Appendix A, Figure 2-4: Wind Turbine Construction Site

24’
Permanent Road,
Gravel Surface
Temporarily Cleared & Leveled
to 5% Grade
40’–50’
Crane Pad
85’–120’
Radius
99’-161’
Foundation
Tower Base
Gravel Driveway
45’-60’
80’
Pad Mount
Electrical
Transformer on
Concrete Slab
100’
Underground
Electrical Circuit
Figure 2-4
Wind Turbine Construction Site
West Butte Wind Project
Deschutes/Crook Counties, Oregon
40’
Temporary
Disturbance
Construction
Access