Details of the Labs & Workshops

Annexure – U
Details of the Labs/Workshops
S.No.
Name of Laboratory
Major Equipment
Physics
1)
Applied Physics – I
Bar Pendulum, Fly Wheel, Newton’s Ring set-up, Wavelength by grating set up,
Resolving power of grating setup, dispersive power of prism setup, Divergence of laser
setup, Polari meter, Melde’s experiment. e/m Setup, Stefan’s law, Charging &
discharging set up , lee’s disc, Carey-Foster’s bridge, CRO, Function generator,
Ultrasonic set-up, He-Ne Laser, Fiber optics Kit Potientio meter , Energy band gap
setup
2)
Applied Physics - II
Bar Pendulum, Fly Wheel, Newton’s Ring set-up, Wavelength by grating, Resolving
power of grating, dispersive power of prism setup, Divergence of laser setup, Polari
meter, Melde’s experiment. e/m Setup, Stefan’s law, Charging & discharging set up ,
lee’s disc, Carey-Foster’s bridge, CRO, Function generator, Ultrasonic set-up, He-Ne
Laser, Fiber optics Kit Potientio meter Energy band gap setup
Chemistry
3)
Applied Chemistry – I
Burettes, Pipettes, Beakers, Conical Flask, Digital Balance, Distillation Unit, PH Meter,
B.B.D. Northern India University, New Delhi (De-nova)
Page 1 of 24
Measuring cylinder, Conductivity Meter, Physical Balance, Thermos Flask, TDS meter,
Nephelometer, Oven, Melting Point apparatus, UV Spectro Photometer, Colorimeter,
BOD Bottles, Water bath, Dessicator, BOD Incubator, Viscometer, Stalagmometer,
Chemicals
4)
Applied Chemistry – II
Burettes, Pipettes, Beakers, Conical Flask, Digital Balance, Distillation Unit, P H Meter,
Measuring cylinder, Conductivity Meter, Physical Balance, Thermos Flask, TDS meter,
Nephelometer, Oven, Melting Point apparatus, Colorimeter, BOD Bottles, Water bath,
Dessicator, BOD Incubator, Viscometer, Stalagmometer, Chemicals
Electronics & Communication Engineering
5)
Analog Lab – I
CRO-09,Digital Multimeter-08, Active Filter-01, Colpitt Oscillator-02, Darlington pair-02,
PN diode charac.-04, Function generator-05, MOSFET charac.-04, JFET charac-02,
Low pass filter kit-01, Band pass filter-01,High pass filter-01, Hartley oscillator-02, Opamp-04, Power supply-07, Push pull amplifier-04, RC coupled amplifier-05, Rectifier kit04, Phase shift oscillator-02,Single stage RC coupled-02,Transistor charac.-05, Wein
bridge oscillator-02, Computers-02
6)
Analog Lab – 2
CRO-05,Digital multimeter-09, Active filter-03, Colpitt oscillator-02, Darlington pair-02,
B.B.D. Northern India University, New Delhi (De-nova)
Page 2 of 24
PN diode charac.kit-04, Function generator-05, FET charac.- 05, Computer system-01,
Bread board-06, Class A,B,C amplifiers-04, Zener diode-04, Op-amp-08, Power supply07, Differential amplifier-02, RC coupled amplifier-05. Rectifier kit-04, Phase shift
oscillator-02, LCR meter-01, Transistor ccharac.-05, Wein bridge oscillator-02, Hartley
oscillator-02, Computers-01
7)
Communication Lab/Digital
AMTR – 04, AM Rec. – 04, Carrier Mod & Data Formatting Kit – 04, Carrier Demod &
Communication Lab
data reformatting Kit – 04, Function Generator – 04, Delta and adaptive delta mod
Demod – 04, Freq. Division multiplexing Kit – 03, PAM/PPM/PAM Kit – 06, Sampling &
Reconstruction Kit – 04, TDM PCMRX – 04, TDMPCM TX – 04, QAM – 05, CRO -10 ,
DSC – 01, CPU with Key board, mouse and monitor – 3,TDM PAM-02,FM-04, ANALOG
CRO-03,DSO -02
8)
Lab OFC
