Aging Infrastructure Utilities, PDT, Community Services Planning for Resilience & Continuity 1 What is the problem we are trying to solve? • Insuring continuous, reliable and high quality services • Maintaining reliable infrastructure • Upgrading services where and when possible • Anticipating change and preparing to adapt 2 What are the Issues? • Reliable on-going funding • Infrastructure monitoring and timely replacement • Coordinated scheduling & systems • Anticipating & preparing for disruptive changes/events • Appropriate staffing levels 3 Utilities Asset Management Electricity Stormwater Water Wastewater 4 Asset Management Program Status Utilities Division Water Distribution Wastewater Collection Stormwater Collection Water Treatment Facility Water Reclamation Facility Light & Power Distribution Light & Power Substations Lifecycle Preliminary Risk Performance Capital Project Management Plan Assessment Metrics Prioritization Implementation Work complete Work in progress Work scheduled but not yet started Work not scheduled 5 Comments All elements are complete and now in implementation. All elements are complete and now in implementation. All elements are complete and now in implementation. Implementation is on hold until a new WPG manager is hired. All elements are complete and now in implementation. Preliminary RA is scheduled to start Q4 2014. Preliminary RA is scheduled to start Q4 2014. Asset Management Systems vs. Programs 6 Asset Management Systems 7 Strategic Asset Management Programs 8 Capability 9 Asset Management System Program Work Order Management System Yes Yes Work Orders tied to Assets Yes Yes Automated Prev entativ e Maintenance Work Orders Yes Yes Assets Mapped in GI S Yes Yes Asset Register Yes Yes Risk Register Yes Asset Management Plans Yes Asset Condition Assessments Yes Asset Lifecycle Maintenance Strategy Models Yes Asset failure analysis / predictiv e modeling Yes Asset demographics Yes Serv ice Lev el Performance Monitoring Yes Prioritized Capital I mprov ement Plans Yes Risk Management Yes Strategic Financial Plans Yes Asset Management Tools Being Developed in Utilities 10 • Asset Management Plans for all major assets • Service Level Scorecards • Asset Specific Failure Curves • Multi-attribute Decision Analysis Software • Prioritized 10-year Capital Improvement Plans • Strategic Financial Plan 11 Asset Management Lev els of Serv ice Potable Water Treatment and Distribution Key Service Criteria Performance Indicator Quality Taste, Odor, and Color Complaints Regulatory Compliance Reliability Maximum Contaminant Limits & City Water Treatment Facility Limits Number of Outages Experienced by Customers BFO Performance Measure ID Target Level of Service Current Performance (end of 2013 calendar year) Score Points possible ENV 27 ≤ 1 complaint /month regarding taste, odor, or rusty/dirty water 12 complaints for taste/odor & visual/rusty water; 1 complaint/month 20 20 ENV 1 100% compliance with Maximum Contaminant Limits & City Water Treatment Facility Limits 100% compliance 20 20 N/A No more than 3 outages per year TBD 10 20 ENV 32 Firm yield greater than demand Annual demand of 23,367 AF; firm yield of 30,500 AF. 10 10 20 20 Availability of Water to Customers Minimum flow provided to customers Responsiveness to Outages Response time to customer complaints due to a loss of supply N/A Rate per 1k Gallons of Finished Water N/A Top Decile of Similar Cities in Colorado 3rd Decile 7 10 Amount of Annual Rate Increase N/A ≤ 5% 4% for 2013 & 2014 5 5 Percentage of Household Income for Water Service N/A ≤ 1% 0.76% for 2013 5 5 DART Rate N/A 2.5 for the City. N/A N/A RAF Rate HPG 22 4.7 for the City. N/A N/A 97 110 Financials Safety Respond to customer complaints regarding loss of 27.4 minute average supply within 30 minutes 99% response time of the time 3.2 for Utility Services for 2013 6.1 for Utility Services for 2013 Total Score 12 System Replacement Planning 13 Capital Improvement Planning 14 Source: Expert Choice Decision Support Tool Capital Improvement Planning 15 Source: Expert Choice Decision Support Tool Capital Improvement Planning 16 Source: Expert Choice Decision Support Tool Capital Improvement Planning 17 Strategic Financial Plan Strategic Operational Plan Prioritized Capital Projects Rate Forecast Strategic Financial Plan Operating Expense Analysis Debt Analysis Revenue Analysis 18 Additional Elements • Seeking ISO 55000 audit in 2015. • Working towards accreditation in near-term. 19 2016 ISO 55000 2009-11 Asset Management • Risk Register • Asset Database • Capital 2012-3 Strategic Financial Planning • • • Asset Condition Water & Wastewater • Capital Improvement Plans & Strategic Financial Asset Lifecycle Plan audited • Asset Management Plans program fully Strategic Financial implemented Plan Draft Strategic Financial Plan • Management Asset Lifecycle Plans Assessments 20 • Management Prioritization • 2014-5 Capital Improvement Plans Maximo (SFP) • BFO Offers and rate adjustments consistent with & supported by SFP Stormwater Light & Power Community Operations and Services • • • • 21 Facilities Parks Cultural Facilities Natural Areas Facilities • Projected Facilities Maintenance & Repair (M&R) budget -4% of Current Replacement Value (CRV) of GF buildings (52) maintained. Actual budget typically less. (Alterations and new construction not included.) • Building Condition Audits conducted to assess the current and long-term M&R needs–including the service life/functionality of buildings. • No dedicated Facilities Maintenance Reserve since 1996. • Non-general fund departments (Transportation, Utilities, Fleet) typically budget less than 4% target. 