Published by EPA in Federal Register

sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices
correction mechanism ensures the
accuracy of the Inventory without
imposing an unreasonable burden on
the chemical industry. Without the
Inventory correction mechanism, a
company that submitted incorrect
information would have to file a premanufacture notification (PMN) under
TSCA section 5 to place the correct
chemical substance on the Inventory
whenever the previously reported
substance is found to be misidentified.
This would impose a much greater
burden on both EPA and the submitter
than the existing correction mechanism.
This information collection applies to
reporting and recordkeeping activities
associated with the correction of
misreported chemical substances found
on the TSCA Inventory.
Responses to the collection of
information are voluntary. Respondents
may claim all or part of a notice
confidential. EPA will disclose
information that is covered by a claim
of confidentiality only to the extent
permitted by, and in accordance with,
the procedures in TSCA section 14 and
40 CFR part 2.
Burden statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 2.25 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
The ICR provides a detailed
explanation of this estimate, which is
only briefly summarized here:
Estimated total number of potential
respondents: 9.
Frequency of response: On occasion.
Estimated total average number of
responses for each respondent: 1.
Estimated total annual burden hours:
20 hours.
Estimated total annual costs: $1,174.
This includes an estimated burden cost
of $1,174 and an estimated cost of $0 for
capital investment or maintenance and
operational costs.
VerDate Mar<15>2010
16:35 Aug 05, 2010
Jkt 220001
IV. Are There Changes in the Estimates
from the Last Approval?
There is no change in the total
estimated respondent burden compared
with that identified in the ICR currently
approved by OMB.
V. What is the Next Step in the Process
for this ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. EPA will issue another Federal
Register notice pursuant to 5 CFR
1320.5(a)(1)(iv) to announce the
submission of the ICR to OMB and the
opportunity to submit additional
comments to OMB. If you have any
questions about this ICR or the approval
process, please contact the technical
person listed under FOR FURTHER
INFORMATION CONTACT.
List of Subjects
Environmental protection, Reporting
and recordkeeping requirements.
Dated: July 30, 2010.
Stephen A. Owens,
Assistant Administrator, Office of Chemical
Safety and Pollution Prevention.
[FR Doc. 2010–19440 Filed 8–5–10; 8:45 am]
BILLING CODE 6560–50–S
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8992–1]
Environmental Impacts Statements;
Notice Of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or http://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/26/2010 Through 07/30/2010
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: http://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
47591
comment letters on the website satisfies
the Section 309(a) requirement to make
EPA’s comments on EISs available to
the public. Accordingly, on March 31,
2010, EPA discontinued the publication
of the notice of availability of EPA
comments in the Federal Register.
EIS No. 20100283, Draft EIS, USFS, NM,
Santa Fe National Forest Travel
Management, Proposes to Provide for
a System of Road, Trails, and Areas
Designated for Motorized Use, Santa
Fe, NM, Comment Period Ends: 09/
30/2010, Contact: Julie Bain 505–438–
5443.
EIS No. 20100284, Final EIS, USFS, MT,
Lower West Fork Project, To Treat
Units in and Adjacent to the
Wildland-Urban-Interface (WUI) with
Prescribed Fire, and Commercial and
Pre-Commercial Thins, West Fork
Ranger District, Bitterroot National
Forest, Ravalli County, MT, Wait
Period Ends: 09/07/2010, Contact:
Dave M. Campbell 406–821–3269
EIS No. 20100285, Draft EIS, WAPA, SD,
Groton Generation Station (GGS)
Project, Proposes to Modify its
Interconnection Agreement, Basin
Electric Power Cooperative, for the
(GGS) to Eliminate 50–Megawatts
(MW) Annual Average Operating
Limit, Brown County, SD, Comment
Period Ends: 09/20/2010, Contact:
Erika Walters 720–962–7279.
EIS No. 20100286, Draft EIS, FHWA, SC,
Mark Clark Expressway Extension
Project, Proposed Construction from
the Interchange at I–526 and U.S. 17
to the James Island Connector,
Charleston County, SC, Comment
Period Ends: 09/30/2010, Contact:
Patrick Tyndall 803–765–5460.
EIS No. 20100287, Final EIS, NPS, NY,
Roosevelt-Vanderbilt National
Historic Sites, General Management
Plan, Implementation, Hyde Park, NY,
Wait Period Ends: 09/07/2010,
Contact: Marjorie Smith 339–223–
0131.
