Magnolia Ri College Shields Potential short and midterm ideas to accomodate all travel modes in the Mulberry Corridor City Park Taft Hill Mulberry / Magnolia St N ve rs id Mulberry Mulberry Study Area Existing Conditions: •Four vehicle travel lanes •Center turn lane (east of Meldrum) •Western Portion: Approx. 15,000 vehicles per day •Eastern Portion: Approx. 25,000 vehicles per day •No bike lanes •Mix of attached & detached sidewalks •Narrow & missing sidewalks (eastern portion) Mulberry Looking East @ City Park Ave What We’ve Heard: •Strong interest in bicycle & pedestrian enhancements •Improved crossings (frequency, timing) •Maintain functionality for vehicles •Explore parallel routes Parallel Routes Question @ Open Streets, Sep. 20, 2015 Mulberry & Magnolia Street: Preliminary Concept Ideas: •4-lane to 3-lane conversion (Mulberry, west of City Park Ave) •New buffered bike lane (Mulberry, west of City Park Ave) •4-lanes remain on Mulberry east of City Park Ave •Explore Magnolia Parallel Route for bikes •Fill in missing sidwealk gaps; widen sidewalks long-term •Arterial Crossing Improvements (detection / frequency) Segments: Mulberry - Taft Hill to City Park Mulberry - City Park to Riverside Magnolia Parallel Route •4-lane to 3-lane conversion •New center turn lane •New buffered bike lanes •Sidewalk/path widening (long-term) •Explore parking options along City Park edge •Transition bikes from Mulberry to Magnolia on Jackson •4 vehicle travel lanes* & center turn lane remain •Explore Magnolia Parallel Route for bikes •Sidewalk widening (long-term) •Install missing sidewalks (east Mulberry) •Crossing enhancements •New buffered bike lanes •Explore intersection management (e.g. 4-way stop to 2-way stop) •Explore parking options (bike visibility) •Explore options for crossing at Shields St •Potential bike/greenway amenities * Why not explore a road diet? Traffic volumes too high e Jackson Ave Skip stripe at minor intersections Enhanced Crossing Treatment To Be Considered Explore Alternative Parking Options Explore Alternative Parking Options Explore Alternative Parking Options Explore Alternative Parking Options S Mason St Intersection Transition To Be Determined Explore Alternative Parking Options Explore Alternative Parking Options Magnolia Remington St Intersection Transition To Be Determined Magnolia Connection into/out of Bike Lanes To Be Determined Magnolia ve Evaluate Pedestrian Crossing Treatments Stover St Evaluate Pedestrian Crossing Treatments Lilac Ln Consider crosswalk (as warranted) Smith St Whedbee St Peterson St Priority shared lane striping Matthews St C y n a Ri Double buffered bike lanes added Remington St on A ve Priority shared lane striping S College Ave Green paint in conflict zone Explore Parking Options S Mason St e Av 4-lane to 3-lane restriping Long-term: Widen sidewalks Explore Alternative Parking Options S Howes St de rna tive Park ing O ptions Sheldon Dr lte Green skip stripe at intersection Skip stripe at minor intersections S Meldrum St Skip stripe at minor intersections Mulberry Double buffered bike lanes added S Whitcomb St Evaluate Intersection Alternatives That Include Left Turn Lane From WB Mulberry to SB City Park Widen multiuse path esi Lak Ex plo re A Transition to Multiuse Path To Be Determined City Park Ave Long-term: Widen sidewalks Cook Dr Crestmore Pl Long-term: Widen sidewalks Bryan Ave Intersection & Multiuse Path Transition To Be Determined Transition to Buffered Bike Lane Only To Be Determined Magnolia S Loomis Ave Mulberry Buffered bike lanes added S Grant Ave Mulberry Skip stripe at minor intersections Double buffered bike lanes added S Washington Ave Buffered bike lanes added Canyon Ave Intersection Transition To Be Determined Green skip stripe at intersection Explore Alternative Parking Options Gordon St 4-lane to 3-lane restriping Magnolia Wayne St Taft Hill Intersection Transition To Be Determined Buffered bike lanes added Scott Ave 4-lane to 3-lane restriping Magnolia Double buffered bike lanes added Shields St Dr Transition at/on Jackson Ave To Be Determined on Sheld Bryan Ave Skip stripe at minor intersections Skip stripe at minor intersections Green skip stripe at intersection rs id e A ve
© Copyright 2026 Paperzz