Handouts

P
Prospect
Corridor
VISION
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
We aspire to achieve:
T
1
T
2
T
3
T
4
Safe and comfortable
corridor for all modes of
travel
Well-Marked Bike Facilities
Comfortable Sidewalks
7UDI¿F6DIHW\DQG(I¿FLHQF\
Automatic Detection of Cyclists at
Intersections
Pedestrian Refuges
Grade Separated or Enhanced
Crossings
Welcoming Intersections
Gateway Treatments
Street Trees and Medians
Walk
Bike
Safe crossings
Attractive gateway to
campus, downtown, and
midtown
Seamless connection to
MAX
Ride
fcgov.com/westcentral
P
Existing
Prospect
Corridor
VISION
Prospect Alternatives Summary
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
Shields to Whitcomb
Whitcomb to Center
Center to College
• 4 travel lanes
• 3’ attached sidewalk
• 4 travel lanes
• 8’ attached sidewalk
• Center turn lane
• 4 travel lanes
• 5-8’ attached sidewalk
• Center turn lane
Alternative A - Existing curb lines and roadway width maintained plus pedestrian enhancements - renovate and retrofit.
• 4 travel lanes
lanes
“All About Pedestrians” ••• 46’8’travel
• 6’ detached sidewalk
detached sidewalk
• 8’ tree lawn
tree lawn
• Planted median
• Planted median
•
•
•
•
4 travel lanes
6’ detached sidewalk
8’ tree lawn
Planted medians
Alternative B - Replace one travel lane w/ buffered bike lane each on side plus pedestrian enhancements - minimize Sight-of-Xay 308
acquisition.
• 2 travel lanes
• 4 travel lanes
• 4 travel lanes
• 6’ detached sidewalk
• 10’ shared bike/ped path
• 10’ shared bike/ped path (partial)
“Boulevard”
• 6’ tree lawn
• 6’ tree lawn
• 6’ tree lawn
• Buffered bike lanes (5’ lane, 2’ buffer)
• Planted median
• Planted median
• Planted medians
Alternative C - Existing travel lanes maintained plus shared bike/ped path - minimize SJHIUPGXBZ308
acquisition on south side of Prospect Road.
• 4 travel lanes
• 4 travel lanes
• 4 travel lanes
“Complete Street”
• 10’ shared bike/ped path
• 10’ shared bike/ped path
• 10’ shared bike/ped path
• 6’ tree lawn
• Roadway shifted North
• 6’ tree lawn
• Planted median
• 6’ tree lawn
• Planted medians
/PUF"MMUSBWFMMBOFTGPS"MUFSOBUJWFT"#BOE$BSFhXJEF&YJTUJOHUSBWFMMBOFTPO1SPTQFDU3PBESBOHFGSPNhXJEF
N
fcgov.com/westcentral
Draft - 9/22/2014
VISION
Shields Street to College Avenue
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
Alternative A - “All About Pedestrians”
Plymouth Congregational
Church
Potential north/south
connection
Street tree
40’ O.C., typ.
Access point, typ.
Transfort stop,
typ.
Heading
ely
Potential pedestrian
activated crossing
8’ tree lawn
D ri
Right-of-Way line
Access point, typ. 6’ sidewalk
ve
Raised median
8’ tree lawn
Prospect Lane
Shields Street
She
Potential sidewalk connection
to Spring Creek Trail
Right-of-Way line
6’ sidewalk
Whitcomb Street
Enhanced intersection treatment
with refuge islands
Potential future condition on Whitcomb Tree lawn detached sidewalk and bike lane
Potential 8’ sidewalk connection
to Lake Street
A’
Prospect
Corridor
Existing Residential
Neighborhood
A
P
Raised median
8’ tree lawn
B
6’ sidewalk
8’ tree lawn
Bike box
Existing trees to
remain
Existing walk to remain
Enhanced crosswalk
Connection to Lake Street
for Mason Corridor Transfort stop,
typ.
trail
Street tree
40’ O.C., typ.
Mason Corridor
Potential
underpass
Raised median
Right-of-Way line
Bay Road
Transfort stop,
typ.
CSU - Parking Garage
C’
6’ sidewalk
Prospect Station
C
B’
Center Avenue
Right-of-Way line
College Avenue
CSU - Aggie Village North
Hilton Fort Collins
Desired bus
pull-out
Enhanced intersection treatment
with refuge islands
0
Raised planted median
Detached sidewalk
Existing spruce trees
100
150
N
Detached sidewalk
Existing ROW
Existing ROW
CSU-Aggie Village
South
Turn lane
Attached sidewalk
Existing ROW
Existing ROW
Existing ROW
Tree lawn
Detached sidewalk
Existing ROW
Tree lawn
50
CSU-Aggie Village
North
Section A-A’
6’ 8’
11’
11’
11’ 11’
Section B-B’
8’ 6’
6’ 8’
Existing curb to
curb dimension
Existing ROW - 60’
Total Required ROW - 72’
Section C-C’
10’ 10’ 9’ 10’ 10’ 8’ 6’
8’
Existing ROW - 60’
Total Required ROW - 77’
Total Required ROW - 71’
#!%$#%$
"#!####!#
#!
