Capacity Expansion for Transportation Project

Case Study
April 2016
D352384X012
Capacity Expansion for Transportation Project
San Antonio’s Project, Bolivia
Using PipelineStudio® from Emerson (formerly Energy Solutions International), Transierra S.A. has
successfully planned and optimized a capacity expansion for a critical natural gas pipeline
Margarita Natural gas field output is connected through a 10“ set line (17km) with Sabalo GASAN gas field export lines 28“ OD
(20km), which goes to Villamontes GASYRG compressor station (MOP 1440 Psig) and is connected with Yabog.
Average Volume Margarita = 1.43 Mmcd
Average Volume San Antonio = 13.39 Mmcd
total Volume SAN + MGT = 14.82 Mmcd
Pressure out San Antonio = 1080 Psig
Pressure in Villamontes = 1030 Psig
Midstream Oil and Gas Solutions
April 2016
“Gasan” Maximun Transport Capacity
The maximum design transport capacity is 21 MMCD. To achieve this, an output pressure of 1080 Psi (Sabalo) is required and arrival
pressure of 1030 Psig (Villamontes) as shown in the simulation below.
To increase transport volume and meet the GTCS, we propose the
following alternatives based on simulation:
1. Independent booster system
2. Integrated booster system
3. Loop + booster independent/integer
Current Transportation System
Transport Capacity with System Compression Booster
Installing a booster compression system, at operating conditions of:
Suction Pressure = 850-900 Psig
Discharge Pressure = 1030 Psig
Sabalo Pressure = 1073 Psig
Required Power (Approx.) = 8400 Hp is reached at 34 Mmcd
Transport Capacity
2
www.EmersonProcess.com/Remote
April 2016
Midstream Oil and Gas Solutions
Operating Condition Alternative - 1
Alternative - 1 28/34 Mmcd
www.EmersonProcess.com/Remote
3
Midstream Oil and Gas Solutions
April 2016
Alternative - 1 28/34 Mmcd
Transport System’s Simulation, Using PipelineStudio, Ver. 3.1
4
www.EmersonProcess.com/Remote
April 2016
Midstream Oil and Gas Solutions
Gasan with Loop 28 Mmcd
As has been mentioned before, it is required to build a 7Km Loop and 28 OD to increase the transport capacity.
The simulation shows that, to achieve an arrival pressure of 1036 Psig
(Villamontes) with a 28 Mmcd Flow and an output pressure 1080 Psig
(Sabalo Gas Plant), it is not necessary to use compression for this volume,
because the conditions of delivery are achieved at this point.
Gasan with Loop 7 KM
The simulation shows that, to achieve an arrival Pressure of 979/940 Psig
(Villamontes) with a 34 Mmcd Flow and an output pressure 1050/1080
Psig (Sabalo Gas Plant), it is necessary to use compression for this
volume, because the conditions of delivery required are not achieved at
this point.
Gasan with Loop 7 KM with Booster
The simulation shows that, to achieve an arrival Pressure of 1030 Psig
(Villamontes) with a 34 Mmcd Flow and an output pressure 1080 Psig
(Sabalo Gas Plant), it is necessary to use a system compression booster
with a power of 3000 Hp.
www.EmersonProcess.com/Remote
5
Find us around the corner or around the world
For a complete list of locations please visit us at www.EmersonProcess.com/Remote
Global Headquarters
North America and Latin America
Emerson Process Management
Remote Automation Solutions
6005 Rogerdale Road
Houston, TX, USA 77072
T +1 281 879 2699
F +1 281 988 4445
www.EmersonProcess.com/Remote
Europe
Emerson Process Management
Remote Automation Solutions
Unit 8, Waterfront Business Park
Dudley Road, Brierley Hill
Dudley, UK DY5 1LX
T +44 1384 487200
F +44 1384 487258
© 2016 Remote Automation Solutions, a business unit of Emerson Process Management. All rights reserved.
Emerson Process Management Ltd, Remote Automation Solutions (UK), is a wholly owned subsidiary of Emerson Electric Co. doing business
as Remote Automation Solutions, a business unit of Emerson Process Management. FloBoss, ROCLINK, ControlWave, Helicoid, and
OpenEnterprise are trademarks of Remote Automation Solutions. AMS, PlantWeb, and the PlantWeb logo are marks owned by one of the
companies in the Emerson Process Management business unit of Emerson Electric Co. Emerson Process Managment, Emerson and the
Emerson logo are trademarks and service marks of the Emerson Electric Co. All other marks are property of their respective owners.
The contents of this publication are presented for informational purposes only. While every effort has been made to ensure informational
accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein
or their use or applicability. Remote Automation Solutions reserves the right to modify or improve the designs or specifications of such
products at any time without notice. All sales are governed by Remote Automation Solutions’ terms and conditions which are available
upon request. Remote Automation Solutions does not assume responsibility for the selection, use or maintenance of any product.
Responsibility for proper selection, use and maintenance of any Remote Automation Solutions product remains solely with the purchaser
and end-user.
Find us in social media
RemoteAutomationSolutions
Emerson_RAS
Remote Automation Solutions Community
Remote Automation Solutions
D352384X012 / Printed in USA / 04-16
Middle East and Africa
Emerson Process Management
Remote Automation Solutions
Emerson FZE
PO Box 17033
Jebel Ali Free Zone - South 2
Dubai, UAE
T +971 4 8118100
F +1 281 988 4445
Asia Pacific
Emerson Process Management
Asia Pacific Private Limited
Remote Automation Solutions
1 Pandan Crescent
Singapore 128461
T +65 6777 8211
F +65 6777 0947