Course Year Version : S0484/Foundation Engineering : 2007 : 1/0 Session 23 – 24 PILE INSTALLATION AND LOADING TEST PILE INSTALLATION AND LOADING TEST Topic: • Installation Method of Driven Pile • Installation Method of Bored Pile • Loading Test by Static Method • Loading Test by Dynamic Method INSTALLATION METHOD Pile Installation Equipment The primary tools used in the actual driving (installing) of piles are : • • • • Impact Hammers, Vibrator Driver / Extractors Special Hydraulic Presses Supporting Equipment – power sources, hoisting & material handling equipment, etc. PILE INSTALLATION EQUIPMENTS Types of Impact Hammers Impact Hammers are identified by their method of operation or the motive force employed. They are generally identified as : • Drop Hammers • Air or Steam Hammers • Diesel Hammers • Hydraulic Impact Hammers PILE INSTALLATION EQUIPMENTS Drop Hammers PILE INSTALLATION EQUIPMENTS Air (or Steam) Hammers PILE INSTALLATION EQUIPMENTS Air (or Steam) Hammers PILE INSTALLATION EQUIPMENTS Diesel Hammers PILE INSTALLATION EQUIPMENTS Diesel Hammers PILE INSTALLATION EQUIPMENTS Hydraulic Impact Hammers PILE INSTALLATION EQUIPMENTS Hydraulic Impact Hammers PILE INSTALLATION EQUIPMENTS Vibro Driver/Extractors PILE INSTALLATION EQUIPMENTS Vibro Driver/Extractors PILE INSTALLATION EQUIPMENTS Hydraulic Press Installer PILE INSTALLATION EQUIPMENTS Hydraulic Press Installer PILE INSTALLATION EQUIPMENTS Land Based Rigs Cantilevered Fixed Lead (With Fixed Bottom Brace) (With Spotter) PILE INSTALLATION EQUIPMENTS Land Based Rigs Under slung Swinging Lead (With Fixed Bottom Brace) (With stabbing points) PILE INSTALLATION EQUIPMENTS Land Based Rigs European Style, Fixed Lead with Fixed Bottom Brace (Driving Aft Batter with Hydraulic Hammer) PILE INSTALLATION EQUIPMENTS Land Based Rigs European Style, Fixed Lead on Crawler Lower DRIVEN PILE INSTALLATION BORED PILE INSTALLATION PILE QUALITY Two aspects of final quality of pile: – Structural integrity of pile. – Pile ability to support external load, consist of strength of structure element and relationship load-settlement between pile and soil support STATIC LOADING TEST TEST METHODS – – – – – – Use Static Load The load is 200% of working load Preparation before testing Loading Measurement of pile movement Instrumentation STATIC LOADING TEST • Loading Methods – Standard Method of Loading-SML, Monotonic – Standard Method of Loading-SML, cyclic – Quick Load Test (Quick ML) – Constant Rate of Penetration Method (CRP) Sumber : Manual Pondasi Tiang, GEC Typical arrangements for axial compressive load test Anchor Pile Dead Load STATIC LOADING TEST STATIC LOADING TEST Test load arrangement using kentledge DYNAMIC LOADING TEST • PDA (Pile Driving Analyzer), Case Institute od Technology • DLT (Dynamic Load Test), TNO • Theory of wave propagation Sumber : Manual Pondasi Tiang, GEC PDA computer Strain gauge and accelerometer Interpretation of PDA result PULL OUT TESTS Pullout load by using hydraulic jack between beam and reaction frame (ASTM D 368983, 1989) Sumber : Manual Pondasi Tiang, GEC PULL OUT TESTS Pullout load by using hydraulic jack, one at each end of the beam (ASTM D 3689-83, 1989) LATERAL LOADING TEST Sumber : Manual Pondasi Tiang, GEC LATERAL LOADING TEST PILE INTEGRITY TEST • This test is needed to check the integrity of bored pile or driven pile. • Some methods generally adopted is by using the principle of wave propagation. The test is carried out by applying vibration and evaluating its reflection. • Through this test, the defect on pile will be able to detect. Sumber : Manual Pondasi Tiang, GEC
© Copyright 2026 Paperzz