The Replacement of the Automatic Fire Alarm Systems Buildings E, J, K, N, P, SSC, TC, & W Central New Mexico Community College Hughes Associates, Inc Albuquerque, NM HAI Project No. 1KLG00046 CNM RFP #T-2922 ADDENDUM #1 JUNE 6, 2013 ADDENDUM OVERVIEW A. Part 1 provides modifications to specifications exclusive of section 0200 Bid Form B. Part 2 provides clarifications to drawings and responses to written requests for information C. Attachment 1 includes the “Publics Works Requirements” directive and two wage determination forms; # BE-14-0342 B applicable to the main campus and , # BE-14-0344 B applicable to the Montoya Campus PART 1 – SPECIFICATION REVISION ITEMS A. Specification paragraph 028000 2.3.B shall be revised to read: B. The fire alarm control panels shall be as listed below: Building E: Building J: Building K: Building N: Building SSC: Building TC: Building W: B. ACC-25/50 Single Zone ACC-25/50 Single Zone Capable ACC-25/50 Dual Zone Capable ACC-25/50 ZS with Zone Splitter Module (ACC-ZSM) ACC-25/50 Dual Zone Capable ACC-25/50 Single Zone Capable ACC-25/50 Single Zone Capable The second paragraph of 028000 2.2.A. shall be revised to read: The FACP shall be physically sized and provide motherboards required for supporting the indicated number of points for addressable, detectors, input or output modules plus an additional number points of 20% for future expansion. All circuitry shall be UL Listed for power-limited application. Each panel shall be provided with an IPDACT-2/2UD Internet Monitoring Module. Panels shall be provided with all annunciators, interface devices and accessories necessary for voice control centers where necessary. The system shall include emergency voice communications (except for Building P) utilizing distributed amplification. C. Add the following paragraphs 3.1.C numbers 10 and 11: 10. Existing conduit or raceway may be used in place if compliant with this specifications and current code requirements. ADDENDUM-1 3/18/2014 The Replacement of the Automatic Fire Alarm Systems Buildings E, J, K, N, P, SSC, TC, & W Central New Mexico Community College Hughes Associates, Inc Albuquerque, NM HAI Project No. 1KLG00046 CNM RFP #T-2922 11. Contractor shall notify the CNM project manager and CNM security two business days prior to the use of any “powder -type shots” for the installation of anchors or support. D. Specification paragraph 028000 3.1.E.2 shall be revised to read: 2. Surface Repairs: Holes in walls or floors cut during the performance of this work and all holes or cuts resulting from the removal of existing fire alarm system devices, equipment or circuits shall be patched or covered with standard escutcheon plates so as to completely conceal the cuts where they would otherwise be exposed to view. Final finishes shall match adjacent surfaces in texture and shall be primed for application of paint by the Owner. Escutcheon plates shall not be used on painted ceilings or walls without specific approval by the Owner. PART 2 – DRAWING REVISION ITEMS AND WRITTEN CLARIFICATIONS A. Annotations are provided on Attachments for drawings FA101E, FA200E, FA201E, FA102K and FA200K. ADDENDUM-1 3/18/2014 CELINA BUSSEY SECRETARY SUSANA MARTINEZ GOVERNOR JOHN SANCHEZ LT. GOVERNOR STATE OF NEW MEXICO DEPARTMENT OF WORKFORCE SOLUTIONS 625 Silver Ave SW Suite 410 Albuquerque, NM 87102 Telephone (505) 841-4405 Fax (505) 841-4420 PUBLIC WORKS PROJECT REQUIREMENTS As a participant in a Public Works project valued at more than $60,000 in the State of New Mexico, the following list addresses many of the responsibilities that are assigned by statute to each project stakeholder. Contracting Agency • Ensure that all contractors/prime contractors wishing to bid on a Public Works project when the project is $60,000 or more are actively registered with the Labor Relations Division, Labor Enforcement Fund (LEF) prior to bidding. • Provide completed Notice of Award (NOA) and Sub-Contractor list to Labor Relations Division promptly after the project is awarded. • Provide updates to the Sub-Contractor list to the Labor Relations Division General Contractor • Provide to the Contracting Agency within 3 (Three) days of award a complete subcontractor list and Statements of Intent (SOI) to pay Prevailing Wages for each contractor. • Ensure that all sub-contractors wishing to bid on a Public Works project when their portion is over $60,000 are actively registered with the Labor Relations Division prior to bidding. • Submit bi-weekly certified payrolls to the owner/contracting agency. • Make certain NM