Digital Optical Fiber Trainer Kit-04,Advanced fiber optics trainer-01,Optical Fiber Trainer03,Fibre optics communication trainer-01 Laser Optical Communication Trainer01,Optical power meter-02,Laser Diode module
APD module
LD modulator
Coupler -04, 04 PCs
9)
VLSI Lab /VHDL Lab
Computers 300 GB HOD, LCD, 4GBRAM – 38, Software
B.B.D. Northern India University, New Delhi (De-nova)
- ORCAD 10.5-05 user,
Page 3 of 24
Mentor graphics tool-30 users, MATLAB 7.1-05 user, Xilinx 8.1-Multiuser,Xilinx 14.3Multiuser, Tanner Tools 11.2 -05 user,Sparton2 Trainer board-02,Sparton6 Trainer
board-02,CPLD trainer board-02
10)
DSP Lab
Computer (I3, 300 GBHOD, 4 GB RAM) – 22, TMS Starter Kit – 10
11)
Microprocessor Lab 1, 2
KITs–8085–15,KITs–8086–16,InterfacingCards15,Computers – 03
12)
Electronic Device Lab – 1
CRO–06,DiodeCharacteristics– 08,Transistor Characteristics Kit – 04,Rectifier & Filters
Kit – 04,Function Generator – 06,Bread Board Kit – 05Computer – 06,Multi meter - 14
13)
Microwave
Gun Oscillator based bench – 02,Reflex Klystron based bench – 04,Power Meter –
01,Computer – 04
14)
Circuit System Lab
Broad board – 10,Reciprocity theorem Kit – 08,Max,Power Theorem Kit – 08,Two port
network kit –20,Digital Multi meter – 10,Power Supply 04,Computer – 04
15)
EDC Lab – 2
PC. – 02,CRO – 04,Multi meter – 03,Function Generator – 08,Rectifier Kit – 04,Diode Kit
– 06,Transistor Kit – 04
16)
Digital Ckt./digital electronics
Bread Board–10,Digital Trainer–32,DigitalICTester 01, Computer – 03
Lab.
17)
Mobile Computing Lab
Mobile Phone trainer-02,GSM trainer kit-01,GSM Evaluation -01
B.B.D. Northern India University, New Delhi (De-nova)
Page 4 of 24
Computer Labs
18)
Computer Lab 1 Project Lab Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02, Dot Matrix
& Algorithm analysis &
Printer: 03 UP gradation of computer has been done.
Design
19)
Computer Lab 2 DBMS
&Java Programming
20)
Computer Lab 3 OOPS &
Computer Graphics
21)
Computer Lab 4Linux
Computer system:30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Printer: 03UP gradation of computer has been done.
Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02, Dot
Matrix Printer: 03UP gradation of computer has been done.
Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02, Dot Matrix
Printer: 03UP gradation of computer has been done.
22)
ComputerLab5 Programming Computer system: 30, 2/4GB RAM, 160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot
Matrix Printer: 03 UP gradation of computer has been done.
23)
Computer Lab 6
Programming
24)
Computer Lab 7
Programming
Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02 ,Dot
Matrix Printer: 03UP gradation of computer has been done.
Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02, Dot
Matrix Printer: 03 UP gradation of computer have been done.
B.B.D. Northern India University, New Delhi (De-nova)
Page 5 of 24
25)
Computer Lab 8
Programming Lab
26)
27)
28)
29)
30)
31)
32)
Computer Lab 9
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot
Matrix Printer:,03 UP gradation of computer has been done.
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot
Programming Lab
Matrix Printer: 03UP gradation of computer has been done.
Computer Lab 10
Computer system: 30, 2/4GB RAM, 160/320 GB HDD 5 KVA Online UPS: 02, Dot
Programming Lab
Matrix Printer: 03UP gradation of computer has been done.