!"#
#!!#")
!#*
#!!#")$#*
3!%"
5+#&
'
#"
02!!#"(
12!!#"(
6+!&
#
)&!*
10’ 10’ 9’ 10’ 10’ 8’ 6’
Existing ROW - 60’
#!
!"#
3!%"
5+#&
'
#"
6+!&
#
)&!*
##!###!%$
#!!#")
!#*
#!!#")$#*
00!!#"($! 3!!#"($!
#!
!"#
#!!#")
!#*
#!!#")$#*
3!%"
5+#&
'
#"
1!!#"($!
1!!#"($!
6+!&
#
#' $"#
&5.(3+
$53(/.+
5/.+%
Legend
Potential Right-of- Way
dedication/acquisition
Pedestrian Wayfinding
Transfort Stop
fcgov.com/westcentral
Draft - 9/17/2014
VISION
Shields Street to College Avenue
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
Alternative B - “Boulevard”
Potential north/south
connection
Street tree
40’ O.C., typ.
Access point, typ.
6’ sidewalk
Transfort stop,
typ.
Right-of-Way line
Potential pedestrian
activated crossing
6’ tree lawn
Shields Street
She
ely
Potential sidewalk connection to
Spring Creek Trail
D ri
Prospect Lane
5’ bike lane - including 2’ buffer
ve
Right-of-Way line
Access point, typ. 6’ sidewalk
Whitcomb Street
Enhanced intersection treatment
with refuge islands
Future condition on Whitcomb - Tree lawn
detached sidewalk and bike lane
Potential 8’ sidewalk
connection to Lake Street
Plymouth Congregational
Church
A’
Prospect
Corridor
Raised median
6’ tree lawn
5’ bike lane - including 2’ buffer
Existing Residential
Neighborhood
Desired bus
pull-out
A
P
Bike pass through
Raised median
Potential
underpass
Raised median
6’ sidewalk
8’ tree lawn
10’ shared bike/ped path
Existing trees to
remain
Bike box
Enhanced crosswalk Transfort stop,
for Mason Corridor typ.
trail
Street tree
40’ O.C., typ.
Mason Corridor
Transfort stop,
typ.
Right-of-Way line
Bay Road
10’ shared bike/ped path
B
8’ tree lawn
CSU - Parking Garage
C’
10’ shared bike/ped path
10’ shared bike/ped path
C
B’
Center Avenue
Right-of-Way line
College Avenue
CSU - Aggie Village North
Prospect Station
Hilton Fort Collins
Connection to Lake Street
Desired bus Enhanced intersection treatment
pull-out
with refuge islands
0
Buffered bike lane
Raised planted median
Tree lawn
Raised planted median
Shared bike/ped path
Tree lawn
Turn lane
Shared bike/ped path
50
100
150
N
Detached sidewalk
Section A-A’
Existing ROW
Existing ROW
CSU-Aggie Village
South
Existing ROW
Existing ROW
Existing ROW
Existing ROW
Existing spruce trees
CSU-Aggie Village
North
Section B-B’
6’ 6’ 5’ 10’ 8’ 10’ 5’ 6’ 6’
2’
2’
Buffer
Buffer
Existing ROW - 60’
Total Required ROW - 67’
10’ 8’
Section C-C’
10’ 10’ 9’ 10’ 10’ 8’ 10’
10’ 10’ 10’ 9’ 10’ 10’ 8’ 6’
Existing ROW - 60’
Total Required ROW - 74’
Existing ROW - 60’
Total Required ROW - 85’
!!!!!!
!#"!#"
!!!!!#"
!
!
!! '
!(
!! '"!(
.# '!
(
2)!$
1)$%.)"
!
-/! &$
,!
!
!
!! '
!(
!! '"!(
0# '!
(
-,)!
-,)!
!
.! &
.! &
!
!
!! '
!(
!! '"!(
0#
!%!!
$
-,)!!
!%!!
!
--! &"
0! &
#' $"#
Legend
&5.(3+
Potential Right-of- Way
dedication/acquisition
Pedestrian Wayfinding
$53(/.+
5/.+%
Transfort Stop
fcgov.com/westcentral
Draft - 9/17/2014
VISION
Shields Street to College Avenue
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
Alternative C - “Complete Street”
Potential north/south
connection
Street tree
40’ O.C., typ.
Access point, typ. Right-of-Way line
Transfort stop,
typ.
10’ shared bike/ped path
Potential pedestrian
activated crossing
6’ tree lawn
Shields Street
Sh
eel
Potential sidewalk connection to
Spring Creek Trail
yD
Prospect Lane
10’ shared bike/ped path
riv
e
Right-of-Way line Access point, typ.
