APPENDIX D Prioritized Roadway CIP List No. 1 Project Number Location From R132 C1 Timberline Drake To Prospect Facility Type Description Upgrade from 2L arterial to 4L arterial and intersection improvements at 4 lane arterial Prospect Upgrade from 2L collector to 4L arterial and intersection improvements at 4 lane arterial Shields College upgrade from 4L to 6L Timberline 6 lane arterial Arterial standards Cost Street Oversizing Fund Development Direct Contributions (frontage, etc.) City Capital $11,400,000 $4,500,000 $1,500,000 $7,500,000 $4,300,000 $8,700,000 $6,090,000 CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $5,400,000 $11,400,000 10 7 7 10 7 41 High 1 $3,200,000 $7,500,000 5 15 4 5 7 36 High 2 $8,700,000 10 15 4 0 7 36 High 2 2 R46 B Harmony Seneca 3 R47 B Harmony Lemay 4 R117 Shields Elizabeth intersection improvements $4,000,000 $4,000,000 $4,000,000 5 15 4 5 7 36 High 2 5 R127 Taft Hill Elizabeth intersection improvements $4,000,000 $4,000,000 $4,000,000 5 15 4 5 7 36 High 2 6 R22 College Prospect intersection improvements $4,000,000 $4,000,000 $4,000,000 5 15 1 5 7 33 High 6 7 R21 College Drake intersection improvements $4,000,000 $4,000,000 $4,000,000 5 15 1 5 7 33 High 6 Lincoln upgrade from 2L collector to 4L arterial with intersection realingment and RR 4 lane arterial grade separation $23,000,000 $11,500,000 $23,000,000 1 7 7 10 7 32 High 8 $4,000,000 $4,000,000 1 15 4 5 7 32 High 8 $2,250,000 $3,000,000 10 7 7 0 7 31 High 10 $4,350,000 $8,700,000 5 15 4 0 7 31 High 10 8 R71 Lemay 9 R48 Harmony Mason intersection improvements $4,000,000 10 R156 Taft Hill intersection improvements $3,000,000 11 R11 C 12 R47 C 13 R47 D 14 R69 Conifer Horsetooth upgrade from 4L College Fossil CreeHarmony 6 lane arterial arterial to 6L arterial upgrade from 4L arterial to 6L Arterial 6 lane arterial standards Harmony Timberline Ziegler upgrade from 4L arterial to 6L Arterial 6 lane arterial standards Harmony Ziegler I-25 Lemay $6,900,000 $450,000 $2,610,000 $4,600,000 $300,000 $8,700,000 $4,350,000 $6,675,000 $3,337,500 $1,335,000 $2,002,500 $6,675,000 5 15 4 0 7 31 High 10 $10,680,000 $3,204,000 $2,136,000 $5,340,000 $10,680,000 5 15 4 0 7 31 High 10 $4,000,000 $4,000,000 5 15 4 0 7 31 High 10 $1,200,000 $4,000,000 10 7 4 0 7 28 High 15 $4,000,000 5 7 4 5 7 28 High 15 $3,000,000 5 7 4 5 7 28 High 15 Drake intersection improvements $4,000,000 $4,000,000 15 R104 B Prospect Summit VieI-25 upgrade from 2L ar 4 lane arterial terial to 4L arterial 16 R17 College Harmony intersection improvements $4,000,000 17 R128 Taft Hill LaPorte intersection improvements $3,000,000 $1,600,000 $1,200,000 $2,000,000 $600,000 $2,000,000 $2,400,000 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number 18 R27 College Willox 19 R12 A College Vine 20 R47 A Harmony College 21 R68 22 Location From To Conifer Lemay Facility Type Description intersection raised median north of improvements Willox upgrade to 4L arterial 4 lane arterial standards upgrade to 6L Arterial 6 lane arterial standards Cost Street Oversizing Fund Development Direct Contributions (frontage, etc.) $3,000,000 $1,800,000 $1,200,000 $8,000,000 $8,700,000 $1,305,000 $870,000 City Capital CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $3,000,000 5 7 4 5 7 28 High 15 $4,000,000 $4,000,000 $8,000,000 5 15 1 0 7 28 High 15 $3,262,500 $3,262,500 $8,700,000 5 15 1 0 7 28 High 15 $3,000,000 1 15 4 1 7 28 High 15 $3,337,500 1 15 4 0 7 27 High 22 $2,000,000 5 2 7 5 7 26 High 23 R42 Horsetooth Overland Elizabeth Trail Taft Hill intersection improvements 2 lane minor arterial 23 R49 Harmony Ziegler intersection improvements $2,000,000 24 R19 College intersection improvements $4,000,000 $2,000,000 $2,000,000 $4,000,000 5 7 1 5 7 25 High 24 25 R23 $2,000,000 $2,000,000 $4,000,000 5 7 1 5 7 25 High 24 R2 intersection improvements minor roadway and intersection improvements (streets, bridges, railroads) $4,000,000 26 College Mulberry Annual Capital (bridges, streets, and RR crossing upgrades) $13,200,000 $13,200,000 $13,200,000 0 2 7 0 4 13 High 26 27 R67 Lemay Harmony intersection improvements $4,000,000 $800,000 $4,000,000 5 7 4 1 7 24 Medium 27 28 R106 Prospect Lemay Intersection improvements $4,000,000 $3,000,000.00 $4,000,000 5 7 4 1 7 24 Medium 27 $8,000,000 $8,000,000 $8,000,000 1 15 1 0 7 24 Medium 27 $750,000 $750,000 $750,000 1 15 1 0 7 24 Medium 27 $4,000,000 $4,000,000 10 2 4 0 7 23 Medium 31 $6,500,000 5 7 4 0 7 23 Medium 31 Lemay Horsetooth College Lemay upgrade to constrained 4L arterial 4 lane arterial standards 2 lane minor arterial $3,000,000 $3,337,500 $3,000,000 $3,337,500 $2,000,000 $1,000,000.00 $3,200,000 29 R103 Prospect 30 R80 Mountain Meldrum 31 R124B Taft Hill upgrade from 2L Harmony Horsetooth 4 lane arterial collector to 4L arterial $4,000,000 32 R114C Shields upgrade from 2L Fossil CreeHarmony 4 lane arterial collector to 4L arterial $6,500,000 33 R59 JFK Troutman Intersection improvements $2,000,000 $2,000,000 $2,000,000 5 2 4 5 7 23 Medium 31 34 R119 Shields LaPorte Intersection improvements $3,000,000 $3,000,000 $3,000,000 5 7 4 0 7 23 Medium 31 35 R129 Taft Hill Mulberry Intersection improvements $2,000,000 $2,000,000 $2,000,000 5 7 4 0 7 23 Medium 31 36 R70 Lemay Riverside intersection improvements $2,000,000 $2,000,000 $2,000,000 5 7 4 0 7 23 Medium 31 College $6,500,000 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List Street Oversizing Fund Development Direct Contributions (frontage, etc.) City Capital CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank No. Project Number 37 R20 College Swallow intersection improvements $2,000,000 $400,000 $1,600,000 $2,000,000 0 15 1 0 7 23 Medium 31 38 R89 Mulberry Summit View intersection improvements $3,000,000 $600,000 $2,400,000 $3,000,000 5 2 7 1 7 22 Medium 38 39 R65 intersection improvements $2,000,000 $1,500,000 $500,000 $2,000,000 5 2 7 0 7 21 Medium 39 40 R52 B Lemay Carpenter Horsetoot h Taft Hill Shields 4 lane arterial $4,000,000 $2,000,000 $2,000,000 $4,000,000 5 2 7 0 7 21 Medium 39 41 R66 Lemay Trilby intersection improvements $3,000,000 $3,000,000 $3,000,000 0 2 7 5 7 21 Medium 39 42 R118 Shields Mulberry intersection improvements $2,000,000 $2,000,000 $2,000,000 5 7 1 1 7 21 Medium 39 43 R64 Laurel College intersection improvements $4,000,000 $3,200,000.0 $4,000,000 5 7 1 1 7 21 Medium 39 44 45 R144 R102 US 287 Prospect State Highway 1 GMA Overland TTaft Hill upgrade from 2 lane 4 lane arterial collector 4 lane arterial $4,000,000 $6,000,000 $4,000,000 $6,000,000 $4,000,000 $6,000,000 10 1 2 7 1 4 0 0 7 7 20 19 Medium Medium 44 45 $4,400,000 $22,000,000 5 2 4 1 7 19 Medium 45 $2,000,000 $2,000,000 0 2 4 5 7 18 Medium 47 46 Location From R132 E1 Timberline Mulberry To Facility Type 4 lane arterial and Mountain intersection Vista improvements R16 College Skyway 48 R85 A Mulberry 49 R85 B Mulberry Riverside Timberline 6 lane arterial Summit Timberline View 6 lane arterial R132d1 Timberline Prospect 51 R57 Jefferson Linden 52 R10 B 53 R10D 54 R151 A Carpenter Lemay County Carpenter Road 9 Rock Ziegler Creek 55 R41 56 R151 B 57 R53 58 R82 upgrade from 2L to 4L arterial and intersection improvements at Vine Intersection improvements 47 50 Description Cost $22,000,000 $800,000 $17,600,000 $2,000,000 $16,020,000 $16,020,000 $16,020,000 5 2 4 0 7 18 Medium 47 $1,668,750 $1,668,750 $1,668,750 5 2 4 0 7 18 Medium 47 $16,000,000 5 2 4 0 7 18 Medium 47 $2,000,000 0 7 4 0 7 18 Medium 47 $4,005,000 1 2 7 0 7 17 Medium 52 $4,005,000 1 2 7 0 7 17 Medium 52 upgrade from 2L 4 lane arterial arterial to 4L arterial $16,000,000 intersection improvements $2,000,000 Timberline 4 lane arterial $4,005,000 I-25 4 lane arterial $4,005,000 4 lane arterial 2 lane minor arterial $500,000 $500,000 $500,000 1 2 7 0 7 17 Medium 52 $1,335,000 $1,335,000 $1,335,000 1 2 7 0 7 17 Medium 52 4 lane arterial 2 lane collector upgrade from CR $1,000,000 $1,000,000 $1,000,000 1 2 7 0 7 17 Medium 52 $2,670,000 $2,670,000 $2,670,000 1 2 7 0 7 17 Medium 52 4 lane arterial incl underpass $10,012,000 $10,012,000 $10,012,000 1 2 7 0 7 17 Medium 52 Mulberry Harmony Rigden Drake Timberline Pkwy Horsetoot Ziegler Harmony h Horsetoot Strauss h Ziegler Cabin Rd Mountain