Computer Lab 11
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot
Programming Lab
Matrix Printer: 03UP gradation of computer has been done
Computer Lab 12
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot
Programming Lab
Matrix Printer: 03UP gradation of computer has been done
Computer Lab 13
Computer system: 30, 2/4GB RAM,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03UP gradation of computer has been done
Computer Lab 14
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 .Dot
Programming Lab
Matrix Printer: 03UP gradation of computer has been done
ComputerLab15
Programming Lab
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Printer: 03 UP gradation of computer has been done
B.B.D. Northern India University, New Delhi (De-nova)
Page 6 of 24
33)
34)
35)
36)
37)
38)
39)
40)
Computer Lab 16
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 17
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03UP gradation of computer has been done
Computer Lab 18
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 19
Computer system: 30, 2/4GB RAM , 160/320 GB HDD 5 KVA Online UPS: 02 ,Dot
Programming Lab
Matrix Printer: 03 UP gradation of computer has been done
Computer Lab 20
Computer system: 30, 2/4GB RAM ,160/320 GB HDD 5 KVA Online UPS: 02 .Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 21
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 22
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 23
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
B.B.D. Northern India University, New Delhi (De-nova)
Page 7 of 24
41)
42)
43)
44)
45)
46)
47)
48)
Computer Lab 24
Computer system: 30, 2/4GB RAM ,160/320 GB HDD
Programming Lab
5 KVA Online UPS: 02 ,Dot Matrix Printer: 03 UP gradation of computer has been done
Computer Lab 25
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 26
Computer system: 30, 2/4GB RAM ,160/320 GB HDD ,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 27
Computer system: 30, 2/4GB RAM,160/320 GB HDD,5 KVA Online UPS: 02 ,Dot Matrix
Programming Lab
Printer: 03 UP gradation of computer has been done
Computer Lab 28
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot Matrix
Programming Lab
Printer: 03UP gradation of computer has been done.
Computer Lab 29
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot Matrix
Programming Lab
Printer: 03, UP gradation of computer has been done.
Computer Lab 30
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot Matrix
Programming Lab
Printer: 03, UP gradation of computer has been done.
Computer Lab 31
Computer system: 30, 2/4GB RAM, 160/320 GB HDD, 5 KVA Online UPS: 02, Dot Matrix
Programming Lab
Printer: 03UP gradation of computer has been done.
B.B.D. Northern India University, New Delhi (De-nova)
Page 8 of 24
49)
Server Room 1
Server: 2 Linked with LAN Up gradation of computer has been done.
50)
Server Room 2
Server: 2 Linked with LAN Up gradation of computer has been done.
Mechanical & Automation Engineering
51)
Engineering Graphics Lab
52)
Workshop Practice Lab
Drawing Boards
Electric Arc Welding Machine, Oxygen & Acetylene Welding Kit, Oil Furnaces Gas
Welding
53)
Engineering Mechanics Lab Control of Gravity Apparatus, Differential Wheel & Axle apparatus, Parallel Forces
Apparatus, Jib Crane Apparatus and Jointed roof Truss on wheels apparatus.
54)
Mechanics of Solid Lab
Impact Testing Machine, Rockwell Cum Brinell Hardness Tester, Torsion Testing
Machine Capacity-50 Kgm., Universal Testing Machine Capacity 40 tones, Spring
testing Machine 2 Ton capacity working table. Polygon force apparatus, Parallel force
apparatus, Inclined plane apparatus, Jib crane apparatus, Screw Jack Apparatus, worm
& worm wheel apparatus, Differential wheel apparatus, truss apparatus, Bell Crank lever
apparatus, Flywheel apparatus. 5 New Machines are Purchased
55)
KOM/DOM lab
Reciprocating Engine Mechanism, Balancing apparatus, Gear Box, Model complete on
base board, clutches, Epicyclic Gear Box(sun and planet type), cam & followers,
B.B.D. Northern India University, New Delhi (De-nova)
Page 9 of 24
Torsional Vibrations with viscous damping apparatus, apparatus to determine coefficient
of friction for plate Clutch instrument, Working tables, Motorized whirling of shaft
apparatus, Models Reciprocating Engine Mecha. Model, Scotch Yoke Mech. Model,
Watt Mechanism Model, Whitworth Quick Return Mech. Model, Peaucellier
Mech.,
Oscillating Cylinder Model, Gear Box Model, Clutches: Centrifugal Clutch, Cone Multiple
Clutch Model Single Plate Clutch Model Diff. Gear Model Epicycle Gear Model (Train)
Epicyclic, Sun & Planet Cam and followers models: Bosnia Vibrating/ Viscous Damping
Apparatus Friction of plate, Motorized Gyroscope, Motorized Whirling of shafts
apparatus, Motorized Balancing of revolving masses Machine.
