Nevada Power Plants Plant Name Plant Type Other ID Label Owner Operator Operational Date Status Status Date : : : : : : : : : Patua Binary Cycle NBMG_ID:65 Patua | NBMG_ID:65 Gradient Resources Gradient Resources 2012-01-01T00:00 Under Construction 2012-07-21T00:00 UTM East UTM North UTM Datum Zone County State Lat Degree Long Degree SRS Location Uncertainty Statement Location Uncertainty Code Uncertainty Radius (m) Location Keyword : : : : : : : : 321489.97 4383576.49 NAD 1983 Churchill Nevada 39.583331 -119.078602 EPSG:4326 Unknown Use Application Facility Contact Phone Postal Address Zip Email Address : : : : : : Source Related Resource Facility URI Metadata URI Notes Update Time Stamp : : missing : 0 : Patua PLSS Meridians Township Range Section_ Section Part : : : : : Mt. Diablo 20 N 26 E 21 SWNW Capacity MW Fluid Temperature (C) Flow (gpm) : 30.00 : 132 : 0 Commercial/Purveyor Jim Combs (775) 284-8842 9670 Gateway Drive, Suite 200, Reno, NV 89521 [email protected] http://data.nbmg.unr.edu/public/Geothermal/Data/_metadata/TXT_Files/Geotherma : lPowerPlants.txt None : : http://resources.usgin.org/uri-gin/nbmg/powerplant/NBMG_ID:65/ http://repository.stategeothermaldata.org/repository/resource/3592f7bc37ea27adea : 06455fbf7eac2f/ : First phase under construction 2013 - 30 MW : 7/21/2013
© Copyright 2026 Paperzz