22 Buildings • Issues for the future 1. Replacement / Disposal / Re-purpose 2. Major Alterations / Additions 3. Funding for full “Cost of Ownership” of buildings. • Aging buildings & installed mechanical systems : Of the 52 buildings Facilities maintains, 23 are > 50 yrs; 15 btwn 50-25; 8 btwn 24-10; 6 < 9 yrs • Long-Range building space planning for growth and efficiencies 23 Parks • Parks has 196 acres of parkland which has no life cycle funding including medians & parkways • Water for existing parks and future parks will be more difficult to obtain without additional storage • Aging structures within parks will need to be upgraded and modernized. Great pressure from citizens for access to these facilities • Current irrigation system will need upgrading and new technologies may change the way water is applied 24 Parks 25 • Current irrigation system will need upgrading and new technologies may change the way water is applied • Field usage will continue to be an issue with more entities requesting field usage • Citizens are requesting more water features which have high maintenance issues • Fleet • Average age • Vehicles – 9.2 years • Equipment – 11.4 years • Fleet Value – $93,757,259 (cost) 26 Fleet Replacement Guidelines – Light Duty vehicles – 95,000 miles – Mowers – 2,000 - 4,000 hours(depending on size) – Utility Trucksters – 5,000 hours – Small dump trucks – 120,000 miles – Tandem Trucks – 150,000 miles – Backhoes / Loaders – 8,000 hours – Trailers - 10 years + condition – Sweepers – 8,000 hrs – Other equipment – case by case basis 27 Natural Areas Fort Collins Natural Areas has a Capital Replacement Plan and Fund to anticipate and pay for major maintenance and replacement of infrastructure. Staff monitors the condition of all infrastructure and schedules preventive maintenance to minimize major maintenance and replacement costs. Natural Areas contributes over $600,000 annually to its Capital Replacement Fund which is capped at $2,000,000, and then replenished annually as needed. Cultural Services Cultural Services has three primary facilities: Lincoln Center; Museum of Discovery; Carnegie Building. The Lincoln Center renovation upgraded aging infrastructure so it is in good shape for the near term. The Museum is a new building and also in good shape for the near term. The Carnegie Building needs $2 million in infrastructure improvements and funding is being requested in BOB 2.0. 28 The City currently spends ~$585,000 annually on repair and replacement of park infrastructure (lifecycle funding). The amount of annual lifecycle funding needed to keep our parks in acceptable condition is $770,000, which equates to $1,000 per acre of developed parkland and a deficit of $185,000 annually. The City’s Golf Division is self-funded through user fees. Fees are not sufficient to fund infrastructure needs for our three golf courses. The 30 year old irrigation system at Southridge needs to be replaced at a cost of $2.2 million and the 35 year old irrigation system at City Park Nine also needs to be replaced at a cost of $1.2 million. The golf operation has additional unfunded infrastructure needs of $3.3 million for parking lots, shelters, bridges, buildings, netting and restrooms. 29 Streets, Bridges,and Sidewalks • The City has had a Computerized Pavement Management System Since 1989 • The current system (Deighton) has been in place since 1997 • This system has been expanded to include the bridges and sidewalks • Has the capabilities to manage all assets • This System is fully integrated with the City’s Geographic Information System (GIS) 30 Deighton Total Asset Management 31 Pavements • • • • • • 32 Determination of Level Service Customized Pavement Deterioration Curves Predictable Maintenance Costs Over Time Multi-attribute Decision Analysis Software Prioritized 5 year Pavement Maintenance Plan Strategic Financial Plan Funding and Pavement Condition Index (PCI) 80 $50 $40 70 $30 65 $20 60 55 $13.59 $14.80 $15.20 $15.10 $15.40 $7.10 $8.80 $8.99 $8.99 $8.99 $8.99 2016* 2017* 2018* 2019* 2020* 50 $10 $0 2010 2011 Total Funding 33 Funding in Millions of Dollars Pavement Condition Index (PCI) 75 2012 2013 2014* 2015* Continued Funding with 1/4 Cent Sales Tax Current Funding without 1/4 Cent Sales Tax *Projected Bridges • • • • • • 34 New rating system under development Use same inspection items as SR Incorporate City functionality – Sidewalks – Bike lanes Incorporate risk factors – Age past design life City currently uses Level of Service (LOS) for Pavements Goal is to have consistent LOS for all assets Planning Development & Transportation • Transportation 35 36 Future Asset Management Projects • Cross asset analysis and optimization • Integrate all of the City's assets into one system for strategic and tactical planning including o Traffic Signals o Pavement Marking o Transfort o Utilities 37 Consider • Should there (can there be)be a single asset management system for the City? • Should all departments have a consistent reserve policy? • Are we budgeting adequately for continuous improvement of our infrastructure? • Can we adapt to disruptive changes/events? • Should Facilities become an Internal Service Fund similar to Fleet? 38
© Copyright 2026 Paperzz