol System ~ ~ 11. JMMC/I-Building - H.W.S., C.H.W.S. ~ ~ 12. JMMC/J Building - H.W.S. ~ ~ 4. Main Campus/L-Building - H.W.S 13. JMMC/K Building - H.W.S. ~ ~ 14. South Valley Campus/SV2 Bldg. - H.W.S./CH.W.S. ~ ~ 15. ATC Campus/ATC Bldg. - H.W.S./CH.W.S., Cooling Tower 230 ~ 16. ATC Campus/CTS Bldg./South System - H.W.S./CH.W.S., Cooling Tower 326 ~ 17. ATC Campus/CTS Bldg./North System - H.W.S./CH.W.S., Cooling Tower 250 ~ 18. Westside Campus/MJG Bldg. - H.W.S./CH.W.S. and Cooling Tower 320 ~ 19. Westside Campus/PH II Bldg. - H.W.S./CH.W.S. and Cooling Tower 200 ~ 20. Workforce Training Center - H.W.S./CH.W.S. ~ ~ 21. Rio Rancho Campus/one Bldg. – Closed-loop ground-source heat pump. ~ ~ 245 ~ 23. JMMC/Tom Wiley Hall - H.W.S. ~ ~ 23. Westside Campus/Phase I – Closed-loop ground-source heat pump. ~ ~ 22. Main Campus/Jeanette Stromberg Hall - Main Campus Condenser, H.W.S./2 ea. CH.W.S.
© Copyright 2026 Paperzz