10’ shared bike/ped path
Whitcomb Street
Enhanced intersection treatment
with refuge islands
Future condition on Whitcomb - Tree lawn
detached sidewalk and bike lane
Potential 8’ sidewalk
connection to Lake Street
Plymouth Congregational
Church
A’
Prospect
Corridor
6’ tree lawn
10’ shared bike/ped path 6’ tree lawn
Existing Residential
Neighborhood
A
P
Potential
underpass
Transfort stop,
typ.
10’ shared bike/ped path
6’ tree lawn
Bike box
Existing trees to
remain
10’ shared bike/ped path
Enhanced crosswalk Transfort stop,
for Mason Corridor typ.
trail
Street tree
40’ O.C., typ.
Mason Corridor
6’ tree lawn
Raised median
Right-of-Way line
Bay Road
10’ shared bike/ped path
B
6’ tree lawn
CSU - Parking Garage
10’ shared bike/ped path
C’
Raised median
10’ shared bike/ped path
10’ shared bike/ped path
C
B’
Center Avenue
Right-of-Way line
Prospect Station
Hilton Fort Collins
College Avenue
CSU - Aggie Village North
Connection to Lake Street
Desired bus Enhanced intersection treatment
pull-out
with refuge islands
0
Raised planted median
Shared bike/ped path
Shared bike/ped path
Section A-A’
Existing ROW
Existing ROW
Existing ROW
Existing ROW
Existing ROW
Existing spruce trees
CSU-Aggie Village
South
Turn lane
Attached Shared
Bike/Ped Path
100
150
N
Detached Shared
Bike/Ped Path
Existing ROW
Tree lawn
Shared bike/ped path
Tree lawn
50
CSU-Aggie Village
North
Section B-B’
10’ 6’ 10’ 10’ 10’ 10’ 6’ 10’
10’ 6’ 10’
Existing ROW - 60’
Total Required ROW - 72’
Section C-C’
10’ 10’ 10’ 10’ 6’ 10’
10’
"!
& '
&! '
."
+*(
+*(
+.
%
.
%#
10’ 10’ 9’ 10’ 10’ 6’ 10’
Existing ROW - 60’
Total Required ROW - 76’
Existing ROW - 60’
Total Required ROW - 82’
"! "!
& '
&! '
& '
&! '
."&
'
+*(
+*(
,
%
,
%
."
+*(
+*(
++
%!$
.
%!$
#' $"#
&5.(3+
$53(/.+
5/.+%
Legend
Potential Right-of- Way
dedication/acquisition
Pedestrian Wayfinding
Transfort Stop
fcgov.com/westcentral
Draft - 9/17/2014
P
Prospect
Corridor
VISION
Lake Street AlternatLYes
Attractive and functional, well-integrated, mixed-use corridor that serves
the mobility needs of nearby neighborhoods, CSU, and the community
-BLF4USFFUAlternative A - Protected bike lane both sides, maintain on street parking, 2 travel lanes - Maintain exsting curbs
4’ planted buffer
Parallel parking
6’ bike lane
Parallel parking
Drive lane
Planted buffer
6’ sidewalk
CSU - Aggie Village North
A
Center Avenue
Whitcomb Street
Existing ROW
Lake Street
CSU - Aggie Village North
Section A-A’
Existing ROW
Future CSU project
A’
Potential Stadium
6’ 6’
8’
4’
10’
10’
8’
6’ 6’
4’
Existing ROW - 60’
Total Required ROW - 74’
0
30
60
90
N
-BLF4USFFUAlternative B - 2 way protected bike lane (north side only), on street parking, 2 travel lanes
4’ planted buffer
Future CSU project
Parallel parking
A’
Potential Stadium
12’ wide two way protected 6’ sidewalk
bike lane
Parallel parking
Drive lane
Planted buffer
Two-way protected bike lane
CSU - Aggie Village North
A
Existing ROW
6’ tree lawn
Center Avenue
Whitcomb Street
6’ sidewalk
Existing ROW
Lake Street
CSU - Aggie Village North
Section A-A’
6’ 6’
8’
10’
10’
8’
12’
4’
6’
Existing ROW - 60’
Total Required ROW - 70’
0
30
60
N
90
A’
-BLF4USFFUAlternative C - 2 way protected bike lane (north side only), no parking, 2 travel lanes - Maintain ex. curbs
Potential Stadium
4’ planted buffer
Future CSU project
Two way travel lane - no
parking on either side
Drive lane
12’ wide two way protected
bike lane
Planted buffer
Existing sidewalk
Two-way protected bike lane
Existing sidewalk
Section A-A’
8.5’ 8’
Existing ROW
Existing ROW
CSU - Aggie Village North
CSU - Aggie Village North
Center Avenue
Whitcomb Street
6’ tree lawn 6’ sidewalk
A
Lake Street
11’
11’
5’
12’
8.5’
Existing ROW - 60’
Total Required ROW - 65’
0
30
60
90
N
fcgov.com/westcentral
Draft - 9/17/2014