Published by EPA in Federal Register

Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities:
Commercial and industrial solid waste
incineration units.
Estimated Number of Respondents: 31
Frequency of Response: Initially,
occasionally, semiannually, and
annually.
Estimated Total Annual Hour Burden:
11,246
Estimated Total Annual Cost:
$1,029,921, which includes $1,021,351
in labor costs, $2,240 in capital/startup
costs, and $6,330 in operation and
maintenance (O&M) costs.
Changes in the Estimates: There are
no changes in the estimates. This is due
to two considerations. First, the
regulations have not changed over the
past three years and are not anticipated
to change over the next three years.
Secondly, the growth rate for the
industry is very low, negative or nonexistent. Therefore, the burden hour
figures in the previous ICR reflect the
current burden to the respondents and
are reiterated in this ICR. It should be
noted that there are some minor
corrections due to calculations errors in
the previous ICR.
Dated: March 12, 2010.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2010–6104 Filed 3–18–10; 8:45 am]
BILLING CODE 6560–50–P
[ER–FRL–8989–2]
erowe on DSK5CLS3C1PROD with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)© of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146 or http://www.epa.gov/
compliance/nepa/.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009 (74 FR 34754).
14:14 Mar 18, 2010
Jkt 220001
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: http://
www.epa.gov/compliance/nepa/
eisdata.html.
Including the entire EIS comment
letters on the Web site satisfies the
Section 309(a) requirement to make
EPA’s comments on EISs available to
the public. Accordingly, after March 31,
2010, EPA will discontinue the
publication of this notice of availability
of EPA comments in the Federal
Register.
Draft EISs
EIS No. 20090438, ERP No. D–NPS–
C61013–NY, Roosevelt-Vanderbilt
National Historic Sites, General
Management Plan, Implementation,
Hyde Park, NY.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20100016, ERP No. D–USN–
K11127–CA, Silver Strand Training
Complex (SSTC) Project, Proposed
Naval Training Activities, Cities of
Coronado and Imperial Beach, San
Diego County, CA.
Summary: EPA expressed
environmental concerns about impacts
to water resources and biological
resources, and the need for waste
minimization. Rating EC2.
Final EISs
ENVIRONMENTAL PROTECTION
AGENCY
VerDate Nov<24>2008
Notice
EIS No. 20100023, ERP No. F–AFS–
K65367–00, Klamath National Forest
Motorized Route Designation,
Motorized Travel Management,
(Formerly Motorized Route
Designation), Implementation,
Siskiyou County, CA and Jackson
County, OR.
Summary: EPA expressed
environmental concerns about the scope
of the travel management planning
process and season of use and wet
weather closures, and recommended the
action include current roads and trails
with known impacts and a thorough
evaluation of all impacts to water
resources.
EIS No. 20100055, ERP No. F–NPS–
K61170–CA, Yosemite National Park
Project, Construction of Yosemite
Institute Environment Education
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
13275
Campus, Implementation, Mariposa
County, CA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: March 16, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–6078 Filed 3–18–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8989–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information, (202)
564–1399 or http://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/08/2010 through 03/12/2010
Pursuant to 40 CFR 1506.9
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: http://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly,
after March 31, 2010, EPA will
discontinue the publication of this
notice of availability of EPA comments
in the Federal Register.
EIS No. 20100074, Draft EIS, FHWA,
MO, First Tier—Future I–70 Kansas
City Metro Project, Proposing to
Improve I–70 Corridor from East of
the Missouri and Kansas State Line to
East of I–470 Interchange, Downtown
Central Business Freeway Loop,
Kansas City, Jackson County, MO,
Comment Period Ends: 05/07/2010,
Contact: Peggy Casey 573–636–7104.
EIS No. 20100075, Final EIS, USA, LA,
Joint Readiness Training Center and
Fort Polk Land Acquisition Program,
Purchase and Lease Lands for
Training and Management Activities,
in the Parishes of Vernon, Sabine,
Natchitoches, LA, Wait Period Ends:
E:\FR\FM\19MRN1.SGM
19MRN1
erowe on DSK5CLS3C1PROD with NOTICES
13276
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
04/19/2010, Contact: Kristin
Evenstad, 703–692–6427.
EIS No. 20100076, Final EIS, FRBSF,
WA, Federal Reserve Bank of San
Francisco, Proposes to sell the
Property at 1015 Second Avenue that
is Eligible for Listing on the National
Register of Historic Places, located in
Seattle, WA, Wait Period Ends: 04/19/
2010, Contact: Robert Kellar 415–974–
2655.
EIS No. 20100077, Final EIS, USFWS,
NV, Southeastern Lincoln County
Habitat Conservation Plan,
Application Package for Three
Incidental Take Permits, Authorize
the Take of Desert Tortoise (Gopherus
agassizii) and Southwestern Williow
Flycatcher (Empidonax traillii
extimus), Implementation, Lincoln
County, NV, Wait Period Ends: 05/03/
2010, Contact: John Robles 916–414–
6731.
EIS No. 20100078, Draft EIS, USACE,
FL, Central and Southern Florida
Project, Comprehensive Everglades
Restoration Plan, Biscayne Bay
Coastal Wetlands Phase I Project, To
Restore the Natural Hydrology and
Ecosystem in an Area Degraded by
Drainage Systems and Land
Development, Miami-Dade County,
FL, Comment Period Ends: 05/03/
2010, Contact: Brad Tarr 904–232–
3582.
EIS No. 20100079, Revised Draft EIS,
FRA, SC, Bay Area to Central Valley
High-Speed Train (HST) Project,
Additional Information and Analysis
Needed for Compliance with the
Court Judgement, Provide a Reliable
High-Speed Electrified Train System
to Link Bay Area Cities to the Central
Valley, Sacramento, and South
California, Comment Period Ends: 05/
03/2010, Contact: Dan Leavitt 916–
324–1541.