Apprenticeship and Training Fund payments are to be paid either to an approved Apprenticeship program or to the Labor Relations Division. • Confirm the Wage Rate poster, provided by the Labor Relations Division, is displayed at the job site in an easily accessible place. • Make sure, when a project has been completed, the Affidavits of Wages Paid (AWP) is sent to the Contracting Agency. Sub-Contractor • Ensure that all sub-contractors wishing to bid on a Public Works project when their portion is over $60,000 are actively registered with the Labor Relations Division prior to bidding. • Submit bi-weekly certified payrolls to the General Contractor(s). • Make certain NM Apprenticeship and Training Fund payments are to be paid either to an approved Apprenticeship program or to the Labor Relations Division. “AN EQUAL OPPORTUNITY EMPLOYER” Additional Information Reference material and forms for these requirements are available through the following New Mexico Workforce Solutions Web Link. www.dws.state.nm.us/new/Labor_Relations/publicworks.html. Additional Information Additional information, requirements, and documents on these topics can be found through the Public Works web pages. • Labor Enforcement Fund (LEF) • Weekly Certified Payroll • Public Works Apprenticeship and Training Fund (PWAT) • Forms: Statement of Intent (SOI), Affidavit of Wages Paid (AWP) • Prevailing Wage Rates (Base Rates, Fringe, and Apprenticeship Contributions) CONTACT INFORMATION Contact us for any questions relating to Public Works Projects. Kim Kew at [email protected] or 505-841-4405 Otis Caddy [email protected] 505-841-4406 Stacey Lowrey [email protected] 505-841-4412 “AN EQUAL OPPORTUNITY EMPLOYER” Revision Date 8/23/13 New Mexico Department of Workforce Solutions Public Works 625 Silver Ave SW, Suite 410, Albuquerque, NM 87102 Phone: (505)-841-4400 fax to: (505) 841-4423 or Email to: [email protected] Wage Decision # BE-14-0342 B NOTIFICATION OF AWARD (NOA) THIS WAGE DECISION # EXPIRES FOR BIDS ON 07/04/14 Description and Location of Work: EIGHT BUILDING FIRE ALARM SYSTEM REPLACEMENT PROJECT The contractor shall furnish and install a complete distributed microprocessor based 24VDC, electrically supervised, analog "intelligent", fire alarm systems as specified herein and indicated on the drawings in each of the following buildings: Main Campus Buildings E, N, SSC, TC, W. Montoya Campus Buildings J, K, and P. The system shall include, but not be limited to, all control equipment, manual smoke control equipment, remote transponder panels, power supplies, signal initiating, distributed amplifiers and visual and voice evacuation notification devices, conduit, wire, fittings, and all other accessories required to provide a complete and operational system as herein specified and indicated on the contract drawings. Work shall begin at the source of 120 volt AC power for the fire alarm panels; auxiliary power supplies; and all control equipment. City of Albuquerque County of Bernalillo 525 Buena Vista SE Main Campus REMINDER for Agency Conducting BID Process: If bids are NOT submitted before new wage rates go into effect, a NEW wage decision WILL be required. After the Contracting Agency awards this project the Wage Rate Poster and the Wage Rate Packet, excluding this NOA and Subcontractor List, must be delivered to the GENERAL/PRIME CONTRACTOR. The Contracting Agency or its agent must complete this form (including the next page listing all of the subcontractors including all tiers of subcontractors) and fax or mail it to the address above. If the project is canceled, this form must be completed by the Contracting agency conducting the bid process and the wording “Cancelled” written on the form and send to the Labor Relations Division. Failure to submit the NOA in a timely manner is a violation of paragraph 11.1.2.9.B (3) of the Public Works Minimum Wage Act Policy Manual. General/Prime Contractor Company Name:________________________________________ License#:_______________ Address:__________________________________ City:__________________________ State:_______ Zip:___________ Telephone: _________________________________________ Fax:___________________________________________ Project Contact’s name:__________________________________________________E-Mail:_________________________ Approximate Date Work to Start:_________________________________________________________________ Estimated Completion Date:_____________________________________________________________________ Estimated Cost of Project:______________________________________________________________________ Bid Opening Date:____________________________________________________________________________ Note: The General/Prime Contractor MUST mail/fax in their Statement of Intent to Pay Prevailing Wages to the Contracting Agency or its agent before beginning work on the project. Each Subcontractor (and all tiers of subcontractors) MUST also mail/fax their Statement of Intent to Pay Prevailing Wages to the General/Prime Contractor 3 days after award of project. After work on the project is completed and before, final payment, is made to subcontractors and all tiers of subcontractors, the contractor and subcontractors must mail/fax their Affidavit of Wages paid to the Contracting Agency for final payment. Signature for Contracting Agency (or agent) _____________________________________ Printed Name____________________________________________ Email address for Contracting Agency (not agent)_______________________________Required Field Date ____________________________________ 8/29/13 Page 1 of 2 SUBCONTRACTOR LIST DO NOT list suppliers or professional services (such as surveyors) INCLUDE individual subcontractor dollar amount for project Email to: [email protected] or fax to: (505) 841-4423 Please include 2nd & 3rd Tier subcontractors. Make extra copies of form if necessary. Wage Decision. # BE-14-0342 B General Contractor:______________________________________________ Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2ne TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2ne TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: Amount ($): (To Whom) Revised 8/23/13 Page 2 of 2 EIGHT BUILDING FIRE ALARM SYSTEM REPLACEMENT PROJECT : Wage Decision # BE-14-0342 B The contractor shall furnish and install a complete distributed microprocessor based 24VDC, electrically supervised, analog "intelligent", fire alarm systems as specified herein and indicated on the drawings in each of the following buildings: Main Campus Buildings E, N, SSC, TC, W. Montoya Campus Buildings J, K, and P. Type "B" - GENERAL BUILDING Trade Classification Asbestos Worker - Heat & Frost Insulator Boilermaker Bricklayer/Blocklayer/Stonemason Carpenter/Lather Cement Mason Electricians Outside Classifications Groundman Equipment Operator Lineman/Tech Cable Splicer Inside Classifications Wireman/Technician Cable Splicer Sound Classifications Installer Technician Soundman Elevator Constructor Elevator Constructor Helper Glazier Ironworker Painter (Brush/Roller/Spray) Paper Hanger Drywall Finisher/Taper Plasterer Plumber/Pipefitter Roofer Sheetmetal Worker Soft Floor Layer Sprinkler Fitter Tile Setter Tile Setter Helper Laborers Group I Group II Group III Group IV Group V Group VI Operators Group I Group II Group III Group IV Group V Group VI Group VII Group VIII Truck Drivers Group I Group II Group III Group IV Group V Group VI Group VII Group VIII Group IX Effective January 1, 2014 Base Rate Fringe Rate Apprenticeship 27.35 18.40 22.85 20.86 17.72 10.23 3.78 6.00 6.25 7.45 $0.20 $0.20 $0.74 $0.36 $0.34 22.32 25.14 25.73 26.91 8.62 8.62 8.62 8.62 $0.36 $0.36 $0.36 $0.36 27.80 29.53 8.06 8.06 $0.37 $0.37 23.39 24.94 27.01 33.61 15.55 20.15 25.00 16.60 19.71 19.64 18.65 28.30 15.18 26.56 20.74 24.41 14.80 13.00 8.31 8.31 8.31 14.99 3.56 4.15 10.00 3.88 8.42 3.91 7.15 11.00 0.50 13.41 4.40 11.27 1.20 1.02 $0.24 $0.24 $0.24 $0.24 $0.25 $0.35 $0.53 $0.36 $0.35 $0.34 $0.35 $0.63 $0.54 $0.45 $0.35 $0.28 $0.00 $0.00 15.04 15.61 15.91 16.01 16.21 16.36 4.25 4.25 4.25 4.25 4.25 4.25 $0.27 $0.27 $0.27 $0.27 $0.27 $0.27 28.03 29.07 29.15 29.21 29.27 29.37 29.47 30.55 5.16 5.16 5.16 5.16 5.16 5.16 5.16 5.16 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 20.56 20.68 20.76 20.88 20.93 21.03 21.13 21.27 21.42 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 Subsistence & Incentive Rates Refer to Note 1 Refer to Note 2 Refer to Note 3 Refer to Note 4 NOTE: SUBSISTENCE AND INCENTIVE RATES BY TRADE & LOCATION #1 - Inside Electricians working at a Los Alamos County job site get $4.10/hr. subsistence pay plus base/fringe. Inside Electricians working at a Lea Co. job site get $75.00/day subsistence pay plus base/fringe. #2 - Ironworkers working on projects 50+ miles over the most direct regularly traveled route from Albuquerque, or the employee's home, whichever is closer, shall be paid $5.00/hr. subsistence plus base/fringe. The "Big I" Interchange in Albuquerque, or the employee's home, respectively shall be used as basing points. The current State of New Mexico Official Highway Map shall be the reference for