Published by EPA in Federal Register

51458
Federal Register / Vol. 75, No. 161 / Friday, August 20, 2010 / Notices
Comment Date: August 31, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–20651 Filed 8–19–10; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8992–3]
sroberts on DSKD5P82C1PROD with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or http://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/09/2010 through 08/13/2010.
Pursuant to 40 CFR 1506.9.
Notice: In accordance with Section
309(a) of the Clean Air Act, EPA is
required to make its comments on EISs
issued by other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: http://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100318, Draft Supplement,
FHWA, AR, River Valley Intermodal
Facilities, New and Updated
Information, Construction and
Operation of Multi-Modal
Transportation Complex, U.S. Army
COE Section 10 and 404 Permits, City
of Russellville, Pope County, AR,
Comment Period Ends:
10/08/2010, Contact: Randal J. Looney
501–324–5625.
EIS No. 20100319, Final EIS, NOAA, 00,
Amendment 17A to the Fishery
Management Plan for the Snapper
Grouper Fishery of the South Atlantic
Region, To Implement Long-Term
Management Measures Expected to
End Overfishing of the Red Snapper
Stock, South Atlantic Region, Wait
Period Ends: 09/20/2010, Contact:
Roy E. Crabtree 727–824–5305.
EIS No. 20100320, Final EIS, FHWA,
MN, U.S. 14 Construction, Owatonna
VerDate Mar<15>2010
17:19 Aug 19, 2010
Jkt 220001
to Kasson, Funding and Section 404
Permit, Dodge and Steele Counties,
MN, Wait Period Ends: 09/20/2010,
Contact: Phil Forst 651–291–6110.
EIS No. 20100321, Final EIS, NPS, KY,
Cumberland Gap National Historical
Park, General Management Plan,
Implementation, Middlesboro, KY,
Wait Period Ends: 09/20/2010,
Contact: David Libman 404–507–
5701.
EIS No. 20100322, Draft EIS, USAF, 00,
Powder River Training Complex
Project, Proposal to Improve Airspace
for Training, Primarily, B–1 Aircrews
at Ellsworth AFB, South Dakota, and
B–52 Aircrews at Minot AFB, North
Dakota, Comment Period Ends:
11/17/2010, Contact: Linda Devine
757–964–9434.
EIS No. 20100323, Draft Supplement,
BLM, NV, Cortez Hills Expansion
Project, Updated Information to
Refine the Analysis of Specific Air
Quality Effects and Dewatering
Mitigation Effectiveness, Proposes to
Construct and Operate a New
Facilities and Expansion of the
Existing Open-Pit Gold Mining and
Processing Operations, Crescent
Valley, Lander and Eureka Counties,
NV, Comment Period Ends: 10/04/
2010, Contact: Christopher
Worthington 775–635–4000.
EIS No. 20100324, Final EIS, BR, ID,
Minidoka Dam Spillway Replacement
Project, To Prevent Structural Failure
of the Minidoka Dam Spillway and
Canal Headworks, Lake Walcott,
Minidoka County, ID, Wait Period
Ends: 09/20/2010, Contact: Jim Taylor
208–378–5081.
EIS No. 20100325, Draft EIS, NRC, AZ,
GENERIC EIS—License Renewal of
Nuclear Plants, Regarding Palo Verde
Nuclear Generating Station,
Supplement 43, NUREG–1437,
Maricopa County, AZ, Comment
Period Ends: 10/29/2010, Contact:
David Drucker 301–415–6223.
EIS No. 20100326, Draft EIS, NPS, SD,
South Unit—Badlands National Park,
General Management Plan,
Implementation, SD, Comment Period
Ends: 10/18/2010, Contact: Eric J.
Brunnemann 605–433–5361.
EIS No. 20100327, Draft EIS, BLM, NM,
Alamogordo Regional Water Supply
Project, Construct and Operate
Groundwater Wells, Right-of-Way
Application, Otero County, NM,
Comment Period Ends: 10/18/2010,
Contact: Rena Gutierrez 575–525–
4338.
EIS No. 20100328, Final EIS, DOE, KS,
Abengoa Biorefinery Project, To
Support the Design, Construction, and
Startup of a Commercial-Scale
Integrated Biorefinery, Federal
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Funding, Located near the City
Hugoton, Stevens County, KS, Wait
Period Ends: 09/09/2010, Contact:
Kristin Kerwin 720–356–1564.
EIS No. 20100329, Final EIS, BLM, CA,
Blythe Solar Power Project (09–AFC–
6), Application for Right-of Way Grant
to Construct and Operate, and
Decommission a Solar Thermal
Facility on Public Lands, Riverside
County, CA, Wait Period Ends:
09/20/2010, Contact: Allison Shaffer
760–833–7104.
Dated: August 17, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2010–20702 Filed 8–19–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9191–6]
Notice of Extended Availability of Draft
National Pollutant Discharge
Elimination System (NPDES) General
Permit for Residually Designated
Discharges in Milford, Bellingham and
Franklin, Massachusetts; and Notice of
Extended Availability of Proposed
Amendments to the Preliminary
Residual Designation Issued by EPA
on November 12, 2008
Environmental Protection
Agency (EPA).
ACTION: Notice of Extended Availability
of Draft NPDES General Permit.
AGENCY:
On April 20, 2010, the
Director of the Office of Ecosystem
Protection, Environmental Protection
Agency-Region 1 (EPA), issued a Notice
of Availability of a draft NPDES general
permit for storm water discharges in the
Charles River watershed within Milford,
Bellingham and Franklin,
Massachusetts, from sites that are
proposed for final designation for
NPDES permitting pursuant to EPA’s
residual designation authority, and a
Notice of Availability of Proposed
Amendments to the Preliminary
Residual Designation issued by EPA on
November 12, 2008 (see FRL–9139–4).
Today EPA is extending the public
comment period for the draft permit and
proposed Residual Designation until
September 30, 2010. The draft general
permit, appendices, and fact sheet are
available at: http://www.epa.gov/
region1/npdes/stormwater.
DATES: The public comment period is
extended to September 30, 2010.
Interested persons may submit
comments on the draft general permit
SUMMARY:
E:\FR\FM\20AUN1.SGM
20AUN1