EIS No. 20100080, Final EIS, USFS, CA,
Sugar Pine Adaptive Management
Project, Proposal to Create a Network
of Strategically Placed Landscape
Area Treatments (SPLATs) and
Defensible Fuels Profiles near Key
Transportation Corridors to Reduce
the Intensity and Spread of Wildfires
across the landscape and near
Communities, Madera and Mariposa
Counties, CA, Wait Period Ends: 04/
19/2010, Contact: Mark Lemon 559–
877–2218 Ext 3110.
EIS No. 20100081, Draft EIS, USFS, AZ,
Coconino National Forest Travel
Management Project, Proposes to
Designate a System of Road and
Motorized Travel, Implementation,
Coconino and Yavapai County, AZ,
Comment Period Ends: 05/17/2010,
Contact: Jim Beard 928–527–3474.
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
EIS No. 20100082, Draft EIS, USFS, ID,
Clear Prong Project, To Implement
Silvicultural Activities, Including
Thinning of Sub-Merchantable Trees,
Prescribed Fires and Aspen
Enhancement on 2,190 Acres, Bois
National Forest, Cascade Ranger
District, Valley County, ID, Comment
Period Ends: 05/03/2010, Contact:
Keith Dimmett 208–382–7400.
EIS No. 20100083, Draft EIS, BLM, NV,
Amargosa Farm Road Solar Energy
Project, Construction and Operation
of Two Concentrated Solar Power
Plant Facilities, Right-of-Way
Application on Public Lands, Nye
County, NV, Comment Period Ends:
05/03/2010, Contact: Gregory Helseth
702–515–5173.
EIS No. 20100084, Final EIS, USCG, AL,
Bienville Offshore Energy Terminal
(BOET) Deepwater Port License
Application Amendment (Docket #
USCG–2006–24644), Proposes to
Construct and Operate a Liquefied
Natural Gas Receiving and
Regasification Facility, Outer
Continental Shelf of the Gulf of
Mexico, South of Fort Morgan, AL,
Wait Period Ends: 04/30/2010,
Contact: Lt. Hannah Kawamoto 202–
372–1438.
EIS No. 20100085, Draft EIS, BLM, CA,
Blythe Solar Power Project (09–AFC–
6), Application for Right-of Way Grant
to Construct and Operate, and
Decommission a Solar Thermal
Facility on Public Lands, Riverside
County, CA, Comment Period Ends:
06/16/2010, Contact: Sandra
McGinnis 916–978–4427.
EIS No. 20100086, Final EIS, NOAA, 00,
Amendment 3 to the 2006
Consolidated Atlantic Highly
Migratory Species (HMS), Fishery
Management Plan, To Implement
Management Measures that Prevent
Overfishing and Rebuild Overfished
Stocks, Implementation, Wait Period
Ends: 04/19/2010, Contact: Margo
Schulze-Haugen 301–713–2347.
Amended Notices
EIS No. 20100037, Second Draft
Supplement, USFS, 00, Sierra Nevada
Forest Plan Amendment, Proposes to
Provide an Objective Comparison of
all of the Alternatives for 2004 Final
EIS, Amending Land and Resource
Management Plans, Modoc, Lasser,
Plumas, Tahoe, Eldorado, Stanislaus,
Sequoia, Sierra, Inyo and HumboldtToiyabe National Forests, and the
Lake Tahoe Basin Management Unit,
Several Counties, CA and NV,
Comment Period Ends: 05/05/2010,
Contact: Randy Moore 707–562–8737,
Revision to FR Notice Published 02/
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
19/2010: Extending Comment Period
from 04/05/2010 to 05/05/2010.
EIS No. 20100066, Final EIS, FHWA, FL,
WITHDRAWN—Interstate 395 (I–395)
Development and Environment Study
Project, From I–95 to West Channel
Bridges of the MacArthur Causeway at
Biscayne Bay, City of Miami, MiamiDade County, FL, Wait Period Ends:
04/12/2010, Contact: Linda K.
Anderson 850–942–9650 Ext. 3053,
Revision to FR Notice Published 03/
12/2010: EIS is withdrawn due to
Non-Distribution of the document.
Dated: March 16, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–6081 Filed 3–18–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2010–0236; FRL–8817–1]
Pesticide Program Dialogue
Committee; Notice of Public Meetings
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: Pursuant to the Federal
Advisory Committee Act, EPA gives
notice of a public meeting of the
Pesticide Program Dialogue Committee
(PPDC) on April 29 and 30, 2010. A
draft agenda is under development that
will include reports from and
discussions about current issues from
the following PPDC work groups: Work
Group on 21st Century Toxicology/New
Integrated Testing Strategies; Work
Group on Web-Distributed Labeling; and
Work Group on Comparative Safety
Statements for Pesticide Product
Labeling. Discussion topics will also
cover National Pollutant Discharge
Elimination System permit issues
regarding pesticides and current
Endangered Species Act issues. PPDC
work group meetings are also being
scheduled and are open to the public.
The PPDC PRIA Process Improvements
Work Group will meet on April 28,
2010, from 1 p.m. to 4 p.m. Information
about all PPDC work group meetings
can be found on EPA’s website at:
http://www.epa.gov/pesticides/ppdc.
DATES: The PPDC meeting will be held
on Thursday, April 29, 2010, from 9
a.m. to 5 p.m., and Friday, April 30,
2010, from 9 a.m. to noon.
To request accommodation of a
disability, please contact the person
listed under FOR FURTHER INFORMATON
CONTACT, preferably at least 10 days
E:\FR\FM\19MRN1.SGM
19MRN1