Vista Timberline I-25 $3,200,000 $12,800,000 $400,000 $3,003,750 $1,600,000 $1,001,250 $4,005,000 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number 59 R86 Mulberry 60 R98 Overland Trail Drake 61 R164 62 Location From To Taft Hill Shields Facility Type roadway realignment, bridge extension Description Cost Street Oversizing Fund Development Direct Contributions (frontage, etc.) City Capital CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $8,000,000 $8,000,000 $8,000,000 1 7 1 0 7 16 Medium 59 Intersection improvements $2,000,000 $2,000,000 $2,000,000 0 2 7 0 7 16 Medium 59 Horsetoot Timberline h Intersection improvements $2,000,000 $2,000,000 $2,000,000 1 7 1 0 7 16 Medium 59 R18 College Boardwalk intersection improvements $2,000,000 $400,000 $1,600,000 $2,000,000 1 7 1 0 7 16 Medium 59 63 R26 College Monroe intersection improvements $2,000,000 $400,000 $1,600,000 $2,000,000 1 7 1 0 7 16 Medium 59 64 R63 LaPorte College intersection improvements $1,600,000 $2,000,000 1 7 1 0 7 16 Medium 59 65 66 R29 R146 A 67 R146 B 68 69 R96 C R10 A 70 R10 C Conifer Extension Lemay Vine College Vine Lemay Overland Trail Prospect Carpenter College R11 A College 72 73 R11 B R114 A College Shields 74 R114 B Shields 75 R85 C Mulberry R131 A 77 R131B 78 79 R132A R140 A 80 R142 81 R39 83 84 R52 A R72 $3,200,000 $8,010,000 $3,200,000 $8,010,000 $3,200,000 $8,010,000 0 1 2 2 4 4 5 0 4 7 15 14 Medium Medium 59 66 Timberline 4 lane arterial $6,007,500 $6,007,500 $6,007,500 1 2 4 0 7 14 Medium 66 4 lane arterial 4 lane arterial $4,005,000 $6,000,000 $3,000,000 $4,005,000 $3,000,000 $4,005,000 $6,000,000 1 1 2 2 4 4 0 0 7 7 14 14 Medium Medium 66 66 4 lane arterial $4,005,000 $3,003,750.00 $1,001,250 $4,005,000 1 2 4 0 7 14 Medium 66 upgrade from 4L 6 lane arterial arterial $10,680,000 $2,136,000 $8,544,000 $10,680,000 1 2 4 0 7 14 Medium 66 6 lane arterial 4 lane arterial $10,680,000 $4,005,000 $8,544,000 $2,002,500 $10,680,000 $4,005,000 1 1 2 2 4 4 0 0 7 7 14 14 Medium Medium 66 66 4 lane arterial $4,005,000 $4,005,000 $4,005,000 1 2 4 0 7 14 Medium 66 6 lane arterial $10,000,000 $10,000,000 1 2 4 0 7 14 Medium 66 $4,005,000 1 2 4 0 7 14 Medium 66 $2,002,500 1 2 4 0 7 14 Medium 66 $6,675,000 $4,005,000 1 1 2 2 4 4 0 0 7 7 14 14 Medium Medium 66 66 $3,000,000 1 2 4 0 7 14 Medium 66 Carpenter Trilby Fossil Trilby Creek Carpenter Trilby Fossil Trilby Creek Summit View I-25 upgrade from 2L to 4L Timberline Trilby Kechter 4 lane arterial arterial Battle upgrade from 2L to 4L Timberline Kechter Creek Dr 4 lane arterial arterial Horsetoot upgrade to 6L Arterial Timberline Harmony h 6 lane arterial standards Trilby College Lemay 4 lane arterial Trilby R146 C Vine 82 $400,000 Mulberry Lemay County Carpenter Timberline Road 9 71 76 $2,000,000 new facility; part of 2 lane minor Mountain Vista Timberline arterial subarea plan Lemay 4 lane arterial new alignment intersection improvements College Timberline Overland Drake Trail Horsetoot Overland h Trail Lemay Carpenter $4,005,000 $2,000,000 $8,000,000 $4,005,000 $2,002,500 $6,675,000 $4,005,000 $2,136,000 $2,002,500 $2,002,500 $6,675,000 $4,005,000 $3,000,000 $600,000 $2,400,000 I-25 4 lane arterial Hampshir upgrade from 2 lane e 4 lane arterial minor arterial $8,000,000 $8,000,000 $8,000,000 1 2 4 0 7 14 Medium 66 $2,000,000 $2,000,000 $2,000,000 1 2 4 0 7 14 Medium 66 Taft Hill Trilby $4,005,000 $4,005,000 $2,002,500.0 $4,005,000 $4,005,000 $4,005,000 1 1 2 2 4 4 0 0 7 7 14 14 Medium Medium 66 66 4 lane arterial 4 lane arterial $2,002,500.0 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number 85 R73C Location Lemay From Conifer To Country Club Lincoln Riverside Lemay Cottonwo Overland od Glen Trail Pk Drake Overland Trail Drake Prospect Overland Trail Mulberry LaPorte Development Direct Contributions (frontage, etc.) CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $4,800,000.0 $6,000,000 1 2 4 0 7 14 Medium 66 Cost Street Oversizing Fund 4 lane arterial $6,000,000 $1,200,000.0 include bridge over Poudre; upgrade from 4 lane arterial 2L collector $6,007,500 $6,007,500 $6,007,500 1 2 4 0 7 14 Medium 66 4 lane arterial $2,002,500 $2,002,500 $2,002,500 1 2 4 0 7 14 Medium 66 4 lane arterial $4,005,000 $2,002,500 $4,005,000 1 2 4 0 7 14 Medium 66 $4,005,000 $4,005,000 1 2 4 0 7 14 Medium 66 Facility Type Description City Capital 86 R75 87 R96 A 88 R96 B 89 R96 D 90 R139 A 91 R139 B 92 R150 93 R33 A 94 R36 95 R81 4 lane arterial 2 lane minor Trilby Taft Hill Shields arterial 2 lane minor Trilby Shields College arterial Kechter Rock 2 lane minor Ziegler Road Creek arterial County County County 2 lane minor Road 52 Route 11 Route 9 arterial County Mountain Douglas 2 lane minor Road 11 Vista Road arterial upgrade from CR Mountain County 2 lane minor Vista Road 11 Timberline arterial 96 R105 Prospect Overland Trail Intersection improvements $2,000,000 97 R100 Overland Trail Elizabeth Intersection improvements $4,005,000 $4,005,000 $4,005,000 98 R134 Mountain Timberline Vista County Extension Drive Road 11 2 lane collector $6,675,000 $6,675,000 99 R43 McHugh Elizabeth Street Intersection improvements $3,000,000 100 R56 Jefferson Pine intersection improvements 101 R58 Jefferson Chestnut intersection improvements 102 R87 103 R34 Mulberry County Road 9 intersection improvements 2 lane minor upgrade to minor arterial arterial R35 County Road 9 Mountain 2 lane minor Extension Timberline Vista arterial 104 105 106 R37 R62 B Canyon Mountain County Vista Road 52 County Road 11 Extension Vine LaPorte Taft Hill new facility $2,002,500 $4,005,000 $2,670,000 $1,335,000 $1,335,000 $2,670,000 1 2 7 0 4 14 Medium 66 $4,005,000 $2,002,500 $2,002,500 $4,005,000 1 2 7 0 4 14 Medium 66 $1,335,000 $1,335,000 $1,335,000 1 2 7 0 4 14 Medium 66 $2,670,000 $2,670,000 $2,670,000 1 2 7 0 4 14 Medium 66 $2,002,500 $2,002,500 $2,002,500 1 2 7 0 4 14 Medium 66 $2,002,500 $2,002,500 $2,002,500 1 2 7 0 4 14 Medium 66 $2,000,000 0 2 4 0 7 13 Medium 96 $6,675,000 0 2 4 0 7 13 Medium 96 $3,000,000 $3,000,000 0 2 4 0 7 13 Medium 96 $3,000,000 $3,000,000 $3,000,000 0 2 4 0 7 13 Medium 96 $3,000,000 $3,000,000 $3,000,000 0 2 4 0 7 13 Medium 96 $2,000,000 $2,000,000 $2,000,000 0 2 4 0 7 13 Medium 96 $2,000,000 $2,002,500 $2,002,500 $2,002,500 0 2 7 0 4 13 Medium 96 new facility $4,005,000 $4,005,000 $4,005,000 0 2 7 0 4 13 Medium 96 Mountain 2 lane minor Vista arterial new facility Shields 4 lane arterial $2,670,000 $8,010,000 $2,670,000 $2,670,000 $8,010,000 0 1 2 7 7 1 0 0 4 4 13 13 Medium Medium 96 96 $8,010,000 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number 107 R157 108 Location From Shields Trilby R140 B Trilby Lemay 109 110 R12 B R124A College Taft Hill Conifer GMA 111 112 R109 R115 113 Development Direct Contributions (frontage, etc.) CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank Cost Street Oversizing Fund Intersection improvements $2,000,000 $1,000,000 $1,000,000 $2,000,000 1 7 4 0 1 13 Medium 96 Timberline 4 lane arterial $7,000,000 $5,600,000 $1,400,000 $7,000,000 1 2 1 0 7 11 Medium 108 To Facility Type Description City Capital $8,010,000 $8,010,000 $1,602,000 $8,010,000 $6,408,000 $8,010,000 $8,010,000 1 1 2 2 1 1 0 0 7 7 11 11 Medium Medium 108 108 Riverside Mulberry Shields LaPorte State upgrade to 4L arterial Highway 1 4 lane arterial standards Harmony 4 lane arterial upgrade to 4L arterial Lincoln 4 lane arterial standards Vine 4 lane arterial $6,007,500 $3,000,000 $1,201,500 $3,000,000 $4,806,000 $6,007,500 $3,000,000 1 1 2 2 1 1 0 0 7 7 11 11 Medium Medium 108 108 R125 Taft Hill LaPorte Vine 4 lane arterial upgrade from collector $2,002,500 $2,002,500 $2,002,500 1 2 1 0 7 11 Medium 108 114 115 R15 R40 College Drake Carpenter Harvard Stover intersection improvements 4 lane arterial $3,000,000 $2,002,500 $600,000 $2,002,500 $3,000,000 $2,002,500 1 1 2 2 1 1 0 0 7 7 11 11 Medium Medium 108 108 116 117 R54 R62 C intersection improvements 4 lane arterial $4,000,000 $2,002,500 $4,000,000 $2,002,500 $4,000,000 $2,002,500 1 1 2 2 1 1 0 0 7 7 11 11 Medium Medium 108 108 118 4 lane arterial 2 lane minor GMA arterial R104 C Prospect I-25 Strauss Kechter 2 lane minor Harmony arterial R121 Cabin Rd Road Overland 2 lane minor Trail Taft Hill