Design Approach Comparison Chart: Segments Design Approach Mode CSU Foothills Campus • Complete bike lanes • Add buffer where feasible Bike Transportation System Management Traffic Calming MAX on West Elizabeth Overland Trail to Hillcrest Dr. Drive Potential Park & Ride Transit Transit stop/station Hillcrest Dr. to Taft Hill Rd. • • • • Complete bike lanes Add buffer where feasible Access control Restriping of continuous WB right turn lane Segment Taft Hill Rd. to Constitution Ave. to Constitution Ave. City Park Ave. • Complete bike lanes • Add buffer where feasible • Complete bike lanes • Add buffer where feasible City Park Ave. to Shields St. • Complete bike lanes • Add buffer where feasible • Higher frequency transit • Bus turnaround or roundabout Higher frequency transit Walk Complete sidewalk network to ADA standards if ROW available Complete sidewalk network to ADA standards, if ROW available Complete sidewalk network to ADA standards Complete sidewalk network to ADA standards Complete sidewalk network to ADA standards Bike Enhanced bike facility Enhanced bike facility Enhanced bike facility Enhanced bike facility Enhanced bike facility • Center turn lane/ median • 1 travel lane each dir. • 2 travel lanes each dir. • Landscaped median • Access control Potential Park & Ride • Center turn lane/ median • 1 travel lane each dir. • Center turn lane/ median • 1 travel lane each dir. • Access control • Center turn lane/ median • 1 travel lane each dir. Transit Transit stop/station Lower frequency transit Higher frequency transit Higher frequency transit Walk • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) Wide sidewalk Bike Enhanced bike facility Enhanced bike facility Enhanced bike facility Enhanced bike facility Enhanced bike facility Potential Park & Ride • Center turn lane/ median • 1 travel lane each dir. • Center turn lane • 1 travel lane each dir. • Access control • Center turn lane • 1 travel lane each dir. • Center turn lane • 1 travel lane each dir. • Center turn lane • 1 travel lane each dir. • Access control Transit Transit stop/station • BRT in shared lane • BRT station • BRT in shared lane • BRT station • BRT in shared lane • BRT station • BRT in dedicated lane • BRT station • BRT in dedicated lane • BRT station • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) • Complete sidewalk network to ADA standards • Tree lawn (Interim condition*: attached walk) Complete sidewalk network to ADA standards Complete sidewalk network to ADA standards Connect to MAX at Laurel Station or transfer at CSU Transit Center • Buffered bike lane • Shared bikeway connection to Skyline Dr Higher frequency transit Drive *If ROW not available Shared bikeway connection to Skyline Dr Higher frequency transit Drive Draft- 12/2/15 CSU Main Campus Access control Lower frequency transit Walk Plum Street Connect to MAX at Laurel Station or transfer at CSU Transit Center • Buffered bike lane • Shared bikeway connection to Skyline Dr Connect to MAX at Laurel Station or transfer at CSU Transit Center 1 Design Approach Comparison Chart: Intersections Design Approach Mode W. Elizabeth & Overland W. Elizabeth & Ponderosa W. Elizabeth & Hillcrest Green bike lanes through int. Bike Transportation System Management W. Elizabeth & Taft Hill Roundabout or bus turnaround just east oi Ponderosa Dr. Drive W. Elizabeth & Constitution • Green bike lanes through int. • Two stage turn queue box Intersection W. Elizabeth & City Park • Green bike lanes through int. • Two stage turn queue box • Transit signal priority • Bus queue jump • Green bike lanes through int. • Two stage turn queue box Roundabout • Green bike lanes through int. • Two stage turn queue box • Transit signal priority • Bus queue jump • Green bike lanes through int. • Two stage turn queue box Bike Drive Transit Walk Draft- 12/2/15 Roundabout • Green bike lanes through int. • Two stage turn queue box • Investigate as Protected Intersection • Green bike lanes through int. • Two stage turn queue box Potential protected EB right phase Howes & Laurel • Transit signal priority • Bus queue jump Transit signal priority • Transit signal priority • Bus queue jump Transit signal priority • Transit signal priority • Bus queue jump Transit signal priority Green bike lanes through int. Two-way stop, N/S direction Leading pedestrian interval • Transit signal priority • Bus queue jump Leading pedestrian interval Green bike lanes through int. Green bike lanes through int. Transit signal priority Walk MAX on West Elizabeth • Transit signal priority • Bus queue jump Leading pedestrian interval Transit signal priority Roundabout Transit Meldrum & Laurel Green bike lanes through int. Leading pedestrian interval Bike Plum & Shields Two-way stop, N/S direction Walk Drive Plum & City Park Green bike lanes through int. Traffic signal for bus turnaround Transit Traffic Calming W. Elizabeth & Shields • Green bike lanes through int. • Two stage turn queue box Leading pedestrian interval • Green bike lanes through int. • Two stage turn queue box Traffic signal for bus turnaround Two-way stop, N/S direction • Transit signal priority • Bus queue jump Transit signal priority Transit signal priority • Transit signal priority • Bus queue jump Leading pedestrian interval Leading pedestrian interval 2 Design Approach Comparison Chart: Campus West Approach What if Campus West Redevelops? Option A What if Campus West Redevelops? Option B Mode Bike Enhanced bike facility Drive • Center turn lane • EB: 1 travel lane, 1 parking lane • WB: 2 travel lanes City Park Ave. to Shields St. Enhanced bike facility Walk Complete sidewalk network to ADA standards • Center turn lane • 2 travel lanes each dir. • 1 parking lane each dir. • Access control • BRT in shared lane • BRT station Complete sidewalk network to ADA standards Bike Enhanced bike facility Enhanced bike facility • Center turn lane • 1 travel lane each dir. • Side running BRT in dedicated lane • BRT station Complete sidewalk network to ADA standards • • • • Transit Drive Transit Walk Draft- 12/2/15 Segment Constitution Ave. to City Park Ave. *If ROW not available 2 travel lanes each dir. Access control Center running bidirectional BRT BRT station Wide sidewalk W. Elizabeth St. & Constitution Ave. Intersection W. Elizabeth St. & City Park Ave. W. Elizabeth St. & Shields St. • Green bike lanes through int. • Two stage turn queue box • Green bike lanes through int. • Two stage turn queue box • Green bike lanes through int. • Two stage turn queue box Transit signal priority Transit signal priority Leading pedestrian interval • Green bike lanes through int. • Two stage turn queue box • Green bike lanes through int. • Two stage turn queue box Transit signal priority Transit signal priority • Green bike lanes through int. • Two stage turn queue box Leading pedestrian interval 3 Which bike treatments do you think are appropriate for the West Elizabeth Corridor? Facility Image Conventional Bike Lane Buffered Bike Lane Vertical separation Concrete curb and/or parking Protected Bike Lane Planters and/or parking Raised with a mountable curb November 23, 2015 Draft November 23, 2015 Draft
© Copyright 2026 Paperzz