routes and distances. All of Santa Fe County shall be $5.00/hr subsistence area. #3 - Plumbers/Pipefitters working at a Los Alamos County job site get $.80/hr. incentive pay plus base/fringe. #4 - Sheet Metal Workers working at a Los Alamos County job site get $2.00/hr. incentive pay plus base/fringe. #4 - Sheet Metal Workers living 60+ miles from a San Juan County job site get $3.00/hr. subsistence pay plus base/fringe. Sheet Metal Workers working 90+ miles from Contractors Homebase & employees home get $50.00/day subsistence pay plus base/fringe regardless of county. New Mexico Department of Workforce Solutions Public Works 625 Silver Ave SW, Suite 410, Albuquerque, NM 87102 Phone: (505)-841-4400 fax to: (505) 841-4423 or Email to: [email protected] Wage Decision # BE-14-0344 B NOTIFICATION OF AWARD (NOA) THIS WAGE DECISION # EXPIRES FOR BIDS ON 07/04/14 Description and Location of Work: EIGHT BUILDING FIRE ALARM SYSTEM REPLACEMENT PROJECT The contractor shall furnish and install a complete distributed microprocessor based 24VDC, electrically supervised, analog "intelligent", fire alarm systems as specified herein and indicated on the drawings in each of the following buildings: Main Campus Buildings E, N, SSC, TC, W. Montoya Campus Buildings J, K, and P. The system shall include, but not be limited to, all control equipment, manual smoke control equipment, remote transponder panels, power supplies, signal initiating, distributed amplifiers and visual and voice evacuation notification devices, conduit, wire, fittings, and all other accessories required to provide a complete and operational system as herein specified and indicated on the contract drawings. Work shall begin at the source of 120 volt AC power for the fire alarm panels; auxiliary power supplies; and all control equipment. City of Albuquerque County of Bernalillo 4700 Morris AVE NE (Montoya Campus) REMINDER for Agency Conducting BID Process: If bids are NOT submitted before new wage rates go into effect, a NEW wage decision WILL be required. After the Contracting Agency awards this project the Wage Rate Poster and the Wage Rate Packet, excluding this NOA and Subcontractor List, must be delivered to the GENERAL/PRIME CONTRACTOR. The Contracting Agency or its agent must complete this form (including the next page listing all of the subcontractors including all tiers of subcontractors) and fax or mail it to the address above. If the project is canceled, this form must be completed by the Contracting agency conducting the bid process and the wording “Cancelled” written on the form and send to the Labor Relations Division. Failure to submit the NOA in a timely manner is a violation of paragraph 11.1.2.9.B (3) of the Public Works Minimum Wage Act Policy Manual. General/Prime Contractor License#:_______________ Company Address:__________________________________ Zip:___________ Name:________________________________________ City:__________________________ State:_______ Telephone: _________________________________________ Fax:___________________________________________ Project Contact’s name:__________________________________________________E-Mail:_________________________ Approximate Date Work to Start:_________________________________________________________________ Estimated Completion Date:_____________________________________________________________________ Estimated Cost of Project:______________________________________________________________________ Bid Opening Date:____________________________________________________________________________ Note: The General/Prime Contractor MUST mail/fax in their Statement of Intent to Pay Prevailing Wages to the Contracting Agency or its agent before beginning work on the project. Each Subcontractor (and all tiers of subcontractors) MUST also mail/fax their Statement of Intent to Pay Prevailing Wages to the General/Prime Contractor 3 days after award of project. After work on the project is completed and before, final payment, is made to subcontractors and all tiers of subcontractors, the contractor and sub-contractors must mail/fax their Affidavit of Wages paid to the Contracting Agency for final payment. Signature for Contracting Agency (or agent) _____________________________________ Printed Name____________________________________________ Email address for Contracting Agency (not agent)_______________________________Required Field Date ____________________________________ 8/29/13 Page 1 of 2 SUBCONTRACTOR LIST DO NOT list suppliers or professional services (such as surveyors) INCLUDE individual