arterial R145 A Vine 2 lane minor I-25 GMA arterial R147 Vine 2 lane minor Shields College arterial R149 A Willox 2 lane minor College Lemay arterial R149 B Willox Horsetoot Rigden 2 lane minor h Pkwy arterial R152 Ziegler County County 2 lane minor I-25 arterial R33 B Road 52 Route 9 Douglas County County 2 lane Road Road 13 Road 11 collector R38 Kechter 2 lane minor Timberline Ziegler arterial R60 A Road Kechter Strauss 2 lane minor Ziegler Cabin Rd arterial R60 B Road Kechter Strauss 2 lane minor Cabin Rd I-25 arterial R60 C Road 2 lane minor Impala Taft Hill arterial R62 A LaPorte Mountain 2 lane minor Vista I-25 GMA arterial R83 Overland 2 lane minor LaPorte Vine arterial R97 A Trail Overland 2 lane minor Vine Michaud arterial R97 B Trail $1,001,250.00 $4,005,000 1 2 1 0 7 11 Medium 108 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 R84 Horsetoot McClellan h d LaPorte Shields Wood Overland Mulberry Trail Taft Hill upgrade from 2 lane facility upgrade from CR upgrade from CR upgrade from CR $2,400,000 $4,005,000 $3,003,750.00 $3,000,000 $3,000,000 $3,000,000 1 2 4 0 4 11 Medium 108 $2,670,000 $2,670,000 $2,670,000 1 2 4 0 4 11 Medium 108 $2,670,000 $1,335,000.0 $2,670,000 1 2 4 0 4 11 Medium 108 $1,335,000 $1,335,000 $1,335,000 1 2 4 0 4 11 Medium 108 $1,335,000.0 $3,200,000 $3,200,000 $3,200,000 1 2 4 0 4 11 Medium 108 $2,670,000 $2,670,000 $2,670,000 1 2 4 0 4 11 Medium 108 $2,002,500 $2,002,500 $2,002,500 1 2 4 0 4 11 Medium 108 $2,670,000 $2,670,000 $2,670,000 1 2 4 0 4 11 Medium 108 $2,670,000 $2,670,000 $2,670,000 1 2 4 0 4 11 Medium 108 $2,670,000 $2,002,500 $667,500 $2,670,000 1 2 4 0 4 11 Medium 108 $2,670,000 $2,002,500 $667,500 $2,670,000 $2,002,500 $2,002,500 $2,002,500 1 2 4 0 4 11 Medium 108 $1,001,250 $500,625 $1,001,250 1 2 4 0 4 11 Medium 108 $1,335,000 $1,335,000 $1,335,000 1 2 4 0 4 11 Medium 108 $2,002,500 $2,002,500 1 2 4 0 4 11 Medium 108 $2,002,500 $4,005,000 1 2 4 0 4 11 Medium 108 $2,002,500 $4,005,000 $2,002,500 $500,625 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List Cost Street Oversizing Fund $1,335,000 $1,335,000 $1,000,000 $500,000 $1,335,000 $1,335,000 Development Direct Contributions (frontage, etc.) CDOT (State and/or Federal funds) Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $1,335,000 1 2 7 0 1 11 Medium 108 $1,000,000 0 2 4 0 4 10 Low 136 $1,335,000 0 2 7 0 1 10 Low 136 No. Project Number 135 R8 136 R55 Facility Type Description Location From To Rock 2 lane Cambridg Harmony Creek collector new facility e Ave Internation Greenfield 2 lane minor al Blvd Lincoln s arterial 137 R143 Troutman Extension Seneca 138 R154 Overland Trail LaPorte Intersection improvements $4,000,000 $4,000,000 $4,000,000 0 2 4 0 4 10 Low 136 139 R158 Shields Intersection improvements $2,000,000 $2,000,000 $2,000,000 0 2 4 0 4 10 Low 136 Shields Vine 2 lane collector new facility New facililty Between New Mountain 2 lane minor Vine and Conifer Roadway Timberline Vista arterial Extension new facility west of New Mountain Waterglen Roadway Vine Vista minor arterial Development Overland County Horsetoot 2 lane minor Trail Road 38E h arterial new facility 140 R90 141 R93 142 R95 143 R99 144 R108 Overland County Trail Road 42C Rigden Pkwy Custer Dr Ziegler R110 Rock Creek Extension Ziegler Strauss 2 lane Cabin Rd collector 146 intersection 1500' widening at improvements Overland 2 lane collector new facility City Capital 500000 $2,670,000 $2,670,000 $2,670,000 0 2 4 0 4 10 Low 136 $2,670,000 $2,670,000 $2,670,000 0 2 4 0 4 10 Low 136 $2,002,500 $2,002,500 $2,002,500 0 2 4 0 4 10 Low 136 $3,000,000 0 2 4 0 4 10 Low 136 $3,000,000 $3,000,000 $1,335,000 $1,335,000 $1,335,000 0 2 7 0 1 10 Low 136 New facility $2,670,000 $2,670,000 $2,670,000 0 2 7 0 1 10 Low 136 R138 Timberwo od Dr Timberwo 2 lane Extension Timberline od Dr collector new facility $1,335,000 $1,335,000 $1,335,000 0 2 7 0 1 10 Low 136 147 R141 Trilby Westchas Extension e Ziegler 2 lane collector new facility $2,002,500 $2,002,500 $2,002,500 0 2 7 0 1 10 Low 136 148 R162 Timberline Trilby Intersection improvements $2,000,000 $2,000,000 $2,000,000 0 2 7 0 1 10 Low 136 149 R30 $1,335,000 $1,335,000 $1,335,000 0 2 7 0 1 10 Low 136 150 R50 $2,002,500 $2,002,500 $2,002,500 0 2 7 0 1 10 Low 136 151 R6 $2,002,500 0 2 7 0 1 10 Low 136 152 R7 153 145 Corbett Extension Technolog y Pkwy Blue Spruce Buckingha m Sunstone Harmony Drive Rock Harmony Creek R116 Shields Vine 154 R126 Taft Hill Vine 155 R130 Timberline Carpenter Trilby Conifer Linden 2 lane collector 2 lane collector 2 lane Willox Ln collector 2 lane Lemay collector Douglas 2 lane minor Road arterial 2 lane minor GMA arterial 2 lane minor arterial new facility new facility Upgrade to Collector standards $2,002,500 $2,002,500 $2,002,500 $1,501,875 $500,625 $2,002,500 0 2 7 0 1 10 Low 136 upgrade from CR $10,000,000 $7,500,000.00 $2,500,000.00 $10,000,000 1 2 1 0 4 8 Low 153 upgrade from CR upgrade from 2L CR to 2L minor arterial standard $4,005,000 $1,001,250.00 $3,003,750.00 $4,005,000 1 2 1 0 4 8 Low 153 $4,005,000 $4,005,000 1 2 1 0 4 8 Low 153 $4,005,000 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number Location 156 R145 B 157 R31 A 158 R31 B 159 R61 160 R122 161 R79 From To Vine Taft Hill Shields Country Club Country Club State Highway 1 Lemay County Lemay Road 11 Facility Type 2 lane minor arterial 2 lane minor arterial 2 lane minor arterial 2 lane minor LaPorte GMA Impala arterial Strauss Horsetoot 2 lane Cabin Rd Harmony h collector Overland 2 lane Michaud Trail GMA collector Mason/Ho 2 lane minor wes Laurel Cherry arterial Description conversion to two way streets Cost Low 153 $3,003,750 $3,003,750 $3,003,750 1 2 1 0 4 8 Low 153 $5,006,250 $5,006,250 $5,006,250 1 2 1 0 4 8 Low 153 $3,200,000 $3,200,000 $3,200,000 1 2 1 0 4 8 Low 153 $2,670,000 $2,670,000 $2,670,000 1 2 4 0 1 8 Low 153 $1,335,000 $1,335,000 $1,335,000 1 2 4 0 1 8 Low 153 $650,000 $650,000 $650,000 0 2 1 0 4 7 Low 162 $4,005,000 $4,005,000 $4,005,000 0 2 1 0 4 7 Low 162 $0 0 2 4 0 1 7 Low 162 Redwood Extension Willox 166 R113 Sharp Point Drive Extension Drake 167 R120 Solar Ct 168 R123 Swallow Road Extension Taft Hill 169 R153 Overland Trail Mulberry Intersection improvements $4,000,000 170 R155 Overland Trail Vine Intersection improvements $2,000,000 171 R159 Shields Intersection improvements $3,000,000 172 R161 Timberline Carpenter Intersection improvements $2,000,000 173 R163 Timberline Kechter Intersection improvements $2,000,000 175 $1,000,000 new facility includes bridge $2,002,500 $2,002,500 $2,002,500 0 2 4 0 1 7 Low 162 new facility $2,002,500 $2,002,500 $2,002,500 0 2 4 0 1 7 Low 162 new facility $2,002,500 $1,001,250 $2,002,500 0 2 4 0 1 7 Low 162 new facility $1,335,000 $1,335,000 $1,335,000 0 2 4 0 1 7 Low 162 $4,000,000 $4,000,000 0 2 4 0 1 7 Low 162 $2,000,000 $2,000,000 0 2 4 0 1 7 Low 162 $3,000,000 0 2 4 0 1 7 Low 162 $2,000,000 $2,000,000 0 2 4 0 1 7 Low 162 $1,000,000 $2,000,000 0 2 4 0 1 7 Low 162 $2,002,500 $2,002,500 0 2 4 0 1 7 Low 162 $667,500 0 2 4 0 1 7 Low 162 R3 Aran St 2 lane collector new facility $2,002,500 R4 Avondale Drive Avondale Carpenter 2 lane Extension Rd Road collector new facility $667,500 Trilby Rank 8 R107 174 Priority Category 4 165 North of Skyway Dr Total Score 0 R101 Willox Roadway Classification Score 1 164 2 lane collector APF Score 2 Gregory Country State 2 lane minor Road Club Road Highway 1 arterial Paving of Downtown Alleys Dunbar Ave Construction Feasibility 1 R45 Trilby Safety Score $4,005,000 163 2 lane collector 2 lane collector Total Funding Level of Service/ Capacity Score $4,005,000 R78.5 Midpoint Dr Skyway Dr City Capital CDOT (State and/or Federal funds) $4,005,000 162 Country 2 lane Club Road collector Street Oversizing Fund Development Direct Contributions (frontage, etc.) $1,001,250 $3,000,000 $1,000,000 $667,500 APPENDIX D: STREET PROJECTS Prioritized Roadway CIP List No. Project Number 176 R44 Location From Greenfield s Ct Locust Mulberry Facility Type 2 lane collector 177 R51 Hickory Extension Shields College 2 lane collector 178 R92 New County Roadway Timberline Road 9 179 R148 Willow College 180 R160 Shields US 287 181 R77 Linden 182 R94 183 R13 A Old Vine College Parallel