Status and Plans for the LHC and the Experiments! ! LHC ! !RRB 39! ! ! October 12, 2014! Sergio Bertolucci ! CERN! Chamonix 2014 Conclusions Frédérick Bordry 8 October 2014 22nd September 2015 from Les Aiglons 9th meeting of CERN Machine Advisory Committee (CMAC9) linked to Chamonix CMAC members Brinkmann Reinhard Fischer Wolfram Gourlay Stephen Holtkamp Norbert Oide Katsunobu Qing Qin Roser Thomas (chair) Seeman John Shiltsev Vladimir DESY BNL LBNL SLAC KEK IHEP BNL SLAC FNAL Meetings during Chamonix (afternoon, morning, evening). Closed session on Friday 26th September at CERN. CMAC Close Out : Friday 26th September at 15h30. Main focus of CMAC9: strategy for the restart of the machine, plan for LIU & HL-LHC, optimizing luminosity LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 3 LS 1 from 16th Feb. 2013 to Dec. 2014 19 months October 13th 16th Feb. 2013 2014 2015 F M A M J J A S O N D J F M A M J J A S O N D J F M A beam to beam available for works Physics Beam commissioning LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 Shutdown Powering tests 4 PS Physics has started • nTOF planned for 15-07-2014 - Slightly delayed start for EAR2 installation work - First beam on target 25-07-2014 - Since, physics during night and weekends and continuation of installation during daytime. • East Area planned for 15-07-2014 - First beam on 15-07-2014, physics start on 16-07-2014 • AD beam - In March 2014, beam on target delayed by 3 weeks due to Horn strip line problem new optimistic date for beam on target 01-08-2014 - First beam delivered on target 05-08-2014, physics start on 16-09-14 • Ion beam in preparation for 2015 run planed for 25-08-14 - Argon Ions were successfully injected, accelerated and extracted from PS on 26-08-2014 Better define different periods: Shut-down HW commissioning Cold Check-out Beam Commissioning LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 Clear definition of roles and responsibilities for each period and interfaces IEFC will follow this issue 5 SPS: start-up with beam more-or-less on schedule Beam was foreseen for Monday 8th September, Despite… • Conditioning of injection and dump kickers which took longer than foreseen after LS1 • Hardware testing of main circuits and debugging of converter software issues after updates during LS1 • Water leak on water cooled main bus bar in SPS point 3 was detected on 8th Sept. 1st beam on Saturday 13th September 6th North Area (started physics Oct) HiRadMat (first run 13th Oct) Fixed target LHC LHC (2015) LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 6 Cool-down of LHC sectors Sector 12 Sector 23 Sector 34 Sector 45 Sector 56 Sector 67 Sector 78 Sector 81 Arc-‐magnet average temperature [K] 300 Slow-down during weekends 250 200 150 100 CSCM 50 0 5/5/14 0:00 2/6/14 0:00 30/6/14 0:00 LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 28/7/14 0:00 Time 25/8/14 0:00 22/9/14 0:00 ITR8 intervention Courtesy of Laurent Tavian 7 Safety First, Quality Second, Schedule Third LHC schedule V4.1 NC CSCM Cool-down CSCM Cool-down CSCM PT Φ 1 ELQA PT Φ 1 PT Φ 2 ELQA PT Φ 1 PT Φ 2 March April P6 67 78 P8 81 CSCM ELQA NC Cool-down ELQA Flushing, nQPS, ELQA NC Cool-down CSCM Cool-down ELQA ELQA PT Φ 1 Cool-down CSCM PT Φ 2 CSCM PT Φ 1 PT Φ 2 ELQA PT Φ 1 PT Φ 2 PT Φ 1 PT Φ 2 Machine Check-out August Flushing, nQPS, July Pressure test ELQA ELQA P7 September ELQA Cool-down 56 December November October P5 26 27 28 29 30 31 32 33 34 ELQA 35 Flushing, nQPS, ELQA 36 37 38 NC 39 40 41 42 43 44 Cool-down 45 46 CSCM 47 48 49 50 ELQA 51 52 1 2 3 4 PT Φ 1 5 6 7 PT Φ 2 8 9 10 11 12 13 14 15 16 17 January September December November October ELQA Flushing, nQPS, PT Φ 2 45 Pressure test NC ELQA P4 Pressure test February January ELQA 34 February NC August July Flushing, nQPS, P3 March 23 Beam Commissioning April P2 CV maintenanc e 12 CV maintenanc e P1 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1st beam on week 11 (starting 9th March 2015) LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 Courtesy of Katy Foraz 8 Maximum beam energy : 13 TeV c.m. in 2015 Decision to run at a maximum energy of 6.5 TeV per beam during the powering tests and during 2015. (10 to 15 training quenches per sector are expected to be needed to reach that energy). “We accept the risk that results from late quench tests could force to run at lower energy” Emilio Meschi NO change