EIS No. 20100288, Final EIS, BIA, OR,
Cascade Locks Resort and Casino
Project, Application for the Fee-toTrust Transfer of 25 Acres of Land
within the City of Cascade Locks,
Confederated Tribes of the Warn
Springs Reservation of Oregon,
Cascade Locks, Hood River County,
OR, Wait Period Ends: 09/07/2010,
Contact: Scott Aikin 503–231–6883.
EIS No. 20100289, Draft EIS, USACE,
CA, San Clemente Shoreline
Protection Project, To Provide Shore
Protection Through Nourishment of
the Beach at the San Clemente Pier,
San Clemente, CA, Comment Period
Ends: 09/20/2010, Contact: Thomas
W. Keeney 213–452–3875.
E:\FR\FM\06AUN1.SGM
06AUN1
sroberts on DSKD5P82C1PROD with NOTICES
47592
Federal Register / Vol. 75, No. 151 / Friday, August 6, 2010 / Notices
EIS No. 20100290, Final EIS, FHWA,
MN, Trunk Highway 23 and US
Highway 71 Project, Construction of
One or More Grade-Separated Bridge
Crossings, Dovre Township, Northeast
of Wilmar County, Kandiyohi, MN,
Wait Period Ends: 09/07/2010,
Contact: Philip Forst 651–291–6110.
EIS No. 20100291, Draft EIS, USFS, CA,
Sequoia National Forest Plan
Amendment, Giant Sequoia National
Monument, Comprehensive
Management Plan, Implementation,
CA, Comment Period Ends: 11/03/
2010, Contact: Anne Thomas 559–
784–1500 ext. 1164.
EIS No. 20100292, Final EIS, BLM, CA,
Ivanpah Solar Electric Generating
System (07–AFC–5) Project, Proposal
to Construct a 400-m Megawatt
Concentrated Solar Power Tower,
Thermal-Electric Power Plant, San
Bernardino County, CA, Wait Period
Ends: 09/07/2010, Contact: Tom
Hurshman 970–240–5345.
EIS No. 20100293, Final EIS, USN, CA,
Marine Corps Base Camp Pendleton
Basewide Utilities Infrastructure
Construct and Operate Six Utility
Infrastructure Project, San Diego
County, CA, Wait Period Ends: 09/07/
2010, Contact: Jesse Martinez 619–
532–3844.
EIS No. 20100294, Final EIS, USN, FL,
Renewal of Authorization to Use
Pinecastle Range, New Information
that was not Available in the 2002
FEIS, Continued Use of the Range for
a 20 Year Period, Special Use Permit
Issuance, Ocala National Forest,
Marion and Lake Counties, FL, Wait
Period Ends: 09/07/2010, Contact:
Tom Currin 904–542–6301.
EIS No. 20100295, Final EIS, FHWA,
OR, Sellwood Bridge Project,
Rehabilitate or Replace the Bridge
Crosses the Willamette River on
Southeast Tacoma Street and Oregon
State Highway 43, Funding,
Multnomah County, OR, Wait Period
Ends: 09/07/2010, Contact: Jeffrey
Graham 503–587–4727.
EIS No. 20100296, Draft EIS, NOAA, 00,
Columbia River Basin Hatchery
Operations and the Funding of
Mitchell Act Hatchery Program, To
Authorize the Establishment,
Operation and Maintenance of One or
More Hatchery Facilities, OR, WA and
ID, Comment Period Ends: 11/04/
2010, Contact: Allyson Purcell 503–
736–4736.
EIS No. 20100297, Final EIS, NRC, NE,
Generic—License Renewal of Nuclear
Plants, Regarding Cooper Nuclear
Station, Unit 1, Supplement 41 to
NUREG–1437, Nemaha County, NE,
Wait Period Ends: 09/07/2010,
VerDate Mar<15>2010
16:35 Aug 05, 2010
Jkt 220001
Contact: Bennett M. Brady 301–415–
2981.
EIS No. 20100298, Final EIS, USFS, WV,
Allegheny Wood Product Easement,
Proposes to Convey an Easement of
Right-of-Way along the Railroad
Grade located in the Blackwater
Canyon Area, Monongahela National
Forest, Tucker County, WV, Wait
Period Ends: 09/07/2010, Contact:
David Ede 304–636–1800 Ext 233.