Streets College Parallel Streets College Parallel Streets 184 185 186 187 188 189 190 191 192 To Lincoln 2 lane collector 2 lane collector new facility New facility - Fossil Creek area, south of CR 36 Intersection improvements 2 lane Jefferson Redwood collector 2 lane College Lemay collector Jefferson Conifer Description 2 lane collector upgrade to 2L collector standards; include Vine intersection improvements new facility State 2 lane Highway 1 collector new facility 2L collector Skyway parallel street new facility east and Trilby Dr system west of College R14 Intersection reConifer Hickory alignment R28 State SH-14/USHighway 14 relocation new facility R112 287 Horsetoot upgrade to 6L Arterial Drake 6 lane arterial standards R132b2 Timberline h upgrade to 6L Arterial Prospect 6 lane arterial standards R132c2 Timberline Drake upgrade to 6L Arterial R132d2 Timberline Prospect Mulberry 6 lane arterial standards upgrade to 6L Arterial 6 lane arterial standards R132e2 Timberline Mulberry Vine upgrade to 6L Arterial I-25 6 lane arterial standards R165 Carpenter College R13 B Conifer Cost Street Oversizing Fund $1,335,000 $1,335,000 $3,200,000 $2,670,000 Development Direct Contributions (frontage, etc.) City Capital CDOT (State and/or Federal funds) $3,200,000 $2,670,000 Total Funding Level of Service/ Capacity Score Safety Score Construction Feasibility APF Score Roadway Classification Score Total Score Priority Category Rank $1,335,000 0 2 4 0 1 7 Low 162 $3,200,000 0 2 4 0 1 7 Low 162 $2,670,000 0 2 4 0 1 7 Low 162 $1,335,000 1 2 1 0 1 5 Low 179 $4,000,000 1 2 1 0 1 5 Low 179 $1,335,000 $1,335,000 $4,000,000 $800,000 $1,335,000 $1,335,000 $1,335,000 1 2 1 0 1 5 Low 179 $2,670,000 $2,670,000 $2,670,000 1 2 1 0 1 5 Low 179 $4,005,000 $4,005,000 $4,005,000 0 2 1 0 1 4 Low 183 $4,005,000 $4,005,000 $4,005,000 0 2 1 0 1 4 Low 183 $2,002,500 $2,002,500 $2,002,500 0 2 1 0 1 4 Low 183 $4,000,000 $4,000,000 $4,000,000 0 2 1 0 1 4 Low 183 $1,300,000 $1,300,000 $1,300,000 0 2 1 0 4 4 Low 183 $3,200,000 $10,680,000 $10,680,000 $10,680,000 Low 188 $10,680,000 $10,680,000 $10,680,000 Low 188 $10,680,000 Low 188 $10,680,000 Low 188 $10,680,000 $10,680,000 $10,680,000 $10,680,000 $15,000,000 $15,000,000 $798,512,000 $15,000,000 $782,512,000 APPENDIX D: STREET PROJECTS Prioritized Transit CIP List (Chronological) No. Project Number 1 2 TO1 TC1 Transit Services/Capital Service Type/Description Reference Source Continuation of Service 2025 RTP Operation Cost Breakout Operation Cost Capital Cost Capital Cost Breakout Strategic Plan Scenario 1 Continuation of Services (2004-2005) New/Replacement Vehicles $3,091,031 Replacement Fixed Route Buses Replacement Paratransit Buses Service Vehicles/Pool Vehicles 3 TC1a 4 TC1b 5 TC1c 6 TC2 7 TC2a Route Identification Time Schedule 8 TC2b Signage at Bus Stops 9 TC3 10 TC3a Moblie Video Solutions 11 TC3b Magnetic Card Readers 12 TC3c Eligibility Cards & Equipment 13 TC3e Dispatch Radio System Upgrade 14 TC3f Desktop Replacement 15 TC3g Laptop Replacement 16 TC3h Server Replacement 17 TC3i Modems 18 TC3j Microsoft desktop operating system 19 20 TC3k TC4 Shelters (Passenger Amenities) Technology Improvements Other Misc products Facilities - Maintenance/Repair $21,836,000 2025 RTP - $2,263,700 2025 RTP - $680,615 2025 RTP 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan - $146,716 $68,750 - $18,750 - $50,000 $424,000 - $300,000 - $10,000 - $10,000 - $10,000 - $12,500 - $3,000 - $50,000 - $15,000 - $3,500 $10,000 $303,220 APPENDIX D: TRANSIT PROJECTS Prioritized Transit CIP List (Chronological) No. 21 Project Number TC4a 22 TC4b 23 TC4c 24 25 TC4d TC5 26 TC5a 27 TC5b 28 TC6 Transit Services/Capital Reference Service Type/Description Source Transfort Shop/Facility 2025 RTP 10-Year Capital Copier Plan 10-Year Capital Training Room Plan 10-Year Capital Employee Lockers Plan Operation Cost Breakout Operation Cost Capital Cost - - $15,000 - $55,000 $8,000 $150,000 Planning Dial-A-Ride Strategic Plan Enhanced Travel Corridors Plan Bus Stop Access Modifications Capital Cost Breakout $225,220 ADA Accessibility Improvements UPWP - $100,000 UPWP 10-Year Capital Plan - $50,000 $69,480 Strategic Plan Scenario 2 29 30 TO2 TO3 31 TO3a 32 TO3b 33 TO3c 34 TO3d 35 TO3e 36 TO3f 37 38 TO3g TC7 39 TC7a 40 41 TC7b TC8 42 TC8a Continuation of Services (2006-2007) New/Expanded Services Continuation of Service Increase College Ave service from 30 to 15 min Increase College/W Harmony service from STC to FRCC from 30 to 15 min Increase all service on Route 2 from 60 to 30 min Increase service on Route 3 Constitution to DTC 15 min to 7.5 min Add new 30 min Route 7 from South Campus to CTC via Center Ave Demand Response Service Evening service (includes 3204 fixed & 411 paratransit hours) $21,836,000 $4,162,981 2025 RTP - $1,026,092 2025 RTP - $431,378 2025 RTP - $814,437 2025 RTP - $308,021 2025 RTP - $485,211 2025 RTP - $868,894 2025 RTP - $228,949 $4,613,000 New/Replacement Vehicles Replacement Paratransit Buses Service Vehicles/Pool Vehicles 2025 RTP - 2025 RTP - $533,916 $130,418 $107,500 Shelters (Passenger Amenities) Route Identification Time Schedule 10-Year Capital Plan - APPENDIX D: TRANSIT PROJECTS $37,500 Prioritized Transit CIP List (Chronological) No. Project Number 43 44 TC8b TC9 Transit Services/Capital Service Type/Description Signage at Bus Stops Reference Source 10-Year Capital Plan Operation Cost Operation Cost Breakout Capital Cost $70,000 $717,500 Technology Improvements 45 TC9a Wirelss Technology 46 TC9b Automatic Annoncement System TF GPS 47 TC9c Fixed Route AVL 48 TC9d Debit Card System 49 TC9e Sever Replacement 50 TC9f Microsoft office products 51 52 TC9g TC10 Microsoft misc products 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan - $5,000 - $300,000 - $200,000 - $150,000 - $25,000 - $7,500 $30,000 - Facilities - Maintenance/Repair $720,477 53 TC10a Transfort Shop/Facility 54 TC10b Wide format plotter 55 TC10c Bus simulator 56 57 58 TC11 TC12 TC12a 59 TC12b 60 61 TC13 TC13a 62 63 64 TC13b TC13c TC13d Bus Stop Access Modifications Facilities - New Construction Capital Cost Breakout ADA Accessibility Improvements Bus Facility Expansion Dial-a-Ride Maintenance Facility Expansion Mason Transportation Corridor Construction 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 10-Year Capital Plan 2025 RTP 10-Year Capital Plan MTC Master Plan 2025 RTP Engineering and Construction Management 2025 RTP Right of Way Acquisition 2025 RTP Rolling Stock 2025 RTP - $700,477 - $10,000 - $10,000 $69,480 $24,496,000 - $12,496,000 - $12,000,000 $65,950,000 - $42,750,000 - APPENDIX D: TRANSIT PROJECTS $6,020,000 $7,250,000 $3,480,000 Prioritized Transit CIP List (Chronological) No. 65 Project Number TC13e 66 67 TO4 TO5 68 TO5a 69 TO5b 70 TO5c 71 TO5d 72 TO5e 73 TO5f 74 TO5g 75 TO5h 76 TO5i 77 TO5j 78 TO5k 79 TC14 Transit Services/Capital Reference Service Type/Description Source Contingency 2025 RTP Operation Cost Breakout Operation Cost Capital Cost - Capital Cost Breakout $6,450,000 Strategic Plan Scenario 3 80 81 82 TC15 TC16 TC17 83 TC17a 84 TC17b 85 86 87 TC17c TC17d TC17e Continuation of Services (2008-2010) New/Expanded Services New/Replacement Vehicles Bus Stop Access Modifications Shelters (Passenger Amenities) Technology Improvements Continuation of Service Increase Foxtrot from 60 to 30 min Add Route 1C - DTC to E Harmony/I-25 Transfer Center 60 min all day Increase Route 2 Shields/Drake/CTC from 30 to 15 min Increase all of Route 3 from 30 to 15 min Add new 60 min Route 4 from Dunbar/Horsetooth/Taft to DTC Add new 60 min Route 9 from DTC to STC via Timberline Add new Route 22 peak 60 min from STC to Harmony/Timberline Increase Route 5 DTC to STC via Lemay from 60 to 30 min Increase Route 6 DTC to STC via Shields from 60 to 30 min when CSU in session (163 days) Demand Response Service Evening service (includes 3204 fixed & 411 paratransit hrs) Replacement Fixed Route Buses ADA Accessibility Improvements Signage at Bus Stops Web Interface Transfort/DAR Interactive Voice Recognition Eligibility Cards and Equipment Desktop Replacement Server Replacement $25,998,981 $5,186,725 2025 RTP - $854,222 2025 RTP - $626,070 2025 RTP - $471,410 2025 RTP - $356,498 