76’ ROW Setback Setback Section A: Overland Trl to Taft Hill Rd *Interim condition: attached walk as needed 91’ ROW Section B: Taft Hill Rd to City Park 91’ ROW Section C: City Park to Shields St N Traffic Calming Design Approach West Elizabeth Enhanced Travel Corridor 76’ ROW Setback Setback Section A: Overland Trl to Taft Hill Rd *Interim condition: attached walk as needed 91’ ROW Section B: Taft Hill Rd to Constitution Rd 85’ ROW Section C: Constitution Rd to Shields St N MAX on West Elizabeth Design Approach West Elizabeth Enhanced Travel Corridor OR Bus signal required Bus turn-around Green bike Bus queue lanes through Transit signal jump lanes intersection priority (TSP) Access Control CSU CAMPUS Green bike lanes through Two stage intersection turn box Myrtle St Leading pedestrian interval (LPI) Access Control Laurel St Leading pedestrian interval (LPI) Green bike lanes through intersection Access Control Shields St City Park Ave Bryan Ave Constitution Ave Skyline Dr Castlerock Dr Cragmore Dr Glenmoor Dr Meadowbrook Dr Taft Hill Rd Hillcrest Dr Ponderosa Dr Cypress Dr Timber Ln Rocky Rd Overland Trl Avery Park Transit signal priority (TSP) Leading pedestrian interval (LPI) University Ave Crossing Improvement Transit stop/ station CSU Main Campus Elizabeth St Overland Park CSU Transit Center Plum St Mason Corridor Roundabout Two-Way stop control Transit signal Bus queue priority (TSP) jump lanes Howes St New crossing (consistent w/ City plans) CAMPUS WEST Green bike Transit signal lanes through Two stage turn box priority (TSP) intersection Green bike Transit signal lanes through Bus queue priority (TSP) intersection jump lanes Meldrum St Transit stop/ station NEIGHBORHOODS/COMMERCIAL CONNECTOR WESTERN NEIGHBORHOODS CSU Foothills Campus Mulberry St City Park South Dr Crossing Improvement Pitkin St Lake St N Prospect Rd Legend Point Improvements Existing Transit Stops Fill in Sidewalk Gaps Bike Route Connecting Skyline Drive to Plum Street Lower Frequency Transit Operations High Frequency Transit Operations w/ Short route/surge frequency from Constitution Ave. to CSU Transit Center. Study Area Boundary Currently Funded Intersection Improvements RED FOX MEADOWS Low-Stress Bike Network NATURAL AREA SUMMARY: Minimal Capital Investment/Emphasis on Transit, Bikes and Ped. Improvements • Retain existing bike lanes, complete where necessary, add a striped buffer if possible • Fill in gaps in sidewalks and widen existing sidewalks when there is not sufficient width for ADA standards. Access Control Potential Underpass Pending Feasibility Analysis Transportation System Management (TSM) Design Approach West Elizabeth Enhanced Travel Corridor Draft 12.2.15 CSU CAMPUS Green bike Transit signal lanes through Bus queue priority (TSP) intersection jump lanes Leading pedestrian interval (LPI) Green bike Bus queue lanes through Two stage Transit signal jump lanes turn box priority (TSP) Access Control intersection Two-Way stop control Laurel St Leading pedestrian interval (LPI) Green bike Two stage lanes through intersection Access Control turn box Potential Protected E. Bound Right Phase Shields St City Park Ave Bryan Ave Constitution Ave Skyline Dr Avery Park Transit signal priority (TSP) Leading pedestrian interval (LPI) University Ave Crossing Improvement Transit stop/ station CSU Main Campus Roundabout Castlerock Dr Cragmore Dr Glenmoor Dr Meadowbrook Dr Taft Hill Rd Hillcrest Dr Ponderosa Dr Cypress Dr Timber Ln CSU Transit Center Plum St Mason Corridor Roundabout Rocky Rd Overland Trl Myrtle St New crossing (consistent w/ City plans) Elizabeth