VISION Prospect Corridor P Attractive and functional, well-integrated, mixed-use corridor that serves the mobility needs of nearby neighborhoods, CSU, and the community Prospect Road - Shields Street to College Avenue - Draft Design PROSPECT ROAD - DRAFT DESIGN Potential pedestrian activated crossing Shields Street Sh eel Potential sidewalk connection to Spring Creek Trail Raised median Potential underpass 10’ Shared bike/ped path Mason trail Connection to Lake Street Raised median Right-of-Way line Enhanced crosswalk Enhanced crosswalk for Mason Corridor w/ ped. signal Desired bus pull-out trail Bus pull-out D’ 6’ Tree lawn Existing Residential Neighborhood C’ B’ 10’ Shared bike/ped path riv e 6’ Tree lawn CSU - Parking Garage Center Avenue Right-of-Way line 8’ Sidewalk College Avenue CSU - Aggie Village North yD 10’ Shared bike/ped path 6’ Tree lawn Prospect Lane 8’ Sidewalk Right-of-Way line Access point, typ. A’ Transfort stop, Right-of-Way line 10’ Shared bike/ped path typ. 6’ Tree lawn Access point, typ. A Enhanced intersection treatment with refuge islands Whitcomb Street Potential north/south connection Street tree 40’ O.C., typ. Future condition on Whitcomb - Tree lawn detached sidewalk and bike lane Potential 8’ sidewalk connection to Lake Street Plymouth Congregational Church Existing trees to remain Bike box 10’ Shared bike/ped path 10’ Shared bike/ped path Interm condition required w/ existing land-use Prospect Station Hilton Fort Collins Enhanced intersection treatment with refuge islands Sidewalk connection Mason trail D Potential underpass C B 10’ Shared bike/ped path Mason Corridor 6’ Tree lawn Bay Road Transfort stop, typ. 0 8’ 6’ 10’ 10’ 10’ 10’ 10’ 6’ 10’ South Side 2.5’ 2.5’ Existing ROW - 60’ Total Required ROW - 85’ *Note - Total required ROW dimension includes 30” curb/gutter along street per LCUASS standards North Side Ped Bike 4 Travel Lanes 10' S hared path North -‐ 10' Shared Path North -‐ 8' Sidewalk South 1 center turn lane 8' Sidewalk South Raised median 6’ Tree Lawn Section C-C’ Section B-B’ 10’ 6’ 10’ 10’ 8’ 10’ 10’ 6’ 10’ South Side 1.5’ 1.5’ 2.5’ Draft Design 2.5’ Existing ROW - 60’ Vehicle Ped TotalMotor Required ROW - 88’ 4 Travel Lanes along 10' S hared *Note - Total required ROW dimension includes 30” curb/gutter streetpath North -‐ center turn lane 8' Sidewalk South and 18” curb/gutter around median(s) per 1 LCUASS standards Raised median Draft Design Shields Street to Whitcomb Street Motor Vehicle Existing ROW CSU-Aggie Village North Section A-A’ Design Existing ROW CSU-Aggie Village South Existing ROW Existing ROW Existing ROW Existing spruce trees Draft Design Detached shared bike/ped path 10' Shared Path North -‐ 8' Sidewalk South Low range Impacted Properties (North) Impacted Properties (South) Motor Vehicle Stops 14 Properties -‐ High range/ 3 Low range 16 Properties -‐ Low range/ 4 Medium 4 Travel Lanes 10' Shared Path Raised median 6’ Tree Lawn Ped Medium Motor Vehicle Ped 4 Travel Lanes 10' Shared Path Raised median Draft Design Whitcomb Street to Center Avenue Transit North Side Draft Design Existing ROW - 60’ Transit Impacted Properties (North) Total Impacted Properties (South) Required ROW - 82.5’ 14 Pcurb/gutter roperties -‐ Halong igh range/ 16 ofProperties Low range/ 4 *Note - Existing both3sides street to -‐remain Stops Ped Bike Transit Impacted Properties (North) Impacted Properties (South) 10' Shared Path Stops 2 Properties -‐ High range 2 Properties -‐ High range Bike 4 Travel Lanes 10' S hared path North -‐ 10' Shared Path North -‐ 1 center turn lane 8' Sidewalk South 8' Sidewalk South Raised median 10’ 6’ 10’ 10’ 10.5’ 10’ 10’ 6’ 10’ North SouthStreet Side Shields Street to Side Whitcomb Bike Motor Vehicle Detached shared bike/ped path Shields Street to Whitcomb Street Section D-D’ 10’ 100 150 Tree lawn Detached shared bike/ped path Transit Impacted Properties (North) Impacted Properties (South) Stops 14 Properties -‐ High range/ 3 Low range 16 Properties -‐ Low range/ 4 Medium 6’ 10’ South Side Whitcomb Street to Center Avenue 11’ 8.5’ 11’ 10’ Existing ROW - 60’ Bike Transit (North) TotalImpacted RequiredProperties ROW - 82.5’ *Note - Existing curb/gutter along both sides of street to2 Premain 10' Shared Path Stops roperties -‐ High range N Existing ROW Sidewalk Attached shared bike/ ped path Painted Median Existing ROW Tree lawn Center turn lane Raised planted median Shared bike/ped path Existing ROW Tree lawn Center turn lane Shared bike/ped path 50 6’ 10’ North Side Impacted Properties (South) 2 Properties -‐ High range Center Avenue to College Avenue Motor Vehicle Ped 4 Travel Lanes 10' Shared Path 1 center turn lane 6’ Tree Lawn Raised median Bike 10' Shared Path Transit Impacted Properties (North) Stops 15 Properties -‐ High range Pullouts Impacted Properties (South) 6 Properties -‐ Medium range ROW Dedication/Acquisition Range Low = 0-‐5' Design Whitcomb Street to Center Avenue Motor Vehicle Ped Bike Transit Draft Design Impacted Properties (North) Legend4 Travel Lanes 10' Shared Path 10' Shared Path Stops 2 Properties -‐ High range Raised median Potential Right-of-Way (ROW) Pedestrian Wayfinding dedication/acquisition Design Impacted Properties (South) 2 Properties -‐ High range Transfort Stop Medium = 5-‐10' High = 10' and above Center Avenue to College Avenue Motor Vehicle Ped 4 Travel Lanes 10' Shared Path 1 center turn lane Raised median Bike 10' Shared Path Transit Impacted Properties (North) Stops 15 Properties -‐ High range Pullouts Impacted Properties (South) 6 Properties -‐ Medium range Center Avenue to College Avenue Motor Vehicle Ped 4 Travel Lanes 10' Shared Path 1 center turn lane Raised median Bike 10' Shared Path Transit Impacted Properties (North) Stops 15 Properties -‐ High range Pullouts Impacted Properties (South) 6 Properties -‐ Medium range fcgov.com/westcentral Draft - 10/27/2014
© Copyright 2026 Paperzz