2025 RTP - $586,398 2025 RTP - $576,746 2025 RTP - $347,530 2025 RTP - $459,022 2025 RTP - $140,828 2025 RTP - $502,956 2025 RTP - $265,045 $1,953,500 10-Year Capital Plan $69,480 $75,000 $537,000 - $250,000 - $150,000 - $2,000 $25,000 $50,000 APPENDIX D: TRANSIT PROJECTS Prioritized Transit CIP List (Chronological) No. 88 89 90 91 92 Project Number Transit Services/Capital TC17f TC17g TC18 Facilities - Maintenance/Repair TC18a TC18b Service Type/Description Modems Other Misc products Reference Source Operation Cost Breakout Operation Cost Transfort Shop/Facility Proxima Capital Cost $702,321 - Capital Cost Breakout $50,000 $10,000 $697,321 $5,000 Strategic Plan Scenario 4 93 94 TO6 TO7 95 TO7a 96 TO7b 97 TO7c 98 TO7d 99 TO7e 100 TO7f 101 TO7g 102 TO7h 103 TO7i 104 105 TO7j TC19 106 TC19a 107 TC19b 108 109 110 111 112 113 114 115 116 TC19c TC20 TC21 TC22 TC22a TC22b TC22c TC22d TC22e 117 118 119 TC22f TC22g TC22h Continuation of Services (2010-2012) New/Expanded Services Continuation of Service Increase Route 1 from DTC to Harmony from 15 to 7.5 min & increase Route 1C from 60 to 30 min Increase All Route 2 from 30 to 15 min Increase All Route 4 from 60 to 30 min Increase All Route 7 from 30 to 15 min Increase Route 8 from 30 to 15 min Increase Route 9 from 60 to 30 min Increase Route 22 from 60 to 30 min Increase Route 6 from 60 to 30 min when CSU not in session (95 days) Demand Response Service Evening service (includes 3204 fixed & 411 paratransit hrs) $31,185,706 $4,780,138 2025 RTP - $760,999 2025 RTP - $573,005 2025 RTP - $712,776 2025 RTP - $682,753 2025 RTP - $648,295 2025 RTP - $323,792 2025 RTP - $45,174 2025 RTP - $99,863 2025 RTP - $611,316 2025 RTP - $322,166 $2,151,324 New/Replacement Vehicles Replacement Fixed Route Buses Replacement Paratransit Buses Service Vehicles/Pool Vehicles Bus Stop Access Modifications Shelters (Passenger Amenities) Technology Improvements Signage at Bus Stops $2,020,920 $93,600 $36,804 $69,480 $75,000 $193,000 Wireless Technology Debit Card System Desktop Replcement Laptop Replacement Server Replacement $5,000 $50,000 $12,500 $3,000 $75,000 Microsoft Office Products Microsoft Misc Products Other Misc Products $7,500 $30,000 $10,000 APPENDIX D: TRANSIT PROJECTS Prioritized Transit CIP List (Chronological) No. 120 121 122 123 Project Number Transit Services/Capital TC23 Facilities - Maintenance/Repair TC23a TC23b TC23c Service Type/Description Reference Source Operation Cost Breakout Operation Cost Capital Cost $61,804 Transfort Shop/Facility Copier Wide Format Plotter $36,804 $15,000 $10,000 Long Range Plan 124 TO8 Continuation of Services (2013-2017) 125 126 127 TC24 TO9 TO10 Replacement Buses (2015) Phase 1 Transit Service Expansion Continuation of Services (2018-2021) 128 129 130 TC25 TO11 TO12 Replacement Buses (2018) Phase 2 Transit Service Expansion Continuation of Services (2022-2025) 131 132 TC26 TO13 Replacement Buses (2022) Phase 3 Transit Service Expansion Capital Cost Breakout Continuation of Service $35,965,844 2025 RTP CES 2025 RTP Continuation of Service 2025 RTP CES 2025 RTP Continuation of Service 2025 RTP CES 2025 RTP $3,026,602 $109,278,178 $145,244,022 $6,323,808 $109,278,178 $254,522,200 $6,781,316 $109,278,178 $109,278,178 $122,800,073 APPENDIX D: TRANSIT PROJECTS Prioritized Bike CIP List Bike Facility Location Corresponding Project (listed entirely or as a part of projects in other categories) No. Project Number 1 B3 Campus West/Elizabeth 2 B10 College 3 B20 Jefferson Street Mountain College bike lanes 4 B57 College Harmony 5 B12 From To Shields Facility Type bike/ped improvements @ Elizabeth and Plum P26 City Park State Poudre River Highway 1 bike lanes Carpenter Overland Trail R12A/R12B Cost Known Safety Access to Hazard/Crash Area (Y=15, Destinations (Y=10, N=0) N=0) Construct Jointly Construction w/other Street Classification depart/proj/A Feasibility Multi-modal (R=0, I/C=4, Off gency (Y=10, (Good=10, Fair=5, Connectivity Street=5, C=6, Partially=5, Poor=1) N=0) A=8) (Y=8, N=0) Total Score Ranking $650,000 15 10 8 8 10 10 61 1 $1,000,000 15 10 8 8 10 10 61 1 $500,000 15 10 8 8 10 10 61 1 bike lanes R11A/R11B/R11 C $2,000,000 15 10 8 8 10 10 61 1 bike lanes R42 $1,000,000 15 10 8 8 10 5 56 5 $17,500,000 15 10 8 8 10 5 56 5 $1,500,000 15 10 8 8 10 5 56 5 $750,000 $750,000 15 15 10 10 8 8 8 8 10 10 5 5 56 56 5 5 $750,000 15 10 8 8 10 5 56 5 TC13 $2,700,000 15 10 8 8 10 5 56 5 6 B31 7 B31a Elizabeth Taft Hill Mason Transportation Corridor Bike/Pedestrain Fossil Creek Trail Trail Cherry Fossil Creek Mason Trail Harmony 8 9 B31b B31c Mason Mason 10 B31d Mason 11 B31e Mason Horsetooth bike trail Drake bike trail Spring Drake Creek bike trail Spring Creek bike trail and Trail Prospect underpass 12 B31f Mason Prospect Laurel bike lanes/sidewalks TC13 $750,000 15 10 8 8 10 5 56 5 13 B31g Mason Laurel Cherry bike lanes/sidewalks TC13 $1,000,000 15 10 8 8 10 5 56 5 14 B31h Mason grade separated crossing P62/RR16 $1,500,000 15 10 8 8 10 5 56 5 15 B31i Mason Troutman NRRC Employment/ CSU Vet Campus grade separated crossing $1,200,000 15 10 8 8 10 5 56 5 16 B31j Mason Harmony grade separated crossing $2,400,000 15 10 8 8 10 5 56 5 17 B31k Mason Horsetooth grade separated crossing $2,100,000 15 10 8 8 10 5 56 5 18 B31l Mason Drake grade separated crossing RR5 $2,100,000 15 10 8 8 10 5 56 5 off-street bike/pedestrian trail TC13 bike trail Harmony Horsetooth APPENDIX D: BIKE PROJECTS Prioritized Bike CIP List No. 19 20 21 Project Bike Facility Number Location Mountain B38 Prospect B45 Drake B61 From Meldrum Shields College Corresponding Project (listed entirely or as a part of projects in other categories) To Facility Type Riverside bike lanes Part in R80 Timberline bike lanes Part in R103 Stover bike lanes R40 22 B64 Harmony 23 B65 Harmony 24 25 B70 B76 Lincoln Taft Hill 26 B79 Trilby 27 B80 Vine BNSF tracks College Strauss Cinquefoil Ln Cabin Summit 12th Street View Dr LaPorte GMA Constellati Lynn Dr on Overland Trail Taft Hill 28 29 B9 B21 College Laurel Laurel Shields 30 B22 Lemay Horsetooth B14 Timberline Road/Power Trail north-south grade separated Fossil Creek Spring crossings @ Trail Creek Trail Power Trail 31 32 33 34 35 36 37 38 B14a B14b B14c B14d B44 B56 B62 Keenland Harmony Horsetooth Drake Overland Trail Carpenter Drake/Ziegler Known Safety Access to Hazard/Crash Area (Y=15, Destinations (Y=10, N=0) N=0) Cost $500,000 15 10 $3,000,000 15 10 $1,000,000 15 10 Construct Jointly Construction w/other Street Classification depart/proj/A Feasibility Multi-modal (R=0, I/C=4, Off gency (Y=10, (Good=10, Fair=5, Connectivity Street=5, C=6, Partially=5, Poor=1) N=0) A=8) (Y=8, N=0) 8 8 10 5 8 8 10 1 8 8 10 1 Total Score 56 52 52 Ranking 5 20 20 bike lanes R46 $1,000,000 15 10 8 8 10 1 52 20 bike lanes R47D $1,000,000 15 10 8 8 10 1 52 20 bike lanes bike lanes R76 R125 $1,000,000 $1,000,000 15 15 10 10 8 8 8 8 10 10 1 1 52 52 20 20 bike lanes R139 $400,000 15 10 8 8 10 1 52 20 R145 $800,000 15 10 8 8 10 1 52 20 College bike lanes street crossing improvements bike lanes - $1,000,000 $1,000,000 15 15 10 10 8 8 8 8 0 0 10 10 51 51 28 28 Riverside widen bike lanes - $5,000,000 15 10 8 8 0 10 51 28 $3,900,000 15 10 8 8 0 10 51 28 UPRR north-south grade separated crossing @ Power Trail RR7 $1,200,000 15 10 8 8 0 10 51 28 UPRR north-south grade separated crossing @ Power Trail $1,500,000 15 10 8 5 5 5 48 33 UPRR north-south grade separated crossing @ Power Trail $1,200,000 15 10 8 5 5 5 48 33 UPRR north-south grade separated crossing @ Power Trail $1,200,000 15 10 8 5 5 5 48 33 $1,500,000 $1,500,000 $800,000 15 15 15 10 10 10 0 0 0 8 8 8 10 10 10 5 5 5 48 48 48 33 33 33 Mulberry College Horsetooth CR 50 bike lanes Timberline bike lanes Timberline bike lanes R96D/R97A/R97 B R10 R41/R152 APPENDIX D: BIKE PROJECTS Prioritized Bike CIP List No. Project Number Bike Facility Location 39 40 B67 B69 Kechter Lemay 41 B72 42 43 44 From To Rabbit Creek Rd Nassau Facility Type bike lanes bike lanes Prospect Timberline Carpenter Poudre River Trail GMA B75 B81 B39 Taft Hill Vine Mulberry GMA Lemay Jackson bike lanes bike lanes bike lanes 45 B50 Shields Laurel 46 B7 College Woodlawn Dr 47 B46 Prospect Whitcomb 48 49 B53 B58 Taft