St Overland Park Transit signal Bus queue priority (TSP) jump lanes Howes St Roundabout Green bike Transit signal lanes through Two stage priority (TSP) intersection turn box Meldrum St Transit stop/ station CAMPUS WEST NEIGHBORHOODS/COMMERCIAL CONNECTOR WESTERN NEIGHBORHOODS CSU Foothills Campus Mulberry St City Park South Dr Crossing Improvement Pitkin St Lake St N Prospect Rd Legend Lower Frequency Transit Operations High Frequency Transit Operations w/ Short route/surge frequency from Constitution Ave. to CSU Transit Center. Point Improvements Existing Transit Stops Protected Bike Lanes Bike Route Connecting Skyline Drive to Plum Street Study Area Boundary Currently Funded Intersection Improvements RED FOX MEADOWS Low-Stress Bike Network NATURAL AREA SUMMARY: Focus on Traffic Calming and Pedestrian/Bicycle Safety with efficient Transit operations • Overland Trail to Taft Hill Road - 3 Lane cross section w/mix of detached and attached sidewalks (interim where needed) • Taft Hill Road to City Park Avenue - 3 Lane cross section w/ detached sidewalk and protected bike lanes • City Park Avenue to Shields Street - 5 Lane cross section w/ attached sidewalk and protected bike lanes Access Control Potential Underpass Pending Feasibility Analysis Traffic Calming Design Approach West Elizabeth Enhanced Travel Corridor Draft 12.2.15 Bus signal required Bus turn-around Two-Way stop control Green bike Bus queue lanes through Two stage jump lanes turn box Access Control intersection Transit signal Bus queue priority (TSP) jump lanes Myrtle St Leading pedestrian interval (LPI) Transit signal priority (TSP) Laurel St CSU Transit Center Plum St Crossing Improvement CSU Main Campus City Park Ave University Ave Bryan Ave Avery Park Constitution Ave Skyline Dr Green bike Bus queue lanes through intersection Access Control jump lanes Castlerock Dr Cragmore Dr Glenmoor Dr Meadowbrook Dr Taft Hill Rd Hillcrest Dr Ponderosa Dr Cypress Dr Overland Park Timber Ln Rocky Rd Overland Trl Elizabeth St Transit signal priority (TSP) Mason Corridor Roundabout Green bike lanes through intersection Howes St New crossing (consistent w/ City plans) CSU CAMPUS CAMPUS WEST Green bike Transit signal lanes through Two stage turn box priority (TSP) intersection Meldrum St Transit stop/ station NEIGHBORHOODS/COMMERCIAL CONNECTOR WESTERN NEIGHBORHOODS CSU Foothills Campus Mulberry St City Park South Dr Leading pedestrian interval (LPI) Grade separated crossing Leading pedestrian interval (LPI) Pitkin St Shields St Crossing Improvement Lake St Prospect Rd Legend Lower Frequency Transit Operations High Frequency Transit Operations w/ Short route/surge frequency from Constitution Ave. to CSU Transit Center. Point Improvements Protected Bike Lanes Buffered Bike Lanes Study Area Boundary Currently Funded Intersection Improvements Existing Transit Stops BRT Stations MEADOWS RED FOX Bike Route Connecting Skyline Drive to Plum Street NATURAL AREA Low-Stress Bike Network Access Control Potential Underpass Pending Feasibility Analysis N SUMMARY: Focus on introduction of MAX service through corridor and CSU - Bike and Ped improvements throughout • Overland Trail to Taft Hill Road - 3 Lane cross section w/ attached sidewalk and raised cycle track • Taft Hill Road to Constitution Avenue - 3 Lane cross section w/ detached sidewalk and raised cycle track • Constitution Avenue to Shields Street - 5 Lane cross section w/ Bus Only lane, attached sidewalk and raised cycle track MAX on West Elizabeth Design Approach West Elizabeth Enhanced Travel Corridor Draft 12.2.15
© Copyright 2026 Paperzz