of beam energy in 2015. A decision regarding the possibility of increasing the energy will be taken later in 2015, based on the experience gained in all eight sectors at 6.5 TeV per beam during powering tests and operation with beams. LHC Strategy for 2015 - To restart with the similar 2012 parameters and a relaxed β* (80cm) (Alice 10m; LHCb 3m) to establish asap collisions at 13 TeV with 50 ns bunch spacing, no combined collide-squeeze, ramp-squeeze,… - LHCf request and VdM with same optics - To do a 1st scrubbing run (50ns+25ns; 7-9 days) and to accumulate up to 1fb-1 with 50 ns (around 20 days) - To establish the running with 25 ns: enough time for the scrubbing (10-15 days and no pressure for production) - To run at 25ns with β* (80cm) during 2 months (45 days) and to decrease the β* (60 cm- 40 cm?) to have around 45 days of operation to prepare 2016 and 2017 - One month for heavy ions. LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 10 R2E LHC Target R2E SEE Failure Analysis ! ~400 h Downtime s / fb -1 ~250 h Downtime ~12 dump ! 2008-‐2011 ! 2011-‐2012 Relocation & Shielding ! Equipment Upgrades or f g min-1 i A LS2 / fb – LS1 dumps <0.5 CERN R2E Organiza.on – Extended TM (BE/TE/EN) Analyze and miFgate all safety relevant cases and limit global impact 11 Focus on long downFmes and shielding ! LS1 (2013/2014) ! Final relocaFon and shielding ! LS1-‐LS2 (2015-‐2018) ! Tunnel equipment and power converters February 11th 2014 UFOs may get worse at higher energy • UFO rate increases (also with 25 ns spacing) • energy loss / UFO increases • quench margin is reduced • also: duration of UFOs decreases „Rise&me becomes faster for higher beam energies.“ PRE LIM INA RY 683 arc (≥ cell 12) UFO events with 1374/1380 bunches until 20.08.2012. Signal RS04 > 2·10-4 Gy/s. Only datasets with R² ≥ 0.95. no miFgaFon during LS1 to reduce UFO acFvity T. Baer, UFO Study Working Group , 4 Sept. 2012 LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 100 µs 12 U(Unknown)FO loss concern and scenario 1. Reloca.on of BLMs for 100% coverage of SC magnets to allow localizing and quan.fying UFOs BLMs moved from centre of MQ to position above MB-MB interconnects: Initial numbers of UFO events will be larger. Don’t panic ! 2. Refinement of BLM thresholds (based on quench tests) to avoid u n n e c e s s a r y t r i g g e r s a n d quenches. LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 13 LHC goal for 2015 and for Run 2 and 3 Priorities for the 2015 run : - Establish proton-proton collision at 13 TeV with 25ns and low β* to prepare production run in 2016. Optimisation of physics-to-physics duration - Later in 2015: decision on special runs “when and duration” (90m optics): not in the 1st part of the year. Waiting LHCC recommendation - Pb-Pb run: one month at the end of 2015 The goal for Run 2 luminosity is 1.3 x 1034 cm-2 s-1 and operation with 25 ns bunch spacing (2800 bunches), giving an estimated pile-up of 40 events per bunch crossing. “A maximum pileup of ~50 is considered to be acceptable for ATLAS and CMS” LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 14 LHC goal for 2015 and for Run 2 and 3 Integrated luminosity goal: 2015 : 10 fb-1 Run2: ∼100-120 fb-1 (better estimation by end of 2015) 300 fb-1 before LS3 LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 15 The LIU and HL-LHC projects Cost and Schedule Review 9-11 March 2015 ; Chair: N. Holtkamp (CMAC 10) The goal of the cost and schedule review of the LIU and HLLHC projects is to assess the status and risks of both projects Four major activities ongoing in parallel: • Accelerator complex operation • Accelerator Consolidation Program • LHC Injector Upgrades (LIU) • High Luminosity LHC upgrade LHC Performance Workshop 2014 Conclusions F. Bordry 8th October 2014 This review will cover the LIU and HL-LHC projects, taking into consideration their working hypothesis linked to the Consolidation project and the operation of the CERN accelerator complex. This review will not assess the cost and schedule of the Consolidation project nor the operation of the accelerator complex. 