Hill Cooper Slough Prospect Mulberry 50 51 B8 B13 52 B71 College Elizabeth Mountain Vista Dr 53 54 55 56 57 58 B73 B78 B48 B49 B15 B40 Shields Trilby Riverside Path Riverside Path Horsetooth Mulberry 59 B43 Oak Canal #2 Stover Lemay I-25 frontage road GMA Douglas Poudre River Road Lemay Timberline Prospect Mulberry Mulberry Lincoln College Stanford Mason Riverside Mason Sherwood Street 60 B41 Mulberry frontage roads Lemay 61 B42 Mulberry frontage roads 62 B77 Timberline 63 B24 Magnolia 64 B59 Lemay Mountain Vista Horsetooth Timberline Mason Poudre River Mulberry bike lanes Corresponding Project (listed entirely or as a part of projects in other categories) R60 R72 R104A/R104B/ R104C 10 10 0 0 8 8 10 10 5 5 48 48 33 33 $2,000,000 15 10 0 8 10 5 48 33 $800,000 $1,000,000 $800,000 15 15 15 10 10 10 0 0 8 8 8 8 10 10 5 5 5 1 48 48 47 33 33 44 $1,500,000 15 10 8 8 5 1 47 44 $1,200,000 15 10 10 5 5 1 46 46 $4,000,000 15 10 8 8 0 5 46 46 $800,000 $1,500,000 15 15 10 10 8 8 8 5 0 5 5 1 46 44 46 49 $1,200,000 $500,000 15 0 10 10 10 8 8 6 0 10 1 10 44 44 49 49 $500,000 15 10 0 8 10 1 44 49 - $800,000 $800,000 $800,000 $400,000 $400,000 $1,000,000 15 15 15 15 15 15 10 10 10 10 10 10 0 0 8 8 8 8 8 8 5 5 8 8 10 10 0 0 0 0 1 1 5 5 1 1 44 44 43 43 42 42 49 49 55 55 57 57 - $400,000 15 10 8 4 0 5 42 57 - $2,400,000 0 10 8 6 10 5 39 60 $2,400,000 0 10 8 6 10 5 39 60 $800,000 0 10 8 6 10 5 39 60 $400,000 15 10 8 0 0 5 38 63 $1,600,000 0 10 0 8 10 10 38 63 R124A/R124B R146B Part in R115/R116 R83 R116 R140B I-25 bikes lanes bike lanes bike path bike path bike lanes bike lanes improve/add bike lanes bike lanes/off street path south side of street I-25 bike lanes/off street path north side of street City Park Ave Riverside County Road State Country Club Rd 11 Highway 1 bike lanes Ranking 15 15 bikes lanes bike/ped grade sep crossings intersection improvement widen on-street bike lanes underpass P19 bike/ped underpass, connection to Foothills Mall bike lanes - bike lanes east-west bike connection Total Score $400,000 $400,000 bike lanes CR 52 Cost Known Safety Access to Hazard/Crash Area (Y=15, Destinations (Y=10, N=0) N=0) Construct Jointly Construction w/other Street Classification depart/proj/A Feasibility Multi-modal (R=0, I/C=4, Off gency (Y=10, (Good=10, Fair=5, Connectivity Street=5, C=6, Partially=5, Poor=1) N=0) A=8) (Y=8, N=0) R134 R31A/R31B APPENDIX D: BIKE PROJECTS Prioritized Bike CIP List No. Project Number Bike Facility Location 65 B16 I-25 Frontage Carpenter Harmony 66 B17 I-25 Frontage Carpenter Harmony 67 B18 I-25 Frontage Mulberry Vine 68 B19 I-25 Frontage Mulberry 69 B60 70 71 B68 B74 County Road 11 Vine Drive Strauss Kechter Cabin Strauss Cabin Kechter Vine Douglas Road 72 73 B66 B52 Horsetooth Summit View 74 B63 Gregory Rd I-25 Harmony Strauss Ziegler Cabin Prospect Lincoln Country Club State Rd Highway 1 75 B1 Bikestation North Transit Center 76 B2 Bikestation 77 B4 Canal #2 78 B5 Castlerock Dr 79 80 B6 B55 College Zeigler 81 B11 Constitution Ave Prospect 82 B23 Lynnwood Dr 83 B54 Trail Connection BNSF RR From To Facility Type Corresponding Project (listed entirely or as a part of projects in other categories) bike lanes west side of I-25 bike lanes east side of I-25 bike lanes west side of I-25 bike lanes east side of I-25 - Total Score Ranking $2,400,000 0 10 8 6 0 10 34 65 $2,400,000 0 10 8 6 0 10 34 65 $800,000 0 10 8 6 0 10 34 65 $800,000 0 10 8 6 0 10 34 65 $2,400,000 0 10 0 8 10 5 33 69 $400,000 $800,000 0 0 10 10 0 0 8 8 10 10 5 5 33 33 69 69 bike lanes R36/R37 bike lanes bike lanes R60 C R121 bike lanes bike lanes R53 - $800,000 $1,000,000 0 0 10 10 0 8 6 6 10 0 5 5 31 29 72 73 bike lanes R45 bike parking and commuter facilities bike parking and commuter facilities bike path along canal $1,000,000 0 10 0 8 10 1 29 73 $500,000 0 0 8 0 10 10 28 75 $500,000 0 0 8 0 10 10 28 75 $400,000 0 10 8 5 0 5 28 75 $400,000 0 10 8 8 0 1 27 78 $1,200,000 $800,000 0 0 10 10 8 0 8 6 0 0 1 10 27 26 78 80 - $400,000 0 10 8 0 0 5 23 81 - $400,000 0 10 8 0 0 5 23 81 $2,000,000 $117,850,000 0 10 0 5 0 5 20 83 South Transit Center CSU Vet Hospital Centre Springfield Prospect Dr bike lanes bike/ped Cherry over/underpass Trilby Kechter bike lanes Prospect Cost Known Safety Access to Hazard/Crash Area (Y=15, Destinations (Y=10, N=0) N=0) Construct Jointly Construction w/other Street Classification depart/proj/A Feasibility Multi-modal (R=0, I/C=4, Off gency (Y=10, (Good=10, Fair=5, Connectivity Street=5, C=6, Partially=5, Poor=1) N=0) A=8) (Y=8, N=0) Elizabeth bike lanes Springfield Dr bike lanes bike path and underpass at Taft Hill RR crossing APPENDIX D: BIKE PROJECTS Prioritized Pedestrian CIP List No. Project Number 1 P26 Elizabeth City Park Shields sidewalk improvements 2 P9 College Carpenter Trilby sidewalks 3 P10 College Trilby Fossil Creek Pkwy sidewalks 4 P24 Drake Research Dr Electrical Substation Facility Location To From Facility Type sidewalks 5 P31 Harmony JFK Boardwalk sidewalks 6 P32 Harmony Rock Creek Condos Lemay sidewalks 7 P8 College Vine State Highway 1 sidewalks 8 P59 Stanford Horsetooth 9 P63 UPRR Trilby 10 P7 College Vine Monroe Woodlawn 11 P33 Harmony Boardwalk 12 P42 Linden Jefferson 13 P13 College Foothills Pkwy Monroe 14 P29 Harmony Shields Lemay Buckingha m Starflower Description Construct Phase I sidewalk improvements Campus West Study Report Fill missing links in the walk system Fill missing links in the walk system Construct off street walk along CSU Vet Center, north side of street Fill missing link in trail/walk system, 711 to Home Depot, north side of street, seek grant w/CDOT Fill missing link in trail/walk system, north side of street, work with CDOT Fill missing links in the walk system, east and west side of street Construct sidewalk in front of Aspenleaf Apartments on east sidewalks side of street Construct over/underpass along UP line with under/overpass Parks Dept. Construct walk, west sidewalks side of street sidewalks Fill missing link in trail/walk system, north side of street, seek grant w/CDOT Fill in missing links in sidewalk system Construct sidewalk along east side of street, including pedestrian bridge over Larimer Co. #2 ditch sidewalks Construct walk on south side adjacent to FR Community College sidewalks sidewalks Corresponding Project Cost Street Serves Class Continuity MultiServes Ped (R=0, (A=0, B=3, HC modal Corridor or connector Resident I/C=4, C=5, D=10, Activity E=12, C=6, (Y=8, (Bus, trail) Center F=15) A=8) N=0) (Y=10, N=0) (Y=8, N=0) Street Xing (A=0, B=3, C=5, D=10, E=12, F=15) Visual Int. (A=0, B=3, C=5, D=10, E=12, F=15) Security (A=0, B=3, Other ADA Routes C=5, Available D=10, (Y=0, E=12, N=10) F=15) Construct Jointly w/ other Depart/proj or Agency Total (Y=10, N=0) Score Rank B3 $650,000 10 8 8 8 10 10 10 12 10 10 96 1 R11A $500,000 10 8 0 8 15 0 15 15 10 10 91 2 R11B $550,000 10 8 0 8 15 0 15 15 10 10 91 2 $60,000 10 8 0 8 15 0 15 15 10 10 91 2 $35,000 10 8 0 8 15 0 15 15 10 10 91 2 $55,000 10 8 0 8 15 0 15 15 10 10 91 2 $750,000 10 8 0 8 12 0 12 15 10 10 85 8 $62,000 10 8 0 0 15 0 15 15 10 10 83 9 RR15 $1,000,000 10 8 0 0 15 0 15 15 10 10 83 9 R12A $50,000 10 8 0 8 15 0 15 15 10 0 81 11 R47A $75,000 0 8 0 8 15 0 15 15 10 10 81 11 R77 $200,000 0 8 0 8 15 0 15 15 10 10 81 11 $150,000 10 8 0 8 15 0 15 15 0 10 81 11 $65,000 10 8 0 8 15 0 15 12 10 0 78 15 R47A R12A/R12B APPENDIX D: PEDESTRIAN PROJECTS Prioritized Pedestrian CIP List No. Project Number Facility Location To From Facility Type Description 15 P47 MTC Various neighborhood connections 16 P45 Mason Laurel pedestrian crossing 17 P4 Cherry Howes College sidewalks 18 P34 Horsetooth Taft Hill Shields sidewalks Improve pedestrian connections to the MTC consistent with MTC project Improve pedestrian crossing with MTC project Fill in missing links in the sidewalk system on south side of street Fill in missing links in sidewalk system improvements Construct pedestrian facilities in medians with sidewalks and ramps 19 P14 College Swallow, Harvard 20 P67 Vine Linden Lemay sidewalks 21 P39 Lemay Lincoln Vine sidewalks 22 P1 Alta Vista 23 P36 LaPorte Sunset Taft Hill sidewalks 24 P41 Lincoln Riverside Lemay sidewalks 25 P64 Vine Taft Hill Lyons sidewalks sidewalks 26 