56)
Programming II Lab (O.R)
Computers – 60
57)
Machine Drawing, Lab -1
Knuckle & cotter joint, Gib and cotter point, tie rod joint, Sleeve & cotter joint, socket
and spigot joint, oupling(single), Hook’s coupling (Double), Flexible coupling split muff
coupling, Oldham’s coupling, spur gear coupling
58)
Measurement & Control Lab Displacement measurement tutor using LVDT, Water Level measurement tutor using
water, temperature measurement tutor, speed measurement tutor using elector
magnetic sensor, CRO, MultiMate. Speed Measurement Strain Measurement Torque
B.B.D. Northern India University, New Delhi (De-nova)
Page 10 of 24
Measurement
59)
MAT Lab
60)
Machine Design –II, Lab -2
Computers – 60
Drawing Table with Drawing Boards, Stools, Steel Almirah, Faculty tables & Chairs,
automotive transmission, Single shoe brake, disc brake, double shoe expanding brake,
disc brake, claw clutch, connecting rod, engine piston assembly.
61)
Metrology Lab
Inside Micrometer: a: 25-50 mm b: 50-75 mm c: 75-100 mmOutside Micrometer:a: 25-50
mmb: 50-75 mm c: 75-100 mmVernier Calipers with fineAdjustments Range: 250
,m,Vernier Calipers with Dial Indicator Range: 0-200 mm,Vernier Depth Gauge : a: 250
mm
b: 300 mm,Vernier Depth Gauge : Range 0-25 mm,Vernier Tooth Gauge,Slip
Gauge Sets,Sine Bar 150 mm with Fine Centres Comparators, (Mechanical),Limit
Gauge
(plug
Gauge:
30
mm),Spirit
LevelsClinometers,Surface
plates:
a:
Medium(18”×18”),b: Big (24”×24”),Dial Indicator with Magnetic Base(0-25mm),Screw
thread Micrometer Universal Surface Gauge Tools Makers Measuring Machine
,Tachometer Range: 0-25 mm, Feeler Gauge
62)
Fluid System Lab
Centrifugal Pump test rig, Reciprocating single stage pump test rig, Gear oil pump test
rig, Francis turbine test rig, Kaplan turbine, Pelton Wheel Turbine test rig, Hydraulic
B.B.D. Northern India University, New Delhi (De-nova)
Page 11 of 24
ram,steel almirah, , tables & chairs for faculty & staff, working tables & stools
63)
Metal cutting & Tool Design
Centre Lathe-6 along with all accessories, precision lathe-6’ long with all accessories,
Lab
pillar drilling Machine-25mm heavy duty with standard accessories, Universal Milling
Machine-25mm with Standard accessories, Universal Milling Machine No. 2 including all
accessories, shaping Machine-300mm (all geared ) with standard accessories, power
saw-200mm with standard accessories, Bench Grinder-200mm, Pedestal Grinder-300,
Working tables, staff tables and chairs
64)
65)
Programming IV Lab (Proc-E1) Computers – 60
Mechatronics Lab
PLC Trainer (VMC-PLCT),Optional Accessories, Experimental
Models for PLC
Trainers),Starter Control and star Delta , 3 Phase ¼ H.P. Motor, Water tank Indicator
Fan Control, Seven Segment Display Simulator,(for Displaying a message),Lift Control,
Sequential Switching of Motors
66)
CAM Lab
67)
Refrigeration & AirConditioning Lab
Computers - 16
Refrigerating Testing Rig- Compressor cooling capacity ½ Ton, Mechanical Heat PumpCompressor cooling capacity-⅓ Ton, Water cooling Test Rig-Capacity 20 Liters/hr.
Compressor cooling capacity-⅓ Ton, Ice Plant Tutor, Capacity : 30 Kg. Per Day
B.B.D. Northern India University, New Delhi (De-nova)
Page 12 of 24
Compressor Cooling Capacity-1.5 Ton, Air Condition Test Rig (window type)
Compressor cooling capacity 1.5 ton.