16 The Experiments! Approaching the LS1 endgame! n Focusing on closing the detectors and on the recommissioning ! n Concentrating on the Run II scenarios! n …and of course keeping producing physics results and working for the upgrades.! n The Experiments! n Long term schedule stabilized at the end of 2013! n Phase-I upgrades figures and timelines pretty consolidated! n Phase-II figures and timelines still based on LOI and subject to R&D results! n HL-LHC studies continuing (2nd ECFA HLLHC Experiments Workshop https://indico.cern.ch/event/315626/ )! ! Phase II Upgrades, a proposal for discussion! The scenario:! ! n n n n ! By the year 2023, LHC will have delivered an integral luminosity ~ 300/fb to each of the two general purpose experiments.! At that time, both the LHC low-beta insertions and many critical components of the experiments will have reached the end of their life-cycle, due to radiation damage. This aging model has by now been validated by the data collected in Run I.! It is inconceivable under any reasonable scenario to stop the LHC program at that point, as it is also indicated as the top priority in the Update of European Strategy on Particle Physics ! ATLAS AND CMS PHASE II UPGRADES ARE MANDATORY.! The goal of the upgrades, clearly stated by both experiments, is to retain the same performances as in Run I in a much more challenging environment ! Phase II Upgrades, a proposal for discussion! The scenario:! ! n n n ATLAS and CMS have presented in the October '13 RRB meeting a first assessment of their Phase II upgrade cost, with a total core cost of ~550 MCHF and starting already in 2017, in order to flatten the spending profile as much as possible.! Core costs DO NOT include offline computing, for which the experiments assume the continuation of the present effort.! The LHC schedule is optimized for an efficient running of both machine and accelerator. Moving the Phase II upgrades beyond 2023 is not an option, because it would be economically wrong to run with a crippled machine and inefficient experiments.! Phase II Upgrades, a proposal for discussion! Balancing bottom-up and top down:! ! n n n n Approval of the upgrades should proceed through an iterative process, which will strike a balance between experiments requests, physics performances and needs, and funding agencies capacities.! Experiments will submit Technical Proposals to the LHCC, outlining the connection of the physics requirements with the technical solutions.! A preliminary money matrix, negotiated with all the involved funding agencies, will be mandatory to assess the credibility of the proposals.! Subject to the soundness of the physics case, the technical maturity and a realistic global funding, the LHCC will ask the collaborations to proceed to Technical Design Reports, which MUST contain a detailed cost breakdown connected to the physics requirements and performances, a money matrix and a schedule. ! Phase II Upgrades, a proposal for discussion! Balancing bottom-up and top down:! n n n n n The LHCC and the Upgrade Cost Group will scrutinize the TDRs and recommend them for approval to the Research Board, based on their scientific and technical merits AND on a detailed cost analysis, which will check the compatibility between the needed and the available resources.! The Funding Agencies will run a similar process for their communities, thus providing a realistic input to the money matrix.! Detailed and timely information will be provided to the RRB throughout the process by the Scrutiny Group, whose representatives are ex-officio members of the LHCC and of the UCG.! In case of a substantial unbalance between the needed and the available resources, the experiments will be asked to present staging or descoping plans.! NO TDR WILL BE APPROVED by the Research Board if it lacks a realistic funding scenario.! Experiment approval and monitoring process LOI/TP MoU addenda Money Matrix Directorate Proposal Endorsement TDRs Proposal Time/costs Exp of Int Endorsement R&D LHCC Budget/expenditure Endorsement Construc.on Funding Agencies (including CERN) M&O-‐A Research Board Upgrade Cost Group Scru.ny Groups Resource Review Board M&O-‐B Compu.ng WLCG CERN FP DEPT Phase II Upgrades, a proposal for discussion! The time scale:! n The proposed time scale foresee the process to have an important deadline in October '15, with the goal to have both experiments ready to go for their TDRs! n n earlier dates might not allow for mature choices, (much) later dates would damage the experiments and their timely readiness. ! Of course, we shall use the October '14 and the April '15 RRB's to steer/advance the process. ! THANK YOU!
© Copyright 2026 Paperzz