P19 Cooper Slough Mulberry underpass 27 P30 Harmony College Boardwalk sidewalks 28 P49 Mulberry City Park Shields sidewalks Construct sidewalks on north and south side of street Construct off street walk/path along east side of Lemay Provide/improve sidewalks on Vine, Lemay, & local roads with drainage & street maint. project Fill in missing links in sidewalk system, north and south side of street Construct temporary walk on north side of road, partial overlap with Buckingham walk Construct separate pedestrian facilities, north and south side of street Construct underpass at Mulberry with Parks, Stormwater dept. and CDOT Construct sidewalk on south side of Harmony Fill missing links and increase width of attached walk Corresponding Project Cost Street Serves Class Continuity MultiServes Ped (R=0, (A=0, B=3, HC modal Corridor or connector Resident I/C=4, C=5, D=10, Activity E=12, C=6, (Y=8, (Bus, trail) Center F=15) A=8) N=0) (Y=10, N=0) (Y=8, N=0) Street Xing (A=0, B=3, C=5, D=10, E=12, F=15) Visual Int. (A=0, B=3, C=5, D=10, E=12, F=15) 0 12 10 10 10 75 17 15 12 12 10 0 75 17 Security (A=0, B=3, Other ADA Routes C=5, Available D=10, (Y=0, E=12, N=10) F=15) Construct Jointly w/ other Depart/proj or Agency Total (Y=10, N=0) Score Rank TC 13 $500,000 10 0 0 8 TC 13 $200,000 10 8 0 8 $50,000 10 0 0 8 15 0 15 15 10 0 73 19 $250,000 0 0 0 8 15 0 15 15 10 10 73 19 $35,000 0 8 0 0 15 0 15 15 10 10 73 19 $210,000 0 8 0 0 15 0 15 15 10 10 73 19 $150,000 10 8 0 8 12 0 12 12 10 0 72 24 $1,200,000 0 8 0 8 15 0 15 15 10 0 71 25 $200,000 10 8 0 6 12 0 15 10 10 0 71 25 $200,000 0 8 0 8 15 0 15 15 10 0 71 25 $300,000 10 8 0 8 5 0 10 10 10 10 71 25 $1,500,000 10 8 0 8 15 0 15 5 10 0 71 25 R47A $140,000 10 8 0 8 15 0 15 15 0 0 71 25 R86 $210,000 0 8 0 8 15 0 15 15 10 0 71 25 R52B R71 R62A R145B B58 APPENDIX D: PEDESTRIAN PROJECTS 15 Prioritized Pedestrian CIP List No. Project Number Facility Location To From Facility Type Description 29 P18 College frontage road Harvard 30 P61 Timberline 31 P11 College Caribou Fossil Creek Pkwy Harmony sidewalks Install attached sidewalk on the east side of street where necessary Construct trail and RR underpass to Kruse Elementary through City detention area Fill in missing links in sidewalk system 32 P65 Vine College Linden sidewalks Construct sidewalks south side of street Drake sidewalks underpass 33 P35 JFK Pkwy Bockman Horsetooth sidewalks 34 P37 Laurel Stover Endicott 35 P60 Taft Hill 36 P38 Lemay Rule Drive Oakridge Drive 37 P25 Drake Brookwood RR crossing sidewalks sidewalks trail access ramp sidewalks 38 P2 Andersonville sidewalks 39 P3 Boardwalk Harmony Whalers sidewalks 40 P66 Vine Lemay Timberline shoulder pavement 41 P62 Troutman BNSF rail line bike/ped underpass Corresponding Project Visual Int. (A=0, B=3, C=5, D=10, E=12, F=15) Security (A=0, B=3, Other ADA Routes C=5, Available D=10, (Y=0, E=12, N=10) F=15) Construct Jointly w/ other Depart/proj or Agency Total (Y=10, N=0) Score Rank $50,000 10 8 0 8 10 0 10 15 10 0 71 25 $1,200,000 10 8 0 6 15 0 15 5 0 10 69 33 R11C $250,000 0 8 0 8 15 0 12 15 0 10 68 34 R146A $110,000 0 8 0 8 15 0 15 12 10 0 68 34 $50,000 0 8 0 8 15 0 15 12 10 0 68 34 $50,000 10 8 0 8 15 0 12 15 0 0 68 34 $210,000 10 8 0 8 15 0 12 5 10 0 68 34 $50,000 0 8 0 0 12 0 15 12 10 10 67 39 $140,000 0 0 0 8 12 0 12 12 10 10 64 40 $1,200,000 10 8 0 6 15 0 12 12 0 0 63 41 $50,000 0 0 0 8 15 0 15 15 10 0 63 41 R146B $140,000 10 8 0 8 10 0 12 5 10 0 63 41 RR16 $1,400,000 0 8 0 8 12 0 10 12 10 0 60 44 Construct walk from bridge along empty field to existing walk south of Horsetooth Fill in missing links in the sidewalk system on south side of street Construct ramp from Taft Hill Rd walk/bike lanes to trail with street improvements Construct sidewalk south of Harmony on east side of street in front of farm house Sidewalk missing along south side of street Provide/improve walks on Lemay and local streets with drainage and street maint. Project Construct sidewalk on east side of street 8' asphalt shoulder along north side of street; cost not include bridges Connect neighborhood with College, construct with MTC project Cost Street Serves Class Continuity MultiServes Ped (R=0, (A=0, B=3, HC modal Corridor or connector Resident I/C=4, C=5, D=10, Activity E=12, C=6, (Y=8, (Bus, trail) Center F=15) A=8) N=0) (Y=10, N=0) (Y=8, N=0) Street Xing (A=0, B=3, C=5, D=10, E=12, F=15) APPENDIX D: PEDESTRIAN PROJECTS Prioritized Pedestrian CIP List No. 42 43 Project Number P27 P43 Facility Location Fairway Lane To From BNSF rail line Manhattan south of Horsetooth 44 P40 Lemay Parkwood subdivision 45 P57 Riverside Mulberry Facility Type Cost Security (A=0, B=3, Other ADA Routes C=5, Available D=10, (Y=0, E=12, N=10) F=15) Construct Jointly w/ other Depart/proj or Agency Total (Y=10, N=0) Score Rank $1,200,000 10 8 0 8 3 0 10 10 0 10 59 45 Construct walk along east side of street from self storage facility to homes $100,000 10 8 0 8 15 0 12 5 0 0 58 46 $120,000 10 0 0 8 10 10 5 10 0 53 47 $230,000 10 8 0 8 0 5 10 12 0 0 53 47 $9,000,000 10 8 0 8 12 0 10 5 0 0 53 49 $45,000 10 0 0 8 15 0 12 5 0 0 50 50 $15,000 10 8 0 0 10 0 10 10 0 0 48 51 $4,000,000 10 8 0 8 0 10 0 0 0 10 46 52 8 0 6 15 0 12 5 0 0 46 52 12 0 0 43 55 sidewalks sidewalks 46 P51 Pedestrian Plan, ADA Ramps and Crossing Improvements 47 P44 Maple Meldrum Mason sidewalks 48 P46 Mason RR spur Cherry sidewalks 49 P15 College Laurel 50 P54 Prospect Lemay 51 P58 Shields Plum 52 P28 Harmony west of Regency 53 P16 College Olive 54 P6 College LaPorte 55 P20 Lincoln Jefferson Willow 56 P21 Linden Jefferson Willow intersection improvements Stover Corresponding Project Visual Int. (A=0, B=3, C=5, D=10, E=12, F=15) Construct RR over/underpass for MTC south terminus, jointly with under/overpass MTC sidewalks Mountain Description Street Serves Class Continuity MultiServes Ped (R=0, (A=0, B=3, HC modal Corridor or connector Resident I/C=4, C=5, D=10, Activity E=12, C=6, (Y=8, (Bus, trail) Center F=15) A=8) N=0) (Y=10, N=0) (Y=8, N=0) Street Xing (A=0, B=3, C=5, D=10, E=12, F=15) sidewalks intersection improvements sidewalks downtown crosswalk replacement downtown crosswalk replacement bike/pedestrian streetscape improvements bike/pedestrian streetscape improvements Missing sidewalk along Lemay on the east side of street Fill in missing links in sidewalk system Includes ADA improvements, safe route to school projects, pedestrian audible signals Fill in missing links in sidewalk system Connect sidewalk from Maple to Cherry, jointly with MTC project Improve pedestrian safety at intersection Construct and widen walks along noroth and south side of street Improve pedestrain safety at intersection Install walk on north side of street between Regency and Gates Development R109 TC 13 R64 $175,000 $400,000 10 8 0 8 $425,000 0 0 0 8 12 0 10 12 0 0 42 56 $50,000 0 0 0 6 12 0 12 10 0 0 40 57 $50,000 0 0 0 0 0 0 0 0 0 0 0 58 R75 $2,550,000 0 0 0 0 0 0 0 0 0 0 0 58 R77 $2,550,000 0 0 0 0 0 0 0 0 0 0 0 58 R46B APPENDIX D: PEDESTRIAN PROJECTS 5 Prioritized Pedestrian CIP List No. Project Number Facility Location To From 57 P22 Jefferson/Riverside College Mulberry 58 P23 Willow College Lincoln Facility Type Description bike/pedestrian streetscape improvements bike/pedestrian streetscape improvements 59 P50 Mulberry Smith Cowan sidewalks 60 P52 Plum City Park Shields sidewalks 61 P53 Prospect Heatheridge 62 P55 Prospect Lynwood 63 P5 College Mountain traffic control signal traffic control signal downtown crosswalk replacement Construct sidewalk on south side of street Construct sidewalks Install when warrants are achieved for safer bike crossing on Prospect Install when warrants are achieved for safer bike crossing on Prospect Corresponding Project Cost Street Serves Class Continuity MultiServes Ped (R=0, (A=0, B=3, HC modal Corridor or connector Resident I/C=4, C=5, D=10, Activity E=12, C=6, (Y=8, (Bus, trail) Center F=15) A=8) N=0) (Y=10, N=0) (Y=8, N=0) Street Xing (A=0, B=3, C=5, D=10, E=12, F=15) Visual Int. (A=0, B=3, C=5, D=10, E=12, F=15) Security (A=0, B=3, Other ADA Routes C=5, Available D=10, (Y=0, E=12, N=10) F=15) Construct Jointly w/ other Depart/proj or Agency Total (Y=10, N=0) Score Rank R109 $1,500,000 