DCN 9385 DEPARTMENT OF THE ARMY U.S. ARMY AUDIT AGENCY Office of the Deputy Auditor General Installation Management Directorate 3101 Park Center Drive Alexandria, VA 22302-1596 SAAG-IMT (36-2c) 13 June 2003 MEMORANDUM FOR Director, The Army Basing Study Group SUBJECT: Army Corporate Database Update Schedule, Survey of Base Realignment and Closure 2005-Interim Report #2 (Project Code: A-2003-IMT0440.000) 1. You asked u s to comment on potential issues related to timeliness of data in corporate Army databases a s shown in the enclosed update schedule. Specifically, you asked if those databases-using a December 2003 lock datewould be sufficient to conduct The Army's Base Realignment and Closure (BRAC) 2005 analysis in mid-2004. You also asked u s to coordinate with the U.S. General Accounting Office for its perspective on data timeliness issues. 2. We reviewed the schedule for updating the corporate Army databases, as well a s the regulations governing each of the databases. And, we discussed timeliness of the data for use in BRAC 2005 analysis in mid-2004 with a representative from the U.S. General Accounting Office (GAO). The GAO representative and we agree that the data in corporate Army databases, a s of a December 2003 lock date, is sufficient to conduct analysis for decisions on bases to consider for realignment or closure during BRAC 2005. However, both the GAO representative and we share the opinion that, if there are significant changes in The Army's force structure and/or infrastructure requirements between December 2003 and May 2005, then The Army would need to re-lock the databases at an appropriate point and re-perform its analysis. If you have any additional questions or need more information, please 3. contact Mr. Lawrence Wickens at (703) 428-6524, Mr. Clarence Johnson a t (410) 278-4287, or me a t (703) 68 1-6020. FOR THE DEPUTY AUDITOR GENERAL: Encl DAVID H. BRANHAM Program Director, Installation Studies DRAFT DELIBERATIVE DOCUMENT - FOR DISCUSSION PURPOSES ONLY Do Not Release Under FOlA DCN 9385 Draft Deliberative Document - For Discussion Purposes Only Do Not Release Under FOlA I Cor~orateData,a -,e t Schedule Army Force Structure from July SAMAS, Tenants other than Army, and contractors input by Installations that generate facility requirements in HQRPLANS in December. I Facility requirements based on I ASlP Lock I July and September personnel / population locks. 1 ) ISR Lock I 1 I / *--we- "----*- Jan Feb Mar Apr May Jun Jul --* a -ww - - mh w- _ _ I _- Capacity Data Call #I / Lock I Jan Feb Mar Apr May Jun -."'_*_LI Y- Military Value Data Call #2 Develop Scenarios r Transforming Through Base Realignment and Closure [email protected] 703.588.0192 1 of7 13 May 03
© Copyright 2026 Paperzz