Expansion devices used in refrigeration system (study unit), Basic
Components of Air-Conditioning system (Study unit), Air washed(Study unit)Window AirConditioner (Study unit)
68)
69)
Programming V Lab (Proe-E)Computers - 16
Advanced Methods of
Manufacturing Lab
CPU, Monitor, Keyboard, Mouse, Switch, Printer (Dot Matrix), UPS, FDD, CD Drive,CD
writer, IBM Server, Internet Modem, Steel Almirah, Tables & Chairs, Pro-E Software
(CAD/CAM) Up to 15 users
70)
Robotics Lab
Robotics Trainer Kit
71)
Q C & QA Lab
Case study related to syllabus
72)
73)
Programming IV Lab (Proc-E1)Computers – 60
Mechatronics Lab
PLC Trainer (VMC-PLCT),Optional Accessories
(Experimental
Models for PLC
Trainers)Starter Control and star Delta ,3 Phase ¼ H.P. Motor, Water tank Indicator, Fan
Control, Seven Segment Display Simulator,(for Displaying a message),Lift Control,
Sequential Switching of Motors
B.B.D. Northern India University, New Delhi (De-nova)
Page 13 of 24
74)
CAM Lab
Computers - 16
Electrical & Electronics Engineering
75)
Electrical Technology Lab
Verification of Thevenin’s theorem Verification of super position theorem. Verification of
Norton’s Theorem. Phasor diagram and power factor of RLC circuit. Measurement of
Power and Power factor in single phase load using three ammeters method. Calibration
of Digital Energy Meter. Two wattmeter method of measuring power in three phase
circuit (resistive and inductive load). Load test on single phase transformer.
Short
circuit/open circuit test on single phase transformer. Starting and speed control of DC
shunt motor. Connection and starting of a 3φ IM using Direct on Line Starter. Stair case
wiring system.
76)
Electro-Mechanical Energy
Conversion – 1
Load Test of DC shunt Motor.
Load characteristics of compound generator. Load
characteristics of DC series generator. Load characteristics of DC shunt Generator.
Speed control of DC shunt motor. Swinburne’s Test on DC Shunt Motor. Sumpner’s
back to back test on 1-phase transformer. Scott connection of 3-phase to 2-phase on
transformer. Parallel operation of 1-phase transformer. 3-point DC starter. Cut section of
DC motor. Cut section of 1-phase transformer.
B.B.D. Northern India University, New Delhi (De-nova)
Page 14 of 24
77)
Power System – 1 Lab
Determination of ABCD parameters of a Transmission Line, Turns Ratio Test of a
Single Phase Transformer and to find Transformation Ratio. To find the position of fault
in a cable by conducting Murray Loop Test.
Improvement of Power Factor using
condenser, Measurement of 1 Phase Power using Instruments Transformers. To study
Ferranti effect. Three phase Variac. Frequency response of RLC circuit
78)
Electro-Mechanical energy
Effect of capacitor on starting/Running of 1 φ induction motor. Load test on 1φ induction
conversion – II
motor. Working model of 3φ auto transformer starter. Working model of 3φ Direct on line
starter. Working model of 3 φ Star/Delta starter. V Curves of Synchronous motor
(Electrical Loading). Load test on 3 φ slip ring induction motor. No load and block rotor
test on 3 φ induction motor. Speed control of induction motor-varying voltage. Speed
control of induction motor-varying frequency. Synchronizing Panel for parallel operation
of AC Generators. OC/SC test on 3-phase alternator. Cut section of squirrel cage
induction motor.
79)
Control Engineering
Study of behavior of DC separately excited motor. Speed Torque Characteristics of ac
servo motor. Study of compensating network. Study of DC position control system.
Study of P, PI, PID temperature controller for an oven. Study of servo voltage stabilizer
B.B.D. Northern India University, New Delhi (De-nova)
Page 15 of 24
using load bank. Study of PID controller. Potentiometer as on error detector. Study of
synchro transmitter-receiver. Magnetizing characteristics of saturable core reactor in
magnetic amplifier circuit.
80)
Electrical Measurement Lab Frequency measurement using Wien’s Bridge. Capacitance measurement using Wien’s
Bridge. Owen’s Bridge. Maxwell/s Bridge. Schering Bridge. Kelvin’s Double Bridge.
Anderson’s Bridge. Hay’s Bridge.