subcontractor dollar amount for project Email to: [email protected] or fax to: (505) 841-4423 Please include 2nd & 3rd Tier subcontractors. Make extra copies of form if necessary. Wage Decision. # BE-14-0344 B General Contractor:______________________________________________ Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2ne TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: (To Whom) Amount ($): Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2nd TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Start Date: Amount ($): (To Whom) Company Name:__________________________________________________________________________ Address:____________________________________City:________________State:____Zip:______________ E-Mail Address:______________________________ License No.:___________________ Phone No.:______________________Fax No.:____________________ Sub ____ 2ne TIER ____ 3rd TIER ___ (To Whom) Work to be performed: Revised 8/23/13 Start Date: Page 2 of 2 Amount ($): (To Whom) EIGHT BUILDING FIRE ALARM SYSTEM REPLACEMENT PROJECT : Wage Decision # BE-14-0344 B The contractor shall furnish and install a complete distributed microprocessor based 24VDC, electrically supervised, analog "intelligent", fire alarm systems as specified herein and indicated on the drawings in each of the following buildings: Main Campus Buildings E, N, SSC, TC, W. Montoya Campus Buildings J, K, and P. Type "B" - GENERAL BUILDING Trade Classification Asbestos Worker - Heat & Frost Insulator Boilermaker Bricklayer/Blocklayer/Stonemason Carpenter/Lather Cement Mason Electricians Outside Classifications Groundman Equipment Operator Lineman/Tech Cable Splicer Inside Classifications Wireman/Technician Cable Splicer Sound Classifications Installer Technician Soundman Elevator Constructor Elevator Constructor Helper Glazier Ironworker Painter (Brush/Roller/Spray) Paper Hanger Drywall Finisher/Taper Plasterer Plumber/Pipefitter Roofer Sheetmetal Worker Soft Floor Layer Sprinkler Fitter Tile Setter Tile Setter Helper Laborers Group I Group II Group III Group IV Group V Group VI Operators Group I Group II Group III Group IV Group V Group VI Group VII Group VIII Truck Drivers Group I Group II Group III Group IV Group V Group VI Group VII Group VIII Group IX Effective January 1, 2014 Base Rate Fringe Rate Apprenticeship 27.35 18.40 22.85 20.86 17.72 10.23 3.78 6.00 6.25 7.45 $0.20 $0.20 $0.74 $0.36 $0.34 22.32 25.14 25.73 26.91 8.62 8.62 8.62 8.62 $0.36 $0.36 $0.36 $0.36 27.80 29.53 8.06 8.06 $0.37 $0.37 23.39 24.94 27.01 33.61 15.55 20.15 25.00 16.60 19.71 19.64 18.65 28.30 15.18 26.56 20.74 24.41 14.80 13.00 8.31 8.31 8.31 14.99 3.56 4.15 10.00 3.88 8.42 3.91 7.15 11.00 0.50 13.41 4.40 11.27 1.20 1.02 $0.24 $0.24 $0.24 $0.24 $0.25 $0.35 $0.53 $0.36 $0.35 $0.34 $0.35 $0.63 $0.54 $0.45 $0.35 $0.28 $0.00 $0.00 15.04 15.61 15.91 16.01 16.21 16.36 4.25 4.25 4.25 4.25 4.25 4.25 $0.27 $0.27 $0.27 $0.27 $0.27 $0.27 28.03 29.07 29.15 29.21 29.27 29.37 29.47 30.55 5.16 5.16 5.16 5.16 5.16 5.16 5.16 5.16 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 $0.50 20.56 20.68 20.76 20.88 20.93 21.03 21.13 21.27 21.42 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 $0.55 Subsistence & Incentive Rates Refer to Note 1 Refer to Note 2 Refer to Note 3 Refer to Note 4 NOTE: SUBSISTENCE AND INCENTIVE RATES BY TRADE & LOCATION #1 - Inside Electricians working at a Los Alamos County job site get $4.10/hr. subsistence pay plus base/fringe. Inside Electricians working at a Lea Co. job site get $75.00/day subsistence pay plus base/fringe. #2 - Ironworkers working on projects 50+ miles over the most direct regularly traveled route from Albuquerque, or the employee's home, whichever is closer, shall be paid $5.00/hr. subsistence plus base/fringe. The "Big I" Interchange in Albuquerque, or the employee's home, respectively shall be used as basing points. The current State of New Mexico Official Highway Map shall be the reference for routes and distances. All of Santa Fe County shall be $5.00/hr subsistence area. #3 - Plumbers/Pipefitters working at a Los Alamos County job site get $.80/hr. incentive pay plus base/fringe. #4 - Sheet Metal Workers working at a Los Alamos County job site get $2.00/hr. incentive pay plus base/fringe. #4 - Sheet Metal Workers living 60+ miles from a San Juan County job site get $3.00/hr. subsistence pay plus base/fringe. Sheet Metal Workers working 90+ miles from Contractors Homebase & employees home get $50.00/day subsistence pay plus base/fringe regardless of county. 1 6 2 6 3 6 4 6 5 6 6 6
© Copyright 2026 Paperzz