EIS No. 20100299, Draft EIS, FERC, CA,
McCloud-Pit Hydroelectric Project,
(Project No. 2106) Application to
Relicense its 368-Megawatt (MW),
McCloud and Pit Rivers, Shasta
County, CA, Comment Period Ends:
09/28/2010, Contact: Mary O’Driscoll
1–866–208–3372.
EIS No. 20100300, Draft EIS, BIA, CA,
Cloverdale Rancheria of Pomo Indians
(Tribe) Fee-to-Trust and Resort Casino
Project, Taking Six Parcels into
Federal Trust, Implementation,
Sonoma County, CA, Comment Period
Ends: 10/20/2010, Contact: John
Rydzik 916–978–6051.
EIS No. 20100301, Final EIS, BIA, CA,
Enterprise Rancheria Gaming Facility
and Hotel Fee-To-Trust Acquisition
Project, Implementation, Federal
Trust, Estom Yumeka Maida Tribe,
Yuba County, CA, Wait Period Ends:
09/07/2010, Contact: John Rydzik
916–978–6051.
EIS No. 20100302, Final EIS, BIA, CA,
North Fork Rancheria of Mono
Indians Fee-to-Trust and Casino/Hotel
Project, Proposed 305-Acres-Fee-toTrust Land Acquisition in
Unincorporated Madera County, CA,
Wait Period Ends: 09/07/2010,
Contact: John Rydzik 916–978–6051.
EIS No. 20100303, Final EIS, BLM, CA,
Calico Solar Project, Proposed Solar
Thermal Electricity Generation
Facility Located Public Lands,
Construction and Operation, Right-ofWay Grant, San Bernardino County,
CA, Wait Period Ends: 09/07/2010,
Contact: Jim Stobaugh 775–861–6478.
Amended Notices
EIS No. 20100259, Draft EIS, FAA, RI,
Theodore Francis Green Airport
Improvement Program, Proposing
Improvements to Enhance Safety and
the Efficiency of the Airport and the
New England Regional Airport
System, City of Warwick, Kent
County, RI, Comment Period Ends:
09/15/2010, Contact: Richard
Doucette 781–238–7613.
Revision to FR Notice Published 07/
26/2010: Extending Comment Period
from 08/30/2010 to 9/15/2010.
EIS No. 20100274, Draft EIS, BLM, UT,
VOIDED—Kerr-McGee Oil & Gas
Onshore LP (KMG), Proposes to
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
Conduit Infill Drilling to Develop the
Hydrocarbon Resources Oil and Gas
Leases, Application for Permit to Drill
and Approval Right-of-Way Grants,
Uintah County, UT, Comment Period
Ends: 09/13/2010, Contact: Stephanie
Howard 435–781–4400.
Revision to FR Notice Published 07/
30/2010: The above DEIS was
inadvertently published in 07/30/2010.
The Official Filing was Published in FR
on 07/16/2010 CEQ# 20100253.
Dated: August 3, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–19430 Filed 8–5–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2009–0255; FRL–8412–4]
Final Test Guideline; Product
Performance of Skin-applied Insect
Repellents of Insect and Other
Arthropods (OPPTS Test Guideline No.
810.3700); Notice of Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA is announcing the
availability of the final test guideline for
Product Performance of Skin-applied
Insect Repellents of Insect and Other
Arthropods Test Guidelines (OPPTS
Test Guideline No. 810.3700).
FOR FURTHER INFORMATION CONTACT: For
general information contact: Melissa
Chun, Regulatory Coordination Staff
(7101M), Office of Chemical Safety and
Pollution Prevention, Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460–
0001; telephone number: (202) 564–
1605; e-mail address:
[email protected].
For technical information contact:
Clara Fuentes, Biopesticides and
Pollution Prevention Division (7511P),
Office of Pesticide Programs,
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001; telephone number:
(703) 308–0171; e-mail address:
[email protected].
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Introduction
This test guideline is part of a series
of test guidelines (referred to hereinafter
as the harmonized test guidelines)
established by the Office of Chemical
Safety and Pollution Prevention
(OCSPP) (formerly the Office of
E:\FR\FM\06AUN1.SGM
06AUN1