Linear variable differential transducer, Resistance
Temperature Detector. Load Measurement using strain gauge transducer. CT testing by
Silsbee’s method
81)
Power Electronics Lab
1 φ Dual Converter. 1 φ cyclo converter. Forced Commutation circuit. 1 φ Parallel
inverter. 1 φ series inverter. Study of the characteristics of SCR, MOSFET and IGBT .
1 φ bridge inverter. Morgan & DC Jones Chopper. Firing circuit of SCR using UJT
Triggering. Firing Circuit of SCR & TRIAC using RC Triggering. 1 φ full bridge rectifier
by R, RL, & RL with FD.
82)
Utilization of Electrical
Measurement of dielectric strength, breakdown voltage and acidity of transformer oil.
Energy
Measurement of light intensity of different type of lamps using luxmeter. To plot the
polar curve for different types of lamp of different illumination. Measurement of iron
B.B.D. Northern India University, New Delhi (De-nova)
Page 16 of 24
losses in a line Bar specimen using a wattmeter. Calibration of dynamometer type power
factor meter. Calibration of LPF wattmeter by phantom loading. Study of various types
of lamps.
Study of various types of lamps. Calibration of connection of fluorescent
tube light set. Study of electric arc welding. Measurement of iron losses in a metal ring
specimen using a CRO.
83)
Power System – II
To study L-L fault and find fault current for Transmission Line. To study PT Testing.
Determination of Negative & Zero sequence reactance of synchronous machine.
Determination of Transient, sub-transient reactance of Synchronous Machine. Study of
L-G Fault . Study of Instantaneous Relay. Study of IDMT Relay. Determination of
positive sequence reactance.
84)
Electric Drives Lab
Study of closed control loop of separately excited motor.
changing fire angle.
thyristor.
Study of AC motor by
Microcontroller based speed control of three phase IM using
MOSFET based speed control of universal motor using chopper.
Single
phase fully controlled bridge converter. Single phase half controlled bridge converter.
Speed control of separately excited DC motor using dual converter. Microcontroller
based speed control of single phase IM by AC voltage controller. Single phase cyclo
B.B.D. Northern India University, New Delhi (De-nova)
Page 17 of 24
converter
85)
Simulation Lab
Software based Experiments (MATLAB ver 7.11, C,C++,
Auto-Cad 2010,
Visual
Studio, Rational Rose
Civil Engineering
86)
Geo-informatics
Total station, Vernier Theodolite, Digital Theodolite, Automatic Level, Dumpy Level,
GPS, Automatic Level, Dumpy Level ,Plane Table, Prismatic compass, Ranging Rod,
Leveling Staff, Measuring Chain , Tape
87)
Fluid Mechanics
Reynolds Apparatus, Metacentric height Apparatus ,Impact of Jet apparatus, Pressure
Measurement Apparatus, Free & Forced Vortices Apparatus, Notch Apparatus
88)
Structure Analysis
Elastic Properties of Deflected Beam Apparatus, Behavior of Column & Struts Apparatus,
Apparatus for Verification of Clerk’s Maxwell Reciprocal Theorem, Three Hinged Arch
Apparatus, Curved Member Apparatus, STAAD PRO Software
89)
Geo-technical
Relative Density Apparatus, Direct Shear Apparatus, Permeability Test Apparatus,SPT
Apparatus, Penetrometer, Weighing Balance (30kg),Tri- axial Apparatus, Compaction
Factor Apparatus, Sieve Shaker- Motorised,Hot Air Oven, Consolidation Apparatus,
Rapid Moisture Meter, Constant Volume Mould, High Speed Stirrer ,Sand Pouring
B.B.D. Northern India University, New Delhi (De-nova)
Page 18 of 24
Cylinder, Hydrometer
90)
Geology Lab
Hardness Scale Box, Geological Hammer-Steel Carborised, Geological HammerEstwing Edge ,Brunton Compass, Petrological
91)
Material Testing
Concrete Mixer, Slump Test Apparatus, Compressive Strength Moulds, Aggregate
Crushing Value Apparatus, Accelerated Curing Tank ,Vicat Apparatus, Le- Chatelier
Mould ,Compressive Strength Moulds, Pycnometer, Weighing Balance (50 kg)
92)
Transportation
CBR Apparatus, Aggregate Impact Test Apparatus, Flow table, Ring and Ball Apparatus,
Thickness Gauge ,Length Gauge, Density Basket, Ductility Testing Machine, Digital
Stop Watch
93)
Environmental Lab
BOD Incubator, Oven, ,Jar Test Apparatus, Muffle Furnaces, Portable Water Analysis
Kit, Digital Colony Counter, Digital TDS Meter ,Digital PH Meter, Digital Conductivity
Meter
Master of Computer Application
94)
MCA LAB –1 Fundamentals
1) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
of IT Lab.