0 0 0 0 0 0 0 0 0 0 0 58 R148 $2,550,000 0 0 0 0 0 0 0 0 0 0 0 58 $75,000 0 0 0 0 0 0 0 0 0 0 0 58 $15,000 0 0 0 0 0 0 0 0 0 0 0 58 $60,000 0 0 0 0 0 0 0 0 0 0 0 58 $60,000 0 0 0 0 0 0 0 0 0 0 0 58 $50,000 $35,317,000 0 0 0 0 0 0 0 0 0 0 0 58 APPENDIX D: PEDESTRIAN PROJECTS Prioritized Rail CIP List Project No. Number 1 RR1 Route/Facility Annual RR crossing improvement program From RR4 Downtown 3 4 RR5 RR8 Drake Lake BNSF BNSF 5 RR9 Lemay/Vine BNSF 6 RR13 Timberline/Vine BNSF BNSF UPRR 10 RR16 RR2 RR6 RR11 High $15,000,000 High $15,000,000 $7,000,000 Trilby 14 15 16 R71 RR overpass P63 Medium Grade separation or Troutman Parkway BNSF crossing B31h/P62/TC13 Medium RR bike/pedestrian grade separation Harmony UPRR B14b Medium RR bike/pedestrian grade separation Horsetooth UPRR B14c Medium RR bike/pedestrian grade separation Drake UPRR B14d Medium RR bike/pedestrian grade separation Fairway Lane BNSF P27 Medium CR 32 UPRR RR overpass Low west of IRR grade Mountain Vista 25 separation Low Sharpe Point Drive RR crossing Low RR bike/pedestrian grade College/Cherry separation Low RR grade Greenfields RR spur separation Low Corridor Preservation - Regional Phase I, II, and Passenger Rail III segments None Intra-Regional passenger rail service None Phase II Inter-regional passenger rail US 34 Fort Collins None RR15 RR23 $10,000,000 $150,000 $7,000,000 9 RR22 High High Medium BNSF RR10 RR12 R21/B31l B54 Trilby 12 13 $900,000 $6,000,000 RR14 RR21 RR3 High Medium 8 11 $4,400,000 B14a Keenland Drive RR20 High High RR7 RR19 BNSF crossings RR grade separation RR crossing RR grade separation RR grade separation RR bike/pedestrian grade separation New RR crossing RR grade separation Cost B31i 7 RR18 Service Type/ Corresponding Description Project Priority R2 2 RR 17 CSU Vet Campus To $8,000,000 $1,500,000 $1,200,000 $1,200,000 $15,000,000 $10,000,000 $4,000,000 $1,200,000 $1,200,000 $108,750,000 APPENDIX D: RAIL CROSSING PROJECTS Prioritized Parking CIP List No. 1 2 3 4 5 6 7 8 9 10 11 Project Number PK2a PK4 PK3 PK2b PK5 PK6 PK2c PK2d PK2e PK2f PK7 Parking Facility Name Downtown Strategic Plan Phase 1 Mulberry PNR South Transit Center Downtown Strategic Plan Phase 2 Horsetooth PNR Drake PNR Downtown Strategic Plan Phase 3 Downtown Strategic Plan Phase 4 Downtown Strategic Plan Phase 5 Downtown Strategic Plan Phase 6 Troutman PNR Location Downtown Mulberry/I-25 Harmony/College Downtown Horsetooth/Mason Drake/Mason Downtown Downtown Downtown Downtown Troutman/Mason Service Type/ Description parking improvements new park and ride facility new transit center parking improvements new park and ride facility new park and ride facility parking improvements parking improvements parking improvements parking improvements new park and ride facility APPENDIX D: PARKING PROJECTS Corresponding Project TC13 TC13 TC13 TC13 Cost PNR Only $ 8,500,000 $ 1,000,000 $ 4,200,000 $ 8,500,000 $ 332,000 $ 271,000 $ 8,500,000 $ 8,500,000 $ 8,500,000 $ 8,500,000 $ 722,000 $ 57,525,000 Cost BRT Sta. & PNR $ 8,500,000 $ 1,000,000 $ 4,200,000 $ 8,500,000 $ 648,000 $ 587,000 $ 8,500,000 $ 8,500,000 $ 8,500,000 $ 8,500,000 $ 1,038,000 $ 58,473,000 Prioritized ATMS CIP List No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Project ID TSM138 TSM161 TSM2 TSM3 TSM4 TSM5 TSM7 TSM9 TSM10 TSM11 TSM13 TSM14 TSM15 TSM16 TSM18 TSM21 TSM24 TSM25 TSM26 TSM29 TSM30 TSM31 TSM33 TSM46 TSM47 TSM48 TSM49 TSM50 TSM51 TSM53 TSM55 TSM56 TSM63 TSM74 TSM89 TSM92 TSM96 TSM101 TSM109 TSM110 TSM111 TSM112 TSM113 TSM152 TSM36 TSM37 TSM38 TSM40 TSM41 TSM57 TSM70 Project Name/Location Streets Facility Expansion - de-icing improvements Traffic Operations Management Center Expansion College Mulberry College/Boardwalk College/Bockman College/Carpenter College/Columbia College/Drake College/Elizabeth College/Foothills College/Harmony College/Harvard College/Horsetooth College/Kensington College/Laurel College/Monroe College/Pitkin College/Prospect College/Rutgers College/Spring Park College/Stuart College/Swallow College/Troutman Harmony/Boardwalk Harmony/Corbett Harmony/JFK Harmony/Mason Harmony/McMurry Harmony/Ziegler Horsetooth/JFK Horsetooth/McClelland Horsetooth/Stanford Howes/Mulberry Lemay/Harmony Mason/Horsetooth Mason/Mulberry McClelland/Redwing/Drake Mulberry/Meldrum Remington/Elizabeth Remington/Laurel Remington/Mulberry Remington/Pitkin Remington/Prospect Timberline/Harmony Drake/Constitution Drake/Dunbar Drake/Meadowlark Drake/Worthington Drake/Yorkshire Horsetooth/Stover Lemay/Doctors Ln APPENDIX D: ATMS PROJECTS Description facility expansion facility expansion signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements Cost $2,000,000 $2,000,000 funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded Prioritized ATMS CIP List No. 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 Project ID TSM72 TSM75 TSM76 TSM79 TSM80 TSM81 TSM82 TSM83 TSM84 TSM99 TSM102 TSM115 TSM117 TSM118 TSM119 TSM121 TSM122 TSM123 TSM124 TSM125 TSM126 TSM127 TSM128 TSM129 TSM130 TSM131 TSM132 TSM133 TSM141 TSM155 TSM157 TSM6 TSM8 TSM12 TSM17 TSM19 TSM20 TSM22 TSM23 TSM27 TSM28 TSM32 TSM34 TSM35 TSM39 TSM42 TSM43 TSM44 TSM45 TSM52 TSM54 Project Name/Location Lemay/Elizabeth Lemay/Horsetooth (east) Lemay/Horsetooth (west) Lemay/Mulberry Lemay/Pennock Lemay/Prospect Lemay/Riverside Lemay/Robertson Lemay/Stuart Mulberry/Link Lane Mulberry/Summit View Riverside/Mulberry Shields/Casa Grande Shields/Drake Shields/Elizabeth Shields/Horsetooth Shields/Lake Shields/LaPorte Shields/Laurel Shields/Mountain Shields/Mulberry Shields/Plum Shields/Prospect Shields/Raintree/Centre Shields/Rocky Mountain Shields/Rolland Moore Shields/Stuart Shields/Swallow Taft Hill/Drake Timberline/Mulberry Timberline/Timberwood College/Cherry College/Conifer/Hickory College/Fossil Creek College/LaPorte College/Magnolia College/Maple College/Mountain College/Olive College/SH 1 College/Skyway College/Trilby College/Vine College/Willox Drake/Stover Elizabeth/City Park Elizabeth/Constitution Foothills Mall/Foothills Greenfields/Mulberry Horsetooth/Dunbar Horsetooth/Manhattan APPENDIX D: ATMS PROJECTS Description signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements Cost funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded Prioritized ATMS CIP List No. 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 Project ID TSM58 TSM59 TSM60 TSM61 TSM62 TSM64 TSM65 TSM66 TSM67 TSM68 TSM69 TSM71 TSM73 TSM77 TSM78 TSM85 TSM86 TSM87 TSM88 TSM90 TSM91 TSM93 TSM94 TSM95 TSM97 TSM98 TSM100 TSM103 TSM104 TSM105 TSM106 TSM107 TSM108 TSM114 TSM116 TSM120 TSM134 TSM135 TSM136 TSM137 TSM139 TSM140 TSM142 TSM143 TSM144 TSM145 TSM146 TSM147 TSM148 TSM149 TSM150 Project Name/Location Horsetooth/Tradition Howes/LaPorte Howes/Laurel Howes/Magnolia Howes/Mountain Howes/Oak Howes/Olive JFK/Boardwalk Laurel/Loomis Laurel/Meldrum Lemay/Boardwalk Lemay/Drake Lemay/Fossil Creek Lemay/Lincoln Lemay/Magnolia Lemay/Swallow Lemay/Trilby Lemay/Vine Linden/Jefferson Mason/LaPorte Mason/Mountain Mason/Oak Mason/Olive Mathews/Mountain McClelland/Swallow Meadowlark/Swallow Mulberry/Loomis Overland Trail/CR 54G Overland Trail/Prospect Prospect Pkwy/Prospect Prospect/Centre Prospect/Riverside Prospect/Whitcomb Riverside/Lincoln/Mountain SH 1/Country Club Shields/Harmony Shields/Trilby Shields/US 287 Starflower/Harmony Stover/Swallow Summit View/Prospect Taft Hill/CR 54G Taft Hill/Elizabeth Taft Hill/Harmony/CR 38E Taft Hill/Horsetooth Taft Hill/LaPorte Taft Hill/Mulberry Taft Hill/Prospect Taft Hill/Valley Forge Timberline/Caribou Timberline/Carpenter APPENDIX D: ATMS PROJECTS Description signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements Cost funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded funded Prioritized ATMS CIP List No. 154 155 156 157 158 159 160 Project ID TSM151 TSM153 TSM154 TSM156 TSM158 TSM159 TSM164 Project Name/Location Timberline/Drake Timberline/Horsetooth Timberline/Kechter/Willow Timberline/Prospect Timberline/Trilby Timberline/Vermont Whedbee/Mulberry APPENDIX D: ATMS PROJECTS Description signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements signal improvements Cost funded funded funded funded funded funded funded $4,000,000
© Copyright 2026 Paperzz