NON-RENEWABLE ENERGY PROJECTS on Lands with a Federal Interest 1 Washington March 2016 ER Bellingham Everett RIV MBIA LU O C Lake Chelan ka Spo ne Spokane Seattle W E N AT C H E E Tacoma Olympia BLM Resource Area Boundary BORDER Wenatchee Ya a kim BLM District Boundary PA C I F I C Coal Mining Project Sites 16. Centralia Coal Leases (WAWA-06527 and WAWA-04322) River BLM Administered Land Department of Defense e ak Ri ve r Longview Kennewick Walla Walla N Note: Missing numbers can be found on other maps. Pipeline ROW data are under review and are not shown. OCEA Indian Reservation Sn Yakima Ri v er 16 USFS Administered Land Vancouver COLU B I A M ER RIV Scale 1:2,000,000 when plotted at 11x17 20 0 20 40 Miles 20 0 20 40 Kilometers No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources. This information may not meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notification. 1 Includes only those projects that have been officially entered into BLM’s LR2000 land recordation system. That includes projects that are wholly on federal lands or partially on federal lands via a “connected action”. Any project wholly on private lands is excluded, with the possible exception of split estates. M16-02-02
© Copyright 2026 Paperzz