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
2) Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
B.B.D. Northern India University, New Delhi (De-nova)
Page 19 of 24
2008, Visual studio 2010, Bilender
95)
MCA LAB -1 Programming
3) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
in C Lab
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server 2008,
Visual studio 2010, Bilender
96)
MCA LAB -1 Data and File
4) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
Structures Lab
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server 2008,
Visual studio 2010, Bilender
97)
MCA
LAB
-1
Object
5) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
Oriented Programming in OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
C++ Lab
Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
B.B.D. Northern India University, New Delhi (De-nova)
Page 20 of 24
98)
MCA LAB -1 Data and File
6) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
Structures Lab
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
99)
MCA
LAB
-1
Engineering Lab.
Software
7) 30,Processor-Intel Core 2 Duo E-7400 2.80 GHz., RAM-2GB, HDD-160GB, Monitor-HP,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.206-192.168.0.210, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
100)
MCA LAB --2 Database

Management Systems Lab
14,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9 Switches-02, 24 & 16
Port Wired Network, Windows 7, Ms-Office2007, Acrobat Reader,TurboC

15,Processor-Pentium 4-2.26 GHz., RAM-512 MB, HDD-40 GB, Monitor-HCL, OSWindows 7, Internet Explorer Version-i.e. 99 Switches-02, 24 & 16 Port Wired
Network Windows 7, Ms-Office2007, Acrobat Reader,TurboC
B.B.D. Northern India University, New Delhi (De-nova)
Page 21 of 24
101)
MCA LAB -2 Design and 
Analysis of Algorithms Lab
14,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9 Switches-02, 24 & 16
Port Wired Network, Windows 7, Ms-Office2007, Acrobat Reader,TurboC

15,Processor-Pentium 4-2.26 GHz., RAM-512 MB, HDD-40 GB, Monitor-HCL, OSWindows 7, Internet Explorer Version-i.e. 99 Switches-02, 24 & 16 Port Wired
Network Windows 7, Ms-Office2007, Acrobat Reader,TurboC
102)
MCA LAB -2 Data
Warehousing and Data
Mining Lab

14,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9 Switches-02, 24 & 16
Port Wired Network, Windows 7, Ms-Office2007, Acrobat Reader,TurboC

15,Processor-Pentium 4-2.26 GHz., RAM-512 MB, HDD-40 GB, Monitor-HCL, OSWindows 7, Internet Explorer Version-i.e. 99 Switches-02, 24 & 16 Port Wired
Network Windows 7, Ms-Office2007, Acrobat Reader,TurboC
103)
MCA LAB Advanced
Computer Networks Lab

30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16
Port Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red
hat Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL
B.B.D. Northern India University, New Delhi (De-nova)
Page 22 of 24
Server 2008, Visual studio 2010, Bilender
104)
MCA LAB Object Oriented
Analysis and Design Lab
30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
105)
MCA LAB Linux
Programming lab
30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
106)
MCA LAB Software Testing
lab
30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
B.B.D. Northern India University, New Delhi (De-nova)
Page 23 of 24
107)
MCA LAB --3 Java
30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
Programming Lab
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
108)
MCA LAB --3 Web
30,Processor-Intel Core i3-2130 3.40 GHz., RAM-4GB, HDD-500 GB, Monitor-ACER,
Technologies Lab
OS-Windows 7 Professional, Internet Explorer Version-i.e. 9, Switches-02, 24 & 16 Port
Wired Network Static IP Address-192.168.0.211-192.168.0.215, Windows 7/Red hat
Linux 5.0, Ms-Office2007, Acrobat Reader,TurboC, Java & Net beans, SQL Server
2008, Visual studio 2010, Bilender
B.B.D. Northern India University, New Delhi (De-nova)
Page 24 of 24